Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-4-16-4168 Gregg Mackey Addition to Repair Shop 50 CR 100 Glenwood Springs, CO 1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IECC, IFC, AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS. 2) ALL WORK SHALL COMPLY WITH USES PERMITTED IN THE "CL" ZONE DISTRICT. 3) BUILDING I5 APPROVED AS TYPE IIB CONSTRUCTION, 51 OCCUPANCY. 4) LOCAL FIRE DISTRICT SHALL INSPECT FIRE EXTINQUISHERS, ALARMS, AND OTHER PERTINENT IFC REQUIREMENTS. FIRE DISTRICT FINAL APPROVAL LETTER 15 REQUIRED FOR FINAL/COMPLETION INSPECTION. 5) MAXIMUM ALLOWABLE QUANTITY OF FLAMMABLE AND COMBUSTIBLE MATERIALS PER 2009 IBC, SECTION 414 AND 2009 IFC, CHAPTER 27. 6) INTERCEPTORS AND SEPARATORS PER 2009 IBC, SECTION 1003, SEE ATTACHED. 7) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 1500 PSF. 8) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. FINAL APPROVAL REPORT IS REQUIRED AT FRAME INSPECTION. 9) ACCESSIBILITY REQUIREMENTS PER 2009 IBC, CHAPTER 11, AND ICC/ANSI A117.1-2003. EXISTING NON -ACCESSIBLE TOILET ROOM WILL BE PROVIDED WITH UNISEX SIGNAGE. ADDED TOILET ROOM WILL BE AN ACCESSIBLE -UNISEX FACILITY. 10) LOCKS, LATCHES, AND LANDINGS PER 2009 IBC, SECTION 1008. 11) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 12) VERIFY EXIT DIRECTIONAL SIGNAGE PRIOR TO ELECTRICAL ROUGH -IN INSPECTION. 13) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED PRIOR TO FRAME INSPECTION. 14) ELECTRICAL FINAL APPROVAL IS REQUIRED FOR CERTIFICATE OF OCCUPANCY. 15) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR CO/FINAL APPROVAL.