HomeMy WebLinkAboutApplication - PermitI Garfield County . Building & Planning Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office:970·945 ·8212 Far : 970 ·384·3470 Inspection Line : 970·384·5003 Building Permit No. \\ \(QO Parcel No : 2177-113-01-008 Locality: Powerlin e Professional Park Subdi vis ion , Lot 8 ----------------- Job Address: _________ 6_P_o_w_er_lin_e_R_o_ad..:_, _R_ifle __ Bl_Cl~-B __ Use of Building : commerc ia l Warehouse ----------------------------------------------- Owner : SG Trust Contractor: Me Cauley Construction Inc Fees: Plan Check: $ 3,798.22 Septic: Bldg Perm it: $ 5,843.42 Other Fees : Total Fees: $ 9,641 .64 Clerk: J~T Date: JO-Z>J f)_1 I GARFIELD COUNTY BUILDTNG PERM IT APPLICATION I 08 8th Street, Sui te 40 I , Glenwood Spriugs, Co 8 160 I Phone : 970 -945-8212 I Fax: 970-384-3470 I Inspection Line: 970-384 -5003 www.garfield-county.com Parcel No: (this infonna t ion is available at the assessors office 970-945-9134) 217 7 -11 3 -0/00'b Height: , Z.7 '-G u o Alteration o Addition o Detached Septic~ o ISDS Owners valuation of Work : $ NOTICE No. of Floors: "Z- oCommuni Authority. This application for a Building Pennit must be signed by the Owner of the property, described above, or an authoriz.ed agent If the signature below is not that of the Owner, a separate letter of authority, signed by the Owner, must be provided with this Application. Lee at Attess. A Building Permit cannot be issued without proof of legal and adequate access to the property for purposes of inspections by the Building Department. Other Permits. Multiple separate permits may be required: (I) State Elecoical Penni~ (2) County ISDS Permit, (3) another permit required for use on the property identified above, e.g. State or County H ighway/ Road Access or a State Wastewater Discharge Permit. Void Permit. A Building Permit becomes null and void if the work authoriz.ed is not commenced within 180 days of the date of issuance and if work is s uspended or abandoned for a period of 180 days after commencement . CERTIFICATIO N I hereby certify that I have read this Application and that the information contained above is true and correct 1 understand that the Building Department accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf(submittals ), based upon my certification as to accuracy. Assumi ng completeness of the submittals and approval of thi s App lication, a Building Pennit w ill be issued granting pennission to me, u Owner, to eonstn..lct the structure(s) and fac ilities detailed o n the submittals reviewed by the Building Department. In consideration of the issuance of the Building Permit, l agree that 1 and my agents will comply with provisions of any federal, state or local law regulating the work and the Garfield County Buil ding Code, ISDS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice from the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable taw. 1 hereby grant permission to the Building Department to enter the property, described above, to inspect the work . 1 further acknowledge that the issuance of the Building Permit does not prevent the Bui lding Official from : (I) requiring the correction of errors in the submittals, if any , di scovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violati on of County Regulation(s) or any other applicable law. Review of this Application , including submittals, and inspecti ons of the work by the Building Department do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal, state and local taws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE NOTI CE & CERTIFI CATION ABOVE: 7 -Z. o/-oe, DATE STAFF USE ONLY Special Conditions: Permit Fee: ~~.42 Adjusted Valuation: I /)74;!iPt48 Plan Check Fee: '371B.1.2 Manu b orne Fee: Mise Fees: I SDS Fee: Total Fees: Fees Paid: 11 L\·4 '7 ~ ~lj Setbacks: OCCGroup: s- APPROVAL DATE {0-)0'- The following items are required by Garfield County for a final Inspection: 1) A final Electrica l Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished wal ls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors , walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances ., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agenc ies where applicable . A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. ~< ~~ ~NATURE Bapplicationd ecember2007 7-Z3-cJff!J DATE VALUATION FEE DETERMINATION Applicant Address Date SO Trust Subdivision ~~~-------------------- .---------------------------Lot/Block Contractor -------------------------- Finished (Livable Area): Main Upper Lower Other Total Basement: Unfinished Square Feet Valuation Conversion of Unfinished to Finished Total Valuation Garage: Carport: Total Crawl Space Total Decks/ Patios Total Valuation Valuation Covered Open Valu ation Type of Construction: V-B Occupancy: S-1 M B Valuation Total Valuation sq.ft 1040 sq.ft sq.ft sq.ft X $74.68 1040 sq.ft Commercial sq.ft X $41.00 sq .ft X $33 .68 sq.ft X $18.00 sq.ft X $12.00 sq.ft X $9.00 sq .ft X $24.00 sq.ft X $12.00 20446 sf X $39.88 1300 sf X $59.22 1280 sf X $81.66 sf X sf X sf X Powerline Professional Park, Filing 2 Lot 8 77,667.20 0.00 0.00 0.00 0.00 996,897.28 1,074,564.48 ~~-~If) 5'wo?J, 7~ ·-r C ~. t5 x ·14~~ J ~ ~~. ~ X ,{P5' PLAl4 ~1/tGW 37~.& 34 . Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are perfmming the work? The license number of the person performing the work will be required at time of applicable inspection. Yes t8.5 35 . Are you aware, that on the front of the Building Permit Application you will need to fill in the ParceVSchedule Number for the lot you are applying for this permit on prior to submittal of a building pe1mit application? Your attention in this is appreciated. Yes t!3S 36 . Do you know that the local fire district may require you to submit plans for their review of fire safety issues? Yes 8 5 (please check with the building depa1tment about this requirement) 37. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes 1$5 38. Are you aware that if you will be connecting to a public water and/or sewer system, that the tap fees have to be paid and the connections inspected by the service provider prior to the issuance of a Certificate of Occupancy? Yes t&s I hereby acknowledge that I have read, understand and answered these questions to the best of my ability. ~~ Signature of Owner Phone: C£7o -6S 6-& So o (days); 7-Z./-~ Date tf7~-~s-6-El/o¥ (evenings) Project Name :_G--'--~-=~'-:-''{J)'-7-,.L..-.---'7-..:...., _ _.~~=~~~~'L.I:..::.S---~~~-="...:..."...:....,...-=h~~~~~$~~=------ Project Address :_=~=-----6~"_:;~;..,;":...:.,.__,~:...:./o..:...:~__,~=----.L:./Z:::.o~~"'.u~~f-"""'t£=,L..l-;._.!.l.=e----'C?....____,O£..._ ___ _ 6 Powe1· of Attorney The undersigned, Scott Snnders, in his capacity as a Tmstee of SG Trust, does hereby HppoliJt LEON MCCAULEY AND/OR BRTAN SCHLJCTJNG hereafter the "Age11ts", to act as attoi11eys-in-fact and agent for and behalf of the 1'art11ership regarding all matters telated to the planning, development and construction oftlte property known as 6 Powerline Rd. Rifle, CO. 81650. The undersigned hereby grants to the Agent tl1e full power and authority to do and petfonn each and every act descdbed in this instmment on behalf of the Partnership as fully as the any General Partner o.fthe Partllcrsbip might do if he were present and to exercise auy of the powers, authorities, or discretions granted herein. I. Generg! Grant of Power. The Agent may exercise or perform ally act, power, duty, right, or obligation, wbich may be exercised or preformed by the Trostec, on account of his status as a Trustee, further, the general partner grants to the Agent f11.1l power and authority to take a.ll appropriate action in exercising any of the powers granted in this instrument as fully as the general pa.rtner or Co\Jid do if personally present, with full power of substitution or revocation. The general partner ratifies and confinns all that the Agent shall !awfnlly do or cause to be done by virtue of this instroment and the powers granted herein .. 2. .Execution of Documents, Except as described in paragraph 2 above, the Agent shall have the light, in the name of and on behalf of the Co-Trustee, to sign any and all documents or instruments pe1iaining to the Trust. 3. Real Estate Construction and Development The Agent 1nay, in the name of and and on behalf of the Trostee, maintain, repair, replace, improve, invest, manage, insure, rent, lease, encumber, build upo11, divide, or subdivid.e, and in any manner deal with any real or personal, tangible or intangible property, or any interest in such property, that the Tmst may JlOw own or may hereafter acquire on such tenus and conditions as such Agent shall deem proper. In this connection, lbe Agent may, in the name of the Tmstee in the Trostee's capacity as Trustee of the Trust, execute and deliver contracts, docume11ts, agreements, and other instrumellts pe11aining in all respects to the construction and development of teal property including; without limitation, signing pcrn1it applications for and behalf of the said gen.eral partnership. 4. Governmeut Licenses: The Agent may, in the name of and on behalf of the partnership, prepare, execute, and file any initial application for, or any renewal of, any business .license or pem1it necessary for the current, future o1· ongoing operation of the business of the Partnership. 5. General Management. The Age.nt may, in the name of and on behalf of the Trustee, perf01m any and all other acts or activities customary or incident to the a.cquisition, ownership, management, improvement., renovation, and construction of real or personal property. 6. I.iability .of Agent. The Agent shall not be subject to criminal prosecution or civil liability for exercising any authority or discretion. granted by this inst111mcnt so long as S\ICh exercise is in accordance with the terms of this it1stmment, and not othenvise in violation ofthe Agent's liduciary duty arising hereunder, 7. Third-Par·ty Reliance. Third parties may rely on the representations of the Agent as to all matters relating to atly authority or discretion granted by this instrument, and no person who may act in reliance on the representations of the Agent or any other authority or discretion granted in this instrument shaH incur any liability to the trust as a result ofpennittin!l the Agenl· tn ~""mi<-> •ny ouch authority or discretion. 8. Duration. Thi.s instnnnent shal.l be in full force for a period of one year or until such earlier time as it has been. explicitly revoked by the Tmstee. 9. Governing Law, This instrument is executed and delivered in the State of Colorado and is to be construed pursua11t to the laws of this state. It is the intent of tl1e partnership that this insb·umcnt he recognized to the fullest extent possible by third pmties and courts in other states. 10. Photographic Copy. A photographic copy dfthis instrument, showing the General Partner's signature, shall for all purposes be deemed an original. State of Colorado) ) ss. County of~~)/ T~~ Scott Sanders SG Tmst The foregoing instmment was acknowledged before me this t5 day of~ 2008 by Scott Sanders, as a Trustee of the SO Trust. Witness my hm1d and official seal. · My Commission Expires: (Sen I) 2 September 30, 2008 Maccauley Constructors P.O. Box 200 Windsor, CO 80555 Re: George Sanders Lot 8 Powerline Professional Park Rifle, Colorado Project No. 28129 Gentlemen, Weeks & Associates, Inc. Structural Engineers It has come to our attention that the plans for the referenced project note that the design Is based on the USC (1997 edition). This note shOuld read IBC (2003 edition). If we can be of further assistance please contact us. Sincerely, Weeks & Associates, Inc. $%~ Paull. Cox Staff Engineer Weeks & Associates, lnc. 4700 S. College Avenue, Suite #I, Fort Collins, CO 8052.5 Phone 970/ 225·2422; Fax 9701225-2622 COM check Software Version 3.5.0 Envelope Compliance Certificate 20061ECC Report Date: 06/30/08 Data filename: C:\Documents and Settings\Aia n Hauser\My Documents\GeoSnnders Rifle\Comcheck2006 .cck Section 1: Project Information Project Title : George T . Sanders Plumbing Warehouse Construction Site: Lot 8, Powerline Professio na l Park Rine , CO Owner/Agent: Leon McCauley McCauley Constructors, Inc. P.O. Box 200 Windsor, CO 80550 (970)686-6300 leon @mccau leyconstructors .co m Section 2: Genera l Information Building Location (for wea th er data): Climate Zone: Heating Degree Days (base 65 degrees F): Cooling Degree Days (base 50 degrees F): Rifle, Colorado 5b 6881 2230 Project Type: Vertical Glazing I Wall Area Pet.: New Construction 2% Activity TyP.e(~ Warehouse Office Retail Section 3: Requirements Checklist Envelope PASSES: Design 19% better than code. Climate-Specific Requirements : Component Name/Description Floor Area 15700 1300 1300 Gross Area Designer/Contractor: Alan Hauser Hauser Architects, P.C . 3780 E. 15th Street , Suite 201 Loveland, CO 80538 (970)669-8220 hauserarchitect@aol.com Cavity Cont. Proposed Budget or Perimeter R -Value R-Val ue U -Factor U -Factor Roof 1: Metal Building , Standing Seam 18300 30.0 0.0 0.051 0.065 Exterior Wal l 1: Metal Building Wall 13760 19.0 0 .0 0 .070 0 .057 Window 1: Metal Frame with Thermal Break: Double Pane, Clear, 252 0 .350 0 .550 SHGC0.7 1 Door 1: Insulated Metal, Swinging 105 0.615 0.700 Door 2: Insulated Metal, Non-Swinging 544 0 .125 1.450 Floor 1: Slab-On-Grade:Heated , Vertical 2ft. 620 8.0 (a) Budget U -factors are used for software baseline calculations ONLY, and are not code requirements. Air Leakage , Component Certification, and Vapor Retarder Requirements: 0 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance with the manufacturer's installation instructions. 0 2. Wind ows . doors, and skylights certified as meeting leakage requirements . 0 3. Component R-values & U-factors labeled as certified. 0 4. Insulation installed acco rding to manufacturer's instructions, in substantial contact with the surface being insulated, and in a manner that achieves the rated R-value without compressing the insulation . Project Title : George T . Sanders Plumbing Warehouse Data filename: C:\Documents and Setti ngs\Aian Hauser\My Documents\GeoSnnders Rifte\Comcheck2006 .cck Report date: 06/30/08 Page 1 of 2 w -· -·-··1 -·-·-·-· -··-·• • ._.u_l .,..,,.,.. .., •• ,..,, .,.._", • ..,.., ..... ,. .,,, .... ,, .... ...,,,..,. .... ,..,,._..,....,, v,.. .... ,,III:::J'"" Ill UIV .., ... ., ... Ill~ VIIYVIVjJQ QIQ 0\..IUitJpOU YYIUIIIIV~V IIL.Q U dampers. 0 7. Cargo doors and loading dock doors are weather sealed. 0 8. Recessed l ighting fi xtures are: (i) Type IC rated and sealed or gasketed; or (ii) installed inside an app ropriate air-tight asse mbly with a 0 .5 inch clea rance f rom combustible materials and with 3 inches c learance from insulation material. 0 9. Build ing entrance doors have a vestibule and equipped with cl osing devices. Exceptions: Building entrances with revolving doors. Doors that open directly from a space less than 3000 sq. ft . in a rea. 0 10.Vapor retarder installed. Section 4: Compliance Statement Compliance Statemen t: The proposed envelope design represented in this document is consistent with the building plans, specifications and other calcul ations submitted with this permit application. The proposed envelope system has been designed to meet th e 2006 IECC requirements in COM check Ver sion 3.5 .0 and to comp ly with the rna datory requ ire the Requirements Checklist. i{P.,t.Jq E;\Z. AIZ.CI-\I"rBU0, f& ~AN k I I-\P<I20'f/f I A (A 1-f-'l-'..I.LILI. '-lV-L....,-t--F-+::....=..:....1="'------ Name-Title Project Title: George T . Sanders Plumbing Warehouse Data filename: C:\Docum ents and Settings\Aian Hauser\My Documents\GeoSnnders Rifle\Com check2006.cck Date Report d a te: 06/30/08 Page 2 of2 COM check Software Version 3.5.0 Envelope Compliance Certificate 20061ECC Report Date: 06/30/08 Data fil e name: C :\Documents and Seltings\Aian Hauser\My Documents\GeoSnnders Rifle\Comcheck2006.cck Section 1: Project Information Project Titl e : George T . Sande rs Plu mbing War e h o u se Cons truc tion Sit e : Owner/Agent: Leon McCauley l ot 8, Powerline Professional Park Rifle, CO McCauley Const ru ctor s, Inc . P .O . Box 200 Windsor, CO 80550 (970)686-6300 leon@ mccauleyco nstructors .com Section 2 : General Information Building Location (for weather data ): Climate Zone : Heating Degree Days (base 65 degrees F): Cooling Degree Days (base 50 degrees F): R ifle, Colorado 5b 6881 2230 Project Type: New Construction Vertical Gl azing I Wall Area Pet.: ~) Warehouse Office Ret ail 2% Section 3: Requirements Checklist Envelope PASSES: Design 19% better than code. Climate-Specific Requirements : Component Name/Description Floor Area 15700 1300 1300 Gross Area Designe r/Contractor: Alan H auser Ha use r Architects, P.C . 3780 E . 15th Street , Suite 20 1 Lovela nd , CO 80538 (970)669-8220 hauserarchi tect@aol .com Cavity Cont. Proposed Budget or Perimeter R-Value R-Vatue U -Factor U -Factor Roof 1: Metal Building, Standing Seam 18300 30.0 0 .0 0 .051 0.065 Exterior Wall 1: Metal Building Wall 13760 19.0 0.0 0 .070 0.057 Window 1: Metal Fram e with Thermal Break: Double Pane , Clear, 252 0 .350 0.550 SHGC 0.71 Doo r 1: Insulated Metal, Swi nging 105 0.615 0 .700 Door 2: In su lated Meta l , Non-Swinging 544 0.125 1.450 Fl oor 1: Slab-On-G rade : Heated, Vertical 2 ft . 620 8 .0 (a) Budget U-factor s are used for software ba se lin e calculations ONLY, and are not code requirements. Air Leakage, Component Certification, and Vapor Retarder Requirements: 0 1. All joints and penetrations are caulked, gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance with th e manufacturer's installation instructions. 0 2. Windows, doors, and skylig ht s ce rti fied as meeting leakage requirements . 0 3 . Compone nt R-values & U-factors labeled as certified . 0 4 . Insulatio n installed according to manufacture r's instructions, in subs tantial contact with the surface being insulated , and in a manner that achieves t he r ated R-value without compressing the insulation. Project Title : George T . Sanders Plumbing Warehouse Data fil ename : C:\Documents and Se ttings\Aian Hauser\My Documents\GeoSnnders Rifle\Comcheck2006.cck •• ~ ·~ (I~ ••• Report date: 06/30/08 Page 1 of 2 L.J _, -•-"t ..,,..,,_,_, -·•-•• , ... ,,,..,., ...,,,_ ._.,,..,., ._.,.., ... ._..,, ...,,, ,.,,..,.,,.., "'"''""' ..,,.,,.,..._.~ . ..,,....~1 1111:::f~ 11 1 "'"" ._..._.,...,,.,:::J VI I ,.VIVt-'V .......... V'1""'t-'t-'VU •t tUI IIIV\VII<I.oVU dampe rs. 0 7. Cargo door s and loading dock doors are weather sealed. 0 8. Recessed lighting fixtures are: (i) Type IC rated and sealed or gasketed; or (ii) installed inside an appropriate air-tight assembly with a 0.5 inch clearance from combustible materials and with 3 in ches clearance from insulation material. 0 9 . Building entrance doors have a vestibule and equipped with closi ng devices. Exceptions : Building entrances with revolving doors. Doors that open directly f rom a space less than 3000 sq. ft . in area. 0 10.Vapor retarder installed . Section 4: Compliance Statement Compliance Statement: The proposed envelope design r epresented in this document is consistent with the building plans, specifications and other calcu lati ons submitted with this permit appli cation. The proposed envelope system has been designed to mee t the 2006 IE CC requi rements in COM check Ver sio n 3.5.0 and to comp ly with the mandata r h 1-l-,6<.\JY~ ~~{}~~ ~ r.c . AlAN L. Hpg;&c;-&-1 AlA IR/P~oj08 Name· Title Project Title: George T. Sanders Pl umbing Warehouse Data filename : C:\Documents and Settings\Aian Hauser\My Documents\GeoSnnders Rifle\Comcheck2006.cck Report date: 06/30/08 Page 2 of2 i~ KllCJ llKl"lC l8J AND CIVIL, INC. D ~ -E-3-EI1 Englneere · Con6tructore January 25, 2012 Kuersten Construction P.O. Bo x 1530 13 Powerline Road Rifle, CO 81650 Attn: David Hillbrand Re: Sanders Shed, Garco Permit #s 11160 & 11161 Dear Dave, Project No. 11318 This is to address certain items that have been raised upon inspection by the Building Department. These items are as follows : 1. Relocation of door. The door is currently shown on the east end of the south wall and it is to be moved to the west end of the south wall. It is acceptable to infill the door framing at the east and locate the new door opening to the west. The minimum header called out on the drawings (2-2x1 0) will be adequate under the point load of the roof framing. 2. Posts below 2-9 %" L VL 's at roofframing. Please used doubled 2x4 studs to bear the load of the LVL's at the north and south walls. 3. Plastic wrap at outflow pipe. It is our understanding that %" fiber isolation joint was not installed around the p ipe to isolate it from the slab-on-grade. In lieu of the fiber, a 6 mil plastic is wrapped around the pipe . This 6-mil plastic isolation from the slab will be acceptable for structural purposes. Please feel free to call with any questions or if we can be of further assistance. Thank You, GLENWOOD STRUCTURAL AND CIVIL, INC. v i!~~ Adolfo ~~orra, M.S ., P.E. President cc : File C:\Shares\Data\Jobs\Design\ 11 3 18-Kuersten-Sande rsShed\G e ne ra l\letKu ers ten 12 0 125-inspit ems.wpd 81 2 P1tkm Ave nue • Glenwood Spnngs, C081 GO I • Phon e (970) 928-0135 • Fax (970) 928-9804 ~OLORADU RIVER ENGINEERING III.CORPOI!ATEO David HillBrand P.O. Box 1530 13 Powerline Road Rifle, CO 81650 December 23, 2011 RE: Job No. 790 GT Sanders -Lot 8 Powerline Subdivision-Fire Suppression Pumphouse Design Dear Dave: Colorado River Engineering, Inc. completed the site plan design for the above referenced project with respect to the Pumphouse and underground water snpply pipeline layout. As requested w,e have reviewed the pumphouse foundation design drawings prepared by Glenwood Structural and Civil dated 12/20/2011. The revised pumphouse floor plan has been slightly increased to a width of 13' x 15'-8" (formerly 13' x 13'). The floor plan was superimposed on our site piau drawing and was determined to meet the original layout design criteria with respect to setbacks and clearances. Therefore, the change in size ofthe floor plan is acceptable and will not impact the project's design. If you have any questions, please do not hesitate to call 970-625-4933. Sincerely, Cc: CM M:\CR Ejobfiles\790-Sanders\Kuersten 12-23-20 11.doc P.O. Box 1301 • Rifle, CO 81650 • Tel. 970-625-4933 • Fax 970-625-4564 COLORADO STATE ELECTRICAL BOARD INSPECTION REPORT I CORRECTION NOTICE Date Received: 20-DEC-12 Contractor/HomeOwner: Address: Type of Inspection: Action: Comments or Corrections: Permit Number. 717630 MARK BRIELS ELECTRIC 6 POWERLINE ROAD Complete Final Accepted Inspectors Name: Norman Feck Phone Number: 877-320-9150 Date: 21-DEC-12 COLORADO STATE ELECTRICAL BOARD DEPARTMENT OF REGULATORY AGENCIES 1580 Logan St. Suite 550 Denver, Colorado 80203-1941 Phone: (303) 894-2985 https://www.dora.state.co.us/pls/real/Ep _Web _Inspection_ GUI.Process_Page[12/21120 12 2:32:17 PM] COLORADO STATE ELECTRICAL BOARD 1560 Broadway, Suite 1350 Denver, CO. 80202 Inspection Report ____________________________ .. _____________________ __ Permit#: 661366 Date Inspected:. 12-JUN..09 Permit Holder: ALL CURRENT ELECTRiC INC. Site: owner: Status: Inspection Type: Inspector: JOSEPH SPEAR PO BOX 281 LOUISVILLE CO 80027 Phone: (303) 673-9086 Email: acejws@aol.com Fax:()· #6 Powerline Road Building B Rifle Gatiield Geoge T Sanders ACCEPTED Final i"artial: N Trim: N Fee Pending: N Hazard: N New Commercial Cyrus Tuchscher ------------------·----------------------------------- Corrections: Comments: 1) Corrections all addressed and repairs made :l!) Card signE~d for C.O. 3) Electric final OK http:l/dora. state .co. us/cpp ,.prd!EP _ b;pection _ G UJ.Select_From_ List _Process 8/31/2011 • • • KUERSTEN Construction, LLC September 22, 20 I I To: Garfield County Building Department RE: G.T. Sander's Buildings -Powerline Park near Rifle, Colorado 13 Powerline Rd . -PO Box 1530 Rifle, CO 81650 Phone:970-625 -8210 Fax: 970-625-8211 www.kuerstenconstruction.com Kuersten Construction has been hired by the George T. Sanders Company to complete the work necessary for receipt of a Certificate of Occupancy for the project started in 2008. You may recall that the two large metal buildings were unable to meet the fire protection requirements set forth by the local fire district. In order to remedy this, a fire sprinkler system has been designed which should address the fire protection requirements. We hav e already submitted this information to Kevin Whalen at the Rifle Fire Protection District for his review and approval. The owner has assembled a team including Colorado River Engineering and Excel Fire Protection Company to assist with the design and construction of this system . Essentially , the design consists of tying into the existing fire protection water supply system, in stalling a precast concrete fire water intake vault for the fire pump s, construction of a small wooden framed 160 S .F. insulated and heated pump house and tying in the existing original piping to the new supply system. The original building permits issued for the two buildings are #11160 and #11161. This new fire protection supply system will serve both buildings . If you have any questions or need additional information , please contact me at: Office Phone -(970)625.821 0 Cell Phone -(970)948-9326 Em a il -dave@kuerstenconstruction .com David Hillbrand Kuersten Con struction David Bartholomew From: Andy Schwaller Sent: To: Tuesday, July 26, 2011 4 :39 PM David Hillbrand Cc: Dav id Bartholomew Subject: RE : SG Trust Building -Rifle With the fire code, it is the size and type of construction . The amendments to the fire code are on line at Garfield- co unty.com The building code has more fle xibilit y depending on actual use classification . 12 ,000 sq .ft. is about the most lenient. A build ing us ed for a commercia l parking is limited to 5,000 sq.ft Sec 903.2.9 .1. A wood shop is 2500 sq . ft. Sec 903.2 .3. Repair garages are lim ited to 12,000 903.2 .8 .1. Fabrication is also 12,000 903 .2.2. All Ha zard occupations need a sprinkler. It appears building B also required the sprinklers to al low for the area increase from the a llo wed 17 ,500 to the 23,000sq.ft. as per Table 503 and Sect ion 506 . There are also other tradeoffs with the spr inklers . Po ss ibly the use of fire walls would change the requirements as well. Andy From: David Hi llbrand [mai lto:dave@kuerstenconstruct ion.coml Sent: Tuesday, July 26, 20111:19 PM To: Andy Schwaller Subject: RE : SG Trust Building -Rifle Hi Andy -Thank you for the synopsi s-it is my understanding th at the Building B i s th e one in question . You refer to an 51 Mod e rate h aza rd storage ... Would changing this cla ss ification make any difference or is it simply the size and constructi on type that ultimately dictates? David Hillbrand Kuersten Construction 0 -970.625.8210 F-970 .625 .82 11 M -970.948 .9326 email : dave@kuerstenconst ru ction.com P.O. Bo x 1530 13 Powerl ine Road Rif le, CO 8 1650 www.kuerst enconst ru ction .co m From: Andy Schwaller [ma il to:aschwa ll er@ga rfie ld -county.coml Sent: Tuesday, July 26 , 2011 12:48 PM To: David Hillbrand Cc: David Bartholomew; Kevin Whelan Subject: RE: SG Trust Building-Rifle David, Permit 11160 Building B is a 23,026 Sq Ft. building . We show the proposed use of the building to be a mixed use 20,446 S-1 (moderate hazard sto r age), M (mercantile), and B (business). Due to the size of the S-1 being over 12,000 sq .ft., a NFPA 13 automa tic sprinkler system is required as per the 2003 IBC for this commercial warehouse . 1 r C l 1111\. .L.J..J.V ..I. LIUIIUII 15 r\ ~I I V VV;J \.V Ut;;;; 0 .LV1 VVV ;J'-1• I \. UU IIUIII5 a I .:JU L.VI I .>I U'C I CU 01 I .J-..1. V\...\...UfJCI I L.Y VV I 11 \...11 I .:J O I .>U 5 1 C O l C I liiQII the 12,000 threshold . An NFPA 13 sp rinkler is also required b ase d on the propose use of the building as per the building code . If the u se of the buildings has changed from t h e proposed use we can verify if the spr inkler requ irement changes . It is important to know that th e sp rinklers also allow for possibly a large r buildin g t o be built. It is possible a sp ri nkler is n eeded just for the size of the buildings for area incre ases. Th e fire code also have sp rinkl er requirements based on the type of cons tru ctio n and size of the building . Ba sed o n t he fire code, both of these buildings requ ire a NFPA 13 sp rinkl er system. Th ere may b e other options to de al w ith the above that an architect could help yo u w ith suc h as fire walls to sepa r ate the structures into sma ll er buildings. Any prop osed changes sho uld be subm itted to the building department as an amendm ent to the existing permits. Regards, Andy From: David Hillbrand [mailto:dave@kuersten construction .coml Sent: Tuesday, July 26, 2011 9:47AM To: David Bartholomew; Andy Schwaller Cc: 'Chris Manera' Subject: SG Trust Building -Rifle Hello David a nd Andy -I spoke with you (D avid) briefly last week regarding t h e SG Trust Buildings located near Rifl e. They were originally built in 2008 (Permit #'s 111 6 1 a nd 111 60). The GC for the original project was McCauley Constructors. We h ave s ince been hired by the owner to complete the project which r eally amounts to getting the fire protection system in operation. Due to the constraints of the initia l design of the fire sprinkler s y stem, the Buil ding B (# 1 1 160) will need to be re-classified in order to meet the fire protection r equirements. In addition, we w ill be install ing the s upply system to feed the buildings with water for the fir e protection system. Chris Manera of Co lorado River Engineer ing has designed the system a long with Excel Fire Protection company. We would like to set up a meeting with you to discuss the project including permit requirements and the building reclassification issue. Can you find a time in the next few days that works for you both a nd I will coordinate Colorado River Engineering as well. I h ave attached the fire protection drawings as we ll for yo ur initial information. Rifle Fire Protection District is also in the lo op regarding this project. Respectfully, David Hillbrand Kuersten Construction 0-970.625.8210 F-970 .625 .8211 M -970.948.9326 2 P.O. Box 1530 13 Powerfine Road Rifle , CO 81650 _. --~ ..... unstruction .com www . kue rste nconstruction.com 3 CORRECTION NOTICE 108 8th St., Suite 401 Glenwood Springs, Colorado Phone (970) 945-8212 Job located at ~ /tw~L//1)~ /(je Permit No. /// ~ / I have this day inspected this structure and these premises and found the following corrections needed: t:JAJ WA~ .r-~AS LtA/E' W#;t:</C" z;iC/c$~ .s/IC£.L £-pG-L:S. >;t;c:.t.,~,&c a/A'Z&tlt!. b/NIC.5 tA./o/tfJZAP J!!A riJ -r-z_ ~&1/ 5;/o~~ ?!/ .57A ;,es h# PI/ G/l> L/A/ C. +-1?.!!;-if"IC?T eVICL C/f/Cc/<:: A? E/<'l!MC 0 Call for Re-lnspection 0 $50.00 Re-lnspection Fee must be paid prior to Re-lnspection You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for inspection at 970-384-5003. Date Z-'$ Building Inspector -~~~~~~~~~:::::::::~:___­ Phone (970) 945-8212 11160 ·'Q u '.! Assessor's Parcel No. 2177-113-01-008 Date --~1~0/:...:3..:.:0/c::2-=-00:..:8'-- BUILDING PERMIT CARD Address ----~6~P~o~w~e~r~li~ne~R~o~a~d,~R~i~fl~e~B~u~i~ld~i~ng~-~B~~(P~o~w~e~r~lin~e~P~ro~f~es~s~io~n~a~I~P~a~rk~S~u~b,~L~o~t~8~) ________ __ 1er SG trust Address 10201 we. 49th ave-wheat ridge, co Phone # 800-284-0900 1tractor )acks: McCauley Const Inc Address box 200 windso, co Phone # 970-686-6300 Front _________ Rear _____ RH, _________ LH ______ Zoning ________ __ :ommercial warehouse s Test---------------------- 'ting ------------------------ndation, ____________________ _ ut ___________ ~=-----~~ lerground Plum 1g h PI u mbi ng ..::..L--~:.........:"4--l..lc:Z--f_.l..;~ ning, ________________________ _ 1lation --------------------- ,fing ------------------------ wall • Pip,.-n-g -,cpr~--_---.-1 --t>:---~<qc-:Qi'I\>""T-::-:-:----~- ~S~~,I~-/~02 ~~ INSPECTIONS NOTES Weatherproofing __________________ _ Mechanical ________________________ __ Electrical Rough (State)------------------ Electrical Final (State)'------------------ Final /Checklist Completed? ___ _ Certificate Occupancy # ---------------- Date __ ~~-------------------Septic System # _u:..=:..J{L:!!E=-. ______ _ Date ---------------------- Final•----------------------- Other ------------------------------ (continue on back) h 11161 ""' ''I ' ··> .. Assessor's Parcel No. 2177-113-01-008 Date ___ 1:....::0c:.../3:....:0c:..:/2=-=0:....:0-=8- BUILDING PERMIT CARD ~- Address 6 Powerline Road, Rifle Building-A (Powerline Professional Park Sub, Lot 8) ner _____ S_G_t_ru_s_t~-------Address 10201 we. 49th ave-wheat ridge; co Phone # 800-284-0900 ltractor ____ M_c_C_a_u_le-=-y_C_o_n_s_t_ln_c~ _____ Address box 200 windso, co Phone # 970-686-6300 backs: Front _____ Rear _____ RH _____ LH _____ Zoning ____ _ commercial warehouse 23000sq ft Is Test------------ •ting -------------lndation __________ _ 'ut --------:=----,-...-----,,- ierground Plumbing 1.:2-1)-t:YBif)trl_.__ Jgh Plumb...iflg. "2y~9 ¢t:V ming or-:8 -r;fllrfiiE-_ Jlation ------------ >fing ----==---.,-------- wall 3-if'!i'Z~--~ ~~l:'1~~)~~;~V INSPECTIONS NOTES Weatherproofing 0 _ r?Ji_,..ry~ Mechanical ___ ...:::?~_-;rvL...1"'--.!::{/f:.___!__,~:..=::...~"--"--- Eiectrical Rough (State)---------- Electrical Final (State) _________ _ Final /Checklist Completed? ___ _ Certificate Occupancy # --------- Date Septic System #;;----;;::::=::---------- Date ------------- Fi nai.~.-;-----::--:-::---------- Other lJnU:\J$1~: ~~~ (continue on back) l-'8~~ -~.68 -5:?~ " ll'ol ~f'€d" b ..J 'S BUILDING PERMIT GARFIELD COUNTY, COLORADO INSPECTION WILL NOT BE MADE UNLESS THIS CARD IS POSTED ON THE JOB AGREEMENT In consideration of the issuance of the permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structured for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building department and IMMEDIATELY BECOME NULL AND VOID. use Ct>~wter-CtCIL WtaJe.nouse AddressorlegaiDescription 6 PGwftlttlP J(t-ttfJe au,-e ~ 1t~ contractor Hc~DUl!'f {)oMS·. Owner IN- Build ing Permit Type QO'MWWlerc\at This Card Must Be Posted So It Is Plainly Visible From The Street Until Final Inspection INSPECTION RECORD Footing Drivewa~ Parcel Detail Garfield County Assessor IT reasurer Parcel Detail Information Page I of 5 Assessor IT rea surer ProRert\'Searcb I Assessor Subs~t!l_u_ery I Assessor Sale~ S_egr_qh GJ!lrk S Recorder Reception Search B~i~;_Building Characteristics I Tax lnformatioQ Parcel Detail I Vall!ll_Detail I SaJ~~ lletail I ResidenfuliLGommerciallmRrovement_D_etail Land Detail I P_hotQgf'~Rhs I Mill LevyJmnLJ~Dilta_il I Tax Area II Account Number II Parcel Number II 2DD7 Mill levy I I 021 II RDD7831 II 217711301008 II 46.431 I llwner Name and Mailing Address ISG TRUST 110201 W. 48TH STREET IWHEAT RIDGE. co 80033 Assessor's Parcel Description (Not to be used as a legal description) ISECT.TWN.RNG:II-B-83 SUB:PDWERLINE !PROFESSIONAL PARK SUB LOT:8 DESC: !FILING I AMENDED PRE:R210480 IPRE:R210747 BK:B87 PG:355 BK:650 IPG:8BO BK:588 PG:411 BK:583 PG:540 IBK:583 PG:538 BK:583 PG:535 BK:583 IPG:533 BK:575 PG:748 BK:488 PG:IOI IBK:355 PG:SB8 BK:277 PG:BI http:! I www. garcoact.coml assessor I parcel.asp? ParceiNumber= 2177113 DID D 8 I I I 712S/2D08 Parcel Detail Page 2 of 5 IRECPT:745687 RECPT:745457 BK:I865 IPG:336 RECPT:711444 BK:I631 PG:328 IRECPT:661773 BK:I287 PG:I883 IRECPT:588425 BK:I287 PG:I68 IRECPT:588421 BK:1238 PG:2D IRECPT:577667 BK:I214 PG:4 IRECPT:571278 BK:I212 PG:45 IRECPT:570645 BK:III8 PG:222 IRECPT:541714 BK:ID76 PG:488 IRECPT:528167 BK:D852 PG:D278 IBK:D663 PG:D772 RECPT:358174 location Physical Address: liB POWER LINE RD RIFLE I Subdivision: I PDWERLINE PROFESSIONAL PARK SUB Land Acres: 113.852 I Land Sq Ft: liD I Section II Township II Range I II II 6 II 83 I 2DD8 Property Tax Valuation Information II Actual Value II Assessed Value I I Land: 288.o4oll 83.8201 I Improvements: oil Dl I Total: I 288.o4oll 83.8201 Additional Value Detail Most Recent Sale http:/ I www.garcoact.coml assessor I parcel.asp?Parcel Number= 2177113010 0 8 712912008 Parcel Detail I I I I I I I I Sale Date: 113128/2008 Sale Price: 11680.000 Additional Sales Detail Basic Building Characteristics Number of Residentiallo Buildings: Number of Comm/lnd lo Tax Year I 2007 2007 2006 I 2006 2006 2006 2006 2006 2005 2005 I 2005 2005 2005 2005 2004 I II Buildings: No Building Records Found Tax Information Transaction Type Tax Payment: Whole Tax Amount Fee Payment Interest Payment Interest Charge Tax Payment: Whole Fee Charge Tax Amount Fee Payment Tax Payment: Whole Interest Payment Interest Charge Fee Charge I Tax Amount Tax Payment: Whole II http:/ I www.garcoact.coml assessor I parcel.asp?Parcel Number= 2177113 010 0 8 Page 3 of 5 I I Amount I ($3.680.12)1 $3.680.121 ($42.80)1 ($168.78)1 $168.781 ($2.425.44)1 $42.801 $2.425.441 ($48.45)1 ($2.434.88)1 ($170.44)1 $170.441 $48.451 $2.434.881 ($2.360.00)1 712912008 Parcel Detail 2004 II Fee Payment ($44.85)1 2004 II Interest Payment ($141.60)1 2004 II Interest Charge $141.601 2004 II Fee Charge $44.851 2004 II Tax Amount $2.36o.ool 2003 II Interest Payment ($157.05)1 2003 II Interest Charge $157.051 2003 Tax Payment: Whole ($2.617.48)1 2003 Tax Amount $2.617.481 2002 Interest Charge I $78.551 I 2002 Tax Payment: Whole ($1.136.40)1 I 2002 I Interest Payment ($78.55)1 I 2002 Fee Payment ($42.80)1 I 2002 Fee Charge $42.801 I 2002 Tax Amount $1.136.401 2001 Fee Payment ($44.00)1 2001 Interest Payment ($1.53)1 2001 Interest Charge $1.531 2001 Tax Payment: Whole I ($21.80)1 I 2001 Fee Charge II $44.001 I 2001 Tax Amount II $21.801 T Ojl_[li_P~g~ Asse~S[Jf_Database Search DQtions I Trga~svr_er Database Search DQtions Clerk 8 Recorder Database Search 0RtiQOA Garfield County H_ome e_agg Page 4 of 5 ·------·--·---·~~---------------· http :1 I www.garcoact.coml assessor I parcel.asp? Parce1Number=21771130 10 0 8 712812008 MCCAULEY CONSTRUCTORS, INC. P.O. BOX 200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 if en. I THOMPSON '!IJ ISRMiffli{i@jij{elijf41iUf$~ Iii Date: 1111412008 Report ID: K51854-GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERUNE SUBDIVISION 6 POWERL/NE ROAD Location: FOOTING PAD ON GRIDLINES A/1-11, 11/B-H. Cast Date: 111712008 Ticket: C04729551 In-Lab Date: 11110/2008 Truck Number: 0807 Initial Curing Curing Method: Min. Temp: Box 44 Of Physical Properties of Concrete Supplier: LAFARGE Batch Time: 01:44 Concrete Mix: RMXUV30G Test Time: 03:15 Specimens Made By: ST D97 Final Curing Max Temp: Curing Method: 85 Of Fog Room {ASTM C143, C231, C138, C1064) Specified Strength (!"c) Slump Air Content Density Temperature 3500 psi@ 28 days 3.25 in. 2.6% 147.0 pet. Compressive Strengths {ASTM C39) I Specimen Number 1 I Age in Days 7 I Diameter {inches) 4.00 CTL l!"homps,Q.tl, Inc ~~.·":') DAN DOWNING LABORATORY/FIELD MANAGER I Area {sq. inches) 12.57 I Max. Load Compressive {lbs.) Strength {psi) 47,000 3740 Average: 3740 cc: LAFARGE Percent offc 107 234 Center Dr.! Glenwood Springs. CO 816011 Phone: 970-945-28091 Fax: 970-945-7411 7deg. F Type of Fracture I MCCAULEY CONSTRUCTORS, INC. R.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 CTLITHOMPSON " INCHJ>RRORAIFEiD Date: 12/02/2008 Report ID: K51884 • GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERLINE ROAD Supplier: LAFARGE Location: PADS AND COLUMNS, G. T. SANDSER WAREHOUSE, GRID LINE 1, PADS AND COLUMNS, S. G. TRUST WAREHOUSE, GRID LINES 1, 9, C, A. Cast Date: 11121/2008 Ticket: 85206265 Batch Time: 02:45 Concrete Mix: RMXVU3060 In-Lab Date: 11124/2008 Truck Number: 4789936 Test Time: 03:15 Specimens Made By: ST 97 Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other 50 Of 60 Of Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064) Specified Strength (!'c) Slump Air Content Density 3000 psi @ 28 days 4.50 in. 6.3% 142.3 pcf. Compress1ve Strengths (ASTM C39) Specimen Age in Diameter Number Days (inches) 1 7 4.00 CTL I Thompson, Inc ~~.·~ DAN DOWNING LABORATORY/FIELD MANAGER Area Max. Load Compressive (sq. inches) (lbs.) Strength (psi) I 12.57 32,000 I 2550 Average: 2550 cc: LAFARGE Percent off'c I 85 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-2809 1 Fax: 970-945-7 411 Temperature 56deg. F Type of Fracture MCCAULEY CONSTRUCTORS, INC. P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 CTL .. I THOMPSON Date: 12/02/2008 Report ID: K51819-GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERLINE ROAD Supplier: LAFARGE Location: FOUNDATION WALLS AT A1-A11 AND A11-H11 Cast Date: 11117/2008 Ticket: 85206104 Batch Time: 02:30 Concrete Mix: RMXGE30G In-Lab Date: 11118/2008 Truck Number; 4789940 Test Time: 03:05 Specimens Made By: ST D8V Initial Curing I Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other 63 Of 70 OF Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064) Specified Strength (fc) Slump Air Content Density 3000 psi @ 28 days 4.00 in. 6.9% 141.8 pcf. Compressive Strengths (ASTM C39) Specimen Age in Diameter Number Days (inches) 1 7 4.00 CTL I Thompsop...__lnc ~ ~""' .. "5 DAN DOWNING LABORATORY/FIELD MANAGER Area Max. Load Compressive (sq. inches) (lbs.) Strength (psi) I 12.57 32,000 I 2550 Average: 2550 cc: LAFARGE Percent of f'c I 85 234 Center Dr I Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 Temperature 69 deg. F Type of Fracture MCCAULEY CONSTRUCTORS, INC. P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 CTL I THOMPSON Date: 12/0312008 Report ID: K51858-GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERLINE ROAD Supplier: LAFARGE Location: GT SANDERS BUILDING WALL AT GRIDLINES 1/A-D.5, E/6.5-11, 7/E-H, H/7-11. Cast Date: 11!26/2008 Ticket: C0017358 Batch Time: 01:40 Concrete Mix: RMXGE30G In-Lab Date: 11/28/2008 Truck Number: 0138 Test Time: 02:55 Specimens Made By: ST D8V Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other 40 Of 55 OF Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064) Specified Strength (f"c) Slump Air Content Density 3000 psi @ 28 days 3.75 in. 4.6% 143.0 pcf. . Compressive Strengths (ASTM C39) I Specimen Number 1 I Age in Days 7 I Diameter (inches) 4.00 CTL 1 Thompson, Inc ~~"'.'5 DAN DOWNING LABORATORY/FIELD MANAGER Area Max. Load Compressive (sq. inches) (lbs.) Strength (psi) I 12.57 I 41,500 3300 Average: 3300 cc: LAFARGE Percent off'c 110 234 Center Dr. I Glenwood Springs. CO 81601 1 Phone: 970·945-28091 Fax: 970-945-7411 Temperature 68 deg. F Type of Fracture I I MCCAULEY CONSTRUCTORS, INC. P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 CTi. .. I THOMPSON Date: 12109/2008 Report ID: K51854-GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERL/NE ROAD Location: FOOTING PAD ON GRIDL/NES A/1-11, 11/B-H. Supplier: LAFARGE Cast Date: 1117/2008 \ Ticket: C04729551 Batch Time: 01:44 I Concrete Mix: RMXUV30G In-Lab Date: 11/1012008 I Truck Number: 0807 Specimens Made By: ST D97 Test Time: 03:15 Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Box 44 OF 85 OF Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064} Specified Strength (f'c) Slump Air Content Density Temperature 3500 psi @ 28 days 3.25 in. 2.6% 147.0 pcf. I Compressive Strengths (ASTM C39) Specimen Number 1 2 3 I Age in Days 7 28 28 I Diameter (inches) 4.00 4.00 4.00 CTL I Thomp,son, Inc f"\ ~ ~""""".3 DAN DOWNING LABORATORY/FIELD MANAGER Area Max. Load Compressive Percent (sq. inches) (lbs.) Strength (psi) of f'c I 12.57 I 47,000 3740 Average: 3740 107 12.57 59,500 4730 12.57 55,500 4420 Average: 4580 131 cc: LAFARGE 234 Center Dr. I Glenwood Springs. CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 7 deg. F Type of Fracture I MCCAULEY CONSTRUCTORS, INC. P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 CTLITHOMPSON Date: 12112/2008 Report ID: K51859-GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERLINE ROAD Supplier: LAFARGE Location: COLUMNS ON GRIDLINE C/6-10 GT SANDERS WAREHOUSE. Cast Date: 1215/2008 Ticket: C0017400 Batch Time: 01:05 Concrete Mix: RMXGE30G In-Lab Date: 1218/2008 Truck Number: 0807 Test Time: 02:30 Specimens Made By: ST D8V Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other . : .. 27 OF 70 OF Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064) Specified Strength (fc) Slump Air Content Density Temperature 3000 psi @ 28 days 2.50 in. 5.5% 142.2 pcf. Compressive Strengths (ASTM C39) I Specimen Number 1 I Age in Days 7 CTL I Thompson~ I Diameter (inches) 4.00 DAN DOWNING LABORATORY/FIELD MANAGER I Area (sq. inches) 12.57 I Max. Load Compressive (lbs.) Strength (psi) 41,500 3300 Average: 3300 Percent off'c 110 cc: LAFARGE GARFIELD COUNTY 234 Center Dr. I Glenwood Springs, CO 816011 Phone: 970-945·28091 Fax: 970-945-7411 62deg. F Type of Fracture l MCCAULEY CONSTRUCTORS, INC. P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 CTI.. I THOMPSON Date: 12112/2008 Report ID: K51852-GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERLINE ROAD Supplier: LAFARGE Location: TRUST BUILDING COLUMN LINE E/1.3 TO 8.7 PAD FOOTINGS. Cast Date: 12/5/2008 Ticket: 85206315 Batch Time: 07:14 Concrete Mix: RMXGE30G In-Lab Date: 12/8/2008 Truck Number: 4780728 Test Time: 08:15 Specimens Made By: DC DBV Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other 27 OF 70 OF Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064) Specified Strength (!'c) Slump Air Content Density Temperature 3000 psi @ 28 days 3.50 in. 5.6% 143.4 pcf. Compressive Strengths (ASTM C39) Specimen Age in Diameter Number Days (inches) 1 7 4.00 DAN DOWNING LABORATORY/FIELD MANAGER Area (sq. inches) I 12.57 Max. Load Compressive Percent (lbs.) Strength (psi) of f'c 34,500 I 2750 I Average: 2750 92 cc: LAFARGE GARFIELD COUNTY 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-2809 1 Fax: 970-945-7411 39 deg. F Type of Fracture MCCAULEY CONSTRUCTORS, INC. P.O. BOX ZOO 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 CTLITHOMPSON INC 0 R P 0 R.'AT£ D Date: 12/15/2008 Report ID: K51819 • GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERLINE ROAD Supplier: LAFARGE Location: FOUNDATION WALLS ATA1 • A11 AND A11 • H11 Cast Date: 11/17/2008 Ticket: 85206104 Batch Time: 02:30 Concrete Mix: RMXGE30G In-Lab Date: 1111812008 Truck Number: 4789940 Test Time: 03:05 Specimens Made By: ST D8V Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other 63 OF 70 OF Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064) Specified Strength (f'c) Slump Air Content Density Temperature 3000 psi @ 28 days 4.00 in. 6.9% 141.8 pcf. Compressive Strengths (ASTM C39) Specimen Age in Diameter Number Days (inches) 1 7 4.00 2 28 4.00 3 28 4.00 CTL \ Thompson, Inc ~ DAN DOWNING LABORATORY/FIELD MANAGER I Area (sq. inches) 12.57 12.57 12.57 Max. Load Compressive Percent (lbs.) Strength (psi) off'c 32,000 I 2550 I Average: 2550 85 49,000 3900 50,000 3980 Average: 3940 131 cc: LAFARGE GARFIELD COUNTY 234 Center Dr.[ Glenwood Springs, CO 81601[ Phone: 970-945-2809[ Fax: 970-945-7411 69 deg. F Type of Fracture MCCAULEY CONSTRUCTORS, INC. P.O. BOX 200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 CTLITHOMPSON INCORPORATED Date: 1211612008 Report ID: K51844-GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERLINE ROAD Supplier: LAFARGE Location: GTS TRUST-LINE AIA-D.5, 9/A-D.5, AI 1-9, FOUNDATION WALL Cast Date: 12/9/2008 Ticket: 85206704 Batch Time: 01:08 Concrete Mix: RMXGE30G In-Lab Date: 12110/2008 Truck Number: 4780138 Test Time: 02:10 Specimens Made By: DC D8V Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other 48 OF 75 OF Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064) Specified Strength (f'c) Slump Air Content Density Temperature 3000 psi @ 28 days 2.50 in. 4.5% 146.0 pet. Compressive Strengths (ASTM C39) Specimen Age in Diameter Number Days (inches) 1 7 4.00 CTL I Thompson, Inc 1~,-./ ~N•'AR DAN DOWNING LABORATORY/FIELD MANAGER I Area (sq. inches) 12.57 Max. Load Compressive Percent (lbs.) Strength (psi) off'c 36,500 I 2900 I Average: 2900 97 cc: LAFARGE GARFIELD COUNTY 234 Center Dr I Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 61 deg. F Type of Fracture MCCAULEY CONSTRUCTORS, INC. P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 CTL I THOMPSON I NCORPO'RATE:O Date: 01105/2009 Report ID: K51852-GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERL/NE ROAD Supplier: LAFARGE Location: TRUST BUILDING COLUMN LINE E/1.3 TO 8.7 PAD FOOTINGS. Cast Date: 1215/2008 Ticket: 85206315 Batch Time: 07:14 Concrete Mix: RMXGE30G In-Lab Date: 12/8/2008 Truck Number: 4780728 Test Time: 08:15 Specimens Made By: DC D8V Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other 27 OF 70 oF Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1 064) Specified Strength (!'c) Slump Air Content Density Temperature 3000 psi @ 28 days 3.50 in. 5.6% 143.4 pcf. Compressive Strengths (ASTM C39) Specimen Age in Diameter Number Days (inches) 1 7 4.00 2 28 4.00 3 28 4.00 CTL 1 Thompson, Inc DAN DOWNING LABORATORY/FIELD MANAGER I Area {sq. inches) 12.57 12.57 12.57 Max. Load Compressive Percent (lbs.) Strength (psi) of f'c 34,500 I 2750 I Average: 2750 92 47,500 3780 48,000 3820 Average: 3800 127 cc: LAFARGE GARFIELD COUNTY 234 Center Dr. 1 Glenwood Springs. CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 39 deg. F Type of Fracture MCCAULEY CONSTRUCTORS, INC. P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 CTI.. I THOMPSON INC'ORPORAWED Date: 01105/2009 Report ID: K51859-GS05195.000 Report ofConcrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERLINE ROAD Supplier: LAFARGE Location: COLUMNS ON GRIDLINE C/6-10 GT SANDERS WAREHOUSE. Cast Date: 1215/2008 Ticket: C0017400 Batch Time: 01:05 Concrete Mix: RMXGE30G In-Lab Date: 12/8/2008 Truck Number: 0807 Test Time: 02:30 Specimens Made By: ST D8V Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other 27 OF 70 OF Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064) Specified Strength (f'c) Slump Air Content Density Temperature 3000 psi @ 28 days 2.50 in. 5.5% 142.2 pcf. Compressive Strengths (ASTM C39) I Specimen Number 1 2 3 I Age in Days 7 28 28 CTL I Thompson, Inc I Diameter (inches) 4.00 4.00 4.00 DAN DOWNING LABORATORY/FIELD MANAGER I Area (sq. inches) 12.57 12.57 12.57 I Max. Load Compressive (lbs.) Strength (psi) 41,500 3300 Average: 3300 52,000 4140 52,000 4140 Average: 4140 Percent of f'c 110 138 cc: LAFARGE GARFIELD COUNTY 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970-945-2809 1 Fax: 970-945-7 411 62deg. F Type of Fracture I MCCAULEY CONSTRUCTORS, INC. P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 CTLITHOMPSON INCORPORATED Date: 01/13/2009 Report ID: K51845-GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERLINE ROAD Supplier: Location: FOUNDATION WALLS TRUST BUILDING LINE E/1-6.9, 1/D.5-E. Cast Date: 12/16/2008 Ticket: 85206356 Batch Time: 08:20 Concrete Mix: RMXGE30G ln·Lab Date: 12117/2008 Truck Number: 4780223 Test Time: 09:30 Specimens Made By: DC D8V Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other 68 OF 68 OF Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064) Specified Strength (f'c) Slump Air Content Density Temperature 3000 psi @ 28 days 4.25 in. 5.9% 142.8 pcf. Compress1ve Strengths (ASTM C39) Specimen Age in Diameter Number Days (inches) 1 7 4.00 2 28 4.00 3 28 4.00 CTL I Thompson, Inc b-1~ ~""··~ DAN DOWNING LABORATORY/FIELD MANAGER I Area Max. Load Compressive Percent (sq. inches) (lbs.) Strength (psi) of f'c 12.57 35,500 I 2830 I Average: 2830 94 12.57 46,000 3660 12.57 43,000 3420 Average: 3540 118 cc: GARFIELD COUNTY 234 Center Dr. 1 Glenwood Springs, CO 81601 1 Phone: 970·945-28091 Fax: 970-945-7411 50deg. F Type of Fracture High Strength Bolt Inspection Report CLIENT MCCAULEY CONSTRUCTORS INC. PROJECT GT SANDERS WAREHOUSE LOCATION: RIFLE COLORADO Bolt Manufacturer: UK Bolt Markings A325 Bolt Diameter 5/8 % 1" Description of Work/Location: CTL I THOMPSON INCORPORATED PROJECT NO. GS05195-390 DATE: 2-19-09 Plans By: Chief Buildings Date: 10-08-08 Job No. C092879 Roof level beam to beam and beam to column bolted connections between lines A & H and lines 1 & 11. Anchor bolts for columns between lines A & H and Lines 1-11 on the GT Sanders warehouse. The installation and bolt tension were checked in accordance the project specifications and the American Institute of Steel Construction Specifications for Structural Joints using ASTM A325 or A490 bolts, Sections 8 and 9. At the time of the inspection, bots observed in the above locations were installed and tightened to the minimum required tension values as set by the American Institute of Steel Construction. 0 YES~ NO Remarks: Bolts installed in the snug tight condition. TECHNICIAN: Phil Jones List of Outstanding Discrepancies L{2cC40 f '!:-c1~3~ ~!_=~---~ _ IcL.L::C)L_J _____ 'icuz/J:X:>---"a-""a:<':-ht·•de PROJECT CLIENT LOCATION· Date Item PROJECT NO· DATE: CTL I THOMPSON Date Reported No_ Location/Description Accepted 2-;tf-1'1 1 fh /;"' /;, "" ' I??> lA;; // -?P r-· p /() /;' 11 e J [//,.v [/' FIELD COPY TO ---- -~---------- High Strength Bolt Inspection Report CLIENT: MCCAULEY CONSTRUCTORS, INC. PROJECT GT SANDERS TRUST BUILDING LOCATION: RIFLE. COLORADO Bolt Manufacturer: UK Bolt Markings: A325 Bolt Diameter 5/8 % i" Description of Work/Location: CTL I THOMPSON INCORPORATED PROJECT NO. GS05i 95-390 DATE: 3-09-09 Plans By: Chief Buildings Date: 9-i 0-08 Job No. C092885 As requested by Pat Gilroy with McCauley Constructors, Inc. a bolt observation was performed on the beam to beam and beam to column connections between lines A-11 and lines A-E and anchor bolts between lines 1-11 and lines A-Eon the S.G. Trust Building. Reinspection on item 1 from our list of "outstanding discrepancies" dated 2·19-09. The installation and bolt tension were checked in accordance the project specifications and the American Institute of Steel Construction Specifications for Structural Joints using ASTM A325 or A490 bolts, Sections 8 and 9. At the time of the inspection, bolts observed in the above locations were installed and tightened to the minimum required tension values as set by the American Institute of Steel Construction. l:gj YES 0 NO Remarks: Bolts installed in the snug tight condition. TECHNICIAN: Phil Jones list of Outstanding Discrepancies CLIENT· PROJECT LOCATION ···. Date Reported Item No. PROJECT NO. DATE· Location/Description ,., ===r CTLITHOMPSON Page __ of __ c .. Date Accepted . : . ..····~--+---r----·-----------------~----~ . FIELD COPY TO __ _ --------~--~- REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 1 PLACEMENT TYPE OBSERVED: Observation Date:11/07/2008 Field Rep: ST 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade 0 Wall 0 Column 0 Slab on Deck 0 Other EXTERIOR FOOTING PADS PLACEMENT LOCATION: FOOTING PADS ON GRIDLINE A/1-11, 11/B-H. PLANS: WEEKS AND ASSOCIATES ITEMS CHECKED: 0 Bar Size 0 Bar Quantity 0 Lap Length 0 Cover 0 Form Void 0 Dowel Bars 0 Other 0 Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thompson, Inc DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 2 PLACEMENT TYPE OBSERVED: Observation Date:11 /17/2008 Field Rep: TP 0 Grade Beam 0 Structural Slab 121 Footing 0 Pier Cap 0 Slab on Grade 121 Wall 121 Column 0 Slab on Deck 0 Other PLACEMENT LOCATION: FOOTING PAD & COLUMN REBAR@ GRIDS H@7; H@8; H@9; H@10;P G@7; G@9; F@7; F@9; E@6; E@7; E@8; E@9; E@10; H@7+14.8; H@8+6.8; H+3.9 @7+10.10 1/2; H+3.9@7+15.5; H+3.9 @8+13.9. WALL REBAR ON GRIDLINES A AND 11, PLANS: WEEKS & ASSOCIATES 9-24-08 PP. S1 .0 TO S1 .3 AND S2. 1 ITEMS CHECKED: 121 Bar Size 121 Bar Quantity 121 Lap Length 121 Cover 0 Form Void 121 Dowel Bars 0 Other 121 Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thompson, Inc DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 816011 Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Observation Date:11/21/2008 Project: LOT 8, POWERLINE SUBDIVISION Field Rep: TP Project Number: GS05195.000 Report Number: 3 PLACEMENT TYPE OBSERVED: 0 Grade Beam 0 Structural Slab 121 Footing 0 Pier Cap 0 Slab on Grade 0 Wail 0 Column 0 Slab on Deck 0 Other PLACEMENT LOCATION: GT SANDERS WAREHOUSE PADS AND COLUMNS AT GRIDLINES A + 4.9@1, C@1, d+20.3 @ 1 AND E@1. SGTRUST WAREHOUSE PADS +COLUMNS@ GRIDLINES 1 (ALL PADS) 9 (ALL PADS), A (ALL PADS) AND C (ALL PADS). PLANS: WEEKS & ASSOCATES PLAS -SG TRUST WAREHOUSE PGS S1.1 S1.2, S1.2, S2.1 AND GEORGE T SANDERS WAREHOUSE S1.1, S1.3, S2.1 BOTH PLANS DATED 9-24-08. ITEMS CHECKED: 121 Bar Size 121 Bar Quantity 0 Lap Length 121 Cover 0 Form Void 121 Dowel Bars 0 Other 121 Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: SG TRUST WAREHOUSE: INTERIOR COLUMNS -DOWEL LENGTH & # OF TIES ADJUSTED DOWN, AS APPROVED BY PAUL WITH WEEKS & ASSOCIATES BY PHONE. APPROVE SPECIFICATIONS 6 DOWELS, 30X1 0 WITH 4 TIES SIZE AND GRADE OF REBAR REMAINS THE SAME. REINSPECTION REQUIRED? No CTL I Thompson, Inc DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 4 PLACEMENT TYPE OBSERVED: Observation Date:11 /26/2008 Field Rep: ST D Grade Beam D Structural Slab D Footing D Pier Cap D Slab on Grade l2l Wall D Column D Slab on Deck D Other PLACEMENT LOCATION: GRIDLINES 1/A-0.5, E/6.5-11, 7/E-H, H/7-11. PLANS: WEEKS AND ASSOCIATES S1-1. ITEMS CHECKED: 12] Bar Size 12] Bar Quantity l2l Lap Length I2J Cover I2J Form Void D Dowel Bars D Other 12] Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thompson, Inc DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 5 PLACEMENT TYPE OBSERVED: Observation Date:12/03/2008 Field Rep: ST 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade 0 Wall 0 Column 0 Slab on Deck lZJ Other FOOTING PADS PLACEMENT LOCATION: FOOTING PADS ON GRIDLINE C/6, C/7, C/8, C/9 & C/10. PLANS: WEEKS AND ASSOCIATES ITEMS CHECKED: lZI Bar Size lZI Bar Quantity lZI Lap Length lZI Cover 0 Form Void lZI Dowel Bars 0 Other lZI Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL 1 Thompson, Inc ~~N•'3 DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr.[ Glenwood Springs. CO 81601 I Phone: 970-945-2809[ Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 6 PLACEMENT TYPE OBSERVED: 0 Grade Beam 0 Structural Slab 0 Pier Cap 0 Slab on Grade 0 Column 0 Slab on Deck PLACEMENT LOCATION: GRIDLINE E/1.3 TO 8.7. PLANS: WEEKS AND ASSOCIATES ITEMS CHECKED: l2l Bar Size l2l Bar Quantity l2l Lap Length l2l Cover 0 Form Void l2l Dowel Bars Observation Date:12/04/2008 Field Rep: ST 0 Footing 0 Wall l2J Other FOOTING PADS 0 Other l2l Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thompson, Inc ~ ~N•'-':3 DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970·945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Observation Date:12/09/2008 Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 7 PLACEMENT TYPE OBSERVED: Field Rep: ST 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade IZl Wall 0 Column 0 Slab on Deck 0 Other PLACEMENT LOCATION: FOUNDATION WALL AT GRIDLINES 1/A-0.5, 9/0.5 AND A/1-9. PLANS: WEEKS AND ASSOCIATES ITEMS CHECKED: 1Z1 Bar Size IZl Bar Quantity IZl Lap Length 1Z1 Cover IZl Form Void IZl Dowel Bars 0 Other 1ZJ Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thomp~n, Inc ["\ , ~~Nt'~u:s -· DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs; CO 81601 I Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 8 PLACEMENT TYPE OBSERVED: Observation Date: 12/10/2008 Field Rep: DD 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade 0 Wall 0 Column 0 Slab on Deck 0 Other PLACEMENT LOCATION: 41NTERMEDIATE FOOTING PADS BETWEEN 7 AND 9 LINES ON G LINE & F LINE. PLANS: WEEKS AND ASSOCIATES ITEMS CHECKED: 0 Bar Size 0 Bar Quantity 0 Lap Length 0 Cover 0 Form Void 0 Dowel Bars 0 Other SEE REMARKS 0 Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: WILL BE PLACED AT THE TIME OF CONCRETE PLACEMENT. REINSPECTION REQUIRED? No CTL I Thompson, Inc 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970·945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 12 PLACEMENT TYPE OBSERVED: Observation Date:12/22/2008 Field Rep: MB 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade fZl Wall 0 Column 0 Slab on Deck 0 Other PLACEMENT LOCATION: TRUST BUILDING; NORTH FOUNDATION WALL BETWEEN GRIDS 7 & 9. PLANS: WEEKS AND ASSOCIATES #28129, 9-24-08, 1/S2.1. ITEMS CHECKED: fZl Bar Size fZl Bar Quantity fZl Lap Length 0 Cover 0 Form Void 0 Dowel Bars 0 Other fZ] Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thompson, Inc ~ ~"'""3 DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 9 PLACEMENT TYPE OBSERVED: Observation Date:12/16/2008 Field Rep: ST 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade 0 Wall 0 Column 0 Slab on Deck 0 Other PLACEMENT LOCATION: 6X6 WWF& HAIRPIN INTO PILASTER REINFORCING IN THE OFFICE BUILDING BETWEEN GRIDLINES 9-11/E-H, GT SANDERS WAREHOUSE. PLANS: WEEKS AND ASSOCIATES, JULY 18,2005. ITEMS CHECKED: 0 Bar Size 0 Bar Quantity 0 Lap Length 0 Cover 0 Form Void 0 Dowel Bars 0 Other 0 Reinforcement was placed in general conformance with approved drawings and standard construction· practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thom~on, Inc~ L;f;./ ~N•'-"3, DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Observation Date:12/16/2008 Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 10 PLACEMENT TYPE OBSERVED: Field Rep: ST 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade 121 Wall 0 Column 0 Slab on Deck 0 Other PLACEMENT LOCATION: FOUNDATION WALL BETWEEN GRIDLINES E/1-6.9, 1/0.5-E, TRUST BUILDING. PLANS: WEEKS AND ASSOCIATES ITEMS CHECKED: 121 Bar Size 121 Bar Quantity 121 Lap Length 121 Cover 121 Form Void 121 Dowel Bars 0 Other 121 Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTLjTho~o~,ln~ ~~N•".A.~ ~~ DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 11 PLACEMENT TYPE OBSERVED: Observation Date:12/17/2008 Field Rep: ST 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap [2] Slab on Grade 0 Wall 0 Column 0 Slab on Deck 0 Other PLACEMENT LOCATION: 6X6 WWF AND HAIRPIN INTO PILASTERS BETWEEN GRIDLINES 7-11/A-E. G.T. SANDERS BUILDING PLANS: WEEKS AND ASSOCIATES JULY 18, 2008. ITEMS CHECKED: 0 Bar Size 0 Bar Quantity lZl Lap Length 0 Cover 0 Form Void lZl Dowel Bars 0 Other , •....... "1f1li" [2] Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL 1 Thompson, Inc ~~"'·'s DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Observation Date: 12/31 /2008 Project: LOT 8, POWERLINE SUBDIVISION Field Rep: DD Project Number: GS05195.000 Report Number: 13 PLACEMENT TYPE OBSERVED: 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade 0 Wall 0 Column 0 Slab on Deck lZJ Other FOOTING PADS PLACEMENT LOCATION: FOOTING PADS E-3, D-3, C-3, E-4, D-4, C-4, C-5, E-5, E-4.5 & E-5.5@ GT SANDERS WAREHOUSE. PLANS: WEEKS AND ASSOCIATES JULY 18, 2008 AND SEPTEMBER 24, 2008. ITEMS CHECKED: lZl Bar Size lZl Bar Quantity lZl Lap Length lZl Cover 0 Form Void 0 Dowel Bars 0 Other lZJ Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thompson, Inc DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr.\ Glenwood Springs. CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 17 PLACEMENT TYPE OBSERVED: Observation Date:o1 /26/2009 Field Rep: ST 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade 0 Wall 0 Column 0 Slab on Deck 0 Other PLACEMENT LOCATION: 6X6 WWF AND HAIR PINS BETWEEN GRIDLINES 1-7/A-E@ GT SANDERS WAREHOUSE. PLANS: WEEKS AND ASSOCIATES ITEMS CHECKED: [21 Bar Size 0 Bar Quantity 0 Lap Length 0 Cover 0 Form Void 0 Dowel Bars 0 Other [21 Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 14 PLACEMENT TYPE OBSERVED: Observation Date:o1 /07/2009 Field Rep: DO 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade 0 Wall 0 Column 0 Slab on Deck [2] Other PILASTER PLACEMENT LOCATION: COLUMN LINE C-5; GT SANDERS WAREHOUSE. PLANS: WEEKS AND ASSOCIATES 7-18-08 AND 9-24-08. ITEMS CHECKED: !2l Bar Size [2] Bar Quantity 0 Lap Length [2] Cover 0 Form Void 0 Dowel Bars 0 Other [2] Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thompson, Inc ~ ,.D~~""""":S DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Observation Date:o 1/08/2009 Project: LOT 8, POWERLINE SUBDIVISION Field Rep: ST Project Number: GS05195.000 Report Number: 15 PLACEMENT TYPE OBSERVED: 0 Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade 0 Wall 0 Column 0 Slab on Deck 1ZJ Other FOOTING PADS PLACEMENT LOCATION: FOOTING PADS AT GRIDLINE C/2, B/3, B.8/3, E/2. PLANS: WEEKS AND ASSOCIATES, JULY 18,2008 (PRELIMINARY SET); SEPTEMBER 24, 2008 (CONSTRUCTION SET). ITEMS CHECKED: IZl Bar Size IZl Bar Quantity IZl Lap Length IZl Cover 0 Form Void IZl Dowel Bars 0 Other IZJ Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thompson, Inc DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970·945·28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Observation Date:Qi/13/2009 Project: LOT 8, POWERLINE SUBDIVISION Field Rep: ST Project Number: GS05195.000 Report Number: 16 PLACEMENT TYPE OBSERVED: D Grade Beam D Structural Slab D Footing D Pier Cap D Slab on Grade 121 Wall D Column D Slab on Deck D Other PLACEMENT LOCATION: WALL BETWEEN GRIDLINES D.5-E/1, E/6.5, 3/A-E, 4/C-E AND C/3-4. PLANS: WEEKS AND ASSOCIATES, JULY 18, 2008 (PRELIMINARY SET); SEPTEMBER 24, 2008 (CONSTRUCTION SET). ITEMS CHECKED: 121 Bar Size 121 Bar Quantity 121 Lap Length 121 Cover D Form Void 121 Dowel Bars D Other 121 Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thompson, Inc bt,A/ ~""""S 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970-945·2809 1 Fax: 970-945· 7 411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 18 PLACEMENT TYPE OBSERVED: Observation Date :Q2/06/2009 Field Rep: TW l2l Grade Beam 0 Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade 0 Wall 0 Column 0 Slab on Deck 0 Other PLACEMENT LOCATION: 2 THROUGH 7, SOUTH OF LINE C@ TRUST BUILDING. PLANS: WEEKS AND ASSOCIATES ITEMS CHECKED: l2l Bar Size l2l Bar Quantity l2l Lap Length 0 Cover 0 Form Void 0 Dowel Bars 0 Other l2l Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr I Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 REINFORCING STEEL OBSERVATION REPORT Client Name: MCCAULEY CONSTRUCTORS, INC. Project: LOT 8, POWERLINE SUBDIVISION Project Number: GS05195.000 Report Number: 19 PLACEMENT TYPE OBSERVED: Observation Date:Q2/09/2009 Field Rep: ST 121 Grade Beam Structural Slab 0 Footing 0 Pier Cap 0 Slab on Grade 0 Wall 0 Column 0 Slab on Deck 0 Other PLACEMENT LOCATION: TRUST BUILDING; GRADE BEAMS BELOW THE FLOOR SLAB. PILASTER DETAIL 4/2-1. GRIDLINES 2-8 BETWEEN GRID LINES A-E. PLANS: WEEKS AND ASSOCIATES ITEMS CHECKED: 121 Bar Size 121 Bar Quantity 121 Lap Length 0 Cover 0 Form Void 0 Dowel Bars 0 Other 121 Reinforcement was placed in general conformance with approved drawings and standard construction practice. Contractor to ensure proper coverage is maintained at time of concrete placement. REMARKS AND/OR DEFICIENCIES NOTED: REINSPECTION REQUIRED? No CTL I Thompson, Inc ~ ~D~-"""5 DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr I Glenwood Springs, CO 81601 I Phone: 970-945-28091 Fax: 970-945-7411 .~ CTL I THOMPSON ··lllll ~<r~E'!~~1::~:~1~:'&tltJ:nr11:1~;: GEOTECHNICAL INVESTIGATION LOTS POWERLINE PROFESSIONAL PARK GARFIELD COUNTY, COLORADO Prepared For: MCCAULEY CONSTRUCTORS, INC. P.O. Box 200 700 Automation Drive, Suite H Windsor, CO 80550 Attention: Mr. Leon McCauley President Project No. GS05195-125 234 Center Drive I Glenwood Springs, Colorado 81601 Telephone: 970-945-2809 Fax: 970-945-7 411 June 12, 2008 TABLE OF CONTENTS SCOPE ............................................................................................................................................. 1 SUMMARY OF CONCLUSIONS ..................................................................................................... 1 SITE CONDITIONS ......................................................................................................................... 2 PROPOSED CONSTRUCTION ....................................................................................................... 2 SUBSURFACE CONDITIONS ......................................................................................................... 3 SITE EARTHWORK ........................................................................................................................ 4 Excavations ................................................................................................................................. 4 Sub-Excavation .......................................................................................................................... 4 Backfill ......................................................................................................................................... 5 Site Grading Fill .......................................................................................................................... 6 FOUNDATIONS ............................................................................................................................... 6 Footings ...................................................................................................................................... 6 Helical Piers ................................................................................................................................ 7 FLOOR SYSTEM AND SLAB-ON-GRADE .................................................................................... 8 BELOW-GRADE CONSTRUCTION ............................................................................................... 9 PAVEMENTS ................................................................................................................................... 9 SURFACE DRAINAGE .................................................................................................................. 11 CONCRETE ................................................................................................................................... 12 LIMITATIONS ................................................................................................................................ 13 FIGURE 1-LOCATIONS OF EXPLORATORY BORINGS FIGURES 2 AND 3-SUMMARY LOGS OF EXPLORATORY BORINGS FIGURE 4-GRADATION TEST RESULTS FIGURES 5 AND 6-SWELL-CONSOLIDATION TEST RESULTS TABLE 1-SUMMARY OF LABORATORY TEST RESULTS APPENDIX A-PAVEMENT CONSTRUCTION RECOMMENDATIONS MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLINE PROFESSIONAL PARK PROJECT NO, GS05195-12S S:IGS05195.000112512. Reports\GS05195 125 R1.doc SCOPE This report presents the results of our geotechnical investigation for the construction proposed on Lot 8, Powerline Professional Park in Garfield County, Colorado. We conducted the investigation to evaluate the subsurface conditions at the site and provide geotechnical recommendations for the proposed construction. Our report is based on data developed from our subsurface exploration, laboratory testing, and our engineering analysis and experience with similar conditions. The recommendations contained in the report were developed based on our understanding of the proposed construction anticipated at the time of our investigation. We should be informed if actual construction will differ significantly from the descriptions herein so that we can revise our recommendations and design criteria, if necessary. A summary of our conclusions is presented below. SUMMARY OF CONCLUSIONS 1. Subsurface conditions encountered in our exploratory borings consisted of about 6 inches of sandy clay "topsoil" and about 12.5 to 19 feet of clay underlain by clean to silty gravel to the maximum explored depth of 25 feet. Ground water was measured at depths of about 13.5 to 15 feet in our exploratory borings at the time of drilling. 2. Laboratory test results and our experience at nearby sites indicate the soils at this site exhibit the potential for variable volume change when wetted. Differential movement and associated damage to foundations and floor slabs is likely if the proposed buildings are constructed directly on the undisturbed, natural soils. We recommend sub- excavation of the soils below the entire planned building footprint to a depth of at least 3 feet below bottom of footing elevation and replacement with properly placed structural fill to mitigate the potential for foundation and floor slab movements. A deep foundation system supported by the gravel, such as helical piers, is an alternative. Additional discussion is in the report. 3. The building can be constructed on footing foundations supported by a minimum 3-foot thick mat of properly compacted structural fill or a helical pier foundation system. Design and construction criteria for structural fill, footings, and helical piers are presented in the report. MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERUNE PROFESSIONAL PARK PROJECT NO. GS05195-125 S:\GS05195.0001125\2, R&portsiGS05195125 R1.doc 1 4. After the sub-excavation process is accomplished, we judge slab-on- grade construction can be supported by the structural fill with low potential risk of differential movement and associated damage. Additional discussion is in the report. 5. Surface drainage should be designed to provide for rapid removal of surface water off of pavements and away from the proposed building. SITE CONDITIONS Powerline Professional Park is a commercial subdivision located northeast of the intersection of Highway 6 & 24 and County Road 210 in Garfield County, Colorado. Powerline Road provides access to the lots from the highway. Lot 8 is located in the southern part of the development, east of Powerline Road. Ground surface at the site slopes gently down to the southwest. Vegetation on the lot consisted of weeds and grasses. We did not see evidence of significant fill at the site. PROPOSED CONSTRUCTION Building plans were being developed at the time of our investigation. We understand that two buildings will be constructed at the locations shown on Figure 1. We understand the buildings will be pre-engineered metal buildings with slab-on- grade floors. A below-grade loading dock is planned about 4 feet below grade. We expect that maximum foundation excavation depths will be about 4 to 6 feet. Foundations loads are expected to vary between 1,000 and 3,000 pounds per linear foot of foundation wall with maximum interior column loads of about 30 kips. Paved access and parking areas are planned. If actual construction plans will differ significantly from the descriptions above, we should be informed so that we can provide geotechnical input and revise our recommendations, if necessary. MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLINE PROFESSIONAL PARK PROJECT NO. GS05195-125 S:\GS05195.000\12512. Reports\GSOS195 125 R1.doc 2 SUBSURFACE CONDITIONS Subsurface conditions below the planned building were investigated by drilling seven exploratory borings and two subgrade borings at the approximate locations shown on Figure 1. Drilling operations were directed by our project engineer who logged the soils encountered in the borings and obtained representative samples. Graphic logs ofthe soils found in our exploratory borings are shown on Figure 2. Subsurface conditions encountered in our exploratory borings consisted of about 6 inches of sandy clay "topsoil" and about 12.5 to 19 feet of clay underlain by clean to silty gravel to the maximum explored depth of 25 feet. Ground water was measured at depths of about 13.5 to 15 feet in our exploratory borings at the time of drilling. Results of field penetration resistance tests and our observations during drilling indicated that the clay was medium stiff to stiff and the gravel was dense. Borings were backfilled immediately after drilling operations were completed or left open to allow future measurements of ground water. Samples obtained in the field were returned to our laboratory where field classifications were checked and typical samples selected for testing. Two samples of the soils were selected for one-dimensional, swell-consolidation testing. In the test procedure, relatively undisturbed samples at the existing moisture contents were loaded under 1,000 psf. Samples were then flooded under the applied load. The resulting volume change in the samples (i.e., swell or consolidation) was then measured. The samples tested exhibited 0.3 and 4.1 percent swell. Samples of the gravel selected for gradation testing contained 19 to 36 percent gravel, 52 to 70 percent sand, and 11 to 12 percent clay and silt size particles (passing the No. 200 sieve). Samples excluded particles with diameters greater than about 1.5 inches. Gradation test results are shown on Figure 4. Results of swell-consolidation testing are shown on Figures 5 and 6. Laboratory test results are summarized on Table I. MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLINE PROFESSIONAL PARK PROJECT NO. GS05195-125 S:\GS05195.000\1Z512. ReportsiGSOS195125 R1.doc 3 SITE EARTHWORK Excavations Our subsurface information indicates that excavations for foundations and utilities at this site can be accomplished using conventional, heavy-duty excavation equipment. Excavation sides will need to be sloped or braced to meet local, state and federal safety regulations. The soils within anticipated excavation depths at this site will generally classify as Type B soils based on OSHA standards governing excavations. Temporary slopes deeper than 5 feet should be no steeper than 1 to 1 (horizontal to vertical) in Type B soils. The contractor should identify the soils encountered in excavations and refer to OSHA standards to determine appropriate slopes. Contractors are responsible for providing and maintaining safe and stable excavations. Free ground water was measured at depths of about 13.5 to 15 feet in our exploratory borings. Based on our understanding of the planned construction, excavations for foundations and utilities will not penetrate ground water. Excavations should be sloped to positive gravity outfalls or to temporary sumps where water can be removed by pumping. Excessive wetting of the soils should be avoided. Ground surfaces surrounding excavations should be sloped as much as practical to direct runoff away from the excavations. Sub-Excavation Laboratory test results and our experience at nearby sites indicate that the soils at this site exhibit the potential for variable volume change when wetted. Differential movement and associated damage to foundations and floor slabs is likely if the building is constructed directly on the undisturbed, natural soils. We recommend removal (i.e. sub-excavation) of the soils below the planned building footprint to a depth of at least 3 feet below bottom of footing elevation and MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLINE PROFESSIONAL PARK PROJECT NO. GS05195-125 S:\GSD5t95.000\125\Z. Reports\GS05195125 R1.doc 4 replacement with properly compacted structural fill to mitigate the potential for foundation and floor slab movements. The excavation should be below the entire building footprint and should extend laterally at least 1 foot beyond the perimeter of the building footprint. If a deep foundation system is used to support building loads, we recommend sub-excavation to at least 2 feet below interior slabs-on-grade. Performance of exterior slabs-on-grade would likely be improved by sub-excavation to at least 1 foot below the slabs. The bottom of the sub-excavated area should be scarified to a depth of at least 8 inches, moisture treated and compacted. We recommend structural fill consist of an aggregate base course, such as a Class 6 or similar soil. Import structural fill should be placed in loose lifts of 10 inches or less, moisture-treated to within 2 percent of optimum moisture content, and compacted to at least 100 percent of standard Proctor (ASTM D 698) maximum dry density. Alternatively, the on-site clay soils could be re-used. Properly placing the on- site soils will be more difficultthan placement of import granular fill. The on-site soils should be moisture treated to 1 percent below to 3 percent above optimum moisture content and compacted to at least 95 percent of standard Proctor (ASTM D 698) maximum dry density. In order for the procedure to perform properly, close control of structural fill placement to project specifications is required. Our representative should be called to check compaction and moisture content of structural fill during placement. Backfill Proper placement of backfill adjacent to foundation walls and in utility trenches is important to reduce infiltration of surface water, roof runoff and subsequent settlement. Backfill soils should consist of the on-site soils, provided they are free of organic matter, debris and rocks larger than 3 inches in diameter. Backfill should be placed in thin lifts, moisture conditioned to within 2 percent of optimum moisture content and compacted to at least 95 percent of standard Proctor (ASTM D 698) maximum dry density. Our representative should be called to check density and moisture content of backfill during placement. MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLINE PROFESSIONAL PARK PROJECT NO. GS05195·125 S:\GS05195.000\125U. Reports\GS05195125 R1.doc 5 Site Grading Fill Site grading and drainage plans were not provided to us. We expect some fill will be placed adjacent to the planned buildings. Areas which will receive fill should be stripped of vegetation, organic soils and debris. The resulting subgrade surface should be scarified to a depth of at least 8 inches, moisture conditioned and compacted. The on-site soils or similar soils free of organics, debris and rocks larger than 6 inches in diameter can be used as fill. Fill outside the building footprint should be placed in loose lifts of 8 inches thick or less, moisture treated to within 2 percent of optimum moisture content and compacted to at least 95 percent of standard Proctor (ASTM D 698) maximum dry density. FOUNDATIONS Differential movement is likely if the building is constructed directly on the undisturbed, natural soils. The building can be constructed on footing foundations supported on a mat of properly placed structural fill at least 3 feet thick. Recommendations for sub-excavation and structural fill were outlined in the Sub- Excavation section. After the sub-excavation process is accomplished, we believe the risk of differential movement of footings will be low, provided a high degree of care is taken to prevent wetting of the subsoils below the building. An alternative to footing foundations is to support the building on a deep foundation system bottomed in the gravel. The gravel was encountered at depths of about 14 to 20 feet. The subsurface conditions on this site are appropriate for a helical pier foundation system. The foundation system should be designed and constructed with the criteria below. Footings 1. Footing foundations should be supported on an at least 3-foot thickness of properly placed structural fill. Soils loosened during the MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLlNE PROFESSIONAL PARK PROJECT NO. GS05195-125 S:\GS05195.000\12512. Reports\GS05195125 R1.doc 6 forming process for the footings should be removed or re-compacted prior to placing concrete. 2. Footings should be designed for a maximum soil bearing pressure of 3,000 psf. To resist lateral loads, a coefficient of friction of 0.40 can be used for friction between the footings and the structural fill. 4. Continuous wall footings should have a minimum width of at least 16 inches. Foundations for isolated columns should have minimum dimensions of 24 inches by 24 inches. Larger sizes may be required, depending upon foundation loads. 5. Grade beams and foundation walls should be well reinforced, top and bottom, to span undisclosed loose or soft soil pockets. We recommend reinforcement sufficient to span an unsupported distance of at least 12 feet. Reinforcement should be designed by the structural engineer. 6. The soils under exterior footings should be protected from freezing. We recommend the bottom of footings be constructed at a depth of at least 36 inches below finished exterior grades. The Garfield County building department should be consulted regarding required frost protection depth. Helical Piers 1. In general, manufactured helical piers are available with allowable mechanical capacities between 30 and 50 kips. Helical pier bearing capacity shall be verified in the field using manufacturer recommended capacity/torque ratios. A minimum factor of safety of 2.0 is required. 2. Helical piers should be bottomed in the dense, natural gravel. Contractor shall use the number and size of helical blades required to achieve the required depth and capacity. However, the ratio of design bearing capacity specified by the structural engineer and the total area of helical blades used by the contractor should not exceed 75,000 pounds per square foot. 3. Helical piers should be placed as close to vertical as possible. If installed at a slight batter angle due to manufacture recommendations for brackets, the lateral component offorce due to this angle should be taken into account in the design of the connection of the pier to the structure. 4. The helical pier and the connection between the pier and grade beam should be designed to resist vertical loads and lateral earth pressure (if any). Helical piers should be rigidly attached to the structure to resist MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLINE PROFESSIONAL PARK PROJECT NO. G$05195-125 S:\GS05195.000\12512. Reports\G505195125 R1.doc 7 both tension and compression. A structural engineer should design this connection and shall consider the ability of the existing foundation to span between piers in the layout of pier spacing. 5. There should be a 4-inch (or thicker) continuous void beneath all grade beams and foundation walls, between helical piers, to concentrate the dead load of the structure onto the helical piers. 6. Foundation walls and grade beams should be well reinforced. A qualified structural engineer should design the reinforcement. 7. Installation of helical piers should be observed by a representative of our firm to confirm the depth and installation torque of the helical piers are adequate. FLOOR SYSTEM AND SLAB-ON-GRADE The main floors in the buildings are planned as slabs-on-grade. Differential movement and associated damage is likely if the slabs are supported directly on the undisturbed, natural soils. After the soils below the planned building footprint are sub-excavated and re-compacted as described in the Sub-Excavation section, we judge potential for differential movement of floor slabs will be low. If a deep foundation system is used to support building loads, we recommend sub-excavation to a depth of at least 2 feet below interior slabs-on-grade. Sub-excavation to at least 1 foot below exterior slabs-on-grade would likely improve performance. Recommendations in the SURFACE DRAINAGE section should be followed to reduce potential for wetting of the subsoils below slabs. Slabs should be separated from exterior walls and interior bearing members with slip joints which allow free vertical movement of the slabs. Underslab plumbing should be pressure tested before the slab is constructed. Plumbing and utilities which pass through slabs should be isolated from the slabs with sleeves and be constructed with flexible connections to slab supported appliances. Exterior slabs should be isolated from the building. These slabs should be well-reinforced to function as independent units. Movements of these slabs should not be transmitted to the building foundation. Frequent control joints should be provided, in accordance MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLINE PROFESSIONAL PARK PROJECT NO. GS05195-125 S:\GS05195.000\12512. Reports\GS05195125 R1.doc 8 with American Concrete Institute (ACI) recommendations, to reduce problems associated with shrinkage and curling. Provision of a vapor retarder below the slabs should be considered. BELOW-GRADE CONSTRUCTION We understand a loading dock will be constructed to about 4 feet below-grade. Below-grade walls that are rigidly connected to the building should be designed for an equivalent fluid density of at least 50 pcf. Walls that are free to rotate should be designed for an equivalent fluid density of at least 40 pcf. These equivalent fluid densities do not include allowances for surcharge or hydrostatic loads. The wall foundation system should be designed using the recommendations in the FOUNDATION section. The recommendations for sub-excavation should be followed. A drain should be provided to remove water from the below-grade areas. PAVEMENTS The clay soils classify as A-6 with the AASHTO classification system. For our pavement design, we used an R-value of 5 for the clay subgrade soils. The soils are comparatively poor for pavement support. We recommend sub-excavation to a depth of at least 12 inches below pavements. Fly ash stabilization may be an alternative. We were not provided with traffic loading numbers. We expect moderately loaded pavements except in truck turning and loading areas. We used an Estimated Daily Load Application (EDLA) of 10 for parking areas and 30 for access drives. If the anticipated traffic loads are considerably different than those assumed, we should be informed so that we can review our recommendations. Based on our calculations, we recommend the following minimum pavement sections. MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLINE PROFESSIONAL PARK PROJECT NO. GS05195-125 S:\GS05195.000\12512. Reports\GS05195125 R1.doc 9 Asphaltic* Full Depth Portland Pavement Concrete+ Classification Base Course Asphaltic Cement with Fabric Concrete Concrete Automobile Parking 3" + 6" 5" 5" Access Drives 4" + 9" 7" 6" *A geotextile fabric such as Mirafi 600X, or equivalent, is recommended. We are available to discuss the merits of the fabric based on soil conditions, and conditions found during subgrade preparation. Our experience indicates problems with asphalt pavements can occur in areas where heavy trucks drive and turn at low speeds. In areas of concentrated loading and turning movements by heavy trucks, such as entrances and dumpster pads, we recommend Portland cement concrete pavement. We recommend 6-inch or thicker portland cement concrete pads be constructed at areas where trucks will stop or turn. The concrete pads should be large enough to accommodate the entire truck. The design of a pavement system is as much a function of the quality of the paving materials and construction as the support characteristics of the subgrade. The quality of each construction material is reflected by the strength coefficient used in the flexible pavement design calculations. If the pavement system is constructed of inferior material, then the life and serviceability of the pavement will be substantially reduced. We have included construction guidelines for flexible and rigid pavements in Appendix A. Design of asphaltic concrete assumes a strength coefficient of 0.40. Asphaltic concrete should be relatively impermeable to moisture and designed with crushed aggregates that have a minimum of80 percent of the aggregate retained on the No.4 sieve. Routine maintenance, such as sealing and repair of cracks and overlays at 5 to 7-year intervals, are necessary to achieve long-term performance of an asphalt system. We recommend application of a rejuvenating sealant such as fog seal after MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLINE PROFESSIONAL PARK PROJECT NO. G$05195-125 S:\GS05195.000112512. Reports\GS05195125 R1.doc 10 the first year. Deferring maintenance usually results in accelerated deterioration leading to higher future maintenance costs. Our rigid pavement design is based on a modulus of rupture of 650 psi for portland cement concrete. We recommend concrete contain a minimum of 610 pounds of cement per cubic yard and between 5 and 7 percent entrained air. A mix design should be prepared for this project using the aggregate and cement that will be used during construction. Control joints should separate concrete pavements into panels as recommended by ACI. No de-icing salts should be used on paving concrete for at least one year after placement. A primary cause of early pavement deterioration is water infiltration into the pavement system. The addition of moisture usually results in softening of base course and subgrade and the eventual failure of the pavement. We recommend drainage be designed for rapid removal of surface runoff from pavement surfaces. Final grading should be carefully controlled so that design cross-slope is maintained and low spots in the subgrade which could trap water are eliminated. Portland cement concrete drainage pans with subsurface drains should be considered in areas where water will be flowing across pavement surfaces. SURFACE DRAINAGE Surface drainage is critical to the performance of foundations, floor slabs and concrete flatwork. We recommend the following precautions be observed during construction and maintained at all times after the building is completed: 1. The ground surface surrounding the exterior of the building should be sloped to drain away from the building in all directions. We recommend providing a slope of at least 6 inches in the first 5 feet around the buildings, where possible. 2. Backfill around the exterior of foundation walls should be placed as described in the Backfill section. Increases in the moisture content of MCCAULEY CONSTRUCTORS, INC. LOT B, POWER LINE PROFESSIONAL PARK PROJECT NO. G$05195-125 S:IGS05195.000\12512. Reports\GS05195125 R1.dot 11 backfill soils after placement can result in settlement. This settlement is most common adjacent to north facing walls. 3. The buildings should be provided with roof gutters and downspouts. Roof downspouts and drains should discharge well beyond the limits of all backfill. Splash blocks and downspout extensions should be provided at all discharge points. 4. Landscaping should be carefully designed to minimize irrigation near foundation walls. Plants used near foundation walls should be limited to those with low moisture requirements; irrigated grass should not be located within 5 feet of the foundations. Sprinklers should not discharge within 5 feet of the foundation and should be directed away from the building. 5. Impervious plastic membranes should not be used to cover the ground surface immediately surrounding the buildings. These membranes tend to trap moisture and prevent normal evaporation from occurring. Geotextile fabrics can be used to control weed growth and allow some evaporation to occur. CONCRETE Concrete in contact with soil can be subject to sulfate attack. We measured water-soluble sulfate concentrations in one sample from this site. A concentration of 0.01 percent was measured. Sulfate concentrations less than 0.1 percent indicate Class 0 exposure to sulfate attack for concrete in contact with the subsoils, according to the American Concrete Institute (ACI) Guide To Durable Concrete (AC/201.2R-01). For this level of sulfate concentration, ACI indicates any type of cement can be used for concrete in contact with the subsoils. In our experience, superficial damage may occur to the exposed surfaces of highly permeable concrete, even though sulfate levels are relatively low. To control this risk and to resist freeze-thaw deterioration, the water-to-cementitious material ratio should not exceed 0.50 for concrete in contact with soils that are likely to stay moist due to surface drainage or high water tables. Concrete should have a total air content of 6% ± 1.5%. We recommend all walls in contact with the subsoils be damp-proofed. MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLINE PROFESSIONAL PARK PROJECT NO. GS05195-125 S:IGS05195.000112512. Raports\GS0519512S R1.doc 12 LIMITATIONS Our exploratory borings were located to obtain a reasonably accurate picture of the subsurface. Variations in the subsurface conditions not indicated by our exploratory borings will occur. Our representative should be called to observe the completed foundation excavation and the sub-excavation process. We should observe installation of helical piers. This investigation was conducted in a manner consistent with that level of care and skill ordinarily exercised by geotechnical engineers currently practicing under similar conditions in the locality of this project. No warranty, express or implied, is made. If we can be of further service or if you have questions regarding this report, please call. (5 copies sent) MCCAULEY CONSTRUCTORS, INC. L OT 8, POWERLINE PROFESSI ONAL PARK PROJECT NO . GS05 195·125 S :\G$05 195.000\125\2. Repo rts\GS05195 125 R1 .d o c 13 Scale: 1'=60' McCauley Constructors, Inc. J..ot 8, PcM&rlne SubdMQion Project No. GS05195-125 • FUTURE PROPERTY S-2 ----, I I 17,600 1,600 SF! 600 SFI L ___ _ TH-3 Mm..: Locations of exploratory borings are approximate. Locations of Exploratory Borings Rg.1 5 10 v 15- 20 25 30 35 TH-1 12/12 19/12 23/12 Project No. GS05195-125 TH-2 TH-3 13/12 11/12 v 9/12 10/12 30/12 31/18 TH--4 TH-5 TH-6 TH-7 9/12 10/12 v -4/12 50/12 SUMMARY LOGS OF EXPLORATORY BORINGS 12/12 7/12 32/6, Bounce S-1 S-2 rn rn 0 5 10 15 20 25 30 35 Flg. 2 LEGEND: Sandy clay •topsoil•, organics, moist, brown. Clay, sandy, medium stiff to stiff, slightly moist to wet, tan, brown. (CL) Gravel, clean to slightly silty, cobbles, dense, wet, brown. (GP-GM) Drive sample. The symbol 12/12 Indicates that 12 blows of a 140 pound hammer falling 30 Inches were required to drive a 2.5 Inch O.D. California sampler 12 Inches. Project No. GS05195-125 T Drive sample. The symbol 30/12 Indicates that 30 blows of a 140 pound hammer falling 30 Inches were required to drive a 2.0 Inch O.D. standard sampler 12 Inches. Bulk sample from auger cuHings. Indicates free ground water level measured on the day of drilling. Indicates practical auger refusal. SUMMARY LOGS OF EXPLORATORY BORINGS NOTES: 1. 2. 3. Exploratory borings were drilled on May 21, 2008 with 4-lnch diameter, solid-stem auger and a truck-mounted drill rig. Exploratory borings TH-2, TH-4 and TH-7 were backfilled Immediately after drilling operations were completed. Locations of exploratory borings are approximate. These exploratory borings are subJect to the explanations, limitations and conclusions as contained In this report. Fig. 3 HYDROMETER ANALYSIS SIEVE ANALYSIS 25 HR. 7 HR U.S STANDARD SERIES CLEAR SQUARE OPENINGS 45 MIN. 15 MIN 100========================================================.~======~~= 90~~·~-~-~-·-~···~~·--~~--·····fc···-~··-~~~-~~·······~·-~·~·-··1·-·····~~~·~·-······~~~~~~-~--~-~~·-··~···-~~~~~ TIME READINGS 60MIN 19MIN. 4MIN 318" 314" 1W 3'' 5"6" 8" '16 '10 '8 '4 1 MIN. '200 '100 '50 '40 '30 0 10 80 o= Sample does not include 20 ,, !---particles with diameters 1... ______ ~··• larger than 1.5 inches. 30 40 .·· 50 80 20 .. . -'-'-~'- 10 Ec-__ _ 90 0 .001 0.002 .005 .009 .019 .037 .074 .149 .297 .590 1.19 2.0 2.38 4.76 9.52 19.1 36.1 100 76.2 127 200 152 0.42 DIAMETER OF PARTICLE IN MILLIMETERS CLAY (PLASTIC) TO SILT (NON-PLASTIC) SANDS FINE MEDIUM Sample of SAND, CLAYEY, SILTY (SC-SM) From TH-2 AT 19 FEET HYDROMETER ANALYSIS GRAVEL COARSE FINE COARSE COBBLES GRAVEL 1 9 % SAND SILT&CLAY 11% LIQUIDLIMIT PLASTICITY INDEX 70% % % ------- SIEVE ANALYSIS 25 HR. 7 HR. 45 MIN. 15 MIN. TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS 90 80 ~ 70 ~ ~ 60 " w 50 ffi ~ 40 30 20 10 0 60 MIN. 19 MIN. 4 MIN. 1 MIN. '200 '100 --Sample does not include particles with diameters larger than 1. 5 inches. ... j .... + .... '50 '40 '30 '16 '10 ·s '4 318" 314" 1 y.' 3" ----1 .,. 5"6" 8" 0 10 "'-.. 20 30 ITl z 40 ~ ~ 50 iz w ~ 60 ~ "70 80 90 .001 0.002 .005 .009 .019 .037 .074 .149 .297 .590 1.19 2.0 2.38 4.76 9.52 19.1 36.1 100 76.2 127 200 152 0.42 DIAMETER OF PARTICLE IN MILLIMETERS CLAY (PLASTIC) TO SILT (NON-PLASTIC) Sample of SAND, CLAYEY, SILTY (SC-SM) From TH -7 AT 19 FEET McCauley Constructors, Inc. Lot 8, Powerline Professional Park PROJECT NO. GS05195-125 S:\GS05195.0001125\6. C alcs\GS05195-125.G rad ation.xls SANDS FINE MEDIUM GRAVEL COARSE FINE COARSE COBBLES GRAVEL 36% SAND 52% SILT&CLAY 12% LIQUID LIMIT % PLASTICITY IN~ % ------- Gradation Test Results FIG. 4 6 ~--EXPANSION UNDER CONSTANT PRESSURE DUE TO WETTING 5 --- 4 3 2 1 -----------·-------. 0 -------·-------------------------- -1 -------------------~---------------- -2 ----~·--··---·---·------------·----·· z 0 -4 ~--.-----··--·-··-----· iii z ~ X -5 -·--~----···---·----··-···--··--·-· ---··--·-··--· w #- z o-s iii [fl g: -7 ::;; 0 (.) .sL---------------------------------------------------------------~ 0.1 APPLIED PRESSURE -KSF Sample of CLAY, SANDY (CL) From TH-3 AT 9 FEET McCauley Constructors, Inc. Lot 8, Powerline Professional Park PROJECT NO. GS05195-125 S:IG$05195.000\125\6. Calcs\GS05195-125.Swell.xls 1.0 10 DRY UNIT WEIGHT= MOISTURE CONTENT= 100 92 PCF 29.7 % Swell Consolidation Test Results FIG. 5 6 5 4 3 2 ------ __ EXPANSION UNDER CONSTANT PRESSURE DUE TO WETTING 0 --------------·-----·--·------·---~------~--~-~---------~--~--------------~---------'"-----~---·----------~- -1 ~---~---------·-··--·----~----~ ----~-------------~----~------------------~-----___:___ ____ -·--- -2 ~-~------- ·3 ~---- z Q-4 iii z ~ -5 w '#-z Q-6 iii (/) w 0:: D.. -7 ::;; 0 () ------------------ 0 -8~----------------------------------------------------------~ 0.1 APPLIED PRESSURE -KSF Sample of CLAY, SANDY (CL) From TH-5 AT 9 FEET McCauley Constructors, Inc. Lot 8, Powerline Professional Park PROJECT NO. GS05195-125 S:\GS05195.000\12516. Ca1cs\GS05195-126.Swel1.xls 1.0 10 DRY UNIT WEIGHT= MOISTURE CONTENT= 100 94 PCF 27.7 % Swell Consolidation Test Results FIG. 6 MOISTURE DRY DEPTH CONTENT DENSITY LOT I (FEET) (%) (PCF) TH-1 4 8.3 91 TH-2 4 14.8 TH-2 19 15.3 TH-3 9 29.7 92 TH-4 9 15.4 101 TH-5 9 27.7 94 TH-6 9 30.6 90 TH-7 14 25.8 97 TH-7 19 15.5 S-1 0-4 4.8 S-2 0-4 14.3 A HERBERG LIMITS LIQUID PLASTICITY LIMIT INDEX (%) (%) 32 16 36 19 TABLE I SUMMARY OF LABORATORY TESTING PROJECT NO. GS05195-125 SWELL TEST RESULTS" SOLUBLE PERCENT SWELL SULFATES GRAVEL (%) (%) (%) 0.01 19 4.1 0.3 36 .. SWELL MEASURED WITH 1000 PSF APPLIED PRESSURE, OR ESTIMATED IN-SITU OVERBURDEN PRESSURE. NEGATIVE VALUE INDICATES COMPRESSION. PASSING PERCENT NO. 200 SAND SIEVE (%1 1%1 DESCRIPTION 89 CLAY, SANDYiCL) 99 CLAY, SANDY(Ci} 70 11 SAND, CLAYEY TO SILTY ISC-SM) CLAY, SANDY ICU 74 CLAY, SANDY (CL) CLAY, SANDYiCU 99 CLAY, SANDY ICL) 60 CLAY, SANDY (CL) 52 12 SAND, CLAYEY TO SILTY ISC-SM) 88 CLAY, SANDY (CL) 90 CLAY, SANDY(Ci} Page 1 of 1 APPENDIX A PAVEMENT CONSTRUCTION RECOMMENDATIONS MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERUNE PROFESSIONAL PARK PROJECT NO. GS05195-125 S:\GS05195.000\12512. Reports1GS0519S 125 R1.doc FLEXIBLE PAVEMENT CONSTRUCTION RECOMMENDATIONS Experience has shown that construction methods can have a significant effect on the life and serviceability of a pavement system. We recommend the proposed pavement be constructed in the following manner: 1. Natural soils should be stripped of organic matter, scarified, moisture treated, and compacted. We recommend sub-excavation, moisture- treated and recompaction of the subgrade soils to a depth of at least 12-inches below pavements. Subgrade soils should be moisture- treated to within 2 percent of optimum moisture content and com- pacted to at least 95 percent of maximum standard Proctor dry density (ASTM D 696, AASHTO T 99). Moisture treatment and compaction recommendations also apply where additional fill is necessary. 2. Utility trenches and all subsequently placed fill should be properly compacted and tested prior to paving. As a minimum, fill should be compacted to 95 percent of maximum standard Proctor dry density (ASTM D 696, AASHTO T 99). 3. If areas of soft or wet subgrade are encountered, the material should be sub-excavated and replaced with properly compacted structural backfill. Where extensively soft, yielding subgrade is encountered, we recommend the excavation be inspected by a representative of our office. 4. Asphaltic concrete should be hot plant-mixed material compacted to at least 95 percent of maximum Marshall density. The temperature at laydown time should be near 275 degrees F. The maximum compacted lift should be 3.0 inches and joints should be staggered. 5. The subgrade preparation and the placement and compaction of all pavement material should be observed and tested. Compaction criteria should be met prior to the placement of the next paving lift. MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERUNE PROFESSIONAL PARK PROJECT NO. GS05195·125 S:\GSOS195.000\1 2512. Reports\GS05195 125 R1.doc A-1 RIGID PAVEMENT CONSTRUCTION RECOMMENDATIONS Rigid pavement sections are not as sensitive to subgrade support character- istics as flexible pavement. Due to the strength of the concrete, wheel loads from traffic are distributed over a large area and the resulting subgrade stresses are relatively low. The critical factors affecting the performance of a rigid pavement are the strength and quality of the concrete, and the uniformity of the subgrade. We recommend subgrade preparation and construction ofthe rigid pavement section be completed in accordance with the following recommendations: 1. Subgrade soils should be stripped of organic matter, scarified, moisture treated, and compacted. We recommend the sub-excavation, moisture-treated and recompaction of the subgrade soils to a depth of at least 12-inches below pavements. Subgrade soils should be moisture-treated to within 2 percent of optimum moisture content compacted to at least 95 percent of maximum standard Proctor dry density (ASTM D 698, AASHTO T 99). Moisture treatment and compaction recommendations also apply where additional fill is necessary. 2. The resulting subgrade should be checked for uniformity and all soft or yielding materials should be replaced prior to paving. Concrete should not be placed on soft, spongy, frozen, or otherwise unsuitable subgrade. 3. The subgrade should be kept moist prior to paving. 4. Curing procedures should protect the concrete against moisture loss, rapid temperature change, freezing, and mechanical injury for at least 3 days after placement. Traffic should not be allowed on the pavement for at least one week. 5. A white, liquid membrane curing compound, applied at the rate of at least 1 gallon per 150 square feet, should be used within 24 hours of placement. 6. Construction joints, including longitudinal joints and transverse joints, should be formed during construction or should be sawed shortly after the concrete has begun to set, but prior to uncontrolled cracking. All joints should be sealed. 7. Construction control and inspection should be carried out during the subgrade preparation and paving procedures. Concrete should be carefully monitored for quality control. The design section is based upon a 20-year Period. To avoid problems associated with scaling and to continue the strength gain, we recommend deicing salts not be used for the first year after placement. MCCAULEY CONSTRUCTORS, INC. LOT 8, POWERLINE PROFESSIONAL PARK PROJECT NO. 0505195-125 S:\GS05195.000\12512. Reports\G$05195125 R1.doc A-2 140 135 130 125 120 CURVE NUMBER 1 --~--:--:--: -1--:_--: N'--:-_l_ :_-;-+-; -i--:--:-~--:--I--:­·:;:~::;:;:~::~:;:;-~::\1::;:1::;:[:1:~::~:j:5::rlr:;:. . -~--:--:~ -1--:~~_:-:-,--.. -:-~--:--~ -l--:--~---:--:_----:-- __ ; __ : __ : __ ; __ j__: __ ~_; __ : __ l_;_; _: __ ;_j __ :_ : __ ; __ :_j_: MAXIMUM D1~~-~ENSITY PCF :;:_;_:!::t:j:::~~r ·:,:t:!::,:j:::::t:r::::r:;. OPTIMUM MOISTURE CONTENT -•--·--:-_, _ -0:'-: -~ --:··c ;-~--:--: _ r -:-_: -~--:--~-; _ 6.5 %DRY WEIGHT -+-_}:-41-:--: -"j--:--~ -~--:---.~~ -:--:--~-in:--~-~--:--~"'+-~--:--~---:-.. :--+--:--'[--} -~--i--~-' -~--:--' -~-1,--:--~-~--;---~-:--:-·-~-1--:--:--~--:-_l· __ ~-~--:--~---:--~-~ ~ -~--~-~--:--~- ·-·r--, "l---r---·-·· ·-·-· --·--,.-~--1--F-... --1---;·-'"1--·--F"' --,--F-'t--.--~----4--l--l·- 1 ' I I ' I I I I I ' I 1 I I ' ' __ ', ___ : __ :-: ____ ; __ -: __ ', __ :_ --:--:--:--:-·--:--: -----:--f -1-T-f-~-T ~~~b-;;~ 0~6; sPEct;!C G~vlTY = 2~7o ·~- ... ~--\--\--~-~ i--\--~-~ --:---· -~ -:-·~: -~-~ --:--~-~--:--I--t--:--:--~-i--:--~-~--:--11--~-~--:--~- . -~ --:--:--· ~---:--~-~--:---: -~--:-r -j~--:--' -~--:--~-· ··: -~--:--~-i" -:--:· -~-~--" :·-~--:--~­ -~--:--:--~---:·-~-~--:---~-~--:--~---:--~-~--:----~-~--:--,L-i--:·-,'--~-~--~--:·-~--:--,L- 1 I I 1 I 1 I l I I 0 i I I 1 l ' I ' I , j j I I I I 1 1 -;--:--:--:---:--:-.--.---·--:--:--: --:--:··:--:--r·:-r-:--:-1--:--:--:--:--~-:--:--~--:- --l.--•--•--L---•,'--L,' --',~--~,'--_.c _ __, __ : __ ~--~--: __ -~-~--: __ ~_j__: __ ~-~-~----; ___ : __ : __ ~- 1 ' I ' I I I ' ' I I I ' I ' I I I ' I E ' --~'--:--f---:--~-~--:---t-~--:--t--f--~'-T-~-~--:-.. ,L -1--,'--:--f-~----~-~--~~--,L- -,-~--~-,---:--~-~--.---~-~--~-~--~-~--~-~-~--:--~-~--:--~-~----~-~--~- ·-,---,--,--,.- ' ' --.--c-o--·---,·o-·!••c· -~~-;-.:--~-:-~ •• : •• ;.! .. : .. ;.:.~--~--;.; .. : .. ;. 1 ' I ' I ' I I I I I I ' I ' I t I 115 ~~--~-t~~~~+-~~~-i~~~---r--~~--r--~--~-t----~~~ -~-+-:--J.--_,_ -'---'--·---~-""'--:--~---+-'!;ilit ~-+_It_~-~--:--~--j\ -+ -~-~-~-----~-~--:--~- • .!. __ , __ , __ !_ ___ I __ L_J __ , __ .l-~I __ , __ L_ --'--L----'--_i_.J __ I __ L ___ , __ , __ .!_ __ I ____ L_...! __ , __ L_ I l I I I I I I I I I I I I I I I I i I I I I I I I I 1 1 --~-~--~-!---:--~-~-~---!-~--~-~---:--~-~-~ --!-~--:--~--~--~-~-~---!-~--:--~- I I I I --',--',---,'--,'--r··,' --',-·',··rl _ I I I I ! I I I I I 1 1 1 1 I I -;--1--,--,---,--,-,-~--~-,-,--,--,---,--,-,--,----,--;--,--,-- ~~~:--~--'c--:c--c' --c' --t--c'--c: --c' --c: --t--c' --c' --c'--c:~t--c'--c'--c'--c: __ t--c'--c: __ c'--c'--+--c'---c'--·'--"'--~ _;_j __ ~_:_ --~-:.:.J __ ~_:_~--~-:-110 u.. (.) a. 105 1 I I I I I I t I t I I I i I I t I I I t I -,--,--.--,---~--~-·--~---,--,--,--,- ·-;-~--:--!---:--~-~--:----!-~--:--:-- 1 I I I I I I l I I -~-~--~-J.---1--~--'-~---J.-~--~-L- 1 1 I I I I I I I I I i I I I ' i l I I I E -~-~--~-~-~--~--~-~-~----~-~--i--~- 1 I 1 I I o I I I I I I -,--.,--~-,.---1--r--,--,--•;--,--r·r- __ !_~--~-~-__ : __ ~-~-~---!-~--:--~- 1 I I I i I I i I I .l_J--~-L-__ I __ L_J_J ___ J_J __ , __ L_ I t I t I I i I ' ' ' __ . __ , -'--·--R'""--·--,_ I < I I l I I I I I I t I I I I --,--,-,-~--,-,--~--·- --:--~-!--:----,.-~--:--!- i I E I I I I I --1--,_-~ -_,_--J.--_,_ -\..- t l i I I I I I I I 1 I I I l -~--L·'-"-·f·'-'-.L. I I E I I I l j 0 I I I I I t --~--r -1 --~" ---I --, --~--i"" - I I I I I 1 1 j --·--,...-"t-""I"--,-..,--·--,..- t I I 1 I I I 1 --1--L--l.-~--~-~-~--~--~- 1 I I I I I I '' '' ''•f\' '' '' '''' I I I I I I I I I j I I I I j 1 --,--L-1 --~---T-"1-- --I" --,--,-" T--,"---I--,--,--i"- I j I I i I I I I E I I I I E I "-~-"!""" "t" "1"" "T ""\""I" r--""1--r" T" -,-""" T"" "1" -·-" t"" I I I I I I I I I I I E I I I I --:--~-~--:----~-~--:--,---:--~-~-~----:·-~---:--~- --'--L _J __ 1_--J. --'-_1_-L_ --'--L-l_ -'----L-.J __ , __ L _ t l i I E i I I I I I I I I I I ).. 100 1--+--+--+--+---+--+--+--+--+--t--+--+--+--+---t---r'--+--+'---r-I I 0 I I I I I I 1-' ·~": :::: (i) -.,.--,--:--~---,--~-~--:----'-~--:--,----r--r-·1-.,---T-~--~--r-~----~-~--:--~- z -"'---1--1·--+---1--1--..; __ , ___ .._ _ _, __ , __ .__ --·--'--"---1-----J.--1--l--j..--1--·--··--1--1--'--UJ i I I I I I i i I i I I I I > > 0 I i I I t I 1 o 0 -·:·--:--:--L --:--~-~--:----~-~--:--~--,--:--~-~ -~---1-~--'--'·-~----T-~--:---~- ~ . -7--:--:--r---:--~-~ --:---+--:--:--~-1--:--~ -~--:--r .. T--:--:--r--·:----!---:--:--r-c 95 j j I t I I > 1 I 1 I I I ! 0 5 10 15 20 25 30 MOISTURE CONTENT -% 35 Sample Description 3/4 Inch Aggregate Base Course LIQUID LIMIT % PLASTICITY 1-:-N=D-::E:-:X------% GS05195 Location United Sand and Gravel Rifle Pit Com paction Test Procedure -:7A'-:Si:'Tc.M~D..:6:..:9..::8 _________ __ Method C GRAVEL % SAND % SILT AND CLAY % Compaction Test Results 11/4/08 u. (..) 0.. 135 130 125 120 115 110 105 >-100 !:: "' z w 0 ~ 0 95 GS05195 -~ -1-_:_-:-__ :_ -~ _l_1_---~-~-_:_-~--~:_ -~-~-J __ (_-~-~--:--~- ' I I I ' I I I I I ' ' I I I ' I I I ' I I --~--~--1--;.-__ , __ ,. _ _, __ , __ -~-~--:--~---:--;-:-~---~--:--:--~-1--:-~--~-~ ---;-~--:--~- _l ___ , __ , __ l ___ , __ L_J __ , __ ----'--'--L---'--L-J. __ , _____ ..; __ ,_ l---'--_.l __ , ____ J.._J __ , __ I __ 0 I I I I I I I E I I ~ I I I < I I I I I I I I ·-+--:--:---~-·---:--~-+--:---+ -:--:--+---:--~-+--'---~--·--:--r-1 --:--:-·--:---}-~--: -r- , I I I I I I I I I 0 I 0 I --,--t-, --,-- ' ' ' 0 5 10 15 20 25 30 35 MOISTURE CONTENT-% Sam pie Description ..::C::.Ia:cYc:.·.:S:.::il""ty-'-, .;:B.:cro:..:w.:.:n;__ _______ _ LIQUID LIMIT ________ % Location Foundation Excavation Compaction Test Procedure ASTM D698 Method A PLASTICITY INDEX % GRAVEL % SAND % SILT AND CLAY % Compaction Test Results 12/1/08 140 135 130 125 120 CURVE NUMBER 3 MAXIMUM DRY DENSITY 110.0 PCF --o--r--;---1----r -..,--t--r-- ' ' ' _l __ :,__: __ ,. ___ : __ ~_~ __ : __ --~ __ : __ : __ ~-j--· -~-~ __ : ___ ; __ ~ __ : __ ~_ I ' I I I I 0 I l I > I I 0 I I l I I I I I I l I I I 0 I I 0 I I I I I I I I 0 -1--,--,--,---,--,-;--,--'--r--~--,--r---,-,--,--,---,-,--,--,-- --1--1...--'---'----L--'--1--1...-, ' ' __ 1 __ .1__..! __ ,_ I I I t I I I I --~--; -,--,- . ' ' -,-,----:-- 1 I I I -r -'--~--r- ' I I I I I I I I I I I I I I ~; ~ ~:~~::::: : :U ~ L\: :~: U: :1:::.: rNi--~~ ~ t ~ i ~ j~ ~f-:t: U:: t: 115 ,_-_~_,-_-_-,-_-_-,_-_-,_-_-r-__ -_-,_-_-,-_-,-_-_-,-_-_+--_-:-_--L _: __ :. _ _ _: __ 'f ~~ __ : _ _ _ ~ _ ~ __ : __ ~ _ _ _, __ ~-_-'-_ ... ____ .. _ _. __ , __ .. _ ·-+--:--:--~-]--:--~-~--:---+--:--:--~---:--~-~--:----~-~--\--~---:--:--1--'--t--}--,--:--~- 1 I I I I I I I I I I I . I I I I I I I I I I I I I I I I - T --,--,--T---,--,--T--,---T--,--,--T--J--,--.---;-,---T--,--,--,----,--,--T --,----T--,--,--r---~--:--:--~-J--:--~-~--:---~-~--:--~--1--:--~-~-.... ---~-~--:--~---:--~-~-~--. -~-~--:--~- 110 I I ; ~ I I I : ~ I ~ I ' I ~ I ' ' I ~ I I I I ' I I I I I I I I I 1 I I ' •Jtl I • "-!.... I I I I I I I I I L I I I L 1 1 -~--:--:--~---~~--~-~--:----7-->--}---~.:.r~-{-.).--m}-~--:--~---:--~-~--:--~.--}-~--:--~- 1 I I 1 I I I I I I I I I I I I I I I ! I I I I I I I I -;--:--:--;---:--;-;--:--t-;--: -:--:---:--;-;--:--,--:--:--;-~--:--:--;--:----;--:--:--;- -~--:--;--~----:--~-~--:---~-.--:--~---:--~-~--:---~-~--:--~-r-:--~-~-~---~-~--:--~- _ .. __ , __ , __ •. _ --1--<---'--'---~ -'--1--'"---1--'---'--...l---'"-1--1--'"---1--'--"'"--'----'"--'--•--'-- 1 l I I I I I I I I I I I I I I I I I I I I I I I I 1 I ! ! t I • I I I I t I I I I I I I I I ! 1 1 1 105 -+--:--:--~---:--~-~--:---;:--:--\--}-__ : __ :--*--:---~-~ 1\:--~---:--~-*--:--1--~-~--:--~- 1 I I I I t I I I I I I I I I I I I I I I I -..---·--~~--,---~,--,_-,--,---~-·--:--~---:--r-~--:---~-~--:-~---:--~-~-~--~--~-~--:--~- ~ -~--:--:--~---:--~-~--:-~1 -~-~--:--~---1--~-~--1---~·-~--:--1---:--:--~-~--r--~-~--:--~- ~ _J_~ __ I__L_ --~--L-l--1~ _L_J __ I __ L_ --~--L-1-~--_L_J __ I __ L_. -~--L-l_J ____ L_J __ I __ L_ I I I I I I I I I I I I I I I I I I I l I I t I I I I I ~ 100 l--+--+--+--+'--t--+--+--+--+'--t--+--+--+--+--1--+--+'--~-+--1--+:--",--":--":--l'~r-~--,c--r--r--c'--t--+--+--l -en . -~ -~--~ -~--[--:--~ -~--:----~-~--:--~---~--~--..---~---,'. -~--~~--~-tK:_ -~-~-_,:-·---~ _J __ ;_-~- 1 I I I I I I I I I I I I I I I I I I I I I I I I I ' I ffi -~-~--:--~--1--:--~--:--:--, -~·-~--:-·-:·---:--~-~--<---~--:--:--~-1--:----~--".----:·-~--:--~- 0 -f--:--:--;·---:--~ ·:--:--~-7-~--:--~----~--~-~--:---7-.J,--:--~---:--~ -~--:--~--}-·~--:--~- ~ -+--:--:--+-· --:--~-~--:---+--~~--~·--r-· --~--~!_-~--:---r--~·--:--r---,·--~-:--.~----r-~--:--r- u.. I I I I I I I I . I I I I I I I I I I I I I I I I 0 95 0 5 10 15 20 25 30 35 MOISTURE CONTENT-% Sample Description Clay ,Sandy, Tan --~--~~----------------LIQUID LIMIT % GS05195 Location ..::S::to:::c:::k:r:P::;ile::_ _______ _:__ ______ _ Compaction Test Procedure ASTM D698 Method A RECEIVED DEC 2 3 ZOOS G.'\Hf'IELD COUNTY BUILDiNG & PLANNING PLASTICITY I_N_D_E_X ____________ % GRAVEL % SAND % SILT AND CLAY % Compaction Test Results 12/15/08 Compaction Test Report cLIENT MCCAULEY CONSTRUCTORS, INC. P.O. BOX 200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 1 1m~ en. I THOMPSON MIIHo!IJ~i!ii!ejkQjjli#I!I•W DATE 11/03/08 PROJECT NUMBER G$05195 000 Phase: REPORT NUMBER: _1_ SHEET: _j_ OF _j__ suBJEcT LOT 8, POWERUNE SUBDIVISION 6 POWERLINE ROAD RIFLE, co RECEIVED DEC 11 2008 STRUCTURAL FILL GARFIELD COUNTY _01!11 LABORATORY FIELD ·~ "'V U 0 Ln!•'I•;JO" TEST TEST MAX DRY COM· SOIL ll'"PE NO. LOCATION DEPTH OMC% MC'Y{I FEET TYPE NO TESTS PERFORMED ---···---"·---··-------· 1 BELOW SUBGRADE SPECIFICATIONS: 100 %OF MAXIMUM MOISTURE \MTHIN TO TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: MOISTURE ADDED BY TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)BACKHOE 1)t.OADER PROGRESS REPORT ASTM D698 %OF OPTIMUM DENSITY DENSITY PACTION PCF PCF % . -- THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF UFT INCHES ------- AT THIS VISIT HE EARTHWORK CONTRACTOR WAS EXCAVATING THE FOOTING PAD LOCATIONS FOR THE GEORGE T SANDERS BUILDING. 3/4 INCH AGGREGATE BASE COURSE IS IMPORTED FROM UNITED SAND AND GRAVEL PIT IN RIFLE. THE SAMPLE WAS OBTAINED AND DELIVERED TO OUR OFFICE FOR LA BORA TORY TESTING. A PROCTOR DENSITY TEST WILL BE PERFORMED TO DETERMINE THE MAXIMUM DENSITY AND OPTIMUM MOISTURE CONTENT. OUR FIELD REPRESENTATIVE WAS INFORMED THAT THE FOUNDATION WOULD CONSIST OF A GRADE BEAM AND PAD TOE OF FOUNDATION WITHOUT VOID MATERIAL. WE RECOMMEND A VOID MATERIAL AT LEAST 4-INCHES THICK. 0 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 · IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO .(S) ---------- SCOPE OF OBSERVATION: 0 FULL TIME: 0 PERIODIC, ON CALL BASIS: fZI ~g~~~~cTOR's oR CLIENrs REPRESENTATIVE CONTRACTOR SANDON THIBAULT CTLITHOMPSON,INC. ~ ~N''-'3 FIELD REPRESENTATIVE DB Af'PROVEDBY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970-945-28091 Fax: 970-945·7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE: Phase: W CT'L l THOMPSON ml@l~lijt0ta:m;loifijilli##UW ' e 11/04/08 PRO.IECT NUMBER G$05195 000 REPORT NUMBER: _2_ SHEET: _j_ OF" _j__ P.O. BOX 200 SUBJECT LOT 8, POWERLtNE SUBDIVISION TEST NO. 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PAD A-1 1 TEST DEPTH TYPE FEET -·· ·--~---~··-~----- 1 0.0 NUC FOOTING PAD A-2 -· --------. ~~,.--···-- 2 0.0 NUC su 1 BELOW BG RADE SPECIF!GATIONS: too %OF MAXIMUM ASTM D698 MOISTURE WITHIN _;+c.:2::___c.T0;;;__,·2,__ %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)WACKER MOISTURE-ADDEO 8-Y TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)LOADER 1)BACKHOE PROGRE:SS R:EfiORi 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL LABORATORY FIELD MAX DRY COM-SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 139.3 6.7 100 + ------· JOB NO GS06196.000 CURVE NO 1 132.0 6.5 135.3 6.0 100 + JOB NO GS05195,000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS" NOT PRESENT, AI\JD AT LOCATIONS"OTHERTHAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT j()-12 INCHES ---'-"-'"'"---- AT THIS VISIT THE EARTHWORK CONTRACTOR HAD THE FOOTING PADS IN THE AREAS AT THE ABOVE LOCATION BACKFILLED TO GRADE. DENSITY TEST RESULTS ARE SATISFACTORY. IT WAS SUGGESTED TO THE CONTRACTOR TO COMPACT THE NATIVE SOILS AT THE BOTTOM OF THE FOOTING PADS PRIOR TO PLACING STRUCTURAL FILL. 1&2 [ZJ !N OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 · IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ---------- SCOPE OF OBSERVATION: 0 FULL TIME: r.;J PERiODIC ON CALL BASIS· r;! CONTRACTOR'S OR CLIENTS REPRESENTATIVE .t;A,.L,.,E'-'X'-W'-"'-IT_._,H"-------~ ' ' 1!!J ADVISED ,. KRSTEN SANDON THIBAULT CTLITHDMPSON, INC. ~ ~N•'-'5 FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. 1 Glenwood Springs, CO 81601 1 Phone: 970·945-2809 1 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE: Phase: 1ft CTL ! THOMPSON 'I $Sijijteil!m;lsM;j'J.ilj;Jd ilf! 11106/08 PROJECT NUMBER GS05195 000 REPORT NUMBER: __ 3_ SHEET: _j_ OF _2_ P.O. BOX 200 suBJEcT LOT 8, POWERLINE SUBDIVISION TEST NO. 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PAD AT GRIDLINE Al3 1 TEST DEPTH TYPE FEET ---------- 3 0.0 NUC FOOTING PAD AT GRIDLINE A14 ----- 4 0.0 NUC FOOTING PADATGRIDLINEA/5 -- 5 0.0 NUC FOOTING PAD AT GRIDLINEA/6 6 0.0 NUC FOOTING PAD AT GRIDLINEA/7 7 0.0 NUC FOOTING PAD AT GRIDLINE A/8 ------- B 0.0 .NUC FOOTING PAD AT GRIDLINE A/9 9 0.0 NUC FOOTING PAD AT GRIDLINE A110 - 10 0.0 NUC FOOTING PAD AT GRIDLINE A/11 --- 11 (),() NUC 1 BELOW SUBGRADE SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN +2 TO -2 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)BACKHOE WITH SHAKER PLATE MOISTURE ADDED BY WATER TRUCK TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)BACKHOE 1)LOADER 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS BUILDING LABORATORY FJELD MAX DRY COM-SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 138.5 6.0 100 + -JoBNo GS05195:0oo CURVE NO 1 132.0 6.5 137.9 5.0 100 + JOB NO G$05195.000 CURVE NO 1 ----------132.0 6.5 131.0 6.6 99 JOB NO GS05195.000 CURVE NO 1 132.0 6.5 136.2 4.7 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 133.8 6.2 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 140.3 5.6 100 + JOB NO GS05195,000 CURVE NO 1 132.0 6.5 136.4 5.7 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 136.6 6.7 100 + ---------- JOB NO GS05195.000 CURVE NO 1 132.0 &.5 137.7 4.& 1()() + JOB NO GS051.95.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 10-12 INCHES ------~~~------ 3 4AND 6-13 0 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) -"5---------- SCOPE OF OBSERVATION: 0 FULL TIME: r;! PERIODIC ON CALL BASIS· V1 CONTRACTOR'S OR CLIENT'S REPRESENTATIVE PATRICK WITH MCCAULEY ~ ' ·~ADVISED SANDON THIBAULT CTLITHOMPSON,INC. ~ ~''"5 FIELD REPRESENTATIVE DB APPRO"\/EU BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. 1 Glenwood Springs, CO 81601 I Phone: 970-945-2809 I Fax: 970-945-7411 Compaction Test Report -:I1•~jf:-CTL I THOMPSON 'T1f ~ -~~i!liloJll;l!iJI•!•Mil!illi• , DATE 11/06108 PROJECT NUMBER• G$05195 000 cuENT MCCAULEY CONSTRUCTORS, INC. Phase: REPORT NUMBER: _3_ SHEET:_.2_ OF' _2_ P.O. BOX 200 susJEcT LOT 8, POWERLINE SUBDIVISION TEST NO 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PAD AT GRIDLINE B/11 1 TEST DEPTH TYPE FEET . --~---~ 12 0.0 NUC FOOTING PAD AT GRID LINE C/11 ~--~---·------·---·--·--- 13 0.0 NUC 1 BELOW SUBGRADE SPECIFICATIONS: 1()0 %OF MAXIMUM ASTMD698 MOISTURE WITHIN +2 TO ~2 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNiTS: 1)BACKHOE WITH SHAKER PLATE MOISTUREADDEOBY WATER TRUCK ~~~~~--------------TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1 )BACKHOE 1 )LOADER PfkOG~I!SS ~EPOR"f 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS BUILDING LABORATORY FIELD MAX DRY DENSITY OMC% DENSITY MC% PCF PCF 132.0 6.5 133.5 4.6 132.0 6.5 131.7 7.5 COM~ SOIL TYPE PACTION % CURVE. NO 1 100 + JOBN'0-Gso5196.000 CURVE NO 1 100 JOB NO G$05195,000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PlACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS' NOT PRESENT, AJI.ID AT LOCATIONS-OTHERTHAIIJ THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FIL~ MEETS SPECIFICATIONS. THICKNESS OF UFT 10-12 INCHES DURING THIS SITE VISIT PATRICK GILROY WITH MCCAULEY CONSTRUCTION INFORMED OUR FIELD REPRESENTATIVE THAT THEY WOULD CONTINUE TO CONSTRUCT A GRADE BEAM AND PAD TYPE OF FOUNDATION. PATWAS INFORMED THAT THE BUILDrNG WOULD PERFORM BEITER IF STRUCTURAL FILL WAS ALSO PLACED BELOW THE GRADE BEAM WALLS AND FOOTING PADS. A 41NCH VOID WILL BE PLACED BELOW THE GRADE BEAM PORTION, PER PATRICK GILROY. THE CONTRACTOR HAD THE ABOVE FOOTING PADS BACKFILLED TO GRADE DURING THIS VISIT. DENSITY TEST RESULTS ARE SATISFACTORY EXCEPT FOR DENSITY TEST NO. 5. IT WAS SUGGESTED TO THE EARTHWORK CONTRACTOR TO RECOMPACT THAT FOOTING PAD. NO RETEST WILL BE REQUIRED. TWO FOOT OF STRUCTURAL FILL WILL BE PLACED BELOW THE FLOOR SLAB. 3 4AND 6-13 o· IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS" INDICA TED" BY OUR OBSERVATIONS AND TEST NO .(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICA TED BY OUR OBSERVATIONS AND TEST NO .(S) _,5 ________ _ SCOPE OF OBSERVATION: 0 FULL TIME; r;'l PERIODIC ON CALL BASIS·r;t CONTRACTOR's OR CLIENTS REPRESENTATIVE PATRICK WITH MCCAULEY 1!!:.1 ' ' ~ ADVISED SANDON THIBAULT CTLITHDMPSON,INC. ~ ~N•'-;:s, FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 816011 Phone: 970·945-28091 Fax: 970·945-7411 Compaction Test Report cuENT MCCAULEY CONSTRUCTORS, INC. DATE: Phase· "ifrtf CTL I THOMPSON -~~ll®tlGiljij!!!J!oli~l:.ljj\l;j•W 11107108 PROJECT NUMBER GS05195 000 REPORT NUMBER: _4__ SHEET: _j_ OF _i_ P.O. BOX200 suBJEcT LOT 8, POWERLINE SUBDIVISION TEST NO. 14 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PAD AT -GRIDLiNES 1f/D RETEST NO. 14 1 TEST DEPTH TYPE FEET ·--0.0 NUC ---~· --~----· 14 t FOOTING PAD AT 15 GRIDLINES 11/E FOOTING PAD AT 16 GRIDLINES 11/F FOOTING PAD AT 17 GRIDLINES 11/G FOOTING PAD AT 18 GRIDLINES 11/H 1 BELOW SUBGRADE SPECIFICATIONS: 100 MOISTURE WITHIN -· %OF MAXIMUM TO TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)BACKHOE WITH SHAKERPLATE MOISTURE ADDED BY WATER TRUCK TIPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1 )BACKHOE 1 )LOADER PROGRESS REPORT NUC 0.0 NUC 0.0 NUC 0.0 NUC --0.0 NUC ASTM D 698 %OF OPTIMUM 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS BUILDING lABORATORY FIELD MAX DRY COM-SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 130.8 7.1 99 JOB NO GS05195:000 CURVE NO 1 132.0 6.5 133.5 5.3 100 + JOB NO GS05195,00Q CURVE NO 1 132.0 6.5 133.6 4.5 100 + JOB NO GS05195.000 CURVI:NO 1 132.0 6.5 134.7 5.1 100 + JOB NO G$05195.000- CURVE NO 1 132.0 6.5 136.5 5.7 100 + -JOB NO GS05195.Qii0 CURVE NO 1 132.0 6.5 133.5 5.3 100 + JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 10-12 INCHES ------~~~------ THE EARTHWORK CONTRACTOR HAD THE ABOVE FOOTING PADS BACKFILLED TO GRADE. FINAL DENSITY TEST RESULTS ARE SATISFACTORY. 14A 15-18 IZJIN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION. FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ..!1.::!4--------- SCOPE OF OBSERVATION: 0 FULL TIME; 121 PERIODIC,ON CALL BAS!S:0 ~g~~~~~CTOR'S OR CLIENT'S REPRESENTATIVE PAT WITH MCCAULEY SANDON THIBAULT -~~.''5 FIELD REPRESENTATIVE DB CTL\THOMPSON, INC. APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. 1 Glenwood Springs. CO 81601 I Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE: Phase: -'(fff CTL I THOMPSON MW~!Ml®ti;Mi\IM!BI!\!Oilll•M 11/10/08 PROJECT NUMBER G$05195 000 REPORTNUMBER: _5_ SHEET:_j_ OF _j_ P.O. BOX200 suBJEcT LOT 8, POWERLINE SUBDIVISION TEST NO. 19 20 21 22 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PAD ON GRIDLINE H/1 0 ---------------------.------- FOOTING PAD ON GRIDLINE H/9 -----------------·--···- FOOTING PAD ON GRIDLINE H/8 ··---·- FOOTING PAD ON GRIDLINE H/7 ·-··--··-------------- 1 BELOW SUBGRADE 1 TEST DEPTH TYPE FEET 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC SPECIFICATIONS: 100 %OF MAXIMUM MOISTURE WITHIN TO ASTM D698 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1 )BACKHOE WITH SHAKER PLATE MOISTURE ADDED BY WATER TRUCK TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1 )BACKHOE 1 )LOADER PROGRESS REPORT 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD MAX DRY COM· SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 134.6 6.8 100 + --·----··--·----- JOB NO GS05195.000 CURVE NO 1 132.0 6.5 134.7 6.0 100 + JOB NO GS05196.000 CURVE NO 1 132.0 6.5 136.5 6.5 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 137.0 5.2 100 + JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACT!VE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF UFT NOT OBSERVED INCHES -~~===:.-- THE ABOVE DENSITY TESTS WERE PERFORMED ON THE STRUCTURAL FILL PLACED BLEOW THE FOOTING PADS. DENSITY TESTS WERE PERFORMED AT PRESENT FILL LEVELS AT THE TIME OF THE VISITS. THE SITE WAS VISITED 3 TIMES NO ADDITIONAL FILL HAD BEEN PLACED AT THE TIME OF OUR LAST VISIT. THE SITE WILL BE VISITED TOMORROW. 19-22 0 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) SCOPE OF OBSERVATION: 0 FULL TIME: (2j PERIODIC, ON CALL BASIS: 0 ~g~~1~~CTOR'S OR CliENT'S REPRESENTATIVE .t:.A>J,L,<;E~X,__ _______ _ SANDON THIBAULT CTLITHOMPSON,INC. ~~No'~ APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER FIELD REPRESENTATIVE DB 234 Center Dr. 1 Glenwood Springs, CO 81601 I Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report cuENT MCCAULEY CONSTRUCTORS, INC. DATE· Phase: ~A~_f-_, CTL 1 THOMPSO"'' 1"1' n m"' Mb~Well;I!J@MliMiilllijil•*+* 11111 108 PROJECT NUMBER GS05195 000 REPORT NUMBER: _6_ SHEET: _j_ OF _i_ P.O. BOX 200 suBJECT LOT 8, POWERLINE SUBDIVISION TEST NO. 23 23 24 24 25 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PAD AT GRIDLINES 7/E ·-----·----·-------------- RETEST NO. 23 ------·----------------- FOOTING PAD AT GRIDLINES 7/F ----------------- RETEST NO. 24 --------·-- FOOTING PAD AT GRIDLINES 7/G c----------------- 1 BELOW SUBGRADE 1 TEST DEPTH TYPE FEET 0.0 NUC NUC 0.0 NUC NUC 0.0 NUC SPECIFICATIONS: 100 %OF MAXIMUM ASTM D698 MOISTURE WITHIN +2 TO M2 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)BACKHOE WITH SHAKER PLATE MOISTURE ADDED BY WATER TRUCK TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)LOADER 2)BACKHOES PROGRESS REPORT 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS BUILDING LABORATORY FIELD MAX DRY COM~ SOIL TYPE DENSITY OMC'Yu DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 129.8 6.0 98 "J06NC>GS0519s.oo0 CURVE NO 1 132.0 6.5 134.4 5.7 100 + ~S051SS.o00 CURVE NO 1 132.0 6.5 131.3 7.4 99 JOB NO GS051S5.000 CURVE NO 1 132.0 6.5 136.2 6.8 100 + JOB NO GS05195.000- CURVE NO 1 132.0 6.5 136.4 6.0 100 + JOB NO GS06195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF F!LL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPEC!F!CATlONS. THICKNESS OF LIFT 10-12 INCHES ------'='---- AT THIS VISIT THE CONTRACTOR HAD THE ABOVE FOOTING PAD BACKFILLED TO GRADE. FINAL DENSITY TEST RESULTS ARE SATISFACTORY. THE CONTRACTOR WAS IN THE PROCESS OF SUB EXCAVATION BELOW THE FLOOR SLAB ALONG THE SOUTH SIDE OF THE G.T. SANDERS BUILDING. SIX INTERIOR FOOTING PADS WILL BE EXCAVATED BELOW THE BOTTOM OF THE FLOOR SLAB SUB EXCAVATION. OUR FIELD REPRESENTATIVE WAS INFORMED BY PAT WITH MCCAULEY CONSTRUCTION THAT OUR OFFICE WILL BE NOTIFIED WHEN OUR SERVICES ARE REQUIRED. 23A 24A 23-25 0 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ---------- SCOPE OF OBSERVATION: 0 FULL TIME; IZl PERIODIC, ON CALL BASIS: 0 ~g~~~CTOR'S OR CUENT'S REPRESENTATIVE ALEX WITH KUERSTEN , PAT WITH MCCAULEY SANDON THIBAULT CTWTHOMPSON, INC. ~ ~,.,_,,~ FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr.l Glenwood Springs, CO 816011 Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE· Phase: -~~-----CTL 1-THOMP"'"""' "iPf ~vll~ +®~filjlllel#lii/lioiiji;Dii•" j•j!13/08 PROJECT NUMBER G$05195 000 REPORT NUMBER: __ 7_ SHEET: _j_ OF __2._ P.O. BOX200 suBJECT LOT 8, POWERLINE SUBDIVISION TEST NO 26 27 28 29 30 31 32 33 34 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION PAD SUBGRADE@ GRIDLINES .• H+3.9 & 8+I3~s····------------ PAD SUBGRADE@ GRIDLINES ---------------------H+3.9 & 7+15.3 PAD SUBGRADE @ GRIDLINES H+3.9 & 'f+10.10-1/2 PAD SUBGRADE@ GRIDLINES G & 7+14.8 -------------- PAD SUBGRADE@ GRIDLINES G&9 PAD SUBGRADE@ GRIDLINES -G &-9 ------ PAD SUBGRADE@ GRIDLINES c-F&9 PAD SUBGRADE@ GRIDLINES f: & 8+6.8 --- PAD SUBGRADE @ GRIDLINES F.& 7+14.8 LO 1 BE W SUBGRADE 1 TEST DEPTH TYPE FEET 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC SPECIFICATIONS: 100 0,-l, OF MAXIMUM ASTM D 698 MOISTURE WITHIN +2 TO ·~2 %OF OPTIMUM TYPE OF COMPA.CTlON EQUIPMENT AND NO. OF UNITS: NOT OBSERVED MOISTURE ADDED BY WATER TRUCK TIPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD MAX DRY COM-SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 134.8 6.2 100 + ~---~----·---·-JOB NO GS05195.000 CURVE NO 1 132.0 6.5 134.2 6.8 100 + JOB NO G$05195.000 CURVE NO 1 132.0 6.5 134.7 6.8 100 + -- JOB NO 0505195.000 CURVE NO 1 132.0 6.5 134.9 6.5 100 + -JOBNO osos1es.ooo CURVE NO 1 132.0 6.5 134.8 6.2 100 + JOB NO GS05195:00Q CURVE NO 1 132.0 6.5 134.0 6.8 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 133.3 6.6 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 133.9 6.9 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 134.3 7.2 100 + JOB NO G$05195~000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, VVE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF UFT INCHES ------- 26-41 [2] IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN QUI'? OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVA TlONS AND TEST NO.(S) ----------- SCOPE OF OBSERVATION: TED PUTNAM FIELD REPRESENTATIVE DB 0 FULL TIME; 0 PERIODIC, ON CALL BASIS; 0 ~~"i~CTOR'S OR CUENT'S REPRESENTATIVE ALEX WITH KUERSTEN APPROVED BY DAN DOWNING . LABORATORY/FIELD MANAGER 234 Center Dr.! Glenwood Springs. CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. TEST NO P.O. BOX 200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION PAD SUBGRADE@ GRIDLINES ··---~-~- 35 E.6 PAD SUBGRADE@ GRIDLINES ~o=a--·--------·--- 36 E.8 PAD SUBGRADE@ GRIDLINES 37 E.9 PAD SUBGRADE @ GRIDLINES ----38 E.10 PAD SUBGRADE@ GRIDLINES 39 D + 20.3, 1 PAD SUBGRADE@ GRIDLINES 40 C,1------ PAD SUBGRADE@ GRIDLINES -- 41 A+4.9, 1 1 BELOW SUBGRADE 1 DEPTH FEET 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ~~ CTL I THOMPSON -~l@ill0!!$i!!@i!lili:!l!illllill• DATEc 11/13/08 PROJECT NUMBER G$05195 000 Phase REPORT NUMBER: _7_ SHEET: _.2._ OF __2_ suBJEcT LOT 8, POWERLINE SUBDIVISION TEST TYPE NUC NUC NUC NUC NUC NUC NUC 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD MAX DRY COM~ DENSITY OMC% DENSITY MC% PACTION PCF PCF % 132.0 6.5 132.3 6.1 100 132.0 6.5 132.8 5.3 100 + 132.0 6.5 134.7 6.0 100 + 132.0 6.5 134.1 6.0 100 + 132.0 6.5 133.8 6.3 100 + 132.0 6.5 133.5 6.3 100 + 132.0 6.5 133.5 6.7 100 + SOIL TYPE CURVE NO 1 JOBNo oso£196.000 CURVE NO 1 --·----~ JOB NO GS05195.000 CURVE NO 1 JOB NO GS05195.000 CURVE NO 1 JOB NOGS05195.000 CURVE NO 1 JOB NO GS05195.000 CURVE NO 1 JOB NO GS05195.000 CURVE NO 1 JOB NO GS05195.000 SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE WlTHIN +2 TO -2 O,(, OF OPTIMUM THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED< TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIF!CAT!ONS. TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: NOT OBSERVED MOISTURE ADDED BY WATER TRUCK THICKNESS OF LIFT -----------INCHES TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: PROGRESS REPORT AS REQUESTED, A SITE VISIT WAS MADE TO PERFORM COMPACTION AND MOISTURE TESTING ON THE FOOTING PAD SUBGRADE. WE OBSERVED THAT THE SUBGRADE WAS PREPARED PRIOR TO OUR VISIT FOR ALL PADS REPRESENTED ABOVE WITH A COMPACTION TEST AT EACH ONE. THE SUBGRADE FOR ALL PADS ALONG GRIDLINE 1 WERE PREPARED TOGETHER, AND ARE REPRESENTED BY 3 TESTS (39-41). MOISTURE AND COMPACTION WERE SATISFACTORY. A RETURN VISIT WAS REQUESTED FOR NOVEMBER 14, 2008. 26-41 0 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ---------- SCOPE OF OBSERVATION: TED PUTNAM FIELD REPRESENTATIVE DB 0 FULL TIME: IAl PERIODIC ON CALL BAS!S-!Al CONTRACTOR'S OR CLIENTS REPRESENTATIVE ALEX WITH KUERSTEN ~ ' '~ ADVISED --- CTLITHOMPSON,INC. ~ ~N.'5 APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-2809 I Fax: 970-945-7411 Compaction Test Report cuENT MCCAULEY CONSTRUCTORS, INC. DATE: Phase: -~Rt CTL I THOMPSON Dl!i~Ng!Jjjill\l*!f.Mi$5!!•M 11119108 PROJECT NUMBER GS0'5195 000 REPORT NUMBER: 8 SHEET: _1_ OF __3__ P.O. BOX 200 suBJEcT LOT 8, POWERLINE SUBDIVISION TEST NO. 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PAD AT GRIDLINE E/9 1 TEST DEPTH TYPE FEET ·---------------------·· 42 0.0 NUC FOOTING PAD AT GRIDLINE D/9 --------------------- 43 FOOTING PAD AT GRIDLINE C/9 ------· 44 FOOTING PAD AT GRIDLINE B/9 -· 45 FOOTING PAD AT GRIDLINE A.519 46 FOOTING PAD AT GRIDLINE A/9 . 47 FOOTING PAD AT GRIDLINE A/8 ----. 48 FOOTING PAD AT GRIDLINE A/7 49 FOOTING PAD AT GRIDLINE A/6 ------- 50 AD 1 BELOW SUBGR E SPECIFICATIONS: 100 MOISTURE WITHIN %OF MAXIMUM TO TYPE OF COMPACTION EQUIPMENT AND NO. OF UNlTS: 1)BACKHOE WITH SHAKER PLATE MOISTURE ADDED BY WATER TRUCK TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1 )BACKHOE 1 )LOADER 0.0 NUC ··-0.0 NUC 0.0 NUC . 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC ASTM D 698 %OF OPTIMUM 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL TRUST BUILDING LABORATORY FIELD MAX DRY COM~ SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 139.2 5.5 100 + -~----·-·-Jos NO Gso5195.ooo CURVE NO 1 132.0 6.5 137.0 4.3 100 + -:;os NoGsos1sS.OoO CURVE NO 1 132.0 6.5 135.5 3.1 100 + JOJi'NOGsos19S.oiiO- CURVE NO 1 132.0 6.5 139.8 4.5 100 + JOBNO osos1ss.ooo- CURVE NO 1 132.0 6.5 138.0 6.5 100 + fJOs NO GS05195:000 CURVE NO 1 132.0 6.5 138.7 5.4 100 + ~Gsos19s.000 CURVE NO 1 132.0 6.5 137.0 5.0 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 135.0 5.6 100 + JOB NO GS05196.000 CURVE NO 1 132.0 6.5 139.4 5.1 100 + JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACT!VE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT INCHES ------- 42-60 0 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ---------- SCOPE OF OBSERVATION: 0 FULL TIME; 0 PERIODIC, ON CALL BASIS; 0 ~~~~CTOR'S OR CLIENT'S REPRESENTATIVE PAT WITH MCCAULEY SANDON THIBAULT CTLITHDMPSON,INC. ~ ~N•'-"3 FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. 1 Glenwood Springs, CO 81601 I Phone: 970-945-2809 I Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE· Phase: -'1~c CTL ! THOMPSON Ei!!lil!liJI~Ulaio!l;!!Jf.li:®!!ldiilll• 11119108 PROJECT NUMBER G$05195 000 REPORT NUMBER: _8__ SHEET: _2_ OF __3._ P.O. BOX200 suBJECT LOT 8, POWERLINE SUBDIVISION TEST NO. 51 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PAD AT GRIDLINE Al5 --------------· FOOTING PAD AT GRIDLINE Al4 1 TEST DEPTH TYPE FEET 0.0 NUC ·---·----------- 52 FOOTING PAD AT GRID LINE AJ3 ·------ 53 FOOTING PAD AT GRID LINE Al2 54 1--· .. FOOTING PAD AT GRIDLINE Al1 55 FOOTING PAD AT GRIDLINE A.5/1 56 FOOTING PAD AT GRID LINE B/1 ·- 57 FOOTING PAD AT GRIDLINE C/1 --58 FOOTING PAD AT GRID LINE D/1 -· - 59 1 BELOW SUBGRADE SPECIFICATIONS: 100 MOISTURE WITHIN %OF MAXIMUM TO TYPE OF COMPACllON EQUIPMENT AND NO. OF UNITS: 1)BACKHOE WITH SHAKER PLATE MOISTURE ADDED BY WATER TRUCK TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1 )BACKHOE 1 )LOADER 0.0 NUC --0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC ··-0.0 NUC ASTM D 698 %OF OPTIMUM 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL TRUST BUILDING LABORATORY FIELD MAX DRY COM-SOIL TYPE DENSITY OMC% DENSITY MC%) PACTION PCF PCF % CURVE NO 1 132.0 6.5 137.4 4.6 100 + ··:iOa No Gs0519s.o00 CURVENO 1 132.0 6.5 139.7 5.9 100 + JOB -NOGSii5195:00Q CURVE NO 1 132.0 6.5 136.4 5.2 100 + . JOB NO GS05196.000 CURVE NO 1 132.0 6.5 141.4 5.3 100 + . JOB NO G$05195.000 CURVE NO 1 132.0 6.5 135.9 6.3 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 135.4 5.7 100 + -------JOB NO GS05195.000 CURVE NO 1 132.0 6.5 136.8 5.8 100 + JO-B NO GS051-95.iiOQ CURVE NO 1 132.0 6.5 138.4 6.5 100 + JOB NO G$05195.000 CURVE NO 1 132.0 6.5 135.1 5.8 100 + 'JOBNO Gso51ss·.·ooo THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF UFT INCHES ------------------ 42-60 [2] IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) SCOPE OF OBSERVATION: 0 FULL TIME; lZI PERIODIC, ON CALL BASIS: 0 ~~~~CTOR'S OR CLIENT'S REPRESENTATIVE PAT WITH MCCAULEY SANDON THIBAULT FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-2809 I Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE: Phase: en. I THOMPSON 11119108 PROJECT"UMBER GS05195 000 REPORT NUMBER: _8_ SHEET: _.3_ OF _3_ P.O. BOX 200 susJEcr LOT 8, POWERLINE SUBDIVISION TEST NO 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PAD AT GRIDLINE E/1 1 TEST DEPTH CYPE FEET 60 !--·-··--·--·-·---------···-· 0.0 NUC 1 BELOW SUBGRAOE SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE WiTHIN TO %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND 1-JO. OF UNITS: 1)BACKHOE WITH SHAKER PLATE MOISTURE ADDED BY WATER TRUCK TYPE OF EARTH MOVING EQUIPMENT AND NO, OF UNITS; 1)BACKHOE 1)LOADER PROGRESS REPORT 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL TRUST BUILDING LABORATORY FIELD MAX DRY COM· SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 135.6 6.0 100 + "Jos NO GS051-95.0o0 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF UFT INCHES ------- DENSITY TESTS WERE PERFORMED ON THE COMPLETED STRUCTURAL FILL PLACED BELOW THE FOOTING PADS FOR THE TRUST BUILDING. DENSITY TESTS RESULTS ARE SATISFACTORY. PAT GILROY WITH MCCAULEY CONSTRUCTION ASKED OUR OPINION ON THE ORGANIC MATERIAL (ROOTS) THAT WERE BELOW THE FLOOR SLAB AREA FOR THE TRUST BUILDING. PAT WAS INFORMED THAT THEY ORGANICS NEED TO BE REMOVED. THE ORGANICS ARE APPROXIMATELY 6-121NCHES THICK. THE THICKNESS OF THE ORGANIC MATERIAL MAY VARY. 42-60 0 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO .(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO .(S) ---------- SCOPE OF OBSERVATION: 0 FULL TIME; 0 PERIODIC, ON CALL BASIS; 0 ~~~~~CTOR'S OR CLIENT'S REPRESENTATIVE PAT WITH MCCAULEY SANDON THIBAULT CTLITHOMPSON,INC. ~ ~N 1 t4 "" APPROVED BY DAN DOWN NG -FIELD REPRESENTATIVE DB LABORATORY/FIELD MANAGER 234 Center Dr.! Glenwood Springs. CO 81601! Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report cLIENT MCCAULEY CONSTRUCTORS, INC. DATE; 11120108 PROJECT NUMBER GS05195 000 Phase: REPORT NUMBER: _9__ SHEET: _j_ OF __2__ P.O. BOX 200 sUBJECT LOT 8, POWERLINE SUBDIVISION TEST NO. 61 62 63 64 65 66 67 68 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PAD AT GRIDLINES C/8 --·-----··------------·-·-- FOOTING PAD AT GRIDLINES C/7 ----------------------- FOOTING PAD AT GRIDLINES C/6 ·- FOOTING PAD AT GRIDLINES C/5 ----- FOOTING PAD AT GRIDLINES C/4 . -- FOOTING PAD AT GRIDLINES C/3 ------- FOOTING PAD AT GRIDLINES C/2 ----- FOOTING PAD AT GRIDLINES E/1.3 ---------- w 1 BELO SUBGRADE 1 TEST DEPTH FEET TYPE 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC SPECIFICATIONS: 100 ASTM D 698 MOISTURE WITHIN %OF MAXIMUM TO %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: NOT OBSERVED MOISTURE ADDED BY WATER TRUCK TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1 )LOADER 1 )BACKHOE 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL TRUST BUILDING LABORATORY FIELD MAX DRY COM~ SOIL TYPE OMC% MC% DENSITY DENSITY PACTION PCF PCF % CURVE NO 1 132.0 6.5 133.6 6.8 100 + .. --------·--JOB NO G$05195.000 CURVE NO 1 132.0 6.5 137.0 5.6 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 137.1 5.3 100 + JOB NO G$05195.000 CURVE NO 1 132.0 6.5 138.2 4.9 100 + JOB No G$05195.000 CURVE NO 1 132.0 6.5 137.4 4.8 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 132.6 4.6 100 JOB NO GS05195.000 CURVE NO 1 132.0 6.5 133.0 4.0 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 138.8 5.2 100 + -:JOe. NO Gs05195.QOO THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACT!VE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF UFT INCHES ------- 61-68 (21 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OSSERVA TIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTIOH DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ---------- SCOPE OF OBSERVATION: 0 FULL TIME; 0 PERIODIC. ON CALL BASIS: fZ] ~g~~~~CTOR'S OR CLIENT'S REPRESENTATIVE PAT WITH MCCAULEY SANDON THIBAULT Dt.v ~' CTL!THOMPSON, INC. W 6 5 FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE: Phase: CTL I THOMPSON 11 120108 PROJECT NUMBER G$05195 000 REPORT NUMBER: _9__ SHEET: _2_ OF _2_ P.O. BOX 200 SUBJECT LOT 8, POWERLINE SUBDIVISION TEST NO. 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION 1 TEST DEPTH TYPE FEET --------------------~·--- 1 BELOW SUBGRADE SPECIFICATIONS: 100 MOISTURE \flllTHIN %OF MAXIMUM TO TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: NOT OBSERVED MOISTURE ADDED BY WATER TRUCK TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UII.JITS: 1 )LOADER 1 )BACKHOE PROGRESS REPORT ASTM D698 %OF OPTIMUM 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL TRUST BUILDING LABORATORY FIELD MN< DRY COM-SOIL TYPE DENSITY OMC% DENSITY MC%. PACTION PCF PCF % ------ THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF UFT INCHES THE CONTRACTOR HAD THE ABOVE FOOTING PADS BACKFILLED TO GRADE AT THE TIME OF THIS VISIT. DENSITY TESTS RESULTS ARE SATISFACTORY. 61-68 {211N OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ----------- SCOPE OF OBSERVATION: 0 FULL TIME: fZI PERIODIC, ON CALL BASIS; 0 ~~~~~CTOR'S OR CLIENT'S REPRESENTATIVE PAT WITH MCCAULEY SANDON THIBAULT CTLjTHOMPSON,INC. ~ ~A/,',5 FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORYIFIELD MANAGER 234 Center Dr. 1 Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CTl I THOMPSON INCO'RP0RA+ED DATE 11/26/08 PROJECT NUMBER GSQ5195 000 CLIENT MCCAULEY CONSTRUCTORS, INC. Phase: REPORT NUMBER: _1Q_ SHEET: _j_ OF _j__ P.O. BOX200 suBJECT LOT 8, POWERLINE SUBDIVISION TEST NO 69 70 71 72 73 74 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION 50'E OF THE NW CORNER OF GTSANDERSWAREHOUSE ··~~·" -.--·~· 100'E OF THE NW CORNER ofGT SANDERSWAREHOUSE _____ 40'W OF THE NE CORNER "of GfSANDERSWAREHOUSE _____ 50'S OF THE NE CORNER -OF-GT SAN-DERS WAREHOUSE "" FOOTING PAD AT GRIDLINE 6/C FOOTING PAD AT GRIDLINE 7/C 1 BELOW SUBGRADE 1 TEST DEPTH TYPE FEET 2.0 NUC 2.0 NUC 2.0 NUC 2.0 NUC 0.0 NUC 0.0 NUC SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN TO %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)VIBRATORY WALK BEHIND ROLLER 1)BACKHOE WITH SHAKER PLATE MOISTURE ADDED BY WATER TRUCK ~~~~~~~~~----~ TYPE OF EARTH MOVING EQUIPMENT AND NO, OF UNITS: 1)LOADER PROGRESS REPORT 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD MAX DRY COM-SOIL TYPE DENSITY OMC'Ya DENSITY MC% PACTION PCF PCF % CURVE NO 2 105.0 18.3 94.9 24.6 --90 JOB NO GS05195.000 CURVE NO 2 105.0 18.3 97.7 21.0 93 JOB NO GS05195.000 CURVE NO 2 105.0 18.3 99.9 20.6 ------------95 JOB NO GS05195MO CURVE NO 2 105.0 18.3 97.3 21.0 93 JOB NO GS05195.000 CURVE NO 1 132.0 6.5 134.0 4.6 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 136.5 4.6 100 + JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 6~8 INCHES ----~--~~------ THE CONTRACTOR USED THE ONSITE CLAY SOILS AS STRUCTURAL BACKFILL ALONG THE INTERIOR SIDE OF THE FOUNDATION WALL. THE ON SITE CLAY SOILS WERE PLACED BELOW THE 2·FOOTTHICKNESS OF THE STRUCTURAL GRANULAR FILL. A SAMPLE OF THE ON SITE CLAY WAS OBTAINED. A PROCTOR DENSITY TEST WILL BE PERFORMED ON THE SAMPLE. THE CLAY FILL WILL AIR DRY TIL MONDAY ADDITIONAL COMPACTIVE EFFORT WILL BE APPLIED USING THE BACKHOE WITH THE SHAKER PLATE. RETESTS WILL BE REQUIRED FOR DENSITY TESTS 69-72. 73 & 74 0 IN OUR OPINION. Fill COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) G2J IN OUR OPINION. FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) _,6"'9-'·7_,2 _______ _ SCOPE OF OBSERVATION: 0 FULL TIME: 0 PERIODIC. ON CALL BASIS: G2l ~g~~~~~CTOR'S OR CLIENT'S REPRESENTATIVE ALI;2CWITH KUERSTEN SANDON THIBAULT "" .. u:H MCCAULEY CTLjTHOMPSON,INC. ~ YV'~PA..3 FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CTI. .. I THOMPSON I'NCORI?ClRAil"ED DATE• 12/03/08 PROJECT NUMBER• GSQ5195 000 CLIENT MCCAULEY CONSTRUCTORS, INC. Phase: REPORT NUMBER: _1_1_ SHEET: _j_ OF _3_ P.O. BOX200 SUBJECT LOT 8, POWERLINE SUBDIVISION TEST NO. 69 70 71 72 75 76 77 78 79 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION RETEST NO. 69 . ---···--··--·----------- RETEST NO. 70 .-------··--~~·-~ RETEST NO. 71 .------ RETEST NO. 72 ------------------- A FOOTING PADS AT GRIDLINE C/8 GT SANDERS WAREHOUSE FOOTING PADS AT GRIDLINE C/9 GT SANDERS WAREHOUSE FOOTING PADS AT GRIDLINE C/10 GT SANDERS WAREHOUSE FOOTING PADS AT GRIDLINE E/8 TRUST BUILDING FOOTING PADS AT GRIDLINE E/7 .. --TRUST BUILDING 1 DEPTH FEET 0.0 0.0 0.0 0.0 0.0 1 BELOW SUBGRADE "• FA TMD698R 2100Y. 0 s U!R D EO E TEST TYPE NUC NUC NUC NUC NUC NUC NUC NUC NUC SPECIFICATIONS: 95 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN +3 TO -1 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)BACKHOE WITH SHAKER PLATE 1)VIBRATORY WALK BEHIND SHEEPSFOOT MOISTURE ADDED BY _cW~A~T.':E:!R~T.!:R":U~C~K~--------- TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)LOADER 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD MAX DRY COM- DENSITY OMC% DENSITY MC% PACTION PCF PCF % 105.0 18.3 100.0 20.6 95 105.0 18.3 99.0 21.6 94 105.0 18.3 100.0 18.3 95 105.0 18.3 103.7 17.1 99 2 132.0 6.5 136.9 5.1 100 + 2 132.0 6.5 134.6 4.9 100 + 2 132.0 6.5 137.3 4.9 100 + 2 132.0 6.5 136.9 4.9 100 + 2 132.0 6.5 139.5 4.3 100 + SOIL TYPE CURVE NO 2 -------JOB NO GS05195.000 CURVE NO 2 ·-.. ~------- JOB NO GS05195.000 CURVE NO 2 JOB NO GS05195.000 CURVE NO 2 JOB NO GS05195.000 CURVE NO 1 JOB NO GS05195.000 CURVE NO 1 JOB NO GS05195.000 CURVE NO 1 JOB NO GS05195.000 CURVE NO 1 JOB NO GS05195.000 CURVE NO 1 JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT. AS WELL AS THE TESTS SHOWN ABOVE. WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT INCHES ------- 69A, 71A, 72A & 75-84, 85 & 86A 0 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ~7-_,0<!:A'-C&"-"80<6 ______ _ SCOPE OF OBSERVATION; 0 FULL TIME; G2l PERIODIC, ON CALL 8ASIS:I2) ~g~~~~~CTOR'S OR CLIENT'S REPRESENTATIVE ALEX WITH KUER$T_,E,Nt.._ __ SANDON THIBAULT \' KAT WITH MCCAULEY CTLITHOMPSDN,INC. ~ ~No'~ FlaO REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 816011 Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE: CT!.. I THOMPSON I CORRCH~ATED 12/03/08 PROJECT NUMBER GSQ5195 OQQ REPORT NUMBER: _1_1_ SHEET: _2_ OF _.3__ P.O. BOX200 SUBJECT LOT 8, POWERLINE SUBDIVISION TEST NO. 80 81 82 83 84 85 86 86 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PADS AT GRIDLINE E/5.5 TRUST BUILDING------------··· FOOTING PADS AT GRIDLINE E/4 TRUST B-UILDING ---·----- FOOTING PADS AT GRIDLINE E/3 -TRUST BUILDING·---·-··------ FOOTING PADS AT GRIDLINE E/2 TRUST BUILDING FOOTING PADS AT GRIDLINE E/1.2 TRUST BUILDING 45'E OF THE NE CORNER OF OFFICE GT SANDERS WAREHOUSE 30'E OF THE SW CORNER OF OFFICE GT SANDERS WAREHOUSE RETEST NO. 86 ~ 1 DEPTH FEET 0.0 0.0 0.0 0.0 0.0 2.0 2.0 1 BELOW SU8GRADE 2100% OF ASTM 0698 REQUIRED TEST TYPE NUC NUC NUC NUC NUC NUC NUC NUC SPECIFICATIONS: 95 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN +3 TO -1 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)BACKHOE WITH SHAKER PLATE 1)VIBRATORY WALK BEHIND SHEEPSFOOT MOISTUREAODEOBY WATER TRUCK ~~~~~-------------­TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)LOADER 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD MAX DRY COM-SOIL TYPE DENSITY OMC% DENSITY MG<'/o PACTION PCF PCF % 2 CURVE NO 1 132.0 6.5 137.2 5.8 100 + '" _________ JOB NO GS0519MOO 2 CURVE NO 1 132.0 6.5 137.9 5.6 100 + -·------JOB NO GS05195.000 2 CURVE NO 1 132.0 6.5 138.9 4.9 100 + -------JOB NO GS05195.000 2 CURVE NO 1 132.0 6.5 134.3 5.4 100 + JOB NO GS05195.000 2 CURVE NO 1 132.0 6.5 132.4 6.3 100 JOB NO GS05195.000 CURVE NO 2 105.0 18.3 100.1 17.8 95 JOB NO GS05195.000 CURVE NO 2 105.0 18.3 97.7 17.8 93 JOB NO GSOS195.000 CURVE NO 2 105.0 18.3 101.6 18.4 97 JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT INCHES ------- 69A, 71A, 72A & 75-84, 85 & 86A G2] IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S) 0 IN OUR OPINION. FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S) _,_?_,O:;:Ac>&'-".86,__ ______ _ SCOPE OF OBSERVATION: 0 FULL TIME: i2l PERIODIC. ON CALL BASIS:!ZJ ~g~~1~~CTOR'S OR CLIENT'S REPRESENTATIVE ALEX WITH KUERSTEN SANDON THIBAULT )""" , _ .u;:.ITH MCCAULEY CTLjTHOMPSON,INC. ~ ~~r3 FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs. CO 816011 Phone: 970·945·28091 Fax: 970-945-7411 Compaction Test Report CTLITHOMPSON DATE: 12/03f08 PROJECTNUMBER: G$05195 000 cuENT MCCAULEY CONSTRUCTORS, INC. Pl1a.se: REPORT NUMBER: _1_1_ SHEET: _3_ OF __:!__ P.O. BOX200 SUBJEcT LOT 8, POWERLINE SUBDIVISION TEST NO 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION -----'~-·-~----~~--~·····--·--·---·-··"-" 1 DEPTH FEET 1 BELOW SU8GRADE 2 100% OF ASTM D698 REQUIRED TEST TYPE SPECIFICATIONS: 95 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN +3 TO ~1 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)BACKHOE WITH SHAKER PLATE 1)VIBRATORY WALK BEHIND SHEEPSFOOT MOISTURE ADDED BY WATER TRUCK TYPE OF EARTH MOVING EQ.:_U:_:IP.:_M:,:EN:::T.:..AN.:,D:.:N:;:O:::. O':'FC..UN-,ITC:S-, ------- 1)LOADER PROGRESS REPORT 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD MAX DRY COM. OMC% MC% DENSITY DENSITY PACTION PCF PCF % SOIL TYPE ~---~--------··- THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT INCHES ------------------ RETESTS WERE PERFORMED IN THE GT SANDERS WAREHOUSE AND ADDITIONAL TESTS WERE REQUESTED IN THE FOOTING PADS FOR THE TRUST BUILDING AND GT SANDERS WAREHOUSE. FINAL DENSITY TEST RESULTS ARE SATISFACTORY EXCEPT FOR DENSITY TEST NO. 70. THIS AREA WILL BE RECOMPACTED. NO RETEST WILL BE REQUIRED. DENSITY TESTS 80 & 81 REPRESENT THE STRUCTURAL FILL PLACED BELOW THE FOOTING PADS BETWEEN GRIDLINES E/3.9-6 FOR THE TRUST BUILDING. THIS AREA WAS BACKFILLED AS ONE SECTION. A SECOND SITE VISIT WAS REQUESTED IN THE LATE AFTERNOON AT THAT TIME DENSITY TEST NO. 86 WERE PERFORMED ON THE INTERIOR SIDE OF THE OFFICE BUILDING, FOUNDATION WALL FOR THE GT SANDERS WAREHOUSE. ADDITIONAL COMPACTIVE EFFORT WAS APPLIED TO THE AREAS OF FAILING DENSITY TESTS 85 & 86 PRIOR TO RETESTING. THE REMAINDER OF THE INTERIOR SIDE OF THE FOUNDATION WALL IN THE OFFICE AREA WILL BE RECOMPACTED. 69A, 71A, 72A & 75-84, 85 & 86A G2] IN OUR OPINION. FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S} 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S} _:.7'"0A=&-"8"-6 _____ __ SCOPE OF OBSERVATION 0 FULL TIME; GZI PERIODIC, ON CALL BASIS: 0 ~g~~~~~CTOR'S OR CLIENT'S REPRESENTATIVE ALEX WITH KUERSTEN SANDON THIBAULT ~ _ u:ITH MCCAULEY CTLjTHOMPSON,INC. "~ ·w~'~ FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 816011 Phone' 970·945·28091 Fax: 970-945·7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DArE: Phase: CTLITHOMPSON INCORPORATED 12/04/08 PROJECT NUMBER' GS05195 000 REPORT NUMBER: ~ SHEET: _1_ OF __2_ P.O. BOX200 SUBJECT LOT 8, POWERLINE SUBDIVISION TEST NO 87 88 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION 15'E, 17'N OF THE SW CORNER ·oF THE OFFICE G.T SANDERS~··-· 15'E, 45'N OF THE SW CORNER 'oF-THE OFFICE GT SANDERS 45'E, 21'N OF THE SW CORNER 1 TEST DEPTH TYPE FEET ~ 1.5 NUC .. 1.5 NUC 89 OF THE OFFICE GT SANDERS---~. 1.5 NUC 40'E, 45'N OF THE SW CORNER 90 ·oF THE o'FFICE GT SANDERS-~---1.5 NUC FOOTING PAD AT GRIDLINE 91 E/7.8 TRUST BUILDING FOOTING PAD AT GRIDLINE 92 E/6.8 TRUST BUILDING FOOTING PAD AT GRIDLINE 93 E/3.3 TRUST BUILDING FOOTING PAD AT GRIDLINE 94 E/2.8 TRUST BUILDING FOOTING PAD AT GRIDLINE . 95 E/1.8 TRUST BUILDING 1 BELOW SUBGRADE SPECIFICATIONS: 100 MOISTURE WITHIN %OF MAXIMUM TO TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)VIBRATORY SMOOTH DRUM 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC ASTM D 698 %OF OPTIMUM 1) WACKER WITH SHAKER WALK BEHIND VIBRATORY MOISTURE ADDED BY .,:W.::A=T.::E".R,_T:.;R=U::C::,K:._.,.-------- TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)LOADER 1)BOBCAT 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL@ GT SANDERS WAREHOUSE & TRUST BLDG. LABORATORY FIELD MAX DRY COM· SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 126.2 6.6 ---~------·"'·~ 96 JOB NO GS05195.000 CURVE NO 1 132.0 6.5 134.6 5.5 100 + JOB NO GSOS195.000 CURVE NO 1 132.0 6.5 132.5 6.0 ----~--100 JOB NO GS05195.000 CURVE NO 1 132.0 6.5 133.0 6.2 100 + _,,. _______ JOB NO GS05195.000 CURVE NO 1 132.0 6.5 134.7 4.6 100 + JOB NO GSOS195.000 CURVE NO 1 132.0 6.5 134.8 4.4 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 133.6 6.0 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 135.6 5.5 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 134.7 5.4 100 + JOB NO GSOS195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 87 A 88-95 G21 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) D IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S} -"80!.7 _________ _ SCOPE OF OBSERVATION 0 FULL TIME; GZl PERIODIC, ON CALL BASIS: 0 ~g~~1~CTOR'S OR CLIENTS REPRESENTATIVE ALEX WITH KURSTEN SANDON THIBAULT )'-.. _ . n:.: MCCAULEY CTLJTHOMPSON,INC. ~ ~'":::;, FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. 1 Glenwood Springs, CO 81601 1 Phone: 970·945·2809 1 Fax: 970·945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE· Phase: CTI .. I THOMPSON IN 00 RP0,RATED 12/04108 PROJECT NUMBER GS05195 000 REPORT NUMBER: 12 SHEET: _2_ OF _2__ P.O. BOX200 SUBJECT LOT 8, POWERLINE SUBDIVISION TEST NO 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION 1 TEST DEPTH TYPE FEET ··-·-·-~-~~---~--··-··-·-·"'·--·-- 1 BELOW SUBGRADE SPECIFICATIONS: 100 MOISTURE WITHIN %OF MAXIMUM TO TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)VIBRATORY SMOOTH DRUM ASTM D 698 %OF OPTIMUM 1) WACKER WITH SHAKER WALK BEHIND VIBRATORY MOISTURE ADDEO BY WATER TRUCK ~~~~~-------------­ n'PE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1 )LOADER 1 )BOBCAT PROGRESS REPORT 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL@ GT SANDERS WAREHOUSE & TRUST BLDG LABORATORY FIELD MAX DRY COM· SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % -·-~·~------~ THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE. WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 8~10 INCHES ------~~~------ DENSITY TESTS 87-90 WERE PERFORMED ON THE FIRST LIFT OF STRUCTURAL FILL PLACED BELOW THE FLOOR SLAB. THE CONTRACTOR WAS PLACING FILL IN THE OFFICE AREA OF THE GT SANDERS WAREHOUSE. IT WAS SUGGESTED TO THE CONTRACTOR TO APPLY THE COMPACTIVE EFFORT IN AN EAST TO WEST THEN NORTH TO SOUTH PATTERN AND NOT IN A CIRCLE PATTERN AS AREAS OF LOW DENSITY AS INDICATED BY DENSITY TEST NO. 87 ARE LIKELY. THE CONTRACTOR PLACED STRUCTURAL FILL BELOW TEN SMALL FOOTING PADS ALONG GRID LINE E IN THE TRUST BUILDING. RANDOM PADS WERE SELECTED FOR A DENSITY TEST. FINAL DENSITY TESTS RESULTS ARE SATISFACTORY. HAND COMPACTION EQUIPMENT IS BEING USED AROUND THE EDGE OF THE FOUNDATION WALL IN THE OFFICE BUILDING AREA. 87 A 88-95 G2J IN OUR OPINION. FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S} 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) _,8"-7---------- SCOPE OF OBSERVATION: 0 FULL TIME: SANDON THIBAULT F!ELD REPRESENTATIVE DB 0 PERIODIC. ON CALL BASIS: 0 ~g~~1~~CTOR'S OR CLIENT'S REPRESENTATIVE ALEX WITH KURSTEN ~ .u;:ITH MCCAULEY CTqTHOMPSON, INC. Wa'~ Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE: Phase: CTL. I THOMPSON INCO!R'RORA1TED 12108108 PROJECT NUMBER: G$05195 QQQ REPORT NUMBER: .---.11__ SHEET: __i_ OF _2_ R.O. BOX200 suBJEcT LOT 8, ROWERLINE SUBDIVISION TEST NO. 96 97 98 99 100 101 102 103 104 700 AUTOMATION DR, SUITE H WINDSOR CO 80550 LOCATION 18'E, 1 O'N OF THE SW CORNER of'fHE-OFFICE AREA·---------- 30'E, 39'N OF THE SW CORNER OFTHE OFFICE AREA _____ --·-"~ 21'E, 9'S OF THE NW CORNER -OF THE OFFICE AREA -----··-·~ 18'W, 10'S OF THE NE CORNER -OF THE OFFICE AREA 15'W, 12'N OF THESE CORNER OF THE OFFICE AREA 9'E OF THE SW CORNER OF THE OFFICE AREA (EXTERIOR) 40'E OF THE SW CORNER OF THE OFFICE AREA (EXTERIOR) 18'N OF THE SW CORNER OF THE OFFICE AREA (EXTERIOR) 18'S OF THE NW CORNER OF THE OFF-ICE AREA (EXTERIOR) TEST DEPTH TYPE FEET 0.0 NUC 0,0 NUC 0,0 NUC 0.0 NUC 0.0 NUC 0,0 NUC 0.0 NUC 0.0 NUC 2.0 NUC 6 ROWERLINE ROAD RIFLE, CO LABORATORY FIELD MAX DRY COM-SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 137.6 6.6 100 + -------~·~~ JOB NO GS05195.000 CURVE NO 1 132.0 100 + ~ .. ------. 6.5 135.0 6.5 JOB NO GS05195,000 CURVE NO 1 132.0 100 + ---·-------6.5 134.7 6.0 JOB NO G$05195.000 CURVE NO 1 132.0 6.5 132.3 6.8 100 JOB NO GS05195,000 CURVE NO 1 132.0 6.5 135.0 5.7 100 + JOB NO GS05195.000 2 CURVE NO 2 105.0 18.3 100.5 22.1 96 JOB NO GS05195.000 2 CURVE NO 2 105.0 18.3 92.6 22.4 88 JOB NO G$05195.000 2 CURVE NO 2 105.0 18.3 99.5 19.7 95 JOB NO G$05195.000 2 CURVE NO 2 105.0 18.3 95.2 21.6 91 JOB NO GSOS195,000 1 BELOW SUBGRADE .. 0 2 95 Vo ASTM 0698 I 2 Vo OPTIMUM 0 T • • 0 3 95 Vo OF ASTM 0698 WI H 1 TO 3 Vo MOISTURE REQUIRED SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN TO %OF OPTIMUM n'PE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)VIBRATORY SMOOTH DRUM ROLLER 1)WALK BEHIND ROLLER MOISTURE ADDEO BY WATER TRUCK ~~~~~-------------­ TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS· 1)BACKHOE 1)LOADER THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 8~10 INCHES -----'~--- 101 & 103 0 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S} 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO,{S) __,1_,02"--"'&'--'1'-"0:!4 ______ _ SCOPE OF OBSERVATION: 0 FULL TIME: 0 PERIODIC, ON CALL BASIS; [2] ~g~~~~CTOR'S OR CLIENTS REPRESENTATIVE ALEX WITH KUERSTEN SANDON THIBAULT CTL[THOMPSON,INC. ~ ~"'-'''"3 FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING - LABORATORY/FIELD MANAGER 234 Center Dr. 1 Glenwood Springs. CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 I Compaction Test Report CLIENI MCCAULEY CONSTRUCTORS, INC. TEST NO. P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION •.. ""-·-·~----·~ ~-·--·~--~---~····~--"··~ DEPTH FEET 1 BELOW SUBGRADE ,. TMI 8 +I· .. p 29oVoAS )69 2XO TIMU M CTI.. I THOMPSON DATE 12/08/08 PROJECT NUMBER: G$05195 000 Phase REPORT NUMBER: _j]__ SHEET: _2_ OF _2__ SUBJECT LOT 8, POWERLINE SUBDIVISION TEST TYPE 6 POWERLINE ROAD RIFLE, CO LABORATORY FIELD MAX DRY DENSITY OMC% DENSITY PCF PCF COM-MC% PACTION % 5" FA M 6 I H·1T0+3%M 3 9 VoO ST D98WT IT R R 0 S U E EOU!RED SOIL TYPE -·-------- SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN TO %OF OPTIMUM THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACT!VE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)VIBRATORY SMOOTH DRUM ROLLER 1)WALK BEHIND ROLLER MOISTURE ADDED BY ~W~~AT.'::E~Rc_T'.'R~U:::C:::~K ________ _ THICKNESS OF LIFT 8-1 Q INCHES ~----~~------- TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)BACKHOE 1)LOADER PROGRESS REPORT DENSITY TEST NO. 96-100 WERE PERFORMED ON THE STRUCTURAL FILL PLACED BELOW THE FLOOR SLAB IN THE OFFICE AREA. DENSITY TEST 101-103 WERE PERFORMED ON THE EXTERIOR SIDE OF THE FOUNDATION WALL OF THE OFFICE AREA. DENSITY TEST NO. 104 WAS PERFORMED ON THE INTERIOR SIDE OF THE FOUNDATION ALL OF THE GT SANDERS BUILDING. DENSITY TEST RESULTS ARE SATISFACTORY EXCEPT FOR DENSITY TESTS 102 AND 104. IT WAS SUGGESTED TO THE CONTRACTOR TO RECOMPACT THOSE AREAS. RETEST WILL BE REQUIRED. 101 & 103 0 IN OUR OPINION. FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ~~'=':'~======== (2J IN OUR OPINION. FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S} _1,_,0eo2..:e&c_1'-"0::!4 _____ __ SCOPE OF OBSERVATION 0 FULL TIME: 0 PERIODIC, ON CALL BASIS:l2] ~g~~~~~CTOR'S OR CLIENT'S REPRESENTATIVE ALEX WITH KUERSTE,.,_N,_ __ SANDON THIBAULT CTL[THOMPSON,INC. ~ ~N•'s FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-2809 I Fax: 970-945-7 411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. TEST NO. P.O. BOX 200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION RETEST NO. 102 -~·-··"--···~--~·--··~--·~-··---·-·"------ 102 fl RETEST NO. 1 04 -···-··-···--.... . .. 104 fl 45'W OF THE SOUTHEAST CORNER .. OF.GfSANDERS WAREHOUSE (INT.) -- 105 1 BELO W SUBGRADE 295% ASTM 0698 -1/+3 1 DEPTH FEET 2.0 CTL I THOMPSON IN C 10iR P ORATED DATE: 12/09/08 PROJECT NUMBER! G$05195 000 Phase: REPORT NUMBER: ~ SHEET: __1_ OF __1_ suBJEcT LOT 8, POWERLINE SUBDIVISION 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD TEST MAX DRY COM· SOIL TYPE TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % 3 CURVE NO 2 NUC 105.0 18.3 100.4 .. ,.,,,_. ______ 19.7 96 JOB NO GS05195.000 I 2 CURVE NO 2 NUC 105.0 18.3 104.5 ---· 20.2 100 JOB NO GS05195,000 CURVE NO 2 NUC 105.0 18.3 132.8 6.6 100 + JOB NO GS05195.000 3 95% OF ASTM 0698 WITH +2 TO ·2% MOISTURE REQUIRED SPECIFICATIONS: 100 ASTM D 698 MOISTURE WITHIN %OF MAXIMUM TO %OF OPTIMUM THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE REUED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS, TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)BACKHOE WITH SHAKER PLATE MOISTURE ADDED BY WATER TRUCK THICKNESS OF LIFT 1 Q-12 INCHES ------~~~------ TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)LOADER 1)BOBCAT PROGRESS REPORT RETESTS AND ONE ADDITIONAL DENSITY TESTS WAS PERFORMED AT THIS VISIT. FINAL DENSITY TEST RESULTS ARE SATISFACTORY. THE CONTRACTOR SCARIFIED, MOISTURE CONDITIONED AND RECOMPACTED THE BASE OF FILL BELOW THE FLOOR SLAB BETWEEN GRIDLINES A-C.2/7 -11. 104A 105 102A [ZJ IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S} 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S) ----------- SCOPE OF OBSERVATION: 0 FULL TIME; 0 PERIODIC. ON CALL BASIS: 0 ~g~~1~~CTOR'S OR CLIENT'S REPRESENTATIVE PAT WITH MCC.A:>.U,..,L.,Ec.!Y __ _ SANDON THIBAULT 04/,/ ~vAh>~-- CTLJTHOMPSON, INC. I ~ FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr.( Glenwood Springs, CO 816011 Phone: 970·945-28091 Fax: 970-945-7411 Compaction Test Report CTljTHOMPSON INGORPOR:ATED DATE· 12/10108 PROJECT NUMBER G$05195 QQQ CLIENT MCC:AULEY CONSTRUCTORS, INC. Phase: ----REPORT NUMBER: 15 SHEET: _j_ OF _j_ P.O. BOX ZOO suBJECT LOT 8, POWERLINE SUBDIVISION 700 :AUTOMATION DR., SUITE H WINDSOR co 80550 RECEIVED DEC 1 7 2008 GARFIELD COUNTY BUILDING & PI 6 .I hi'"'" 1 TEST TEST NO LOCATION DEPTH TYPE FEET 1106 B LINE & 9 LINE ~-··"--~""--·-··· ----~··--·· 1.5 NUC 1107 B LINE & 7 LINE ----·-"·~---------"--~-----··~-~ 1.5 NUC w R 1 BELO SUBG ADE SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE W!TH!N TO %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 2)VIBRATORY ROLLER 1)WACKER MOISTURE ADDED BY NATURAL TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 2)LOADERS 1)TRACKHOE PROGRESS REPORT 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL LABORATORY FIELD MAX DRY COM-SOIL TYPE DENSITY OMC'-'/o DENSITY·· MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 135.7 5.3 100 + ---··---JOB NO GS05195.000 CURVE NO 1 132.0 6.5 133.2 4.8 100 + JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACT!VE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 8-1 Q INCHES ---""-'-"--- AGGREGATE BASE COURSE WAS BEING PLACED IN THE NORTHEAST CORNER OF THE GT SANDERS WAREHOUSE FOR SUPPORT OF THE FLOOR SLAB. THE ABOVE TESTS WERE PERFORMED AT PRESENT FILL LEVELS AND RESULTS ARE WITHIN PROJECT SPECIFICATIONS. 106 & 107 0 IN OUR OPINION. FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO,(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ---------- SCOPE OF OBSERVATION: 0 FULL TIME: G1 PERIODIC ON CALL BASIS· G1 CONTRACTOR'S OR CLIENT'S REPRESENTATIVE ~ ~ ' ·~ADVISED DAN DOWNING, FIELD MANAGER CTLITHOMPSON, INC. FIELD REPRESENTATIVE APPROVED BY JOHN M DB BRAN 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE· Phase: CTLITHOMPSON ,JNGORPOR'IFTED 12/11/08 PROJECT NUMBER: G$05195 000 REPORT NUMBER: _____12_ SHEET: _j_ OF __1_ P.O. BOX200 SUBJECT' LOT 8, POWERLINE SUBDIVISION TEST NO. 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION GRIDLINE 8/A.8 1 TEST DEPTH TYPE FEET -··-·-"·-~«-··-""'-~--·---·-----~ 108 0.8 NUC GRIDLINE 9.7/B.7 ~-~~----~--~-·------------ 109 0.8 NUC GRIDLINE 9.7/D ~· .. -----~··----' 110 1.5 NUC GRIDLINE 8.4/D -··-- 111 1.5 NUC 1 BELOW SUBGRADE SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN +2 TO -2 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)VIBRATORY SMOOTH DRUM 1)WALK BEHIND ROLLER MOISTURE ADDED BY _:W_:A:..:.:T=E::.R:..T.:.:..:R:::Uc:C:.:K..:.._ ________ _ TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)LOADER 1)BACKHOE PROGRESS REPORT 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD MAX DRY COM-SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 133.5 4.9 100 + -~--~-~--- JOB NO GS05195.000 CURVE NO 1 132.0 6.5 133.2 5.4 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 133.3 4.4 100 + --·-----~-JOB NO GS05195.000 CURVE NO 1 ~·--132.0 6.5 132.1 4.8 100 JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 8 INCHES -----"---- DENSITY TESTS WERE PERFORMED N THE STRUCTURAL FILL PLACED BELOW THE FLOOR SLAB FOR THE GT SANDERS WAREHOUSE. DENSITY TEST RESULTS ARE SATISFACTORY. HAND COMPACTION EQUIPMENT IS BEING USED AROUND THE EDGES OF THE FOUNDATION. 108-111 !ZJIN OUR OPINION. FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S) ----------- SCOPE OF OBSERVATION: 0 FULL TIME: 0 PERIODIC, ON CALL 8ASIS:[2\ ~g~;i~CTOR'S OR CLIENT'S REPRESENTATIVE ALEX WITH KU~RSTEN SANDON THIBAULT ~HMCCAULEY CTLjTHOMPSON,INC. ~ . W•'"':S.) FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 816011 Phone' 970-945-28091 Fax: 970-945·7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. TEST NO. P.O. BOX 200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION NO TESTS PERFORMED ···--··"~-·-·~·-~--~--· - 1 BELOW SUBGRADE ··~--·-· 1 DEPTH FEET CTLITHOMPSON INCORPORA3FED DATE· 12/12/08 PROJECT NUMBER: GS05195 QQQ Phase: REPORT NUMBER: _.1L SHEET: _j_ OF __1_ SUBJECT LOT 8, POWERLINE SUBDIVISION TEST TYPE 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD MAX DRY COM- DENSITY OMC% DENSITY MC0/o PACTION PCF PCF % SOIL TYPE SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. MOISTURE WITHIN TO %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)VIBRATORY SMOOTH DRUM ROLLER MOISTURE ADDEO BY WATER TRUCK THICKNESS OF LIFT INCHES ------------------ TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)LOADER 1)BACKHOE PROGRESS REPORT AS REQUESTED, BY PAT WITH MCCAULEY CONSTRUCTION THE SITE WAS VISITED. AT THAT TIME THE CONTRACTOR WAS NOT READY FOR DENSITY TESTING. THE CONTRACTOR REQUESTED A MONDAY SITE VISIT. A SECOND SAMPLE OF THE ON SITE CLAY SOILS WAS OBTAINED DURING THIS VISIT. PAT WITH MCCAULEY REQUESTED A PROCTOR DENSITY TEST BE PERFORMED. 0 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ------------------- SCOPE OF OBSERVATION: D FULL TIME: [2] PERIODIC. ON CALL BASIS: IZI ~g~~~:CTOR'S OR CLIENT'S REPRESENTATIVE ALEX WITH KUERSTEN SANDON THIBAULT "" -~M 'AS:> CTLJTHOMPSON, INC. ~ . . . ' . ":\ FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING -- LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs. CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE· Phase: CTLITHOMPSON INCORPORATED 12115ffi8 PROJECT NUMBER GS05195 000 REPORT NUMBER: _1L SHEET: _j_ OF __j__ P.O. BOX 200 suBJECT LOT 8, POWERLINE SUBDIVISION TEST NO 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION GRIDLINES Dl7 1 TEST DEPTH TYPE FEET ,-~------"-~-----~·~----·--·-"·- 112 0.0 NUC GRIDLINES D.1/10 ~--------·--·--·--·-- 113 0.0 NUC GRIDLINES B/9.5 ---~--··---· 114 0.0 NUC GRIDLINES B/7 ·---· ·-0.0 NUC 115 1 BELOW SU8GRADE SPECIFICATIONS· 100 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN +2 TO •2 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)VIBRATORY SMOOTH DRUM ROLLER MOISTURE ADDED BY GARDEN HOSE TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: PROGRESS REPORT 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD MAX DRY COM· SOIL TYPE DENSITY OMC% DENSITY MC(l/o PACTION PCF PCF % CURVE NO 1 132.0 6.5 135.4 5.3 100 + ''" ~-------~--~-----~- JOB NO GS05195.000 CURVE NO 1 132.0 137.6 100 + ··-6.5 5.3 JOB NO GS05195.000 CURVE NO 1 132.0 6.5 135.1 5.8 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 134.5 5.4 100 + JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER !S NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 8 INCHES DENSITY TESTS WERE PERFORMED ON THE COMPLETED STRUCTURAL FILL BELOW THE FLOOR SLAB. DENSITY TEST RESULTS ARE SATISFACTORY. 112-115 !ZIIN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S) ----------- SCOPE OF OBSERVATION: 0 FULL TIME; 0 PERIODIC. ON CALL BASIS: [21 ~g~~1~CTOR'S OR CLIENT'S REPRESENTATIVE PAT WITH MCCAULEY SANDON THIBAULT CTLJTHOMPSON, INC. ~ ~N•'.::s::; FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORYIFIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 816011 Phone: 970·945-28091 Fax: 970-945-7411 Compaction Test Report CTl I THOMPSON INCORPORATED DATE: 12{30108 PRO,JECT NUMBER: GS05195 QQQ CLIENT MCCAULEY CONSTRUCTORS, INC. Phase: REPORT NUMBER: _1L SHEET: _j_ OF _..1__ P.O. BOX200 suBJECT LOT 8, POWERLINE SUBDIVISION 700 AUTOMATION DR., SUITE H WINDSOR co 80550 RECEIVED JAN 0 2 ZO(Jlj GARFIELD COUNTY Dl Ill '"""' •. D ,., 1 TEST TEST NO LOCATION DEPTH TYPE FEET FOOTING PAD GRIDLINES E/3.0 ·--·"-----·--···----·----~------~-- 116 0.0 NUC FOOTING PAD GRIDLINES D/3.0 ·--------·· ·- 117 0.0 NUC FOOTING PAD GRIDLINES C/3.0 ----~--·-·---·-------- 118 0.0 NUC FOOTING PAD GRIDLINES C/4.0 119 0.0 NUC FOOTING PAD GRIDLINES E/4.0 120 0.0 NUC FOOTING PAD GRIDLINES E/5.0 121 0.0 NUC 1 BELOW SUBGRADE SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN +2 TO ~2 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: NOT OBSERVED MOISTURE ADDED BY WATER TRUCK TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: PROGRESS REPORT 6 POWERLINE ROAD RIFLE, CO FOOTING SUBGRADE SUBGRADE PREPARATION LABORATORY FIELD MAX DRY DENSITY OMC% DENSITY MC% PCF PCF 132.0 6.5 135.1 5.9 132.0 6.5 134.0 6.3 132.0 6.5 133.2 4.5 132.0 6.5 135.9 5.0 132.0 6.5 135.6 5.3 132.0 6.5 136.4 5.6 COM-SOIL TYPE PACTION % I CURVE NO 1 + ···''"""""---~---""-'"-1QQ Y)B NO GS05195,000 CURVE NO 1 100 + JOB NO GS05195.QOO CURVE NO 1 100 + JoBNo GSOS195jj00 CURVE NO 1 100 + JOB NO GS05195.000 CURVE NO 1 100 + JOB NO GS05195.000 CURVE NO 1 100 + JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOTTHE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF UFT INCHES ------------------ SITE VISIT MADE THIS MORNING AS REQUESTED FOR DENSITY TESTING IN FOOTING PAD SUBGRADE (SANDERS WAREHOUSE). WE WERE INFORMED 361NCHES OF IMPORTED MINUS 3/41NCH AGGREGATE BASE COURSE WAS PLACED BELOW BOHOM OF EXISTING FOOTING PAD ELEVATIONS. PLACEMENT/COMPACTIVE EFFORT NOT OBSERVED. DENSITY TESTS PERFORMED IN PRESENT FILL LEVELS INDICATED SATISFACTORY RESULTS. FORMING OF FOOTING PADS BEGAN THIS AFTERNOON WITH REBAR/CONCRETE SCHEDULED TOMORROW MORNING (12-31-08). 116·121 GZJ IN OUR OPINION. FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.[S) ----------- SCOPE OF OBSERVATION: MATTHEW BARTO FIELD REPRESENTATIVE DB 0 FULL TIME; GZl PERIODIC, ON CALL BASIS: 0 ~g~~~~~CTOR'S OR CLIENT'S REPRESENTATIVE E.8 T WITH MCCAULEY CTLITHOMPSON, INC. tJt,v~ ~.N•'-s APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970-945·28091 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. TEST NO. 122 123 124 125 126 P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION FOOTING PAD AT GRIDLINES C/2 ---·-'"~---·---·--" FOOTING PAD AT GRIDLINES B/3 ---·--------- FOOTING PAD AT GRIDLINES 8.8/3 ------ FOOTING PAD AT GRIDLINES E/2 SO'S OF NE CORNER OF GT SANDERS WAREHOUSE EXTERIOR 1 BELOW SUBGRADE 0 2 90 v~ OF ASTM 0698 SPECIFICATIONS: 100 %OF MAXIMUM MOISTURE WITHIN TO TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)BACKHOE WITH SHAKER PLATE 1)VIBRATORY SMOOTH DRUM MOISTURE ADDED BY TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: PROGRESS REPORT CTL I THOMPSON INCORPORATED DATE: 01/08/09 PROJECT NUMBER G$05195 000 Phase: REPORT NUMBER: _gQ_ SHEET: _j_ OF ___j___ suBJECT LOT 8, POWERLINE SUBDIVISION 1 TEST DEPTH TYPE FEET 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC 0.0 NUC %OF OPTIMUM 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL GT SANDERS WAREHOUSE LABORATORY FIELD MAX DRY COM-SOIL TYPE DENSITY OMC% DENSITY MC% PACTION PCF PCF % CURVE NO 1 132.0 6.5 137.7 5.2 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 138.0 6.2 100 + JOB NO G$05195,000 CURVE NO 1 132.0 6.5 138.4 5.3 100 + JOB NO GS05195.000 CURVE NO 1 132.0 6.5 137.8 5.2 100 + JOB NO G$05195.000 2 CURVE NO 3 110.0 14.1 98.2 17.2 89 JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTJVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 10-12 INCHES ------'='------ DENSITY TESTS WERE PERFORMED IN THE AREAS OF THE ABOVE LOCATIONS. DENSITY TESTS ARE SATISFACTORY EXCEPT FOR DENSITY TEST 126. IT WAS SUGGESTED TO THE CONTRACTOR TO RECOMPACT THAT AREA. NO RETEST WILL BE REQUIRED. 122-125 [211N OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ""-""'---------- SCOPE OF OBSERVATION: 0 FULL TIME; ~ p-RIODIC ON CALL BASIS· f#l CONTRACTOR'S OR CLIENT'S REPRESENTATIVE ~ t:: ' •I!!..J ADVISED ALEX WITH KJ,JERSTE_!L__ SANDON THIBAULT CTLITHOMPSON, INC. ~ VMN..v. '":':5 FIELD REPRESENTATIVE DB APPROVEO BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs. CO 816011 Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CTLITHOMPSON I N C 0 R P 0 RATED DATE: 01[14109 PROJECT NUMBER: GS05195 QQQ CLIENT MCCAULEY CONSTRUCTORS, INC. PMoec REPORT NUMBER ~ SHEET _1_ OF _i_ P.O. BOX 200 fl.J11 /"'ET'S .. \J'f.'D sueJECT LOT 8, POWERLINE SUBDIVISION 700 AUTOMATION DR.,~\!_., ~ Vf !u 6 POWERLINE ROAD WINDSOR CO 80550 RIFLE, CO JAN 2 1 2009 TEST NO. 127 128 129 130 131 132 LOCATION 10'S OF NE CORNER EXTERIOR. ~······-~- 35'N OF SE CORNER GARFIEL 0 COUNTY BUILDIN·,, ~ PLANNING 1 TEST DEPTH FEET TYPE , ___ ,_,_, ___ 3.0 NUC EXTERIOR·-···-~----····-··-3.0 NUC 18'N OF NE CORNER iNTERIOR .. ··-·--·--·--~--2.0 NUC 30'W OF NE CORNER ·-·· ·-----INTERIOR 2.0 NUC 15'S OF NE CORNER INTERIOR 2.0 NUC 50'W OF NE CORNER INTERIOR 2.0 NUC STRUCTURAL FILL TRUST BUILDING LABORATORY FIELD MAX DRY COM-SOIL TYPE OMC% MC% DENSITY DENSITY PACTION PCF PCF % z CURVE NO 3 110.0 14.1 95.8 20.9 87 JOB NO G$05195.000 z CURVE NO 3 --·~~ 110.0 14.1 101.9 18.0 93 JOB NO GS05195.000 CURVE NO 3 110.0 14.1 104.2 19.0 95 JOB NO GS05195.000 CURVE NO 3 110.0 14.1 99.2 17.5 ---·· 90 JOB NO GS05195.000 CURVE NO 3 110.0 14.1 100.1 18.7 91 JOB NO G$05195,000 CURVE NO 3 110.0 14.1 106.6 18.3 97 JOB NO G$05195.000 1 BELOW SUBGRADE L. 90% OF ASTM 0698 WITH +2 TO ·2% MOISTURE REQUIRED SPECIFICATIONS: 95 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN ·1 TO +3 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)BACKHOE WITH SHAKER PLATE 1)WALK BEHIND ROLLER 1)VIBRATORY SMOOTH DRUM MOISTURE ADDED BY TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1 )LOADER 1 )BACKHOE PROGRESS REPORT THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT 8~10 INCHES ------~~~------ DENSITY TESTS WERE PERFORMED IN THE AREA OF FOUNDATION WALL BACKFILL AT THE ABOVE LOCATIONS. DENSITY TEST RESULTS ARE UNSATISFACTORY DUE TO THE HIGH MOISTURE CONTENT. THE ABOVE LOCATION WILL BE AIR DRIED AND RECOMPACTED AS PER THE CONTRACTOR. RETESTING WILL BE PERFORMED AFTER AIR DRYING PROCESS AND RECOMPACTION. LESS MOISTURE WILL BE ADDED TO THE BARROW SOURCE FOR ADDITIONAL FILL PLACEMENT. THINNER LIFTS AND INCREASED COMPACTION EFFORTS WAS ALSO SUGGESTED. IN PLACE FILL TEMPERATURES WERE 37 TO 44 DEGREES. 0 IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S} ---------------- IZ]!N OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) _,1c=2.c;7 ·:_c1"'32,_ ________ _ SCOPE OF OBSERVATION: 0 FULL TIME: IZl PERIODIC, ON CALL BASIS: IZl ~g~~1~CTOR'S OR CLIENT'S REPRESENTATIVE ALEX WITH KUERSTEN SANDON THIBAULT ~~,..,.·~ FIELD REPRESENTATIVE DB CTLJTHOMPSON, INC. APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. 1 Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945· 7 411 MCCAULEY CONSTRUCTORS, INC. P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 INCORPORATED Date: 01/15/2009 Report ID: K51861-GS05195.000 Report of Concrete Compressive Strength Tests Project: LOT 8, POWERLINE SUBDIVISION 6 POWERLINE ROAD Supplier: LAFARGE Location: FLOOR SLAB OFFICE AREA GT SANDERS WAREHOUSE BETWEEN GRIDLJNES 9-11/E-H. Cast Date: 12/17/2008 Ticket: C0020681 Batch Time: 09:33 Concrete Mix: RMXUH40G In-Lab Date: 12/18/2008 Truck Number: 0223 Test Time: 11:20 Specimens Made By: ST D97 [ Initial Curing Final Curing Curing Method: Min. Temp: Max Temp: Curing Method: Other 68 OF 68 OF Fog Room Physical Properties of Concrete (ASTM C143, C231, C138, C1064) Specified Strength (f'c) Slump Air Content Density Temperature 3500 psi @ 28 days 6.00 in. 4.8% 140.2 pcf. Compressive Strengths (ASTM C39) Specimen Age in Diameter Number Days (inches) 1 7 4.00 2 28 4.00 3 28 4.00 CTL 1 Thompson, Inc ~~"' .. ~ DAN DOWNING LABORATORY/FIELD MANAGER Area (sq. inches) I 12.57 12.57 12.57 Max. Load Compressive Percent (lbs.) Strength (psi) of f'c 41,000 I 3260 I Average: 3260 93 51,500 4100 50,500 4020 Average: 4060 116 cc: LAFARGE GARFIELD COUNTY 234 Center Dr. I Glenwood Springs, CO 81601 1 Phone: 970-945-28091 Fax: 970-945-7411 65 deg. F Type of Fracture Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. DATE: Phase: -Ci'ff>l:C····· CTL I THOMPSON INCORPORATED 01123/09 PROJECT NUMBER GS05195 000 REPORT NUMBER: ~ SHEET: _1_ OF _j_ P.O. BOX200 suBJECT LOT 8, POWERLINE SUBDIVISION 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 ''"'?. cou l'li'l TEST N'Gf'\ ~f\E.L0 pl}.l'.\1'.\~TION B\l 1'-0\1'.\G &. 30'E OF THE SW CORNER OF THE 152 GT SANbERS WAREHOUSE, EXTERIOR 80'E OF THE SW CORNER OF THE 153 . GT SANDERS WAREHOUsE;· EXTERIOR 15'E OF THE NE CORNER OF THE 154 '(;r SANbERS WAREHOUSE, EXTERIOR 1 DEPTH FEET 2.0 2.0 3.0 1 BELOW SUBGRADE 2 90% OF ASTM 0698 REQUIRED TEST TYPE NUC NUC NUC SPECIFICATIONS: 95 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN +2 TO -2 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)BACKHOE WITH SHAKER PLATE 1)WALK BEHIND 1)BACKHOE 1)LOADER MOISTURE ADDED BY _,W=A_,T:::E:::R:_T:.:R.::U:cC:::K::._-cc _______ _ TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 1)BOBCAT 1)WACKER PROGRESS REPORT 6 POWERLINE ROAD RIFLE, CO FOUNDATION WALL BACKFILL LABORATORY FIELD MAX DRY COM· SOIL TYPE DENSITY OMC%> DENSITY MC% PACTION PCF PCF % CURVE NO 3 110.0 14.1 105.0 15.5 95 I JOB NO GS05195,000 CURVE NO 3 110.0 14.1 104.0 15.0 --95 JOB NO GS05195.000 2 CURVE NO 3 110.0 14.1 102.0 16.5 -----93 JOB NO GS05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF LIFT INCHES ----------------- AT THIS SITE VISIT PATRICK GILROY WITH MCCAULEY CONSTRUCTION INFORMED OUR FIELD REPRESENTATIVE THAT ALL OF THE BACKFILL PLACED (REPRESENTED BY TESTS 127-132,143 & 144) IN OR AROUND THE TRUST BUILDING WILL BE REMOVED. NEW BACKFILL WILL BE PLACED IN LIFTS AND COMPACTED. DENSITY TESTING WILL THEN BE REQUESTED AND DIRECTED BY PAT GILROY. THE ABOVE DENSITY TEST WERE PERFORMED USING A NEW BACKFILL OPERATION. THE ABOVE DENSITY TESTS ARE SATISFACTORY. 152-154 GZI IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ---------- SCOPE OF OBSERVATION· 0 FULL TIME; SANDON THIBAULT FIELD REPRESENTATIVE DB [21 PERIODIC, ON CALL BASIS: [2] ~g~~1~CTOR'S OR CLIENT'S REPRESENTATIVE ALEX WITH KUERSTEN PAT GILROY \' CTLITHOMPSON, INC. I APPROVED BY DAN D ~ LABORATORY/FIELD MANAGER 234 Center Dr.( Glenwood Springs, CO 81601 I Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. TEST NO 1155 ~56 . 157 158 P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION GRIDLINE 3.5/D TOP DECK@ GTSANDERSWAREH(5"USE --·----·- 30'S OF THE NW TRUST BUILD(NG INTERICiFf--~---~· 75'E OF THE NW TRUST BUILDINGINTERIOR _______ 12'N OF THE SW .TRUST BUILDING INTERIOR - 1 DEPTH FEET 1.5 2.0 2.0 2.0 1 BELOW SUBGRADE . 2 95 VG OF ASTM 0698 REQUIRED en. I THOMPSON DATE· 01{30/09 PROJECT NUMBER: GS05195 ODD Phase: REPORT NUMBER: 25 SHEET:~ OF _j_ SUBJECT LOT 8, POWERLINE SUBfti!Yllil<lJii!ElVVD 6 POWERLINE ROAD ~\..,. f.; RIFLE, CO STRUCTURAL FILL LABORATORY FIELD TEST MAX DRY TYPE DENSITY OMC% DENSITY MC% PCF PCF NUC 132.0 6.5 133.2 7.0 NUC 110.0 14.1 108.6 14.3 NUC 110.0 14.1 98.9 17.1 NUC 110.0 14.1 110.1 14.5 FEB 0 4 Z009 GARFIELD COUNTY BUILDING & PLANNING COM· SOIL TYPE PACTION % CURVE NO 1 100 + ~ --"<--~·· ""'"~--·- JOB NO G$05195.000 2 CURVE NO 3 ---99 JOB NO G$05195.000 2 CURVE NO 3 90 JOB NO GS05195.000 2 CURVE NO 3 100 JOB NO GS05195.0QO SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN TO %OF OPTIMUM THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACT!VE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. TYPE OF COMPACTION EQUIPMENT' AND NO, OF UNITS: 1)VIBRATORY SHEEPSFOOT 1)WALK BEHIND SHEEPSFOOT MOISTURE ADDED BY THICKNESS OF LIFT 8 INCHES ------"---- TYPE OF EARTH MOVING EQUIPMENT AND NO, OF UNITS: 1)LOADER 1)BACKHOE PROGRESS REPORT DENSITY TESTS WERE PERFORMED IN THE WHERE THE CONTRACTOR HAD PLACED STRUCTURAL FILLL DENSITY TEST RESULTS ARE SATISFACTORY EXCEPT FOR DENSITY TEST NO. 157. IT WAS SUGGESTED TO THE CONTRACTOR TO REWORK THAT AREA. A RETEST IS REQUIRED. 155 156 & 158 !Z] IN OUR OPINION. FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S} __,1.o:_57'----------- SCOPE OF OBSERVATION: 0 FULL TIME: 0 PERIODIC. ON CALL BASIS: 121 ;g~~1~~CTOR'S OR CLIENT'S REPRESENTATIVE SCOTT WITH KUE_RSTEN SANDON THIBAULT '""" . . !"\ r CTLJTHOMPSON, INC. ~ ~Nt ~ FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. 1 Glenwood Springs, CO 816011 Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CTI.. I THOMPSON I'NCORPORAIED DATE: 02/02109 PROJECT NUMBER: G$05195 QQQ CLIENT MCCAULEY CONSTRUCTORS, INC. PhaSe· REPORT NUMBER: ~ SHEET: _1__ OF __:1_ P.O. BOX200 SUBJECT, LOT 8, POWERLINE SUBDIVISION TEST NO. 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION RETEST N0.157 .,.. ____ . ---- 157 A 1i4'E OF THE NW CORNEff-··· GRIDLINES 3.5/D AT THE DOCK 159 -GT-SANDERS WAREHOUSE --------- GRIDLINES A.5/8 160 -BELOW FLOOR SLAB @ TRUST BLDG:- GRIDLINES A.5/3.2 - 161 BELOW FLOOR SLAB @TRUST BLDG. GRIDLINES B.5/2.2 162 BELOW FLOOR SLAB @TRUST BLDG. 1 DEPTH FEET 0.0 1.5 1.5 1.5 1 BELOW SUSGRADE . 2 95 Yo OF ASTM 0698 REQUIRED TEST TYPE NUC NUC NUC NUC NUC SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN +2 TO •2 %OF OPTIMUM TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)VIBRATORY SMOOTH DRUM 1)WALK BEHIND ROLLER MOISTURE ADDED BY .:'Wc:A=T:::E:,:R:_T:,:R,::U::_C::_K~-::-:-------- TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 2)LOADERS 1)BACKHOE PROGRESS REPORT 6 POWERLINE ROAD RECEIVED RIFLE, CO STRUCTURAL FILL LABORATORY FIELD MAX DRY DENSITY OMC% DENSITY MC% PCF PCF 110.0 14.1 104.6 17.4 132.0 6.5 132.2 6.4 132.0 6.5 135.6 6.9 132.0 6.5 138.0 4.9 132.0 6.5 137.5 5.8 FEB 0 5 2009 GARFIELD COiJo;·rv BUILDING & Pt..I\N''"'I.i COM-SOIL TYPE PACTION % 2 CURVE NO 3 95 JOB NO GS05195.000 -=~~~.:~.~----··-·1 ___ 1 100 JOB NO GS05195.000 CURVE NO 1 100 + ~·-~ JOB NO GS05195.000 CURVE NO 1 100 + . JOB NO GS05195.000 CURVE NO 1 100 + JOB NO G$05195.000 THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. THICKNESS OF UFT -----~6-~8:__ ____ 1NCHES DENSITY TESTS WERE PERFORMED IN THE AREAS AT THE ABOVE LOCATIONS. DENSITY TEST RESULTS ARE SATISFACTORY. THE BASE OF ALL FILLS WERE NOT OBSERVED BY OUR CTL FIELD REPRESENTATIVE. AGGREGATE BASE COURSE WAS BEING PLACED IN THE TRUST BUILDING EXCEPT FOR THE NORTHEAST CORNER OF THE BUILDING. 159-163 G2l IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.{S) 0 IN OUR OPINION. FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ---------- SCOPE OF OBSERVATION: 0 FULL TIME: (21 PERIODIC, ON CALL BASIS: [2) ~g~~1~CTOR'S OR CLIENT'S REPRESENTATIVE _,_P-'A"'T'--W'-'-'-/ _______ _ ':-.... ~S:/:'.~_1:-EY SANDON THIBAULT I l4.. _,. ~~uc;noN CTL\THOMPSON, INC. "'"---"7. f r ...-'""-' 1 ~ FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING ~ LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 816011 Phone: 970-945·28091 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. TEST NO 163 164 165 P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION GRIDLINE D/3.5 BELOW FLOOR SLAB .. TRUST BUILDING·-··-----····- GRIDLINE B/1.5 BELOW FLOOR SLAB TRUST BUILDING-····----·--- GRIDLINE B/5.5 BELOW FLOOR SLAB -TRUST BUILDING 1 BELOW SUBGRADE 1 DEPTH FEET 0.0 0.0 0.0 CTLITHOMPSON INCORPORA?I:ED OATEc 02/04/09 PROJECT NUMBERc GS05195 000 Phase: REPORT NuMBER: 27 D!V"DJG"1'tffifi SUBJECT LOT 8, POWERLINE SUBDIVI!Mj.i\....1'.1 ' F.JU' TEST TYPE NUC NUC NUC 6 POWERLINE ROAD RIFLE, CO STRUCTURAL FILL LABORATORY FIELD MAX DRY DENSITY OMC% DENSITY PCF PCF 132.0 6.5 131.9 132.0 6.5 132.0 132.0 6.5 135.2 MC% 6.0 4.7 6.2 FEB 0 9 ZOPG GARFIELD ()')tJ•<·cv BUILDING & PLAN I'; lNG COM· SOIL TYPE PACTION % CURVE NO 1 ~·~--'--"--·--·~·-·-100 JOB NO GS05195.000 CURVE NO 1 100 JOB NO GS05195.000 CURVE NO 1 100 + ---------JOB NO GS05195.000 SPECIFICATIONS: 100 %OF MAXIMUM ASTM D 698 MOISTURE W!TH!N _:+!:!2':_____cT:e.0 _ _::,·2~ %OF OPTIMUM THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)VIBRATORY SMOOTH DRUM ROLLER MOISTURE ADDEO 8Y WATER TRUCK TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: 2)LOADERS 2)BOBCATS PROGRESS REPORT THICKNESS OF LIFT _____ _!8Cc.._ _____ INCHES DENSITY TEST WERE PERFORMED IN THE FLOOR SLAB AREA IN THE TRUST BUILDING. STRUCTURAL FILL WAS IN THE PORCESS OF BEING PLACED AT THE EAST END OF THE BUILDING DENSITY TEST RESULTS ARE SATISFACTORY. OUR OFFICE WILL BE NOTIFIED WHEN OUR SERVICES ARE REQUIRED. 163-165 (2j IN OUR OPINION, FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ---------- SCOPE OF OBSERVATION: 0 FULL TIME; 0 PERIODIC, ON CALL BASIS: G2] ~g~~~~~CTOR'S OR CLIENT'S REPRESENTATIVE PAT MCCAULEY SANDON THIBAULT CTLjTHOMPSON,INC. }~,..., U-1--VN •' ~ FIELD REPRESENTATIVE DB APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 81601 I Phone: 970-945-28091 Fax: 970-945-7411 Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. TEST NO 170 171 172 173 P.O. BOX 200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION 140'N, 90'W OF THE NW CORNER ·oF THE TR-USTBUILDING-~---··- 100'N, 110'W OF THE NW CORNER OF THE TRUSTBUILDING ------ 75'N, 40'W OF THE NW CORNER . OF THE TRUSfBUJLDING ··-- 120'N, 15'W OF THE NW CORNER OF THE TRUST BUILDING 1 BELOW SUBGRADE 1 DEPTH FEET 0.0 0.0 0.0 0.0 CTLITHOMPSON DATE: 04/24109 PROJECT NUMBER: GSQ5195 QQQ Phase: REPORT NUMBER _1..§!_ SHEET: __1_ OF _j_ sue.>ECT LOT 8, POWERLINE SUBDIVISION TEST TYPE NUC NUC NUC NUC 6 POWERLINE ROAD RIFLE, CO SUBGRADE PREPARATION LABORATORY FIELD MAX DRY DENSITY OMC'Yo DENSITY MC% PCF PCF 110.0 14.1 103.5 11.0 110.0 14.1 101.0 15.1 110.0 14.1 116.0 14.4 110.0 14.1 117.0 10.0 COM- PACTION % 94 92 100 + 100 + SOIL TYPE CURVE NO 3 -"~-~-~·"---~---- JOB NO GS05195.000 CURVE NO 3 ·-"~-JOB NO GS05195.000 CURVE NO 3 ···------JOB NO G$05195.000 CURVE NO 3 JOB NO GS05195.000 SPECIFICATIONS· 95 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN +2 TO N2 %OF OPTIMUM THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE REUED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACTIVE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: 1)VIBRATORY SMOOTH DRUM 1)BLADE MOISTURE ADDED BY WATER TRUCK THICKNESS OF LIFT NOT OBSERVED INCHES ---'-'-'"'--'-"""-"'=~- TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: PROGRESS REPORT DURING THIS SITE VISIT THE SUBGRADE FOR THE PARKING LOT FROM POWER LINE ROAD TO THE ISLAND WITH THE LIGHT POLES WAS PREPARED. THE CONTRACTOR WAS NOT ON SITE. DENSITY TEST RESULTS INDICATE SATISFACTORY COMPACTION FOR DENSITY TESTS 172 & 173. THE MOISTURE CONTENT OF DENSITY TEST NO 171 & 172 ARE SATISFACTORY. IT WAS SUGGESTED TO THE CONTRACTOR TO SCARIFY AND MOISTURE CONDITION THE AREA OF DENSITY TEST NO. 170 & 173. COMPACTIVE EFFORT SHOULD BE APPLIED TO THE AREA OF DENSITY TEST NO. 170, 171 AND 173. RETEST WILL BE REQUIRED FOR DENSITY TEST NO. 170, 171 & 173. PAT WAS INFORMED BY TELEPHONE. PROOF ROLLING WILL BE PERFORMED LATER. 172 0 IN OUR OPINION. FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) [Z}IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) -'1_,_70,_,,-'1_,_7_,_1_,&'-'1"-7-".3 ____ _ SCOPE OF OBSERVATION: D FULL TIME; I2J PERIODIC. ON CALL BASIS; 0 ~g~~1~CTOR'S OR CLIENT'S REPRESENTATIVE PAT WITH MCCAULEY SANDON THIBAULT bf;r~" ti""""'"~ FIELD REPRESENTATIVE DB CTLITHOMPSON, INC. APPROVED BY DAN DOWNING LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 816011 Phone: 970·945·28091 Fax: 970-945-7411 ! Compaction Test Report CLIENT MCCAULEY CONSTRUCTORS, INC. TEST NO. P.O. BOX200 700 AUTOMATION DR., SUITE H WINDSOR CO 80550 LOCATION RETEST NO. 170 __ .. ___ --------·-· .. -·----<·--~~----~--··"~--·--~· '---··-~ 170 • RETEST NO. 171 ----··-----··-------"~------~----~-~- 171 • RETEST NO. 173 173 •. --·--,--···---··--------- CENTER OF PARKING LOT WEST ·- 174 OF CENTER LIGHT POLE ISLAND 1 BELOW SUBGRADE 1 DEPTH FEET 0.0 CTL. I THOMPSON DATE: 04/27/09 PROJECT NUMBER: GS05195 000 Phase: ---REPORT NUMBER: _lQ__ SHEET: _j_ OF _j__ suaJEcr LOT 8, POWERLINE SUBDIVISION TEST TYPE NUC NUC NUC NUC 6 POWERLINE ROAD RIFLE,q,Q LABORATORY FIELD MAX DRY DENSITY OMC% DENSITY PCF PCF 110.0 14.1 106.9 110.0 14.1 113.1 110.0 14.1 111.1 110.0 14.1 109.0 COM-SOIL TYPE MC%:~ PACTION % CURVE NO 3 12.5 97 -~----·----·- JOB NO G$05195.000 CURVE NO 3 13.3 100 + ·-______ .. ____ JOB NO GS05195.000 CURVE NO 3 12.1 100 + ~----·-·---·--JOB NO GS05195.000 CURVE NO 3 13.2 99 ----·-JOB NO GS05195.000 SPECIFICATIONS: 95 %OF MAXIMUM ASTM D 698 MOISTURE WITHIN +2 TO ~2 %OF OPTIMUM THIS REPORT PRESENTS OPINIONS FORMED AS A RESULT OF OUR OBSERVATION OF FILL PLACEMENT, AS WELL AS THE TESTS SHOWN ABOVE, WE HAVE RELIED UPON THE CONTRACTOR TO APPLY THE NECESSARY COMPACT!VE EFFORT AND MOISTURE TO ACHIEVE SPECIFIED COMPACTION DURING TIMES WHEN OUR OBSERVER IS NOT PRESENT, AND AT LOCATIONS OTHER THAN THOSE TESTED. TEST DATA ARE NOT THE SOLE BASIS FOR OPINIONS ON WHETHER THE FILL MEETS SPECIFICATIONS. TYPE OF COMPACTION EQUIPMENT AND NO. OF UNITS: NOT OBSERVED MOISTURE ADDED BY THICKNESS OF LIFT -----------INCHES TYPE OF EARTH MOVING EQUIPMENT AND NO. OF UNITS: PROGRESS REPORT WE RETURNED TO THE SITE THIS AFTERNOON AS REQUESTED BY PAT MCCAULEY. WE WERE INFORMED PARKING LOT SUBGRADE WEST OF CENTER LIGHTPOLE ISLAND WAS REWORKED BY SCARIFYING, MOISTURE TREATED AND RECOMPACTING USING A VIBRATORY SHEEPSFOOT ROLLER. RETESTS AND ADDITIONAL TESTING INDICATED RESULTS WITHIN PROJECT SPECIFICATIONS ACHIEVED. PROOF ROLL OBSERVATION THEN PERFORMED USING LOADED WATER TRUCK WITH SATISFACTORY RESULTS. PAT INDICATED FURTHER WATER LINE TRENCH EXCAVATION IS PLANNED CROSSING THIS SECTION OF THE PARKING LOT. WE WERE INFORMED OUR OFFICE WILL BE NOTIFIED WHEN FURTHER VISITS ARE NEEDED. ~1~7~0A~1~7~1A~1~7~3~A~&~17~4~---­GZJ IN OUR OPINION. FILL COMPACTION MEETS SPECIFICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) 0 IN OUR OPINION, FILL COMPACTION DOES NOT MEET SPEC!FICATIONS AS INDICATED BY OUR OBSERVATIONS AND TEST NO.(S) ---------- SCOPE OF OBSERVATION: MATTHEW BARTO FIELD REPRESENTATIVE DB 0 FULL riME: r;] PERIODIC ON CALL BASIS· Q CONTRACTOR'S OR CLIENT'S REPRESENTATIVE PAT WITH MC .. CAULEcY._ __ t!:J ' · ~ ADVISED -- APPROVED BY DAN DOWNING - LABORATORY/FIELD MANAGER 234 Center Dr. I Glenwood Springs, CO 816011 Phone: 970·945-28091 Fax: 970·945~7411 Visual Welding Inspection Report CTL I THOMPSON INCOR'PORATED. CLIENT MCCAULEY CONSTRUCTORS, INC. PROJECT 6 POWERLINE ROAD PROJECT NO. GS05195-390 DATE: 2-9-09 LOCATION RIFLE, COLORADO Plan by: WEEKS AND ASSOCIATES Project No. __ _ Date: Plan date September 24, 2008 Description of Work/Location: Trust Building; Grade beam below floor slab. Pilaster detail 4/82.1, Gridlines 2-8 between Gridlines A-E. Welding was complete at the time of our visit. Plan details require a splice lap. Minimum of 30 inches (Detaii4/S2.1). Standard or Code: 0 AWS DLI 0 AWS Dl.3 [2<J AWS DIA Weather Conditions: CLOUDY WITH SNOW 0 Shop [2<J Field Type and Capacity of Machines: MILLER TRAILBLAZER -300 AMP Electrodes: E7018RS Types of Welds: FLARE GROVE WELD Weld Sizes: (VERBALl3 WELDS ONE SIDE ONLY 2-3 INCH LONG AT EACH SPLICE. Welding Positions Used: Horizontal SUMMARY Total Lineal Inches of Welds Made: N/A Inspected: 100% Rejected: ____ _ Rewelded: ___ _ Accepted: 100% 0 Discrepancies Noted: None noted TECHNICIAN SANDY THIBAULT