Loading...
HomeMy WebLinkAbout6.0 Land Use Change PermitEllt i[., f ltH,il hll llilrl Filr],ltrll L' lriil l['{ r ldfi I','}, _l ll IReceptionH: 875538 04lOSl2016 09:47:1O Al'l Jean Rlberico1 of 5 Rec Fee:$O.OO Doc Fee:O.OO CARFIELO COUflTy CO LAND USE CHANGE PERII/IIT for A site approximately 3.3 acres in size within an overallS20 acre parcelof land owned by Encana Oil and Gas (USA) lnc, and described in the Surface Lease found at Heception No. 820165 in the records of the Garfield County Clerk and Recorder and further described in the Site Plan and Legal Description attached as Exhibits "A" and "B", located in Section 36, Township 7 South, Range 96 West of the dh P.M. (Parcel No. 2409-36 1 -00-048) ln accordance with and pursuant to provisions of the Garlield County Land Use and Development Code, as amended, and Resolution No. 201 4-42 of the Board of County Commissioners of Gartield County, State of Colorado, the following activity is hereby authorized by Land Use Change Permlt: A Compressor Pipeline Pump Station (not subject to Atticle 9) known as the Grand River Gathering LLC Summit Midstream High Mesa Compressor Station (LtPA-7752) This Land Use Change Permit is issued subject to the conditions contained in Resolution No. 2014-42 and set forth in Exhibit "C" and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Land Use and Development Code, as amended, Building Code, and other regulations of the Board of County Commissioners of Gartield County, Colorado. ATTEST: COUNTY BOARD OF MMISSIONERS, COUNTY, COLORADO 5, 1l re Date Q , at.,- ry1 AZAurrry Illl fllLHlllrlt il[i lHf,['hi,l]lll,r,lllll,ihrrhlt I,,,1, I lllReceptionS: 87553804lOSl20l6 09;47:10 Ait Jean Alberico2 of 5 Rec Fee:60,O0 Ooc Fee.0 00 GARFIELD COUNTY C0 -,,hibit A (Site Plan) ztFY// ,--{ I i:rr i Iltl fltr.rl mil,t!illi Ht l1?rF,httl,TilEl lltLh l,ltirl,rL Il lllReceptionB; 875538O4|OSl2016 O9:47:10 AM Jean Alberico4 of 5 R€c Fee:$0.00 Doc Fee:o 00 aARFIELD COUNTY co -^nibit c (Page 1 of s) 1. That all representations made by the Applicant in the application and at the public hearing before the Board shall be conditions of approval unless specifically altered by the Board. 2. That the operation of the Station shall be done in accordance with all applicable Federal, State, and local regulations governing the operation of this type of facility. 3. Prior to the issuance of the Land Use Permit, the Appticant shall provide confirmation that the Station site is covered by COGCC Bonding or other security acceptable to the County Attorney's Office for site reclamation. 4. Prior to issuance of the Land Use Change Permit the Applicant shail update the site plan to show all easements including pipeline easements accessing the facility. The Applicant shall also provide information on pipelines serving the facility confirming that they are properly permitted or exempt from permitting in accordance with the Code. 5. The Applicant shall maintain proper permitting and compliance with CDPHE Air Quality Regulations and Stormwater Discharge Regulations, Compliance with the Stormwater Management Permit and Best Management Practices forthe site shall be required. 6. The Applicant shail complete the recommended upgrades and repairs to the drainage system as recommended in the Drainage Report (dated 5/23/14) completed by River City Consultants. Both the high and low priority items shall be completed and notification provided to the Garfield County Community Developrnent Department upon completion. The improvements shall be completed within g0 days of approval of the Land Use Change Permit. 7. The Applicant shall cornply with the wildlife habitat mitigations recommendations contained in the repoft by Westwater Engineering Inc. (dated 3112) and the CPW recommendations contained in their Referral comments (dated 717114). B. A waiver from the access standards contained in Table 7-107 is granted for maximum road grade and curve radius consistent with the Applicant's Report on Policy 04-01 Roadway Waivers completed by River City Consultants (dated 614114) and the roadway alignment surveys submitted with the Application. -lil fl,r rr f 5? H It lll I i, lltlL [I ll h,ltll rlj lt ]\ i I 1d,' I lt] I,il t t ll I ReceptionH:875538 04r05/2016 O9:47:10 Fll Jean Flberico5 ol 5 Rec FeerS0.00 Doc Fee:O O0 GARFIELD COUNTY C0 9. Exhibit C (Page 2 ot 3) The Applicant's Noise Analysis estimates that the Station will operate in compliance with COGCC Noise Standards. Should noise issues be raised in the future, the Applicant shall complete a supplemental noise test to confirm compliance. Pursuant to said results, if additional noise mitigation is required to achieve compliance with COGCC standards, the Applicant shall complete said additional mitigation. Noise control packages including hospital grade mufflers and sound attenuating baffles shall continue to be used on equipment at the Station. All equipment and structures associated with this permit shall be painted with non- reflective paint in neutral colors to reduce glare and mitigate any visual impacts. Portable toilet facilities will be provided for employees in accordance with OSHA requirernents including during construction and for operations personnel. All exterior lighting shall be the minimum amount necessary or required by the building code or industry standards, and shall be directed inward and downward on the site. Lighting shall be shut off during nighttime hours, except as necessary for operations, service activities or building code requirements. The Applicant shall continue weed management on the site and comply with County Weed Control Regulations and the noxious weed management plan. Weed management shall include disturbed areas of the site outside the security fencing. The Applicant shall comply with the Dust Control Plan as represented in the Application, including mitigation for the access roadway including sections located off-site. The Applicant shall comply with all SPCC Plan provisions and shall keep the plan current and updated for any changes to the facility. Future construction or replacement of equipment shall require building permits as applicabte and shall have foundation designs engineered to address soils constraints. 10, 11. 12. 13. 14, 15. 16. llll H,rfu [II,H{U[ Ilr I lhlt l, 1{lltth$ilir!h,' li,tll Il il IRecept5onH: 87553704lASl2015 09:47:10 AI'l Jean Flberico'l of 3 Rec Fee:S0.00 ooc Fee:0.00 cqiflfLo COUNTY CO STATE OF COLORADO County of Garfield At a regular meeting of the Board of County Commissioners for Garfield County, Colorado, held in the Commissioners'Meeting Room, Garfield County Adrninistration Building in Glenwood Springs on Monday, the 2l't day of March A.D. 2016, there were present: John Martin , Commissioner Chairman Mike Samson - absent , Commissioner Tom Jankovsky , Commissioner TariWilliams , County Attorney Kellv Cave , Assistant County Aftorney Jean Alberico , Clerk of the Board Fred Jarman ., Acting County Manager when the following proceedings, among others were had and done, to-wit: ITESoLUTIoN No. JO I L - ]T A RESOLUTION A}PROVING AN EXTENSION OF TIME TO MEET CONDITIONS OF APPROVAL FOR A LAND USE CHANGE PERMIT FOR A COMPRESSOR _ PIPELINE PUMP STATION ON A 320 ACRE PROPERTY LOCATED APPROXIMATLEY 3 MILES SOUTH OF'THE TOWN OF PARACHUTE IN SECTION 36, TOWNSHIP 7 SOUTH, RANGE 96 WEST OF THE 6rH p.M., GARFIELD COUNTy PA RCEL NO. 2 4 09-3 6 t -00-04 I Recitals A. The Board of County Commissioners of Garfield County, Colorado, (Board) has received a request for an extension of time to meet conditions of approval for a Land Use Change Permit - Limited Impact Review for a Compressor - Pipeline Pump Station, submitted by Crand River Gathering LLC - Summit Midstream, known as the High Mesa Compressor Station (File No. LIPA-7752). B. The Application was conditionally approved by Resolution No. 2014-42. It is Iocated on approximately 3.3 acres within an overall 320 aue parcel of land owned by Encana Oil and Gas (USA) Inc. Authorizations and Ownership of this property are described in the Short Form of Surface Lease found at Reception Number 820165 in the records of the Garfield County Clerk and Recorder. ) )ss ) b lll I tl ht'I'l,lr il lH I Hrlt l,'l hlJlll4l,' [fl,] I[ l, hi'ih,l Il ll I Recept ion$ : 875537 04l@512016 09;47;10 Al"l Jean Alberico2 of 3 Rec Fee:$O.OO Doc Feei0.00 GnRFIELO CoUNTY CO C. The one year time period to satisfy conditions of approval has expired. In accordance with the provisions of the Land Use and Development Code Section 4.101.I.4, the Applicant has requested from the Board the extension of an expired approval. D. In accordance with the Land Us" *a Development Code as amended, the Board is authorized to grant extension of time to complete conditions of approval for an otherwise expired approval upon a finding by the board that the failure to file for an extension was due to extenuating circumstances and that it benefits the public interest to grant the extension. The Applicant has included in their request a description of extenuating circumstances. F. At a public meeting held on March 21,2016 the Board considered the question of whether to grant an extension to satisfy conditions of approval, at which meeting the public and interested person were given the opportunity to express their opinions regarding the issuance of said extension. RESOLUTION NOW THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Garfield County, Colorado, that: A. The forgoing Recitals are incorporated by this reference as part of the resolution. B. The approval for the Grand River Gathering LLC - Summit Midstream, High Mesa Compressor Station is hereby extended for 90 days to June 19, 2016. C. All findings and conditions of approval contained in Resolution No. 201442 shall remain' in effect. D. The failure to file for an extension was due to extenuating circumstances and the requested extension is in the best interest of the health, safety and welfare of the citizens of Garfield County. qtx day of A*-^i- , A.D. zo-&-. GARFIELD COUNTY BOARD OF Dated this ATTEST: CO GARFIELD "fi-_, ff-:rt*s"q i sEAr, iit -** rj U**,a'a;G.- of the Board 2 ilil HhEIIrHlUlH | [ tHIt hlrl Hil]lHkffl ] J,ri{lir I','}' I ll I Receot ion$ : 875537 oqtodtzota O9:47:10 AH Jean Albericoi oi g Rec Fee:$o.o0 Doo Fee:0.00 GARFIELD coUNTY co Upon motion duly made and seconded the foregoing Resolution was adopted by the following vote: COMMISSIONER CHAIR JOHN F. MARTIN , Aye COMMISSIONER MIKE SAMSON , Absent COMMISSIONER TOM JANKOVSKY _ , Aye STATE OFCOLORADO ) )ss County of Garfield ) I, , County Clerk and ex-officio Clerk of the Board of County Comrnissioners, in and for the County and State aforesaid, do hereby certify that the annexed and foregoing Resolution is truly copied from the Records of the Proceeding of the Board of County Commissioners for said Garfield County, now in my office. IN WITNESS WHEREOF, I have hereunto set rny hand and affixed the seal of said County, at Glenwood Springs, this _ day of A.D.20_. County Clerk and ex-officio Clerk of the Board of County Commissioners