HomeMy WebLinkAbout6.0 Land Use Change PermitEllt i[., f ltH,il hll llilrl Filr],ltrll L' lriil l['{ r ldfi I','}, _l ll IReceptionH: 875538
04lOSl2016 09:47:1O Al'l Jean Rlberico1 of 5 Rec Fee:$O.OO Doc Fee:O.OO CARFIELO COUflTy CO
LAND USE CHANGE PERII/IIT
for
A site approximately 3.3 acres in size within an overallS20 acre parcelof land owned by
Encana Oil and Gas (USA) lnc, and described in the Surface Lease found at Heception
No. 820165 in the records of the Garfield County Clerk and Recorder and further
described in the Site Plan and Legal Description attached as Exhibits "A" and "B",
located in Section 36, Township 7 South, Range 96 West of the dh P.M.
(Parcel No. 2409-36 1 -00-048)
ln accordance with and pursuant to provisions of the Garlield County Land Use and
Development Code, as amended, and Resolution No. 201 4-42 of the Board of County
Commissioners of Gartield County, State of Colorado, the following activity is hereby
authorized by Land Use Change Permlt:
A Compressor Pipeline Pump Station (not subject to Atticle 9) known as the
Grand River Gathering LLC Summit Midstream High Mesa Compressor Station
(LtPA-7752)
This Land Use Change Permit is issued subject to the conditions contained in Resolution
No. 2014-42 and set forth in Exhibit "C" and shall be valid only during compliance with
such conditions and other applicable provisions of the Garfield County Land Use and
Development Code, as amended, Building Code, and other regulations of the Board of
County Commissioners of Gartield County, Colorado.
ATTEST:
COUNTY BOARD OF
MMISSIONERS,
COUNTY, COLORADO
5,
1l re
Date
Q , at.,- ry1 AZAurrry
Illl fllLHlllrlt il[i lHf,['hi,l]lll,r,lllll,ihrrhlt I,,,1, I lllReceptionS: 87553804lOSl20l6 09;47:10 Ait Jean Alberico2 of 5 Rec Fee:60,O0 Ooc Fee.0 00 GARFIELD COUNTY C0
-,,hibit A
(Site Plan)
ztFY//
,--{
I i:rr
i
Iltl fltr.rl mil,t!illi Ht l1?rF,httl,TilEl lltLh l,ltirl,rL Il lllReceptionB; 875538O4|OSl2016 O9:47:10 AM Jean Alberico4 of 5 R€c Fee:$0.00 Doc Fee:o 00 aARFIELD COUNTY co
-^nibit c
(Page 1 of s)
1. That all representations made by the Applicant in the application and at the public
hearing before the Board shall be conditions of approval unless specifically altered
by the Board.
2. That the operation of the Station shall be done in accordance with all applicable
Federal, State, and local regulations governing the operation of this type of facility.
3. Prior to the issuance of the Land Use Permit, the Appticant shall provide
confirmation that the Station site is covered by COGCC Bonding or other security
acceptable to the County Attorney's Office for site reclamation.
4. Prior to issuance of the Land Use Change Permit the Applicant shail update the
site plan to show all easements including pipeline easements accessing the facility.
The Applicant shall also provide information on pipelines serving the facility
confirming that they are properly permitted or exempt from permitting in
accordance with the Code.
5. The Applicant shall maintain proper permitting and compliance with CDPHE Air
Quality Regulations and Stormwater Discharge Regulations, Compliance with the
Stormwater Management Permit and Best Management Practices forthe site shall
be required.
6. The Applicant shail complete the recommended upgrades and repairs to the
drainage system as recommended in the Drainage Report (dated 5/23/14)
completed by River City Consultants. Both the high and low priority items shall be
completed and notification provided to the Garfield County Community
Developrnent Department upon completion. The improvements shall be
completed within g0 days of approval of the Land Use Change Permit.
7. The Applicant shall cornply with the wildlife habitat mitigations recommendations
contained in the repoft by Westwater Engineering Inc. (dated 3112) and the CPW
recommendations contained in their Referral comments (dated 717114).
B. A waiver from the access standards contained in Table 7-107 is granted for
maximum road grade and curve radius consistent with the Applicant's Report on
Policy 04-01 Roadway Waivers completed by River City Consultants (dated
614114) and the roadway alignment surveys submitted with the Application.
-lil fl,r rr f 5? H It lll I i, lltlL [I ll h,ltll rlj lt ]\ i I 1d,' I lt] I,il t t ll I
ReceptionH:875538
04r05/2016 O9:47:10 Fll Jean Flberico5 ol 5 Rec FeerS0.00 Doc Fee:O O0 GARFIELD COUNTY C0
9.
Exhibit C
(Page 2 ot 3)
The Applicant's Noise Analysis estimates that the Station will operate in
compliance with COGCC Noise Standards. Should noise issues be raised in the
future, the Applicant shall complete a supplemental noise test to confirm
compliance. Pursuant to said results, if additional noise mitigation is required to
achieve compliance with COGCC standards, the Applicant shall complete said
additional mitigation. Noise control packages including hospital grade mufflers and
sound attenuating baffles shall continue to be used on equipment at the Station.
All equipment and structures associated with this permit shall be painted with non-
reflective paint in neutral colors to reduce glare and mitigate any visual impacts.
Portable toilet facilities will be provided for employees in accordance with OSHA
requirernents including during construction and for operations personnel.
All exterior lighting shall be the minimum amount necessary or required by the
building code or industry standards, and shall be directed inward and downward
on the site. Lighting shall be shut off during nighttime hours, except as necessary
for operations, service activities or building code requirements.
The Applicant shall continue weed management on the site and comply with
County Weed Control Regulations and the noxious weed management plan.
Weed management shall include disturbed areas of the site outside the security
fencing.
The Applicant shall comply with the Dust Control Plan as represented in the
Application, including mitigation for the access roadway including sections located
off-site.
The Applicant shall comply with all SPCC Plan provisions and shall keep the plan
current and updated for any changes to the facility.
Future construction or replacement of equipment shall require building permits as
applicabte and shall have foundation designs engineered to address soils
constraints.
10,
11.
12.
13.
14,
15.
16.
llll H,rfu [II,H{U[ Ilr I lhlt l, 1{lltth$ilir!h,' li,tll Il il IRecept5onH: 87553704lASl2015 09:47:10 AI'l Jean Flberico'l of 3 Rec Fee:S0.00 ooc Fee:0.00 cqiflfLo COUNTY CO
STATE OF COLORADO
County of Garfield
At a regular meeting of the Board of County Commissioners for Garfield County,
Colorado, held in the Commissioners'Meeting Room, Garfield County Adrninistration Building
in Glenwood Springs on Monday, the 2l't day of March A.D. 2016, there were present:
John Martin , Commissioner Chairman
Mike Samson - absent , Commissioner
Tom Jankovsky , Commissioner
TariWilliams , County Attorney
Kellv Cave , Assistant County Aftorney
Jean Alberico , Clerk of the Board
Fred Jarman ., Acting County Manager
when the following proceedings, among others were had and done, to-wit:
ITESoLUTIoN No. JO I L - ]T
A RESOLUTION A}PROVING AN EXTENSION OF TIME TO MEET CONDITIONS
OF APPROVAL FOR A LAND USE CHANGE PERMIT FOR A COMPRESSOR _
PIPELINE PUMP STATION ON A 320 ACRE PROPERTY LOCATED
APPROXIMATLEY 3 MILES SOUTH OF'THE TOWN OF PARACHUTE IN SECTION
36, TOWNSHIP 7 SOUTH, RANGE 96 WEST OF THE 6rH p.M., GARFIELD COUNTy
PA RCEL NO. 2 4 09-3 6 t -00-04 I
Recitals
A. The Board of County Commissioners of Garfield County, Colorado, (Board) has
received a request for an extension of time to meet conditions of approval for a Land Use Change
Permit - Limited Impact Review for a Compressor - Pipeline Pump Station, submitted by Crand
River Gathering LLC - Summit Midstream, known as the High Mesa Compressor Station (File
No. LIPA-7752).
B. The Application was conditionally approved by Resolution No. 2014-42. It is Iocated
on approximately 3.3 acres within an overall 320 aue parcel of land owned by Encana Oil and
Gas (USA) Inc. Authorizations and Ownership of this property are described in the Short Form
of Surface Lease found at Reception Number 820165 in the records of the Garfield County Clerk
and Recorder.
)
)ss
)
b
lll I tl ht'I'l,lr il lH I Hrlt l,'l hlJlll4l,' [fl,] I[ l, hi'ih,l Il ll I
Recept ion$ : 875537
04l@512016 09;47;10 Al"l Jean Alberico2 of 3 Rec Fee:$O.OO Doc Feei0.00 GnRFIELO CoUNTY CO
C. The one year time period to satisfy conditions of approval has expired. In accordance
with the provisions of the Land Use and Development Code Section 4.101.I.4, the Applicant has
requested from the Board the extension of an expired approval.
D. In accordance with the Land Us" *a Development Code as amended, the Board is
authorized to grant extension of time to complete conditions of approval for an otherwise expired
approval upon a finding by the board that the failure to file for an extension was due to extenuating
circumstances and that it benefits the public interest to grant the extension. The Applicant has
included in their request a description of extenuating circumstances.
F. At a public meeting held on March 21,2016 the Board considered the question of
whether to grant an extension to satisfy conditions of approval, at which meeting the public and
interested person were given the opportunity to express their opinions regarding the issuance of
said extension.
RESOLUTION
NOW THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Garfield
County, Colorado, that:
A. The forgoing Recitals are incorporated by this reference as part of the resolution.
B. The approval for the Grand River Gathering LLC - Summit Midstream, High Mesa
Compressor Station is hereby extended for 90 days to June 19, 2016.
C. All findings and conditions of approval contained in Resolution No. 201442 shall remain' in effect.
D. The failure to file for an extension was due to extenuating circumstances and the requested
extension is in the best interest of the health, safety and welfare of the citizens of Garfield
County.
qtx day of A*-^i- , A.D. zo-&-.
GARFIELD COUNTY BOARD OF
Dated this
ATTEST:
CO GARFIELD
"fi-_,
ff-:rt*s"q
i sEAr, iit -**
rj
U**,a'a;G.-
of the Board
2
ilil HhEIIrHlUlH | [ tHIt hlrl Hil]lHkffl ] J,ri{lir I','}' I ll I
Receot ion$ : 875537
oqtodtzota O9:47:10 AH Jean Albericoi oi g Rec Fee:$o.o0 Doo Fee:0.00 GARFIELD coUNTY co
Upon motion duly made and seconded the foregoing Resolution was adopted by the
following vote:
COMMISSIONER CHAIR JOHN F. MARTIN , Aye
COMMISSIONER MIKE SAMSON , Absent
COMMISSIONER TOM JANKOVSKY _ , Aye
STATE OFCOLORADO )
)ss
County of Garfield )
I, , County Clerk and ex-officio Clerk of the Board of
County Comrnissioners, in and for the County and State aforesaid, do hereby certify that the
annexed and foregoing Resolution is truly copied from the Records of the Proceeding of the Board
of County Commissioners for said Garfield County, now in my office.
IN WITNESS WHEREOF, I have hereunto set rny hand and affixed the seal of said
County, at Glenwood Springs, this _ day of A.D.20_.
County Clerk and ex-officio Clerk of the Board of County Commissioners