Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLMF-5-16-4204 — SEPT -5-16-4203 Mugford Residence MF Home TBD CR 259 Rifle, CO 1) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS. 2) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 1 00 PSF. 3) DUE TO WATER QUALITY, IT 15 REQUIRED THAT TREATMENT BE ACHIEVED BY A REVERSE OSMOSIS (RO) TYPE SYSTEM. 4) ENGINEERED SYPTIC SYSTEM MUST ACCOMMODATE REVERSE OSMOSIS (RO) IN THE DESIGN. FINAL APPROVAL REPORT REQUIRED FOR FINAL/CO INSPECTION. 5) LOCAL FIRE DISTRICT SHALL REVIEW AND INSPECT THE FIRE SPRINKLER SYSTEM. FINAL APPROVAL REPORT IS REQUIRED FOR FINAL/CO INSPECTION. 6) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED PLUMBER. ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A COLORADO LICENSED ELECTRICIAN. 7) ELECTRICAL PERMITTING AND INSPECTIONS BY THE COLORADO STATE ELECTRICAL BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/CO INSPECTION. 8) C.D.O.H. INSTALLATION INSIGNIA MUST BE AFFIXED PRIOR TO FINAL/CO INSPECTION. 9) GARFIELD COUNTY FINAL/CO INSPECTION REQUIRED.