HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLMF-5-16-4204 — SEPT -5-16-4203
Mugford Residence
MF Home TBD CR 259
Rifle, CO
1) SEE PLAN ATTACHMENTS FOR BUILDING REQUIREMENTS.
2) OPEN -HOLE SOILS REPORT REQUIRED AT FOOTING INSPECTION, 1 00 PSF.
3) DUE TO WATER QUALITY, IT 15 REQUIRED THAT TREATMENT BE ACHIEVED BY A REVERSE
OSMOSIS (RO) TYPE SYSTEM.
4) ENGINEERED SYPTIC SYSTEM MUST ACCOMMODATE REVERSE OSMOSIS (RO) IN THE
DESIGN. FINAL APPROVAL REPORT REQUIRED FOR FINAL/CO INSPECTION.
5) LOCAL FIRE DISTRICT SHALL REVIEW AND INSPECT THE FIRE SPRINKLER SYSTEM. FINAL
APPROVAL REPORT IS REQUIRED FOR FINAL/CO INSPECTION.
6) ALL PLUMBING AND GAS PIPING CONNECTIONS MUST BE PERFORMED BY A COLORADO
LICENSED PLUMBER. ALL ELECTRICAL CONNECTIONS MUST BE PERFORMED BY A
COLORADO LICENSED ELECTRICIAN.
7) ELECTRICAL PERMITTING AND INSPECTIONS BY THE COLORADO STATE ELECTRICAL
BOARD. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL/CO INSPECTION.
8) C.D.O.H. INSTALLATION INSIGNIA MUST BE AFFIXED PRIOR TO FINAL/CO INSPECTION.
9) GARFIELD COUNTY FINAL/CO INSPECTION REQUIRED.