Loading...
HomeMy WebLinkAbout2.0 Response to Conditions of ApprovalffioLssoN* 760 Horizon Drive, Suite 102 Grand Junction, CO 81506 ASSOCIATES May 6, 2016 Kathy Eastley Garfield County Community Development 108 8th Street, Suite 401 Glenwood Springs, CO 81601 Re:Ursa Operating Company, Tompkins lnjection Well GAPA-02-16-8418 Dear Kathy, Thank you for your assistance with the permitting process for this injection well. This letter serves as Ursa Operating Company's (Ursa) response to your Conditions of Approvalfor this land use permit. 1. That all representations made by the Applicant in the application shall be conditions of approval unless specifically altered by the conditions of approval of the Board. Response: Ursa will comply. 2. That the Tompkins lnjection Well shall be operated in accordance with all applicable Federal, State and local regulations governing the operation of this type of facility. Response: Ursa will comply. 3. The Applicant shall maintain all required CDPHE permits for the facility including any applicable air quality APEN permits including as may be required for the storage tank batteries. Response: Ursa will comply. 4. The facility shall maintain compliance with CDPHE Storm Water Management Permits, Drainage and Grading Plans, and Reclamation and Erosion Control Plans for the site. Response: Ursa will comply. TEL 970.263.7800 F4X970.263.7456 www.olssonassociates.com Ursa Operating Company May 6, 2016GAPA-02-16-8418 Page 2 5. The Applicant shall remain in compliance with the Watershed Permit issued by the Town of Parachute. Response: Ursa will comply. 6. The Applicant shall maintain all required COGCC permits and forms for the facility and shall comply with all conditions or requirements of said permits and forms. Copies of COGCC permits and forms shall be provided to the County once issued. Response: Ursa will comply. 7. The facility shall maintain compliance with COGCC Noise Standards/Regulations and the facility shall be required to utilize an electric pump as represented. lf future compliance issues are identified, the Applicant shall provide noise mitigation in order to achieve compliance along with a technical evaluation by a qualified professional to confirm compliance. Should transfer pumps for distribution of water between well pads be constructed on the site as part of the injection well operation, said pump shall be tested for noise compliance with noise mitigation installed if necessary to include the potential for housing in a sound mitigation structure. Response: Ursa will comply. 8. The facility shall have only temporary lighting for unscheduled night time maintenance. All lighting shall comply with Section 7-304, Lighting Standards, with all lighting to be directed inward and downward toward the interior of the site. Facilities and storage tanks shall be painted a non-glare neutral color to lessen any visual impacts. Response: Ursa will comply. 9. The Applicant shall comply with the Battlement Mesa Wildlife Mitigation Plan - Agreements between Ursa Operating Company and CPW which includes limitations on trucking to between the hours of 10 a.m. and 3 p.m., when and where possible, compliance with noise regulations and use of bear proof trash containers for all food related trash. Response: Ursa will comply. 10. The Applicant shall comply with the recommendations of Geologic and Soils Hazards Report related to the Potts-lldefonso Soils present on the site. These recommendations include the use of coated steel or appropriate cathodic protection, as well as the use of corrosion resistant concrete. Response: Ursa will comply. 1 1. The Applicant shall comply with the access representations and Traffic Report including use of designated haul routes and maximum estimated traffic generation. The daily trucking estimates may be applied based on a weekly average to account for minor operational variations. Trucking of water to the site shall utilize watertight tanks and shall comply with all COGCC or COOT requirements for hauling of production water. The Applicant shall provide the County with updates on the progress toward implementing pipelines for transportation of F:\Projects\o14-2878\Documents\COA Response\16-05-06_Ursa_COA Response.Docx Ursa Operating Company GAPA-o2-16-8418 May 6, 2016 Page 3 water to the injection well. Said updates shall be provided on an annual basis and include assessment of and mitigation for any unanticipated traffic impacts. Response: Ursa will comply. Please let us know if you have any questions. Sincerely, {l/r. O,to,*y- Tilda Evans Assistant Planner Cc: Ursa Operating Company F:\Projects\O14-2878\Documents\COA Response\16-05-06_Ursa_COA Response.Docx