Loading...
HomeMy WebLinkAboutApplication-PermitI Garfield County Building & Planning Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office:970·945·8212 Fax: 970·384·3470 Inspection Line: 970·384·5003 Building Permit No. Parcel No: 2395-013-29-254 Locality: lronbri9ge PUD Ph2, ftg 1 .~&3, Lot ~5~4 __ Job Address: __ ···~100 Eagle Claw Circle, GW§_~--~---~--- Use of Building: __ s/f dwelli~g on found_ation with_ attached g_~rage & covered patio . Owner: Rainwater, Larry ~-Karen lronbridge AspenCollection!:_L~C __ _ Contractor: -·------~ Fees: Plan Check: $ 849.78 Septic: -~-·------·- Bldg Permit: $ 1,307.35 RFTA: $ 750.00 .. ----··-""~-~ Total Fees: $ 2~07.13 Clerk: ~··-Date: JJ-fl-Li]te .. I :',( 2 3 4 5 6 7 8 9 10 I I 12 GARFIELD COUNTY BUILDING PERMIT APPLICATION I08 8'' Street, Suite 401, Glenwood Springs, Co 81601 • Phone: 970-945-82!2/ Fax: 970-384-3470 I Inspection Line: 970-384-5003 ~\.\ ~~ \'\'Ww.!larfield-counlv.c-om Describe Work: Class of Work: ew o Alteration o Addition Garage: Septic: oiSDS Driveway Pennit: Owners valuation of Work: $ NOTICE Authority. This application for a Building Pennit must be signed by the Owner of the property, described above, or an authorized agent. If the signature below is not that of the Owner, a separate Jener of authority, signed by the Owner, must be provided with this Application. Legal Access. A Building Permit cannot be issued without proof of !ega! and adequate access to the property for purposes of inspections by the Building Department. Other Permits. Multiple separate permits may be required: (l) State Electrical Penn it, (2) Cou111y JSDS Penni!, (3) another pcmlit required for use on the property identified above, e.g. State or County Highway/ Road Access or a State Wastewater Discharge Pennit. Void Permit. A Building Penni! becomes null and void if the work authorized is not commenced within 180 days of the date of issuance and if work is suspended or abandoned for a period of 180 days after commencement CERTIFICATION I hereby certify that l have read this Application and that tlJC infonnation colltained above is true and correct. J understand that the Building Department accepts the Application, along with the plans and specifications and other data submitted by me or on my behalf (submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval of this Application, a Building Penni! will be issued granting pennission to me, as Owner, to construct tl1e structure{s) and facilities detailed on the submiltals reviewed by the Building Department In consideration of the issuance oftl1e Building Penn it, l agree tl1at I and my agents will comply with provisions of any federal, state or local law regulating the work and tlle Garfield Coml!y Building Code, ISDS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Penn it may be suspended or revoked, upon notice from the County, iftbc location, construction or use of the structure(s) and facility(ics), described above, are not in compliance with County Regu!ation(s) or any other applicable law. I hereby grant pennission to the Building Department to enter the property, described above, to inspect the work. 1 further acknowledge tlmt the issuance of the Building Permit does not prevent the Building Official from: (I) requiring the corre · rrors in t ubmittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or faci!ity(ies) if such is in violation of County Regulation(s) or any other ap · able Ia Review of this Appli tion. includin ubmittals, nd ins ctions of 1e work by the Building Department do not constitute an acceptance of responsibility or liability by the County of errors, omissions or discrepancies. A 1e Owner, J cknowledge th t resp nsibility ~ r compliance with federal, state and local laws and County Regulations rest with me and my authorized agents, including without limitation my arch' e t designer engineer and! orb ilde . I HEREBY A WLEDG THAT I HAVE RE AND DERSTAND THE NOTICE & CERTIFICATION ABOVE: 06 STAFF USE ONLY '"'''· ,f~"-'"!\" ;·. '.v~-..,_''. ~t~~tio~s: v~r Ful.'ff. Y~i l34tir.. Cows rP--u..cr 1~ D~~ G~~?mLcn~ ,/·',"' :-~4jUSted Valuation: Plan Check Fee: Permit Fee: Manu home Fee: Mise Fees: RFJi'4 15f5ft01J. 7(p ~4.18 10()7.3£ 1:SO.a? ISDS Fee: Total Fees: ~42 Balance Due: BP No & Issue Date: ISDS No & md Date: Qq:n.v~ 'f:P 20G>4 .h-3 1117/ ~. • Setbacks: OCCGroup: 1 Const Type: Zoning: / I t=vr:> I;T:b~ APPROVAL~-~-b(J/it/.@ DAT'ir t: DEP-~~ "'~~ APPR~-~ ICJ I Q/t/ tJP:l DATE ,_ The following items are required by Garfield County for a final Inspection: I) A final Electrical Inspection from the Colorado State Electrical Inspector. 2) Permanent address assigned by Garfield County Building Department and posted at the structure and where readily visible from access road. 3) A finished roof; a lockable building; completed exterior siding; exterior doors and windows installed; a complete kitchen with cabinets, sink with hot & cold running water, non-absorbent kitchen floor covering, counter tops and finished walls, ready for stove and refrigerator; all necessary plumbing. 4) All bathrooms must be complete, with washbowl, tub or shower, toilet, hot and cold running water, non-absorbent floors, walls finished, and privacy door. 5) Steps over three (3) risers, outside or inside must be must have handrails. Balconies and decks over 30" high must be constructed to all IBC and IRC requirements including guardrails. 6) Outside grading completed so that water slopes away from the building; 7) Exceptions to the outside steps, decks, grading may be made upon the demonstration of extenuating circumstances., i.e. weather. Under such circumstances A Certificate of Occupancy may be issued conditionally. 8) A final inspection sign off by the Garfield County Road & Bridge Department for driveway installation, where applicable; as well as any final sign off by the Fire District, and/or State Agencies where applicable. A CERTIFICATE OF OCCUPANCY (C.O.) WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. A C.O. MAY TAKE UP TO 5 BUSINESS DAYS TO BE PROCESSED AND ISSUED. OWNER CANNOT OCCUPY OR USE DWELLING UNTIL A C.O. IS ISSJJED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY Al'I'D MAY BE GROUNDS FOR VACATING PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a C.O. for the building identified in the Building Permit. to DATE ;Bapplicationdecember2007 VALUATION FEE DETERMINATION Applicant Address Date .;L;arry~::&'-?Ka~re:"n:.!Rai:::;:'ne.:wi-'a:::le;r=:-::::o::---Subdivision -:l~OO~Eag~le~C;;;l:::aw=C:::;ir:.::c!::le~; G:::W=S:.., ;:;;C;:;;O ___ Lot/Block I 0/22/2008 Contractor Finished (Livable Area): Main Upper Lower Other Total Basement: Unfinished Square Feet Valuation Conversion of Unfinished to Finished Total Valuation Garage: Carport: Total Valuation Crawl Space Total Valuation Decks/ Patios Total Covered Open Valuation Type of Construction: Occupancy: Valuation Total Valuation 977 sq.ft 905 sq.ft sq.ft sq.ft X $74.68 1882 sq.ft sq.ft X $41.00 sq.ft X $33.68 556 sq.ft X $18.00 sq.ftX $12.00 sq. It X $9.00 202 sq.ft X $24.00 sq.ft X $12.00 Commercial sf X sf X sf X sf X sf X sf X Jronbridge, Phase II Lot254 140,547.76 0.00 10,008.00 0.00 4,848.00 0.00 155,403.76 GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS For SINGLE FAMILY DWELLING CONSTRUCTION Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete infonnation be provided. When reviewing a plan and it's discovered that required information bas not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shaH be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. TWO (2) SETS OF CONSTRUCTION DRAWINGS & TWO (2) SITE PLANS MUST BE SUBMITTED FOR ALL APPLICATIONS. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a.design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the fo11owing checklist prior to and during design. Applicants are required to indicate appropriately and to submit the completed checklist at time of application for a permit. Plans to be included for a Building Permit, must be on drafting paper at least 18"x24" and drawn to scale. I Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony, steps, hand rails and guard rails, windows and doors, including the finish grade line and original grade. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. A window schedule. A door schedule. A floor framing plan, a roof framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. wind speed, wind exposure B or C, and a 36 inch frost depth. All sheets to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IRC. I. Is a site plan included that identifies the location of the proposed structure or addition and distances to the property lines from each corner of the proposed structure(s) prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Properties with slopes of 30% or greater must be shown on the site plan. (NOTE Section: 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyor's signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes '(: 2. Does the site plan also include any other buildings on the property, setback easements and utility easements? Please refer to Section 5.05.03 in the Garfield County Zoning Resolution if the property you are applying for a building permit on is located on a corner lot. Special setbacks do apply. Yes "{. 3. Does the site plan include when applicable the location of the I.S.D.S. (Individual Sewage Disposal System) and the distances to the property lines, wells (on subject property and adjacent prope~9s ), streams or water courses? Yes-.-J:.f--- 4. Does the site plan indicate the location and direction of the County or private road accessing the propert.tY, Yes._-t-P-w..---- 2 5. Are you aware that prior to submittal of a building permit application you are required to show proof of a legal and adequate access to the site? This may include (but is not limited to) proof of your right to use a private easement/right of way; A County Road and Bridge permit; a Colorado Dept. of Highway Permit, including a Notice to Proceed; a permit from the federal government or any combination. You can contact the Road & Bridge Department at 625-860 I. See phone book for other a&e:cies Yes. __ ~_c._ __ _ 6. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the IRC or per stamped engineered design? Yes 'i- 7. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes + No ____ _ 8. Do the plans indicate the size and location of ventilation openings for the attic, roof joist spaces and soffits? Yes )( No ____ _ 9. Do the plans include design loads as required by Garfield County for roof snow loads, (a minimum of 40 pounds per square foot up to & including 7,000 feet above sea level), floor loads and wind loads? Y es. __ /7'X,. ___ _ I 0. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes '1 r~ II. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? YesA, I 12. Does the building section drawing or other detail include the method of positive connection of all ~~~n}( and beams? i 3. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a fl't;oof? (Building height measurement usually not to exceed 25 feet) Yes.--,AP...---- 14. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes No )C -+-=c__ __ _ 3 15. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IRC? w ____ No--+-X-"='---- 16. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping_r~oms and/or basements comply with the requirements of the IRC? Yes._~-&=---- 17. Does the plan include a window schedule or other verification that windows provide natural light and ventilati\':for all habitable rooms? Yes. _ _,7,t-&=--- 18. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specifY safety glazinyr these areas? Yes -/"-No ______ _ 19. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? Yes X ' 20. Do you understand that if you are building on a parcel of land created by the exemption process or the subdivisi n process, are building plans in compliance with all plat notes and/or covenants? Yes._F'---- 21. Do you understand that if you belong to a Homeowners Association (HOA), it is your responsibility to obtain written permission from the association, if required by that association, prior to submitting an application for a building permit? The building permit application will be accepted without it, but you run the risk of the HOA bringing action to enforce the covenants, which can result in revocation of permit issued. Additionally, your Plan Review fee is not refundable if the plans have been reviewed by the Building Department prior to any action by the HOA that requires either revoca~o? or substantial modification of the plans. Yes. _ _,_)(_"'---- 22. Will this be the only residential structure on the parcel? Yes ){ lfno-Explain: ______ _ 23. Have two (2~c9-mplete sets of construction drawings been submitted with the application? Yes. _ _,~p-- 24. Do you un~e;:stand that the minimum dimension a home can be on a lot is 20ft. wide and 20ft. long? Yes._E-A-'----- 4 25. Have you designed or had this plan designed while considering building and other construction code requirements? Yes 'f,. 26. Do your plans comply with all zoning rules and regulations in the County related to your properties zone district? Yes 'f 27. Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the c;;celd County Building Department? Yes . 28. Do you understand that approval for design and/or construction changes are required prior to the applicati~f these changes? Yes. _ __,-/'<-~-""--- 29. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application submittal and that you will be required to pay the "Permit Fee" as well as any "Road I~yact" or "Septic System" fees required, at the time you pick up your building permit? Yes. __ PP--- 30. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following bnsiness day? Inspections will be made from 7:30 a.m. to 3:30 p.m. Monday through Friday. Inspections are to be called in ~e~s4-sX. No _____ _ 31. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 rzrspection fee? Yes._-;-,&=---- 32. Are you aware that you are required to call for all inspections required under the JRC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the buildin~/ Yes. __ -/"--?'---- 33. Are you aware that the Permit Application must be signed by the Owner or a written authority being given fvn Agent and that the party responsible for the project must comply with the IRC? Yes. __ +?----- 5 34. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups, unless you as the homeowner are performing the work? The license number of the person perfonning the work will be required at time of ~!.li~-ca_b-t~'-'-· _s_pe_c~t~io_n_._· ~~ 35. Are you aware, that on the front of the Building Permit Application you will need to fill in the Parcel/Schedule Number for the lot you are applying for this permit on prior to submittal of a . building permit-application? Your attention in this is-appreciated, Yes 'X I 36. Do you know that the local fire district may require you to submit plans for their review of fire safety issues?'( Yes ?-(please check with the building department about this requirement) 37. Do you understand that if you are planning on doing any excavating or grading to the property prior to issu7 of a building pennit that you will be required to obtain a grading permit? Yes 38. Are you aware that if you will be connecting to a public water and/or sewer system, that the tap fees have to be paid and the connections inspected by the service provider prior to the issuance of a Certifi\a~ of Occupancy? Yes --f=+"--- I hereby acknowledge that<_...!....m~=~read, understand and answered these questions to the best of my ability. Date Phone: 3 34-399(:) (days); (evenings) ProjectName: LDt ~$q Iv-oobr~e>Yl)D Ph.d. ProjectAddress: D\DO Po~e..., L\a.w C1ccl.e... ~0 6 Notes: If any required information is missing delays in issuing the permit are to be expected. Work may not proceed without the issuance of a permit. If it is detennined by the Building Official that additional . informationisriecessary to review theappllcaii()ri.iind pliinstodetermlne ri1fnilniim compfiance with the adopted coaes, tlie application rria.Y be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review, delay in issuance of the permit or delay in proceeding with construction. 7 No 11177 . ----------~~~----Assessor's Parcel No. 2395-013-29-254 Date 11/14/2008 BUILDING PERMIT CARD JobAddress ----~10~0~E~ag~l~e~C~Ia~w~C~ir~.,~G~W~S~I~ro~n~b~r~id~g~e~P~U~D~,~l~o~t=2~54~----------------------------- 0wner Rainwater, Larry & Karen Address 3814 95th St. Omaha, NE Phone # ________ __ Contractor _____ c:...:H.::.an:.:.s::.:e::.:.n:....Cc:..o.::cn:.:.:s:..:tc:...:ru::.:c:...:.ti:...:.oc:.:n ________ Address 41 0 Iron bridge Dr, GWS Phone # 970-394-3990 Setbacks: Front ________ Rear _____ RH _____ LH ______ Zoning ____ __ s/f dwemng on foundation w/ att. Garage INSPECTIONS Soilt"f&S't -'-p_at_io ________ _ Footing --------------------- Foundation ________________ _ Grout _____________________ ___ Underground Plumbing _________ _ Roug.h Plum~ing. Frammg -f · lp •tA ~~ Insulation 7_----J~" ~JidiV{ Roofing----------------- Drywall ------------------ Gas Piping---------------- pj o'{i-:' V1LkFY 'f>A.bt~~ -r~uv , N NOTES Weatherproofing _____________________ _ Mechanical ______________________ __ Electrical Rough (State)--------- Electrical Final (State) ~ \ Finai2':-2/-CJ9 /Checklist ~.Qieted?:;;:;;m Certificate Occupancy # :-'&"'":::~?=-:------=--=---- Date I'S:>UtD /o .f::,. Oq Septic System # COMM (,),r(.,{fu Date ----------=7=-------------Final _____________________ _ Other ____________________ __ (continue on back) BUlL IN PE GARFIELD COUNTY, COLORADO INSPECTION WILL NOT BE MADE UNLESS TillS CARD IS POSTED ON THE JOB Date Issued l . ._._l _._·( ij_,_·-=O_....f>'------Permit No. __ jJJ.--"-1_._7 ___ _ AGREEMENT In con~ideration of the issuance of the permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structured for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building department and IMMEDIATELY BECOME NULL AND VOID. use slf <:!>V\ .~ounuClftCn wfa\+nc~eu ~ornQe tO'lVQft'd RO ...... ,,...-~:~. Address or Legal Description \00 cll~_C""-=\n,_\l)=-_,.C'-"\f'-'d""~'ti-"G"'-"'\).)""'S""----------=---= ownerR\\m\)J~~ Latt~l\!.llfl('() contractor \tO'Ohl\tlSe> ~ Qo\\tdi BuildingPermitType ~(j~\\()l This Card Must Be Posted So It Is Plainly Visible From The Street Until Final Inspection INSPECTION RECORD Footing Driveway t'::zfi:. / ""-. Foundation I Grouting Insulation ~> K ~'\(1 rv~-b<\ :4~ / ,;;:_ --- Underground'Piumbing "' Drywall {-/5' o9~ _ /~ 'l-05'< f?Jpt- Rough Plumbing Electric F~'tby St~spe~/r.t') 0 f A•I'T·o '1 tf}.J,;, f, /"'"~· '. IPdo<to Fln•l) . f Rough Mechanical ol v Septic Final 1,~-oq ~ Gas Piping FINAL r-z!-C? ( y?J_ 6 !7-c?97!l~&.a.li"'"'-./ (You Must Call For Final Inspection) Electric Rough (by s;;;nspector}(/ IP,Jonf [;:.ng)/Jf 6 ?o lrYJ Notes c.C! __..., ---"' ;[ J/;Clif!:cio ;,Js;p;ic_c:;c P' Fr~t~ _ r,q ~ (J-K (to include Roof in place & Windows & Doors installed & Firestopping in place) THIS PERMIT IS NOT TRANSFERABLE For Inspection Cali 970-384-5003 Office 970-945-8212 108 8th Street, Suite401 Glenwood Springs, Colorado 81601 DO NOT DESTROY THIS CARD ~=:.R_ov_ED_..__.lf_,·('--'ij._ffi~.__--:-::-::-::::-:=-:: By_L· JJ.QQ[}]Tf\rnO~fLtfj[Dt~OO PROTECT PERMIT FROM WEATHER D (DO NOT LAMINATE) COUNTY OF GARFIELD -BUILDING DEPARTMENT CORRECTION NOTICE 108 8th St., Suite 401 Glenwood Springs, Colorado Phone (970) 945-8212 Job located at /00 ~ ~~ Permit No. ---'-''--'1'-'?"--L-7 ____________ _ I have this day inspected this structure and these premises and found the following corrections needed: 0 Call for Re-lnspection 0 $50.00 Re-lnspection Fee must be paid prior to Re-lnspection You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for inspection at 970-384-5003. Date 6 ~; '7-0<f 20 Building Inspector ~:::;~r--gc;zz:.._ Phone (970) 945-8212 COUNTY OF GARFIELD -BUILDING DEPARTMENT CORRECTION NOTICE 108 8th St., Suite 401 Glenwood Springs, Colorado Phone (970) 945-8212 Job located at ,/t;:itJ /{'AGC-£ CLAW C/)(' 1 Permit No. j// Z 7 I have this day inspected this structure and these premises and found the following corrections needed: B~Dif&e/?1 w:-:3 a//dPotJ. 'A& V £ ?cr/{;CS..s 0 Call for Re-lnspection 0 $50.00 Re-lnspection Fee must be paid prior to Re-lnspection You are hereby notified that the above correction must be inspected before covering. When correction(s) have been made, call for inspection at 970-384-5003. Date 7-/ ..:::¥ 20 <!Y ~ Buildi:l9111specto~ ;;:::z~ U~:2 ---... Phone (970) 945-8212 EXIDBITA THE ASPEN COLLECTION FREEDOM PROGRAM CONSTRUCTION CONTRACT ::n.u.Lf 1 • zoo e THIS CONSTRUCTION CONTRACT ("Contract") is made and entered into between IRONBRIDGE ASPEN COLLECTION LLC, a Colorado limited liability company ("Contractor"), whose address is 410 Ironbridge Road, Glenwood Springs, Colorado 81601, whose telephone number is (970) 945-4300, and whose facsimile number is (970) 928-8865, and Lcl.rry R .\:. l<p,.cen l· "Ba.•'nUX~.±ec ("Owner"), whose address is 361'1 1/. 'f5+h StreefJ Dmo..bc!., 1\(f /:8q~hosetelephonenumberisf05•57Z·'1?!2andwhose facsimile number is fttl':r 57J.-'jJ{ftThis Contract is entered into this >/:!~ay of a:...,~ , 200a ("Effective Date"). This Contract is entered into in connection with and pursuant to Con~r and ~~ :;~~m Purchase and Sale Agreement dated ::July l 0 20cB. Terms defined in the Freedom Program Purchase and Sales Agreement and used in this Contract shall hold the same definition in this Contract. The construction of the Residence on the Lot, each as defined in the Freedom Program Purchase and Sale Agreement shall be referred to herein as (the "House"). 1. Contactor' s Scope of Work. Contractor's scope of work shall consist of construction services for the House as set forth below, which collectively shall be referred to herein as the "Work." 2. Plans a. Contractor has prepared the following drawings, consistent with other homes in the Project, as defined in the Freedom Program Purchase and Sale Agreement, and constructed by Contractor: ;, z.:z.o~ .D ii. iii. ______ (collectively, the "Plans"). 3. Construction Services a. Contractor shall procure and pay for all permits, licenses, approvals and inspections required for the House. b. Contractor shall provide or cause to be provided all labor, materials, equipment and services to construct the House in a workmanlike manner, consistent with homebuilding industry standards in Garfield County, pursuant to the Plans. Contractor shall not be responsible for furnishing or constructing any improvements or performing any work unless the same are specifically set forth in the Plans or in this Contract. 4. Owner's Responsibilities a. Owner shall cooperate with Contractor in securing any pennits, licenses, approvals and inspections for the House. b. Upon Contractor's request, Owner shall provide all "Requested lnfonnation" to Contractor in a timely manner, and shall be available to meet with Contractor to approve plans and review the progress of the Work. Requested Information shall include, but not necessarily be limited to: i. proofoftinancing ii. Design and Architectural Option selections by the associated design selection dates iii. change order requests iv. proof of necessary insurance c. Owner specifically agrees and acknowledges that financing for the House is the sole and exclusive obligation of Owner, and Owner's ability to obtain financing is not a condition precedent to Owner's obligations set forth in this Contract. Owner represents that Owner is qualified to obtain such financing and/or has available funds in the amount necessary to complete the House. Owner agrees to promptly seek and obtain any and all required financing for the House. Owner agrees to provide Contractor with proof, satisfactory to Contractor, that Owner's financing for the House has been finalized, and agrees that Contractor is not obligated to proceed with construction on the House until such proof is delivered to Contractor a.nd the Closing of the Lot has occurred. Fonn Date: 6116/08 15 OF 23 d. Owner agrees not to let or enter into any other contracts in connection with the House or the Lot without the prior written approval of Contractor. Owner acknowledges and agrees that entering into any contract or permitting any other contractor onto the Lot may impede the Contractor's ability to manage the cost of the House and timely complete performance of the Work as contemplated herein. Violation of this provision, shall, in addition to any other remedies set forth herein, permit Contractor to exercise its termination rights as specified herein. e. Within three (3) days after substantial completion of the Work, Owner shall notify all utility suppliers that Owner is responsible for utility expenses from and after the date of substantial completion. 5. Time a. Without' lirrii-ting th.e foregoing, Owner agrees to provide 3.II Requested Information to Contractor-to start construction within three (3) months of the date on which the Closing of the Lot occurs. Should Owner delay commencement construction beyond said three (3) months, Owner shall pay Contractor the sum of Five Thousand Dollars ($5,000.00) per month, allocated for fractional portions of months ("Extension Fee"). The parties hereby agree that Contractor's actual damages for such Owner delay cannot be calculated now with certainty, and that Liquidated Damages are a reasonable e$timate thereof. b. Provided that Owner haS complied with all of its obligations hereunder, including but not limited to timely payment of all sums due tO Contractor, and Owner has secured financing for the House and delivered satisfactory proof thereof to Contractor, and Closing of the Lot has occurred, Contractor shall commence construction at the House Site within sixty (60) days after the issuance of a building permit in the Owner's name, as evidenced by accurate installation of the foundation forms (the "Commencement Date"). c. Substantial Completion of the House shall occur within ten (10) months after the Commencement Date (the "Completion Date''). The Completion Date may be extended on account of: i. labor disputes; ii. fire or other damage to the House, including interior damage; iii. material or labor shortages; iv. transportation delays; v. governmental action; vi. unusual weather conditions; vii. change orders or delays caused by Owner; viii. the failure of Owner to provide information and/or approvals in a timely manner; or ix. any other causes which are beyond Contractor's control or which may otherwise justify the delay; and x. Force Majeure events. d. Without limiting the foregoing, Owner agrees to provide all required information to Contractor to substantially complete construction by the Completion Date. Should either party delay Substantial Completion of the House beyond the Completion Date, the delaying party shall pay the other party the sum of five Thousand Dollars ($5,000.00) per month, allocated for fractional portions of months as an Extension Fee. The parties hereby agree that actual damages for such delays cannot be calculated now with certainty, and that these Liquidated Damages are a reasonable estimate thereof. 6. Ownership of Plans. Owner agrees and acknowledges that the Plans, and any amendments or revisions thereto, are and shall remain the sole and exclusive property of Contractor, and Owner agrees not to sell. transfer, assign, use, copy or share the same with any person or entity without the prior and express written consent of Contractor, which may be withheld in Contractor's sole discretion. 7. Contract Price. a. Owner shall pay Contractor the sum oflWO hundred -fwt!17;frt.Jf'r(_ fhaJ.tSa.ac£ :fu>en±~u::ne iJOftoo ollars ($~,02.1 .00) ("Contract Price") for performance of the Work, w'hich amount shall be paid in accordance with the payment provisions set forth in this Contract. b. Owner acknowledges that upon the execution of any change orders during the course of construction, the Contract Price may increase, and in such event Owner shall pay to Contractor such increase upon execution of the change order, and prior to Contractor's performance of any work in connection with the change order. 8. Payment Procedure. a. 0\.\'ller shall make, or cause Owner's lender to make, progress payments for the Work in accorda'1ce with tlJe schedule attached hereto as Exhibit A-1 ('"Draw Schedule'1 ) or at any intermediate point based on the percentage of completion of\vcrk at that time identified by inspection. Progress payments shaH be delivered to Contractor v!lthin Fonn Date: 6/16108 16 OF 23 five (5) days after Owner's receipt of Contractor's request for payment, which requests for payment shall include a blanket lien waiver statement relating to all parties who provided labor and/or materials applicable to the previous request for payment. b. In the event that at any time the amount of Owner's loan available for distribution is less than the amount of the Contract Price remaining to be paid, Owner shaH deposit the difference into a construction control account and execute a customary construction control agreement with respect to the holding and distribution of said sum prior to Contractor's obligation to commence or continue construction at the House Site. Owner shall be responsible for the payment of any fees in connection with the construction control. c. Within ten (10) days after substantial completion of the Work, Owner shall pay all remaining am.ounts due under.this Contract. d. All monies not paid when due as provided herein shall bear interest at the rate of eighteen percent (18%) per annum. e. In the event any installment is not paid when due, Contractor may exercise any remedy set forth in this Contract or exercise any other legal and/or equitable rights which may be necessary or appropriate to enforce this Contract. 9. Changes in the Work a. Buyer understands, acknowledges and agrees that the Contract Price includes only the items set f01th in the document attached hereto as Exhibit B ("Features List"). These are referred to herein as ("Standard Selections"). b. Additions, upgrades, and/or optional items which are made available to Owner shall be selected, contracted and paid for in a separate contract with Contractor or by Change Order. c. Contractor may offer pre-designed and priced options for each Residence to Owner. i. Options which change the architectural design of the Residence, such as an additional garage bay, are referred to as architectural options ('•Architectural Options"). ii. Options which change the materials and colors of the Residence, such as carpet type and/or color, are referred to as design options ("Design Options"). 111. Together these are often referred to as ("'Options'). d. Changes to the Work that are not a pre-designed and priced Architectural Option or Design Options are referred to as change orders ("Change Orders"). i. All change orders shall specizy the following: 1. the change in the Work, 2. the adjustment to the Contract Price, if applicable, and 3. the adjustment to the Completion Date, if applicable. e. Changes in the Work can only occur by purchasing an Architectural Option, purchasing a Design Option or by written Change Order prepared and approved by Contractor. f. Options will be offered to the Owner, provided the following conditions have been adhered to: i. Options must be selected in a timely manner. Each Option is assigned one of three dates which are referred to as Design Selection 1 ("DS1"), Design Selection 2 ("DS2") and Design Selection 3 ("DS3"). DSI is seven (7) days after closing, DS2 is forty five ( 45) days after DS I is executed by Owner and Contractor and DS3 is forty five ( 45) days after DS2 is executed by Owner and Contractor. ii. Should Owner fail to select Options on or before the applicable design selection date, Seller shall have the right to either stop work, install the standard selection or deny the Option. iii. Options and Change Orders shall be selected subsequent to the execution of this .A~greement. Payment in the amount of l 00% of the price of each Option or Change Order shall be due when each Option or Change Order is ordered. g. ALL PAYMENTS FOR OPTIONS AND CHANGE ORDERS ARE NON-REFUNDABLE TO OWNER h. All Option purchases and Change Orders shall be executed by both the Owner and the Contractor and paid for by Owner, prior to the commencement of the work set forth therein. i. In the event that any increase in the cost of construction arises because of a change in applicable governmental regulations taking effect after the date of this Contract~ such revision or condition shall be the basis for a Change Order and Contractor shall receive appropriate compensation for making such change. 10. Possession and Use of the Lot. Upon the Closing of the Lot, Owner is deemed to have conveyed to Contractor an absolute and exclusive right to possess and use the Lot. Owner shall not enter the Lot unless accompanied by an authorized representative of Contractor. Owner shal1 not instruct, direct or otherwise contact Contractor~s laborers, subcontractors or consultants. Contractor shall permit access to the Lot by inspectors of Owner's lender. Contractor shall return possession of the Lot to Owner at the time that all payments and obligations required of the Owner have been fully paid and performed by the Owner. If possession ofthe House and Lot is taken by the Owner before Owner's obligations set forth in this Contract are fully perfom1ed and without the prior written consent of Contractor, Owner shail be deemed to have accepted the \Vork as complete and satisfactory. in compliance of al! of Contractor's obligations hereunder. Fonn Date: 6/16/08 17 OF 23 II. Walk Through. a. Upon notice from Contractor to Owner, Owner and Contractor shall schedule a walk -through of Owner's home and shall compile a list of any items which are materialJy not in accordance with approved plans and specifications, or do not materially confonn to Garfield County standards. Contractor shall repair, replace or otherwise remedy the items within a reasonable time after Substantial Completion. b. Notwithstanding the fact that additional work may be required to correct the items, if the House has reached Substantial Completion, then no funds shall be withheld from Contractor for these items. c. After Substantial Completion, the Limited Seller's Warranty included in the Freedom Program Purchase and Sale Agreement shall apply. 12. No Assignment. This Contract shall not be assigned by Owner or Contractor to any other party except after the prior written consent of Owner or Contractor, which consent may be reserved in Owner's or Contractor's sole discretion. If Owner or Contractor assigns any of Owner's or Contractor's rights under this Contract to any other party in violation of this provision, said assignment shall be void and of no effect, and Owner shall be in default hereunder. Notwithstanding the foregoing, Contractor consents to a collateral assignment of this Contract to Owner's lender pursuant to Owner's agreement with its lender. 13. Insurance. a. Owner shall procure and maintain during the term of this Contract the following policies of insurance: i. Course of Construction insurance in the amount of the Contract Price; ii. Homeowner's insurance, and a fire and extended risk insuranCe policy, covering the House and Lot, in an amount not Jess than the Purchase Price, together with insurance covering loss or damage to Owner's personal property, and Owner's personal liability for injuries which may be sustained within the Property; and m. Comprehensive General Liability insurance in the amount of$1,000,000. b. Contractor shall maintain during the term of this Contract: i. Workers compensation insurance, as required by law. 14. Termination of the Contract upon Termination ofthe Freedom Plan Purchase and Sale Agreement. This Contract shall be deemed terminated upon the termination of the Freedom Plan Purchase and Sale Agreement for any reason. In such event, unless the cause of such termination is the default of Contractor as seller under the Freedom Plan Purchase and Sale Agreement, Contractor shall be entitled to retain all other amount(s) previously paid to Contractor or otherwise due to Contractor under this Contract. 15. Contractor's Right to Stop Work and Terminate Contract. In addition to all other remedies set forth in this Contract, in the event that any payment is not made in full within five (5) days after such payment is due, or Owner fails to perform any of its duties under this Contract within ten (I 0) days after written notice from Contractor, Contractor may stop the Work until payment is made or Owner fulfills its duties. Should the Work be stopped for a period of fifteen (15) days or more upon Owner's failure to make a progress payment or as a result of any other act, omission or neglect of the Owner, then Contractor may, upon providing written notice to Owner, terminate this Contract. Upon such termination, the Contractor may recover from the Owner payment for all work completed and for any Joss sustained by the Contractor for materials, equipment, tools, or machinery to the extent of actual loss thereon, plus an amount equal to the Contractor's anticipated profit under this Contract, plus interest on the foregoing amounts at the rate of eighteen percent ( 18%) per annum. 16. Alternative Dispute Resolution. Owner and Contractor agree to be bound by the alternative dispute resolution procedures set forth in the Declaration. Any and all claims, disputes and controversies arising between Owner and Contractor, whether before or after Closing, relating to this Contract or its subject matter, including, but not limited to, any alleged construction defect, shall be submitted to final and binding arbitration. 17. Notices. All notices required by this Contract shall be in writing and shall be given by any of the following means to the below listed addresses or fax numbers: a. certified or registered mail, postage prepaid, return receipt requested, in which case notice shall be deemed delivered t1.ree (3) business days after the postmark date; b. recognized commercial overnight courier, in which case notice sha!l be deemed delivered one ( 1) business day after Ponn Date: 6/16/08 18 OF 23 receipt for delivery by the courier; c. electronic maiJ transmission with confinned receipt. d. telecopy transmittal ("fux"), in which case notice shall be deemed delivered upon fax confirmation of transmission to the intended party; or e. personal delivery, in which case the notice shall be effective when received. f. Notice shall be given to Contractor to: 410 Ironbridge Dr. Glenwood Springs, CO 81601 g. Notice shall be given toOwnerto: . L R . . 1 LArry ~ir KC~.I'(!Il •. c..lo o..<JQo.-rer -6e~~~~~~ 13'f Lr~Jfl/1£UJ e ~ol. 07)7) h. Notice of change of address shall be delivered by written notice in the manner described in this section. Rejection or other refusal to accept a notice or the inability to deliver a notice because of changed address of which no notice was given shall be deemed to constitute receipt of the notice sent. 18. Contractor's Limited Warranty. Contractor shall provide a one-year limited warranty on the house as provided for in the Freedom Program Purchase and Sales Agreement. 19. Contractor's Disclaimers. Contractor makes no representation or warranty, and shall in no event be responsible for the following: a. Hazardous materials (as defined by applicable law) in the House or on the Lot; b. Homeown~r's association assessments and/or property taxes applicable to the Lot; c. Owner's financing of the Work; d. Any work or materials not supplied or installed by Contractor pursuant to this Contract; or e. All of the matters described in the disclosures and disclaimers set forth in the Freedom Plan Purchase and Sale Agreement, which disclosures and disclaimers are fully incorporated herein by this reference. 20. General Provisions. a. This Contract shall be governed by the laws of the State of Colorado. Jurisdiction and venue for any action concerning this Contract shall be in Garfield County, Colorado. b. In the event of any litigation or other proceedings between the parties concerning this Contract, the prevailing party shall be entitled to the payment by the nonprevailing party of all of its reasonable attorneys' fees, court costs, and litigation expenses. c. This Contract constitutes the entire agreement between the parties and any prior understandings, agreements or representations of any kind whatsoever preceding the date ofthis Contract shall not be binding upon either party except to the extent that they are specifically incorporated into this Contract. d. This Contract shall be binding upon and inure to the benefit ofthe parties hereto and to their respective heirs, representatives, successors and pennitted assignees. This Contract is intended for the exclusive benefit of Owner and Contractor and is not intended and shall not be interpreted as conferring any benefit on any third party. e. This Contract and any amendments to this Contract may be executed in any number of counterparts, each of which shall be deemed an original and all taken together shall constitute one and the same agreement. Fax copies of this Contract and any amendments to this Contract and fax signatures thereon shall have the same force, effect, and legal status of originals. f. If any provision of this Contract is or shall become invalid or unenforceable, the remaining provisions of this Contract shall not be affected. g. Time is of the essence in each and every term and provision of this Contract. All references to days herein shall be deemed to refer to calendar days unless otherwise specified. In the event that the final date for performance of any act required by this Contract falls on a Saturday, Sunday, or legal holiday, such act may be performed on the next day which is not a Saturday, Sunday, or legal holiday. h. The waiver of a breach of any provision in this Contract shall not be construed as a waiver of any other breach of the same or other provision of this Contract, including the time of performance of any provision. i. Owner understands that this Contract is a legally binding contract. Owner represents and warrants that Owner has read the tenns and conditions of this Contract, and has had a full and fair opportunity to consult with legal counsel of Owner's own choosing concerning this Contract. Fonn Date: 6/16/08 19 OF 23 EXECUTED to be effective as of the date of the date first written above. CONTRACTOR: OWNER: IRONBRIDGE ASPEN COLLECTION LLC, :~~=c~~ Managing Member Fonn Dale: 6/16/08 200F 23 t<t:L:tiVEO SEP t 6 2005 <:~tech HEPWORTH-PAWLAK GEOTECHNICAL Hepworth-Pawlak Geotechnical, Inc. 50ZO County Ro•d l54 Glenwood Springs, O:llorado 81601 Phone' 970-945-7988 r • ., 970-945-8454 e(llail: hj;.geo@hpgeorech.com PRELIMINARY GEOTECHNICAL STUDY PROPOSED IRONBRIDGE VILLAS IRONBRIDGE DRIVE GARFIELD COUNTY, COLORADO A~ Crz:,t lec..+·l~(\ ~\l~er+ JOB NO. lOS 115-6 SEPTEMBER 14, 2005 PREPARED FOR: L.B. ROSE RANCH, LLC ATTN:AARONBEVTNGTON 410 IRONBRIDGE DRIVE GLENWOOD SPRINGS, COLORADO 8Ui01 Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989 TABLE OF CONTENTS PURPOSE AND SCOPE OF STUDY ............................................................................ -1- PROPOSED CONSTRUCTION .................................................................................... ,. I - SITE CONDITIONS ....................................................................................................... -2- FIELD EXPLORATION .............................................................................. ,.: ................ -2- SUBSURFACE CONDITIONS ................................................................................ , ..... -3 - ENGINEERING ANALYSIS ......................................................................................... -4- DESIGN RECOMMENDATIONS ................................................................................. -5- FOUNDATIONS .................•......... : ............................................................................ ,. 5- FOUNDATION AND RETAINING WALLS ............................................................ -6- FLOOR SLABS .......................................................................................................... -8 - UNDERDRAIN SYSTEM .......................................................................................... - 8 - SITE GRADING ........... : ............................................................................................. -9 - SURFACE DRAINAGE ................................................................. : ......................... -10- PAVEMENT SECTION ..................................................... : .....................•............... • 11- LIMITATIONS .................................................... : ........................................................ -11- FIGURES 1 AND 2-LOCATION OF EXPLORATORY BORINGS FIGURES 3 THROUGH 8-LOGS OF EXPLORATORY BORINGS FIGURE 9-LEGEND AND NOTES FIGURES 10 THROUGH 16-SWELL-CONSOLIDATION TEST RESULTS FIGURES 17 AND 18-GRADATIONTESTRESULTS TABLE 1-SUMMARYOF LABORATORY TEST RESULTS PURPOSE AND SCOPE OF STUDY Tills report presents the results of a preliminary geotechnical study for the proposed Ironbridge Villas to be located along lronbridge Drive, Garfield County, Colorado. The · project site is shown on Figures 1 and 2. The purpose of the study was to develop recommendations for the foundation and grading designs. The study was conducted in accordance with our agreement for professional engineering services to L.B. Rose Ranch, LLC dated June 30, 2005. We previously conducted geotechnical studies for planning and preliminary design of the Rose Ranch Development (now known as Ironbridge) and presented our findings in reports dated October 29, 1997 and September l 0, 1998, Job No. 197 327. A field exploration program consisting of exploratory borings was conducted to obtain information on the subsurface conditions within the depth of expected foundation loading. The potential for future ground subsidence due to deeper geologic conditions was to be evaluated by others. Sampies of the subsoils obi:ailled during the field exploration were tested in the laboratory to determine their classification and other engineering characteristics. The results of the field exploration and laboratory testing were analyzed to develop recommendations for foundation types, depths and allowable pressures for the proposed building foundation and for the subdivision grading. Tills report summarizes the data obtained during tills study and presents our conclusions, design recommendations and other geotechnical engineering considerations based on the proposed construction and the subsurface conditions encountered. PROPOSED CONSTRUCTION The proposed Villas development is located in the central part of fronbridge near the main club and other common facilities and will consist of tightly spaced, single family residences in two development areas as shown on Figures 1 and 2. The access roads and drives will connect to the existing and proposed Ironbridge Drive. The residences will be 2 story, wood frame structures constructed typically 8 to 10 feet apart. Ground floors will Job No. 105 1!5-6 -2- be structural above crawlspace in the residences and slab-on-grade in the garages. The entire development area will be elevated typically up to about 15 feet. The fill sections will grade into the existing lronbridge Drive, the golf course 18th Hole and the Robertson Ditch. The fill material will be obtained on the project site, likely from the Phase 2 development. The Robertson Ditch will remain open but be improved by lining to reduce leakage. After the subdivision grading, the excavation for the individual residences will be relatively minor. We assume the residences will be relatively lightly loaded, typical of the proposed type of construciion. If building loadings, location or development plans change significantly from those described above, we should be notified to re-evaluate the recommendations contained in this report. SITE CONDITIONS The Villas development is located downhill to the east and south of the existing pro shop . . ' . ,. . . . . . . ;md other commons area, see Figures 1 and 2. The north Villas site was inainly vacant and covered with field grass and weeds. The south Villas site is partly disturbed and covered with grass and weeds with miscellaneous fill piles. The ground surface slope is about 5 to 7% with 20 feet of elevation difference across the north Villas site, and about 6 to 8% with 30 feet of elevation difference across the south Villas site. The entire project site is covered with debris fan deposits that generally increase in depth with increase in ground surface elevation to the west. Bedrock of the Eagle Valley Evaporite outcrops to the west of County Road 109 in the golf course fairway and the steep valley side. FIELD EXPLORATION The field exploration for the project was conducted between July 6 and 8, 2005. Twenty- five exploratory borings were drilled at the locations shown on Figures 1 and 2 to evaluate the subsurface conditions. The borings were advanced with 4 inch diameter continuous flight auger powered by a truck-mounted CME-55 drill rig. The borings were logged by a representative of Hepworth-Pawlak Geotechnical, Inc. Job No. 105 115-6 -3- Sai11ples of the subsoils were taken with a !Ys inch and 2 inch I.D. spoon samplers. The samplers were driven into the subsoils at various depths with blows from a 140 pound hammer falling 30 inches. This test is similar to the standard penetration test described by ASTM Method D-1586. The penetration resistance values are an indication of the relative density or consistency of the subsoils and hardness of the bedrock. Depths at which the samples were taken and the penetration resistance values are shown on the Logs ofExploratory Borings, Figures 3 through 8. The samples were returned to our laboratory for review by the project engineer and testing. SUBSURFACE CONDITIONS Graphic logs of the subsurface conditions encountered at the site are shown on Figures 3 through 8. The subsoils, below a thin topsoil root zone, consist of a variable depth of stratified silt, sand and gravel debris fan deposits overlying dense, river gravel alluvium. AIJOut3 to4feet of existing fill was encountered above thenalll!al soils inBorings 5, 6, 7 and 15, located just east of the Robertson Ditch. The debris fun soils were typically encountered between depths of7 to 19 feet in the north parcel and between depths of 16 to"32 feet in the south parcel. In Borings 6 through 9 and 15 at the north parcel, the debris fan soils were deeper than the adjacent area to the north, with depths of22 to 38 feet before the gravel aliuvium was encountered. Siltstone and gypsum bedrock of the Eagle Valley Evaporite was encountered below the gravel alluvium at a depth of 42 feet in Boring 6. The bedrock quality appeared poor to fair and included gypsum, but did not appear to be a void or cavity. Drilling in the dense gravel alluvium with auger equipment was difficult due to the cobbles and boulders and practical drilling refusal was typically encountered in the deposit. Laboratory testing performed on samples obtained from the borings included natural moisture content and density, liquid and plastic limits and gradation analyses. Results of swell-consolidation testing, presented on Figures 10 through 16, indicate the debris fan soils are typicilly hydrocompressive and moderately to highly compressible under load after wetting. Some of the clay soils showed a low expansion potential when wetted but Job No. !05 !15-6 -4- the resulting heave potential is not expected to be significant compared to the collapse potential. Results of gradation analyses performed on small diameter drive samples (minus I Y, inch fraction) of the debris fan soils are shown on Figures 17 and 18. The laboratory testing is summarized in Table 1. Free water was typically not encountered in the borings and the subsoils were relatively dry. In Borings 6 through 9 and 15, the subsoils became moist with depth and free water was encountered at depths between 26 and 36 feet in Borings 6 and 15. ENGINEERING ANALYSIS Development of the Villas project as proposed should be feasible based on geotechnical conditions. The upper 7 to 38 feet of soils encountered in the borings consist of debris fan deposits that tend to collapse (settle under constant load) when wetted. The amount of settlement will depend on the depth of the compressible soils and the wetted depth below the foundation. The settlement potential and risk of excessive building distress can be reduced by compaction of the soils to a certain depth below the foundation bearing level and by heavily reinforcing the foundation to resist differential settlements. The compaction should also extend to below driveway and utility areas. The soil compaction can consist of the structural fill proposed to elevate the project site but relatively deep structural fills will also have some potential for long term settlement. Proper grading and compaction as presented below in Site Grading will help reduce the settlement risks. In areas underlain by less than lO to 15 feet of debris fan soiis, mainly the northern part of the north parcel, additional compaction below the building foundation shm.ild not.be needed. A heavily reinforced mat foundation designed for large differential settlements or a deep foundation that extends down to the underlying, dense river gravel alluvium could also be nsed to reduce the settlement risk. Eagle Valley Evaporite that underlies the project area is known to be associated with sinkholes and localized ground subsidence in the Roaring Fork RiVer valley. A sinkhole opened in the parking lot ofthe Pro Shop to the northwest of the project site in January 2005 and other irregular bedrock conditions have been identified in the affordable Job No. 105115-6 -5- housing site to the west of the Villas north parcel. Indications of ground subsidence were not observed in the Villas development area that could indicate a risk of future ground subsidence but the variable depth of debris fan soils in Borings 6 through 9 and 15 in the north parcel could be the result of past subsidence. In our opinion, the risk of future ground subsidence in the Villas project area is low and similar to other areas of the Roaring Fork River valley where there have not been indications of ground subsidence. We understand that the potential for future ground subsidence in the project area is being evaluated by others. The southern part of the northern parcel should be further evaluated for potential sinkhole development considering the variable subsurface profile encountered in that area. Recommendations for preliminary design of the proposed development are presented below. When the building plans have been developed, we should review the information for compliance with our recommendations. DESIGN RECOMMENDATIONS FOUNDATIONS Considering the subsurface conditions encountered in the exploratory borings and the nature of the proposed construction, we recommend the buildings be founded with spread footings bearing on at least 5 feet of compacted on-site debris fan soils or compacted structural filL The feasibility of footings placed on the natural soils in the north parcel where the debris fan soils are less than about 10 to 15 feet deep should be evaluated prior to construction If a mat foundation or deep foundation system is considered for building support, we should be contacted for additional recommendations. The design and construction criteria presented below should be observed for a spread footing foundation system. l) Footings placed on at least 5 feet of compacted fill in deeper debris fun areas or on natural soils where there is less than 10 to 15 feet of the natural debris fan soils should be designed for an allowable bearing pressure of Job No. 105 115-6 -6- 1,500 psf. Based on experience, we expect initial settlement of footings designed and constructed as discussed in this section will be about 1 inch or less. Additional differential settlement between about i to 2 inches could occur in deeper fill areas or if the undisturbed debris fan soils are wetted. 2) The footings should have a minimum width of20 inches for continuous walls and 2 feet for isolated pads. 3) Exterior footings and footings beneath unheated areas should be provided with adequate soil cover above their bearing elevation for frost protection. Placement of foundations at least 36 inches below exterior grade is typically used in this area. 4) The foundation should be constructed in a "box-like" configuration rather than with isolated footings. The foundation walls should be heavily reinforced top and bottom to span local anomalies such as by assuming an unsupported length of at least 14 feet F orrndation walls acting as retaining structures should also be designed to resist lateral earth pressures as -.. ' . ' .. -' discussed in the "Foundation and Retaining Walls" section of this report. 5) The topsoil, existing undocumented fill and any loose or disturbed soils should be removed. The soils should be subexcavated as needed to provide at least 5 feet of structural fill below the footing bearing level compacted to at least 98% of the maximum standard Proctor density within 2 percentage points of optimum moisture content. Where footings are placed on the natural soils, the exposed soils in footing area should be moistened and compacted. 6) A representative of the geotechnical engineer should evaluate the compaction of the fill materials and observe all footing excavations prior to concrete placement for bearing conditions. FOUNDATION AND RETAINING WALLS Foundation walls and retaining structures which are laterally supported and can be expected to undergo only a slight amount of deflection should be designed for a lateral Job No. 105 115.0 -7- earth pressure computed on the basis of an equivalent fluid unit weight of at least 55 pcf for backfill consisting of the on-site fine-grained soils. Cantilevered retaining structures which are separate from the buildings and can be expected to deflect sufficiently to mobilize the full active earth pressure condition should be designed for a lateral earth pressure computed on the basis of an equivalent fluid unit weight of at least 45 pcffor backfill consisting of the on-site fmc-grained soils. All foundation and retaining structures should be designed for appropriate hydrostatic and surcharge pressures such as adjacent footings, traffic, constrnction materials and equipment The pressures recommended above assume drained conditions behind the walls and a horizontal backfill surface. The buildup of water behind a wall or an upward sloping backfill surface will increase the lateral pressure imposed on a foundation wall or retaining structure. An underdrain should be provided to prevent hydrostatic pressure buildup behind walls. Site walls with a maximum backslope of2 horizontal to I vertical should be designed for an active earth pressure of at least 60 pcf equivalent fluid unit weight. Backfill should be placed in uniform lifts and compacted to at least 90% of the max.imum standard Proctor density at a moisture content near optimum. Backfill in pavement and walkway areas should be compacted to at least 95% of the maximum standard Proctor density. Care should be taken not to overcompact the backfill or use large equipment near the wall, since this could cause excessive lateral pressure on the wall. Some settlement of deep foundation wall backfill should be expected, even if the material is placed correctly, and could result in distress to facilities constructed on the backfill. The lateral resistance of foundation or retaining wall footings will be a combination of the sliding resistance of the footing on the foundation materials and passive earth pressure against the side of the footing. Resistance to sliding at the bottoms of the footings can be calculated based on a coefficient of friction of0.35. Passive pressure of compacted backfill against the sides of the footings can be calculated using an equivalent fluid unit weight of 300 pcf. The coefficient of friction and passive pressure values recommended above assume ultimate soil strength. Suitable fuctors of safety should be included in the Job No. !05 115-6 -8- design to limit the strain which will occur at the ultimate strength, particularly in the case of passive resistance. Fill placed against the sides of the footings to resist lateral loads should be compacted to at least 95% of the maxirnwn standard Proctor density at a moisture content near optimum. FLOOR SLABS The natural on-site soils, exclusive of topsoil, and compacted structural fill can be used to support lightly loaded slab-on-grade construction. The natural soils are compressible when wetted and there could be some post-construction settlement. To reduce the effects of some differential movement, nonstructural floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due·to shrinkage cracking. The requirements for joint spacing and slab reinforcement should be established by the designer based on experience and the intended slab use. A minirnwn 4 inch layer of free-draining gravel should be placed beneath basement level slabs to fucilitate drainage. This material should consist of minus 2 inch aggregate with at least 50% .retained on the No. 4 sieve and less than 2% passing the No. 200 sieve. All fill materials for support of floor slabs above footing bearing level should be compacted to at least 95% of maximum standard Proctor density at a moisture content near optimum. Required fill can consist of the on-site soils devoid of vegetation, topsoil and oversized rock. UNDERDRAIN SYSTEM Although free water was typically not encountered during our exploration, it has been our experience in the area that local perched groundwater can develop during times of heavy precipitation or seasonal runoff. Frozen ground during spring runoff can create a perched condition. We recommend below-grade construction, such as retaining walls and basement areas, be protected from wetting and hydrostatic pressure buildup by au Job No. 105 115-6 -9- underdrain system. An underdrain should not be provided around crawlspace and slab-on- grade areas. If installed, the drains should consist of drainpipe placed in the bottom of the wall backfill surrounded above the invert level with free-draiulng granular material. The drain should be placed at each level of excavation and at least 1 foot below lowest adjacent finish grade and sloped at a miulmum 1% to a suitable gravity outlet. Free-draining granular material used in the underdrain system should contain less than 2% passing the No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of2 inches. The drain gravel backfill should be at least lVz feet deep. An impervious membrane, such as a 20 mil PVC liner, should be placed beneath the drain gravel in a trough shape and attached to the foundation wall with mastic to prevent wetting of the bearing soils. SITE GRADING EXtensive grading of the Villas area is proposed as part of the development plan. Ii:l. addition, removal and replacement of the debris fan soils compacted is recommended in shallow fill areas to reduce the risk of excessive differential settlements and building distress. The structural fill should extend to at least 8 feet below design surface grade and to at least 2 feet below the water and sewer pipe invert levels. Ii:l. addition, the water and sewer pipe joints should be mechanically restrained to reduce the risk of joint separation in the event of excessive settlement Excavation and compaction below footing bearing level may not be needed where the debris fan soils are less than 10 to 15 feet thick. The struCtural fill materials below footing bearing level shonld be compacted to at least 98% of the maximum standard Proctor density within 2 percentage points of optimum moisture content. Prior to fill placement, the subgrade should be carefully prepared by removing the existing fill, all vegetation and topsoil and compacting to at least 95% of the maximum standard Proctor density at near optimum moisture content. The fill should be benched into slopes that exceed 20% grade. Based on our experience with the Phase 1 development, shrinkage of the debris fan soils due to compaction is expected to be about l5%to20%. Job No. 105 115-<5 -II- PAVEMENT SECTION The upper soils encountered at the site consist of low plasticity sand, silt and clay that are considered a poor support of pavement sections. A Hveem stabilometer 'R' value of 15 was assumed for the native soils and required imported soils. The traffic loadings for the Villas development have not been provided but are assumed to be relatively light for the service traffic loading condition, after the construction phase. Based on these conditions, a preliminary pavement section consisting of3 inches of asphalt on 8 inches of CDOT Class 6 base course for the main drives and 3 inches of asphalt on 6 inches of CDOT Class 6 base course for automobile only parking is recommended. We can review the pavement section design when the roadway subgrade has been graded and the traffic loadings have been determined. LIMITATIONS This study has been conducted in accordance with generally accepted geotechnical . . ' .. . . .. . ' . ' ' ' . engineering principles and practices in this area at this time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory borings drilled at the locations indicated on Figures 1 and 2, the proposed type of construction and our experience in the area. Our services do not include deterthining the presence, prevention or possibility of mold or other biological contaminants (MOBC) developing in the future. If the client is concerned about MOBC, then a professional in this special field of practice should be consulted. Our fmdings include interpolation and extrapolation of the subsurface conditions identified at the exploratory borings and variations in the subsurface conditions may not become evident until excavation is perfonned. If conditions encountered during construction appear different from those described in this report, we should be notified so that re-evaluation of the recommendations may be made. This report has been prepared for the exclusive use by our client for design purposes. We are not responsible for technical interpretations by others of our infonnation. As the project evolves, we should provide continued consultation and field services during Job No. 105 1!5-6 ! • -12. construction to review and monitor the implementation of our recommendations, and to verify that the recommendations have been appropriately interpreted. Significant design changes may require additional analysis 'or modifications to the recommendations presented herein. We recommend on-site observation of excavations and foundation. bearing strata and testing of structural fill on a regular basis by a representative of the geotechnical engineer. Respectfu[Jy Submitted, HBPWORTI!-PAWLAK GEOTECHNICAL, INC. Steven L. Pawlak, P.E. Reviewed by: Daniel E. Hardin, P SLP!ksw cc: High Country Engineering-Attn: Scott Gregory S.K. Peightal Engineers-Attn: Jack Albright Job No. 105 115-<5 I I 105115-6 LOCATION OF EXPLORATORY BORINGS VILLAS NORTH PARCEL Figure 1 I I I I I I 'I i . I I i ; I I 105115-6 LOCATION OF EXPLORATORY BORINGS VILLAS NORTH PARCEL Figure 1 I 105115-6 LOCATION OF EXPLORATORY BORINGS VILLAS SOUTH PARCEL Figure2 J I 0 5 10 15 20 25 105115-6 BORING 1 ELEV.= 5952' 20/12 WC=4.5 00=106 20/6,30/4 BORING2 ELEV.= 5950' 20/12 WC=6.2 00=93 -200=85 25/4,10/0 BORING3 ELEV.= 5944' 24/12 WC=5.1 00=94 Note: Explanation of symbols is shown on Rgure 9. T BORING4 ELEV. = 5946' 25/12 WC=7.1 00=104 -200=83 Ll=28 P1=11 20/6,40/6 ~ LOGS OF EXPLORATORY BORINGS H worth-Pawlak Geotechntc:o1 0 5 10 1i) "' -·t:L·· • ~ 15 Cil 20 25 Rgure 3 BORINGS BORING6 7 8 0 ELEV. = 5950' ELEV.= 5953' ELEV.= 5954' ELEV. = 5946' 0 J .I 11/12 7/12 15/12 29/12 5 WC=4.0 5 00=107 ,I 16/12 14/12 30/12 I WC=9.3 10 00=100 WC=16.3 10 ·200=54 00=108 ·200=62 I 17/12 12/12 32/12 7112 I 15 WC=10.3 WC=6.6 15 -200=50 00=117 -200=44 12/12 20 20 1il IE ., s a. "' 10/12 7/12 0 25 WC=18.2 WC=17.7 25 00=106 00=107 ·200=73 ·200=74 30 30 35 35 40 40 5012 Note: Explanation of symbols is shown on Figure 9. 105115-6 LOGS OF EXPLORATORY BORINGS Figure 4 I I 0 5 10 .1ii ' 'ii Cl> .0 15 20 25 105115-6 BORING9 ELEV.= 5942' 24/12 18/12 28/12 10/12 WC=11.4 00=104 BORING 10 ELEV.= 5938' 18/12 WC=4.0 DD=96 10/12 60/12 BORING 11 ELEV.= 5943' 9/12 11/12 WC=15.5 DD=109 -200=76 7/12 3/6,15/6 Note: Explanation of symbols is shown on Rgure 9. BORING 12 ELEV. = 5938' 33/12 WC=6.1 DD=117 43/12 14/12 LOGS OF EXPLORATORY BORINGS 0 5 10 . 1il ~_{E. ' .c 15. 15 Q) 0 20 25 Figure 5 32/12 30 30 35 35 40 40 Note: EXplanation of symbols is shown on Figure 9. 105 115-6 LOGS OF EXPLORATORY BORINGS Figure 6 0 5 I I 10 15 20 25 30 35 105 115-6 BORING17 ELEV.= 5963' 52/12 34/12 WC=5.9 00=115 23/12 50/3 BORING 18 ELEV. = 5968' 38/12 40/12 WC=3.6 00=104 -200=58 42/12 WC=3.6 00=109 45/12 BORING 19 ELEV. = 5962' 13/12 30/12 WC=1.7 00=120 +4=36 -200=26 Note: Explanation of symbols is shown on Figure 9. BORING20 ELEV. = 5967' 18/6,25/3 WC=1.9 00=103 -200=36 55/12 ~ch LOGS OF EXPLORATORY BORINGS H worth-Powtok ~leal 0 5 10 15 1il Q) u. ' .c ··0..·· Q) 20 0 25 30 35 Figure 7 I ] 0 5 10 15 20 25 30 BORING21 ELEV. ~ 5976' 52/12 15/12 43/12 WC=3.3 .DD=108 '15/12 105115-6 BORING 22 BORING 23 BORING 24 ELEV.= 5957' ELEV.= 5985' ELEV.= 5985' 21/12 WC=3.3 +4=38 -200=23 30/6,25/3 28/12 40/12 WC=3.4 00=109 52/12 WC=1.3 -200=27 57/12 39/12 20/12 WC=2.6 -200=46 Note: Explanation of symbols is shown on Rgure 9. BORING25 ELEV.= 5990' 20/6,30/3 0 5 27/12 WC=4.6 10 00=105 -200=62 30/12 WC=4.1 15 00=112 -200=64 50/6,10/0 20 25 30 LOGS OF EXPLORATORY BORINGS Figure 8 I LEGEND: I 12] FILL; silty sandy gravel, loose to medium dense, slightly moist, brown. ,[] TOPSOIL; root zone, sandy silt, slightly moist, brown. [71 SILT AND CLAY (ML-CL); slightly sandy to sandy, scattered gravel, some sandy clay, stiff to very stiff, slightly I· ~ moist, very moist with depth at Borings 6, 7 and 15, mixed brown, slightly calcareous and porous, low plasticity. I ~. SAND AND SILT (SM-ML); scattered gravel to gravelly, loose to medium dense, slightly moist, light brown. · ,· ~ SAND AND GRAVEL (SM-GM); silty, some sandy silt layers, medium dense, brown, subangular to rounded rock ' ' ~ GRAVEL, COBBLES AND BOULDERS (GM-GP); slightly silty, dense, typically moist, wet at Borings 4 and 15, ;I . ~ brown, rounded rock. , I SILTSTONE AND GYPSUM; medium hard to hard, moist, gray and White. Eagle Valley Evaporite. p •• !,.- ,!'19/12 0,2 ! l T ·.~OTES: Relatively undisturbed drive sample; 2-inch I.D. California liner sample . Drive-sample;·standard penetratien -test (SP:r), 1-3/8 inch-LD. split spoon sample, ASTM-D-1586. Drive sample blow count; indicates thai 39 blows of a 140 pound hammer falling 30 inches were required to drive the California or SPT sampler 12 inches. Free water level in boring and number of days following drilling measurement was taken. Depth at Which boring had caved when checked on July 8 , 2005. Practical drilling refusal. Where shown above bottom of log, indicates that multiple attempts were made to advance the boring. . 1. Exploratory borings were drilled on July 6, 7 and 8, 2005 with 4-inch diameter continuous flight power auger. •. Locations of exploratory borings were measured approximately by pacing from features shown on the site plan ' provided. :1, Elevations of exploratory borings were obtained by interpolation between contours shown on the site plan provided. , The exploratory boring locations and elevations should be considered accurate only to the degree implied by the method used. !i, The lines between materials shown on the exploratory boring logs represent the approximate boundaries between material types and transitions may be gradual. o. Water level readings shown on the logs were made at the time and under the conditions indicated. Ructuations in water level may occur with time. Groundwater was only encountered in Borings 6 and 15. Laboratory Testing Resulls: WC ~ Water Content(%) DD = Dry Density (!)cQ +4 = Percent retained on the No.4 sieve 105115-6 ~h Hep~orth-Pawlok Geotechnlca1 . -200 = Percent passing No. 200 sieve LL = Uquid Umit (%) PI = Plasticity Index (%) LEGEND AND NOTES Figure· 9 Moisture Content = 4.5 percent DryOensily = 106 pcf Sample of: Sand~ Silt and Clay From: Boring 1 at 4 Feet I 0 * I ..--hf... c 1 -~ ........ "" Compression "' upon I ~ I'-wetting· a. 2 E " 0 0 I 3 I I . -" . . .. . 0.1 1.0 10 100 APPUEO PRt;SSURE -ksf 105115-6 ~ SWELL-CONSOLIDATION TEST RESULTS Figure 10 H~orth-Pavdak Gooteclmtcat .I I I I I 0 1 2 3 4 5 *-6 c 0 ·;;; 7 ~ 0. E 8 8 9 10 11 12 13 14 15 0.1 105115-6 -r-- ~-"" I i\ . \ 1.0 . ~ HeoWorih-Paotol< Geotedmlca! Moisture Content = 5.1 percent Dry Density = 94 pel Sample of: Sandy Silt From: Boring 3 at 4 Feet Compression upon wetting .. . ... \ \ \ \ \ 10 100 APPUEO PRESSURE 0 ksf SWELL-CONSOLIDATION TEST RESULTS Figure 11 .I 'I ' I I 0 1 2 ;ft. <= 3 .Q "' @ 0.. E 4 0 (.) 5 6 7 0.1 0 * 1 ·~ ~ 2 0.. E 0 (.) 3 4 0.1 105115-6 Moisture Content = 4.0 perce nt Dry Density = 107 pel Sample of: Very Silty Sand r---!---From: Boring 8 at 4 Feet Compression upon "" wetting ""' . \ ~ \ \ 1.0 10 100 APPUED PRESSURE-ksf Moisture Content = 11.4 percent Dry Density = 104 pcf Sample of: Sandy Silt From: Boring 9 at 19 Feet r----..... -Compression ~ upon wetting ~ "' " 1.0 10 . 100 APPUED PRESSURE-ksl ~ SWELL-CONSOLIDATION TEST RESULTS Figure 12 Het>Worth-Pawfak. Geotecbntool l 0 I :--i-Moisture Content 4.0 percent ":--Dry Density = 96 pcf 1 Sample of: Sandy Silt I From: Boring 10 at 4 Feet 2 ---._ 1'-- 1. * 3 c Compression 0 "' upon ·;;; wetting (/) 4 !'? '\ a. E 8 5 \ 6 1\ \ 7 \ 8 0.1 1.0 10 100 APPUED PRESSURE-ksf . . .... . . .. Moisture Content = 6.1 perce nt Dry Density = 117 pcf * Sample of: Sandy Silty Clay c: From: Boring 12 at 4 Feet -~ 1 c: "' a. ,1:] --........., ' 0 c: ""' --..., ~"r--0 ·;;; "' 1 !'? a. Expans on E 0 upon () wetting 2 0.1 1.0 10 100 APPLIED PRESSURE • ksf 105115-6 ~1 SWEtL-CONSOLIDATION TEST RESULTS Figure 13 H..,worfu-Powlok Geotocllntcol I Moisture Content = 8.5 percent Dry Density = 109 pcf I Sample of: Slightly Sandy Silty Clay From:.Boring 14 at4Feet 2 .I ?fl. c: 0 1 ('--.... ~ <U ' ~ 0. ~ a} """ . 0 c: \ "\ ~ " 1'-2! 1 0. i t:XpanSJc r E 0 upon () wetting 2 I I I I I 0.1 1.0 10 100 APPUED PRESSURE· ksf I . . " I Moisture Content = 5.9 percent Dry Density = 115 pel Sample of: Sandy Silty Clay From: Boring 17 at 9 Feet 0 *' c: -~ 1 c: "' §'!-............. r---...... w --• 0 c: Expansion """ .Q upon " <J) ~ 1 wetting 0. E 0 () 2 0.1 1.0 10 100 APPLIED PRESSURE • ksl 105115-6 ~ HllPWORnf-PA.Wl.AKGF..OlEX::HN.tCAL SWELL·CONSOUDATION TEST RESULTS Rgure 14 I I Moisture Content = 3.6 percent Dry Derisily = 109 pel I Sampl.e of: Sandy Silt and Clay From: Boring 18 al14 Feet 0 I ~ 1 ~ c ""' ,_No movement -~ " upon I "' wetting ~ 2 0. "\ E 0 I 0 3 I 0.1 1.0 APPUED PRESSURE-ksf 10 100 ' ....... Moisture Content = 3.3 percent Dry Densily = 108 pet Sample of: Sandy Silt and Clay From: Boring 21 at 14 Feet 0 . Compression * 1 :......---~ / upon wetting c: -~ ~ m ~ 2 "'-""-,. E "J 0 0 "-... 3 0.1 1.0 10 100 APPUED PRESSURE-ksf 105115-6 ~ SWELL-CONSOLIPATION TEST RESULTS Figure 15 HeoWorth-Po'"ok Geotecflntcal I .I I I I I ' I I . ..._ 0 c: 0 ·ro· . 1 m a. E 0 2 () 0.1 ... ..._ 0 c: 0 ·c;; (J) 1 ~ a. E 0 () 2 0.1 105115-6 . Moisture Content= 3.4 percent Dry Density = 109 pcf Sample of: Sandy Silt and Clay From: Bbring 22 at 19 Feet -1--r-. --i"t "' [', No movement upon wetting 1.0 10 100 APPUED PRESSURE-ksf - Moisture Content = 4.6 percent Dry Density = 105 pel Sample of: Sandy Silt and Clay From: Boring 25 at 9 Feet ~ ~ ~ "'""-. [', No' movement upon wetting 1.0 10 100 APPUED PRESSURE-ksf ~ SWELL-CONSOUDATlONTEST RESULTS Rgure 16 HE.PWORI'HPAWLAKGEX>'f'f:CHNtCA1 I I H'{()AOMEIER ANAlYSIS I SIEVE ANAlYSIS I ,l TIME READINGS I U.S. STPNDARD SERIES I C1.EAR SQUARE OPENINGS _I_ 24Hfl. 1Hl'l I 45 MIN. 15 MIN. 6oM!Nl9MIN.4 MIN. 1 MIN .. #200 #100 #50 #30 #16 #8 #4 3/8' 3/<' 1 1/? 3' s'6" e· 0 '"' 10 ., I 0 20 ., w (!) z 30 "' z ~ Ci'i I (JJ a: <10 " ~ !z 50 ,. !z UJ UJ I 0 0 a: 60 ., a: UJ UJ n. a.. 70 "' I eo "' 90 " I 100 • .001 .., ... "'" ... "" .,. ·'"' .., ""' 1.18 ... '·" 9.S 12.5 19.0 , . '" "' "" '" DIAME1ER OF PARTICLES IN MIWMETERS I """"""' GRAVEL 17% SAND 25 % SILT AND CLAY 58 % UQUIDUMIT % PLASTICITY INDEX % SAMPLE OF: Sandy Gravelly Silt FROM: Boring 15 at 14 Feet I I H'{()ROMEIEA ANALYSIS I SIEVE ANALYSIS I I 2~ ~ 7 HR TIME READINGS I U.S. STPNOARO SERIES I CLEAR SQUARE OPENINGS 8~ 65 IN.15 MIN.60MIN19MIN.4MIN. 1 MIN. #200 #100 #50 #30 #16 #8 #4 3/8' 3/4' 1 1/2' 3' 5"6" 100 I 10 90 20 80 0 (!) w z 30 70 z I ~ Ci'i 40 60 ~ a: f-1- I z 50 50 ill Ul 0 0 a: 60 ·40 ffi Ul n. "- 70 30 80 20 90 10 100 0 .001 .002 .005 .009 .019 .037 .074 .150 .300 .600 1.18 2.36 4.75 9.S,2.5 19.0 37.5 76.2 12}52 203 DIAME1ER OF PARTICLES IN MIWME1ERS C008I£S GRAVEL 34% SAND 24 % SILT AND CLAY 42% LIQUID LIMIT % PLASTICITY INDEX % SAMPLE OF: Siltv Sand and Gravel FROM: Borlna 16 at 14 Feet 105115-6 ~ GRADATION TEST RESULTS Figure 17 HEPWOIUlfPAWl.AK GEOT'£CHNlCAL I HYDROMETER IWALYSIS I SIEVE !WALYSIS I ,l TIME REAOINGS I U.S. STIWDARDSERIES I ClEAR SQUARE OPENINGS ~~tN. 1$~tN. 60MIN19MIN.4 MIN. 1 MIN, #200 #100 #5() #90 #16 #8 #4 3/6' 3/4' 1 1/Z' 3" 5'6' 8" 0 '"' 10 ., @ 20 " ('j z 30 "' z ~ 00 40 .. ~ 0: I-I-z 50 "'m w () () 0: 60 .. 0: w w a. a. I I I 70 "' I 80 20 90 " 100 0 ''" ""' .oos ""' Jll9 '"' .,, ·"" """ .roo us = 4.75 9.$ !2.$ HHl ,,. "" '" ., "' .I DIAMETER OF PARTICLES IN MIWMETERS «AYTOSU co .. ,,. GRAVEL 38% SAND 36 % SILT AND CLAY 26 % I LIQUID LIMIT % PLASTICITY INDEX % SAMPLE OF: Silty Sand and Gravel FROM: Boling 19 at 9 Feet I HYOROMElER IWALYSIS I SIEVE ANALYSIS ·-.. 24 ~-7 HR TIME REAOlNGS I U.S. STANDARD SERIES I ClEAR SQUARE OPENINGS _I 45 • 15 MIN. 60MIN19MIN.4 MIN. 1 MIN, #200 #100 #50 #30 #16 #8 #4 3/8" 3/4' 11/2' 3' s~6" a~ 0 100 I 10 90 0 20 80 UJ ('j z 90 70 z ~ 00 (/) 0: 40 60 if I-I-z 50 so m w () () 0: 60 40ffi w a. a. 70 30 80 20 90 10 100 0 .001 .002 .005 .009 .019 .037 .074 .150 .300 .600 1.18 2.36 4.75 s.s,2_5 19.o 37.5 762 12~52 203 DIAMETER OF PARTICLES IN MIWMETERS """""' GRAVEL. 38% SAND 39 % SILT AND CLAY 23 % UOUIOUMIT % PLASTICITY INDEX % SAMPLE OF: Siltv Sand and Gravel FROM: Borino 22 at 4 Feet 105115-6 Ge~ HE:PW'omlf-PAWLMC GEO'I'I?:CHN!CAL GRADATION TEST RESULTS Rgure. 18 HEPWORTH-PAWLAK G!:OiE:CHNICAL, INC. TABLE 1 · Job No. 105 115·6 SUMMARY OF LABORATORY TEST RESULTS age 0 p 1 f3 SAMPlE LOCATION NATURAL NATURAL GRADATION PERCENT AmRBERG L!MITS UNCONFINED MOISTURE DRY GRAVEL SAND PASSING LIQUID PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY NO. 200 LIMIT INDEX STRENGTH BEDROCK iYPE (%) (%) SIEVE (ft) (%) (od) (%) (%) (PSFl 1 4 4.5 106 ' Sandy silty and clay 2 4 6.2 93 85 Sandy clayey silt 3 4 5.1 94 Sandy silt 4 4 7.1 104 83 28 11 Sandy silty clay 5 8'h 9.3 100 54 Silt and sand with gravel 6 14 10.3. 50 Very silty sand and gravel 106 73 . . Sandy silt 24 18.2 7 9 16.3 108 62 Sandy silt 24 17.7 107 74 Sandy silt 8 4 4.0 107 Very silty sand 14 .6.6 117 44 Very silty sand HEPWORTH-PAWLAk GEOTECHNICAL, INC. TABLE 1 Job No. 105 115·6 SUMMARY OF LABORATORY TEST RESULTS ~e 0 p 2 f3 SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG UMITS UNCONFINED MOISTURE DRY GRAVEL SAND PASSING UQUlO PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY NO. 21io UMIT INDEX STRENGTH BEDROCK TYPE (%) (%) SIEVE (ft) (%) (pcf) (%) (%) (PSF) 9 19 11.4 104 Sandy silt 10 4 4.0 96 Sandy silt 11 9 15.5 109 76 Sandy clayey silt . 12 4 6.1 117 Sandy silty clay . 14 4 8.5 109 91 31 13 Slightly sandy silty clay 15 4 14.3 112 . Sandy silty clay 10 .14.5 71 Sandy silty clay 14 14.4 112 17 25 58 Sandy gravelly silt 16 14 3.2 34 24 42 Silty sand. and gravel . 17 9 5.9 115 Sandy silty clay \ \ ', \ ., ' ' ' \ o>rj>W.\ ·~'11 :unv lQJ1lg '0") '~liVtl'~~ P~?M"Ol~ ""'tiC ~f."l'!>t;WJI Cl? \ ' :)1"1 ~~W~H U(>Pt'~~?~ 30CI~aNOlil \ \ _,...,, .. , .. DNHI33NION3 "tl·f i I I ~I . Hi"iiOS '"'N3·ds·..;;· Nlfld l01d 11¥~3/\0 t ONili:J '0 3SVHd 'G-n'd 300!l;!8NO~I ~~ ~ nEPVvvKTH·PAWLAK GEOTECHNICAL, INC. • TABLE 1 . Job No. 105 115-6 SUMMARY OF LABORATORY TEST RESULTS . qge 0 p 3 f3 SAMPLE LOCATION NATURAL NATURAL GRADATION PERCENT ATTERBERG LIMITS UNCONFINED MOISTURE DRY GRAVEL SAND PASSING t,IQUID PLASTIC COMPRESSIVE SOIL OR BORINGS DEPTH CONTENT DENSITY flo. 2oo LIMIT INDEX STRENGTH BEDROCK iYPE (%) (%) SIEVE (ttl . (%) (pet) ('!'•) (%) (PSF) 18 9 3.6 104 58 Sandy silt with gravel 14 3.6 109 '. Sandy silty and clay 19 9 1.7 120 38 36 26 ; Silty sand and gravel 20 4 1.9 103 36 I; Silty sand and gravel 21 14 3.3 108 Sandy silt and clay 22 4 3.3 38 39 23 Silty sand and gravel 19 3.4 109 Sandy silt and clay Silty sand and gravel 23 4 1.3 27 Silty sand and gravel 24 9 2.6 46 • Very silty sand with· gravel 25 9 4.6 105 62 Sandy silt and clay 14 4.1 112 64 Sandy silty and clay Parcel Detail Page 1 of 4 Garfield County Assessor/Treasurer Parcel Detail Information Assessor/Treasur~r PrQP§rty Search I Assessor Subset QueJ:Y I A~sessor S~k.s_Search Cl~rk&R~<::Qrd~r_R~Ge]2tion_S~-~r~h Basic Building Characteristics I Tax Information Parcel Detail I Value Detail I Sales Detail I Residential/Commercial Im_prQvement Detail _Land DeJ~il I PJlQtQgmp~~ I MillL~yyR~Y~tlll~sJ2~1~il [1;] Account Parcel 2007 Mill Number Number Levy a I 090 II R043470 1239501329254 64.976 Owner Name and Mailing Address IRAINW ATER, LARRY R & KAREN L. 13814 N. 95TH STREET !OMAHA, NE 68134 Assessor's Parcel Description (Not to be used as a legal description) ISECT,TWN,RNG: 1-7-89 SUB:IRONBRIDGE IPUD, PHASE II, FILING 1, 2 & 3 ILOT:254 PRE:R041508 BK:1596 PG:871 IBK:1565 PG:600 BK:1560 PG:438 IBK: 1560 PG:431 BK: 1057 PG:07 45 IBK:1028 PG:768 BK:1028 PG:597 http://www. garcoact. com/ assessor /parce1.asp ?ParcelN umber=23 9 50 13 29254 I I I I I I I I I 10/7/2008 Parcel Detail Page 2 of4 IBK:1006 PG:743 RECPT:756292 I IRECPT:756291 BK:1822 PG:287 I IRECPT:702424 BK:1822 PG:283 I IRECPT:702422 BK:1822 PG:250 I IRECPT:702421 BK:1782 PG:269 I IRECPT:694479 BK:1782 PG:264 I IRECPT:694478 BK:1747 PG:1 I IRECPT:686745 BK:1218 PG:738 I IRECPT:572583 BK:1218 PG:715 I IRECPT:572582 BK:1217 PG:266 I IRECPT:572131 BK:1206 PG:852 I IRECPT:569200 BK:1206 PG:780 I IRECPT:569199 BK:1206 PG:768 I IRECPT:569197 BK:1206 PG:734 I IRECPT:569195 BK:1206 PG:662 I IRECPT:569194 BK: 1206 PG:637 I IRECPT:569192 BK:1206 PG:629 I IRECPT:569191 BK:1206 PG:574 I IRECPT:569190 BK:l063 PG:0578 I IBK:1063 PG:0571 I Location Physical II 00 EAGLE CLAw CIR GLENWOOD SPRINGS I Address: !Subdivision: IIIRONBRIDGE PUD, PHASE II, FILING I, 2 & I !Land Acres: llo I Land Sq Ft: 114,146 I I Section II Township II Range I I 1 II 7 II 89 I http://www. garcoact.com/ assessor/parcel.asp ?ParcelN umber=23 9 50 13 29254 10/7/2008 Parcel Detail Page 3 of4 2008 Property Tax Valuation Information II Actual Value II Assessed Value I I Land: II 86,27011 25,0201 !Improvements: II oil ol I Total: II 86,27011 25,0201 Most Recent Sale Sale Date: 119/19/2008 Sale Price: 11379,000 Additional Sales Detail Basic Building Characteristics Number of Residential 0 Buildings: Number of Commllnd [o Buildings: II No Building Records Found Tax Information I Tax Year II Transaction Type I Amount I I 2007 II Tax Payment: Second Half ($674.12)1 I 2007 II Tax Payment: First Half ($674.12) I 2007 II Tax Amount $1,348.24 I 2006 Tax Payment: Second Half I ($56.14)1 I 2006 Tax Payment: First Half II ($56.14)1 I 2006 I Tax Amount II $112.281 http://www.garcoact.com/assessor/parcel.asp?ParceiNumber=23950!329254 10/7/2008