Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Plans
M�� f t- -%�" (� C \ i _ ✓ — L } os J IS�r�1'%r` �a / i -�[j `� / �r�/ `,ir I .-:✓- J\��N Jt`,N'*,l `� ,, (�a �' �r�'—`r J 65 APPROXIMATE SITE LOCATION `I Id c� '� '_�- —*- ------ ---- APPROXIMATE P TY BOUND4. .R �\ .S � ; ;' �. �'% % � ����� �--��-' 4 �, t)• ' � / � f -�., , � ;�'�� � I -moi' ,y •a - ' _ _ ..�,`i(.) � ""'� r / � � � �\ r jam\ �-„ �`.--- /� / , % 11 l,! ) v per.- • - - . . s LANDFILL LOCATION MAP SCALE." 1 "=1500' iz r _'-'-�`� r r ` gam. -A IIIL\ '- rF 7,15 ,a -,d --~ - it CITY OF GLENWOOD SPRINGS SOUTH CANYON SOLID WASTE DISPOSAL SITE ENGINEERING DESIGN & OPERATIONS PLAN PHASE 6 ADDENDUM N0.3 PREPARED FOR: PREPARED BY: CITY OF GLENWOOD SPRINGS AMERICAN ENVIRONMENTAL CONSULTING, LLC SOUTH CANYON SOLID WASTE DISPOSAL SITE 8191 SOUTHPARK LANE GLENWOOD SPRINGS, COLORADO SUITE 107 LITTLETON, COLORADO 80128 GLENWOOD SPRINGS GARFIELD COUNTY, COLORADO MARCH 2016 LIST OF SHEET: r 1 COVER SHEET / SOUTH CANYON LANDFILL LOCATION NO. 2 EXISTING CONDITIONS NO. 3 s LANDFILL LOCATION MAP SCALE." 1 "=1500' iz r _'-'-�`� r r ` gam. -A IIIL\ '- rF 7,15 ,a -,d --~ - it CITY OF GLENWOOD SPRINGS SOUTH CANYON SOLID WASTE DISPOSAL SITE ENGINEERING DESIGN & OPERATIONS PLAN PHASE 6 ADDENDUM N0.3 PREPARED FOR: PREPARED BY: CITY OF GLENWOOD SPRINGS AMERICAN ENVIRONMENTAL CONSULTING, LLC SOUTH CANYON SOLID WASTE DISPOSAL SITE 8191 SOUTHPARK LANE GLENWOOD SPRINGS, COLORADO SUITE 107 LITTLETON, COLORADO 80128 GLENWOOD SPRINGS GARFIELD COUNTY, COLORADO MARCH 2016 LIST OF SHEET: NO. 1 COVER SHEET / SOUTH CANYON LANDFILL LOCATION NO. 2 EXISTING CONDITIONS NO. 3 1994 SRK PERMITTED PHASING SEQUENCE NO. 4 2014 SCS AQUATERRA PHASE 5 SEQUENCE NO. 5 PROPOSED 2016 PHASE 6 SEQUENCE NO. 6 PROPOSED 2016 PHASE: 6 DESIGN SUBGRADE PLANVIEW NO. 7 PROPOSED 2016 PHAS= 6 DESIGN 3' COMPACTED SOIL LINER PLANVIEW NO. 8 PROPOSED 2016 PHAS= 6 DESIGN DRAINAGE LAYER PLANVIEW NO. 9 1994 SRK PERMITTED FINAL CLOSURE PLAN NO. 10 2014 SCS AQUATERRA REVISED FINAL CLOSURE PLAN NO. 11 PROPOSED 2016 REVISED DESIGN FINAL CLOSURE PLAN NO. 12 CROSS SECTIONS A & 3 NO. 13 LINER, LEACHATE COL_ECTION, & FINAL CLOSURE SYSTEM DETAILS SHEET 1 COVER SHEET SOUTH CANYON LANDFILL LOCATION GARFIELD COUNTY, COLORADO D SPRINGS DATECOMPLETED: 3/2016 APPROVED BY: CJA DWG NAME: SCLDF—SHEEP-7 COVER SHEET.dwg REVISED BY: IDATE, AECAMERICAN ENVIRONMENTAL CONSULTING, LLC. LEIGEN� - ; - - - - �' -- - _ _. 64sa. EXISTING CONTdURS C2 FT_ CONTOUR IIVTERVAI-) - - «',�"' _ - - saso SU BGRAOE CONTOURS PFIASE 6 C2 Ff. CONTOUR /NTZ=RVAL) COVER CONTOURS SITE WISE EXISTING FENCE POWER LINE _ - - _ -a> EXISTING ELECTRICAL POWER POLE CITY �. F- - - - - -- BOU'NOARY _ r E LI M,ITS <20-14 SGS mEN 2A No L•m•ts o I 75 rom '7 rJ94 SRK Per'ra••tted - -_ 1 swos _-.�_�_�_ _ _. - waste Limits for clarity wear. ov'erlavir•g_ 1 - o o c _ _ i—PERMYTTED WAS rE l_1MI-T- — — PR P SE PERMIT WASTE LIMITS PHASE 6 Phase 5 Add _ Y� i \_ Note= L•m•ts _ J It. r• it - PROPOSED PI --LASE 3 AREA 01=1/ELOPED dURING PHASE G Developed = O_17y �- \ �_ - - Nota- Llmlts offset 1 -75' from Permitted waste Limits for Clarity !- _/�-/Limit OverlaYirlg -�-7- / \. - _ _ _ _ - - ; - - - - _ - - - - PROPOSED PHASE 4 AREA OEVELOPEIa DURING PHIASE 6 _ �_ ` _-� rte.. _ _. (Acres Oaveiaped = -1_93 s • • offset 1 -75' from Permitted Waste Ltmits Tor Clarity _ _ - - - - - when L•mrts OverlaYirl9_ `_� _��-�._ -_ — _- — _ _ — — _ — — — — —� — — — — — — — — — — — --- — — — — � — — - - - - _ t nOLifmiTs Overlay om Permit[ d Wastes L•mits for Clarity LIMITS _ a m =-t-- • ng fr - ± - / -- -- FINAL COVER DRAINAGE TERRACES (SEE SHEET 13, DETAIL G) VI . \ ? EXISTING ROADS EXISTING STORM WATER CULVERT MONITORING WELL _ t'� --1 GAS MONITORING PROBE CROSS SECTION LOCATION _ �`q�, � � � � i � seE gr.•.xL sarLi•�-13A - la i --�I� \ i�� I1 i� ` ass SIDE SLOPES AND BpTTl7M WIDTHS 1R �Z ToPo uPl'+itl cover 2.1 ar• dowriFull berM O Gross i TO P ILL- v O Grass .mss` ' J '�. -__�� � �.., . / "" / -s'��� � vy l - - _ _ "". � �'�j - __-._. _ --... __ -... P _P o or• dowrsl-illl b¢rr• O Gr-uss / _ � / /J - - _ -_ - �- - / - _- -- -� - -' - - __ - - SR Z 3.4.1 uPhili eo r 2.1 or• do wr.FrlLl b¢ren O Grass - i �/ _ - �� � � -� � - / / \ S� 2\ - "" _!��*� � _ _ _-._ "_ _. 8R � 3.4.1 uPhilt coo rZ•1 or. tlowrahllt b¢rrn O Cobble EXFS TFIVG SCRAP METAL -» !" f ,/ _ -- ' DROP OFF\` ..\ / �- _ _ _, s'� _ --_. _'-- - -.. WR4 Z Z•1 both sides ,/ / r�� WRS 3.1 both sides �' STORAGE AREA SCLM-8 _ - - O Cobble ' ,y ,- �. -� 1� 1 - Y' __ _ WR7 ZC 3.1 b.o tl-• sfU¢s -x I'.+• -'ice -was=-y_ '- - - _ - _ -� "EX3STiNG MAINTENANCE f RY7N1 O Z abbte Zai bold-. sicl¢s n - RON3 Z•1 botF-. sidles _ _ ._. - e • $ .-_.. � :\ � .� / / a � � 3 '� �f f !-- - � �� _r _ _ - - _- O Cobble PLCIYEE-- 9. ` --- ( / _ _ f - ,, p I l ✓''� _ _- . -" OF1= lCE sv 1> A cobble /s tl¢Fir- -- os I- -sir.a ort cLe g. P i sdz¢ b¢tw¢e» 2.5 a.sid 10.1 b e f h PHASE GOM �DW J _ - - _ Ae¢�¢^ oust¢ Prior to P ae 9 P P to a»s•-ar¢ mie��r-.ue-. ole Pah oF2er 3> Uv¢r¢xc l rl r LM -4 �L� -..I _-� � •�r -{ -- �. \\ _-_ -__ --- -� �_ it '..�- - l I' I � ' LEA HATE ILAGU®N ` � SCLM-3_ - - - - � ! XlST11VG ! _ _ G T.A - i�CUL OE RT o o -- .>e w : r I �� � II � � _ - � -- -- - - - SCLM-7R .._. -_ _-_- CONTOUR INTET.•AL.. 2 � f J S - _ - � r�� _ _ ISTNG C NT URS SH WN ARE EROM AN i SITE JJ•RIVE 4ASER SCANNER SUi2VEY � - - J _ _- ---� - _.----" �� _ 1�� - SCLM=� TO MAPT'EK FOR SURVEY BY HIGH COUNTRY ENGINEERING JUV_Y 2015_ NOTE CONTROL '"- __;! _ �-ir - __ � _ -' � � -- � O BASED ON CITY OE GLENWOOO SPRfNGS COORDINATE SYSTEJ•A_ A GMP -Z. m - FROM RETE NTiON POND _ - --` - _ - _ - _ _ _ - _ - __ sTORiviWATEFDESIGN FEATURES -"-" - -- -- SEE APPENDIX G - - ��-_ .- _ _ - - _-- - - - ----- -- - - - SOUTH CANYON LANI7EILL LOCATION �j l O CZE POND 3 -'� CLIENT_ CI-lY OF GLEN W000 SPRINGSL - _ NTY- O CO LOR _ _. _ REV SIONB BY T2EVGSED MBYB� •ys DATE= EXISTING � E3D 8- WL]RUSH _ - - - _ _. O ISSUED JF ORC VILIN � CUiLVERT s �.vE AR .. ... .. � AMERICAN -� �- - - oL � �oNVIR NMEN'T LC AE •- —_ —_ •-� - I`/I tee.=^^ l.. �_ _.� —_ —.� _ —_ _ —... i _ ... .� ... / a[_» PrsvvErsTv i =E»...aoa spar»as PrsvPcrsi _j � a ..,nsrE =>»:rs � � j- — - — - — - -. --- r ER .rEo o.sPos.... -- i --------- - ---E-- P ---------------- _P s P E,< n n�E � N �n ea »nna. LEGEND NOTES ••^•• 0 ouas 0 000 ' 0 0 0 0 0 0 o sown Eaawins oasE �'Eo»orP s„rP ,. E_ { er owEa Po=E 0 0 0 o e o 0 o G wa== 0 0 — -- naeo vPaox�mnre n.s vaov.oao av cnc�..�Tv ccrv,euw i»�wLL. o 4 ^/�N P>-'<-� ------------------ a e a araN..a- � gw. sa.c varm�am c ® O E <w vn o ) o — — e o pam.�nan wase um�ta w. c�anb $ T.iaEE-wcv vw=vE (wvvrsox..+[•.r�> s_ 0 0 0_ a <wPvaos...nnE) LEG EDP E%ISTING 2" CONTOURS EKISTlNGl0' CONTOURS ------ EXISTING FENCE of EKiSTING ELECTRICAL POWER LINE -a+ EXISTING ELECTRICAL POWER POLE 1 PROPERTY BOVNDARY PERMITTED CD BOUNDARY PERMITTED WASTE LIMITS (1994 SRK Phasing Sequence) PERMITTED WASTE LIMITS (2014 SCS - SWDS Phase E. Addition Addendum No_2) Note. Lem its offset 4' From 1994 SRK Perm iKed Wastes Limits For Clarity -tier- Ovad ayirrg_ - - - HISTORICAL WASTE LIMITS Note= Limns o'tiset 4' Trom Parrtlittecl VV--t- LA M- Overla Yir-9_ EXISTING BVILDING EXISTI N'G ROADS �C EXISTING STORM WATER CULVERT i GROUNDWATER MONITORING WELL � GAS MONITORING PROBE NOTES 1 PERMITTED PHASE SEQUENCE PLAN (PHASES 1-4) WERE DEVELOPED BY STE FFEN ROBERTSON 8. KIRSTEN (U. S_), INC. SEPTEMBER 1994_ 2- THIS SHEET WAS COMPLETED 8Y AEC USING THE SCS AQ VATS RRA DRAWING NO. 3 OF 10 FROM THE SO VTH CANYON SWDS PHASE S ADDITION ADDENDUM NO_ 2 DATED 1/19/2014_ THE EXISTING CONTOURS ON THIS DRAWING ARE FROM THE LASER SCANNER SVRVEY COMPLETED JULY 9 2015_ ... .. ® f :- �� _. --.. -"t.! �= `_ - - ___- - ! i• _3/ \_ EXISTING \ _ _. _ •-��i� �/ LEACHATE LAGOON -, --. SCLM- � v S ' J- - �� -.. !• `_ . SCLM-1 ® 1 -/ _. � . � - __ -� s' _--! - - _- _` _ _ SCLM-7R }-- •l O SO l00 00 EXISTING SOIL _ SaCKPILE T AD- i _ jlSOUTH r POND 3 94 f-- FR PERMITTED PHASING SEQUENCE _ - - -_- -_ ___ - -- - ___ - - •_ ._. -' _ - - - - CANYON LAN OFILL LOCATION GARFlELD COUN COLO RAU _ i - :..GRINDING DAREA sI DLIns s-rolz'Mir:: i 6 �� � AM1FIRICA.N ENV IAONMF_N'7'AL CC)NSilI.T7NGa LLC_ ie \\\ _ BLM PROPERTY I rI Y OF GLENWOOD SPRINGS PROPERTY + le _ \ J - - - - PERMITTED DISPOSAL .f _ / L f i �,� : % AREA I %J /� r r / ' \ I (40.63 ACRES) /,' ,-' f ,��-moi' i' �^, i -�-• \ ) °. I f PHASE 4 I (20.23ACRES) i - �` J + + I a � _ /r PERMITTE! WASTE LIMITS , Q •� /� /� - LEGEND EXISTING 2' CONTOURS EXISTING 10' CONTOURS EXISTING FENCE °E EXISTING ELECTRICAL POWER LINE `al EXISTING ELECTRICAL POWER POLE PROPERTY BOUNDARY - - - - - PERMITTED CD BOUNDARY PERMITTED WASTE LIMITS (2014 SCS - SWDS Phase 5 Addition Addendum No.2) Note: Limits offset 4' from 1994 SRK Permitted Waste Limits for Clarity when Overlaying. PROPOSED PERMIT WASTE LIMITS PHASE 6 Note: Limits offset 4' from Permitted Waste Limits for Clarity when Limits Overlaying. PROPOSED PHASE 3 AREA DEVELOPED DURING PHASE 6 (Acres Developed = 0.17) Note: Limits offset 4' from Permitted Waste Limits for Clarity when Limits Overlaying. PROPOSED PHASE 4 AREA DEVELOPED DURING PHASE 6 (Acres Developed = 1.83) Note: Limits offset 4' from Permitted Waste Limits for Clarity when Limits Overlaying. HISTORICAL WASTE LIMITS Note: Limits offset 4' from Permitted Waste Limits for Clarity when Limits Overlaying. EXISTING BUILDING -� EXISTING ROADS r- < EXISTING STORM WATER CULVERT ® GROUNDWATER MONITORING WELL GAS MONITORING PROBE NOTES -'�� f`-"' 'J-��•J�"` ��^ „\ ,-� 1. PERMITTED PHASE SEQUENCE PLAN PHASES 1-4 WERE DEVELOPED BY 1 � "�� o 100 STEFFEN ROBERTSON & KIRSTEN (U.S.), INC. SEPTEMBER 1994. �'�•L� v~� �� `" \'\�- 0 2. PERMITTED PHASE SEQUENCE PLAN (PHASE 5) WAS DEVELOPED BY SCS AQUATERRA MAY 2014. / _j/ �/� � �' - - �,�-! ,_�✓/ rJ l � `�� � � 3. PERMITTED PHASE SEQUENCE PLAN (PHASE 6) WAS DEVELOPED BY AEC MARCH 2016. 71 ' J�' T, -PHASE 4 AFA (1.83 AC) DEVELOPED CP_ BOUNDARY 1 \ 1 DURING PHAE 6 (SEE LEGEND) \� �. ------- - - 4 PHASE 3 (2.78 ACRES) HISTORICAL WASTE ALREADY PRESENT. NEW WASTE NOT PLACED IN THIS AREA )7 UNTIL THE CD BOUNDARY HAS BEEN \, E PHASE 2 MODIFIED. �I J _.. 1 1(Z ` P i _r1 q �• (1.73 ACRES) �i J, 1 X STIP ,SCRAP METAL _ J \ DROP OFF AREA 1 - - ^ JI / (, \ I } .,%; EXISTING R)FI EXISTING HISTORICAL STORAGE AR EA scLM- - - __ WASTE AREA __-._--1 a is �'•+� F� ` EXISTING MAINTENANCE- B:JILDING N �1 f PHASE 3 AREA (0.17 AC) DEVELOPED PHASE 1 /�� '1 DURING PHASE 6 (SEE LEGEND) �'� (5.93 ACRES) �• EXISTING \ - __ 1 f EMPLOYEE - 1Z \OFFICE 1��" \ . �S� �\��\ I i' 1 SCLM- Q j PROPOSED PHASE PHASE 5 / (6.91 ACRES 1 SLM-4 'I ) Jf (10.88 ACRES) /' I ; LEACHATE EXISTING 1 SCLM-3 r J1 � \a`uuauwlnuruuii�� // j � � ° p • •9Fy � ,�' / '�� ., • _-,-/ �. EXISTNG F MPLOYEEj _ �. •'t ,' �•. 00/4 9�; OFFICE SCLM-1 0 — _ SCLM-7R \ 0 50 100 200 ����r�iigrr4rllrnull��� EXISTING SOIL I \ j +LIE PHASE 5 ADDENDUM 2 AREA / / `. --� -_,_ v nPPtoxnarE scnLE FE STOCKPILE AREA I o&�_- o. --.� % CONTOUR INTERVAL: 2' '•/• \ EXISTING CONTOURS SHOWN AN SIT DRIVE IA � ,�► _ //' -,_ � �`' `? _ .._. SOURCE: I- • _ • / / �--v .-✓'.r--� _�.\ SCLM C `oE` `•�•-•• •'s /-� ,�� --OE COMPLETED JULY 9, 2015 BYRMAPTEK, LAKEWOOD CO. AND SPROVIER C ED TO AECANNER FORSCLM-16 `�� rs--� r--t�- -' `� UEEY _ _ __ E FOR THE CITY OF GLENWOOD SPRINGS. CONTROL POINT SURVEY DATA SUPPLIED �- GMP-� ®`\ \'�•e,.oE - ��--�._- / L�' TO MAPTEK FOR SURVEY BY HIGH COUNTRY ENGINEERING JULY 2015. NOTE CONTROL • ✓ I _ ' �,�,-V j-% �_ \ \� -� T !/ / ✓-'-' j 4 'v POINT SURVEY IS BASED ON CITY OF GLENWOOD SPRINGS COORDINATE SYSTEM. i\ ® ✓�✓ _ %� ~\ PO ( SHEET 5 - 1 u'ND 3 i - PROPOSED 2016 PHASE 6 SEQUENCE SOUTH CANYON LANDFILL LOCATION POND 4 GARFIELD COUNTY, COLORADO CLIENT: CITY OF GLENWOOD SPRINGS \\ PROJECT: SCL-CGS EXIS IN RG \ //y �� \" ,-,r` PROJECT NO: CELLPH6-001 DATE COMPLETED: 2/2016 WOOD >�4USH -( �� v`{{j'�`• \\ DESIGNED BY: AEC APPROVED BY: CJA GRIN➢ING AREA DRAWN BY: JGN fF' " _ ^- DWG NAME: SCLDF_CELLPH6_SHEET-5 2075-PH6.dwg REVISION: REVISED BY: DATE: -;u'1 i / 0 ISSUED FOR REVIEW _ '� _/ ✓ / BIOSOL DS STORAGE AREA:' AMERICAN - ^ �\`\1 _ ' 1� �`� �� �� ENVIRONMENTAL _-r - _ �� E ,.- ._ . ` / ..._.. /� CONSULTING, LLC. SCLM-D I ai.n PaoreH,v � GLENNC,LIn svrsxncs nrsoPcrrty ----------------------- -1— -I-----------_—_--_--- LEGEND _.___.___.____ — - — - — - — - — - — - — - � .. G w�� o..s NON�roR,NO ERosE NOTES 0 PEo sv N o----------g<nnncEseJ ieJ rnaeaE P <vrwaF a) wns OE,/ELOPED av .sc_... i..a�ur.rEnrsn rnP.v ao,w. ---------------------------------------- ` ncawirrgHnEnnxsPvs'.L � ( uo.aa wcasma ( - LEGEND � .. G w�� o..s NON�roR,NO ERosE NOTES 0 PEo sv N o----------g<nnncEseJ ieJ rnaeaE P <vrwaF a) wns OE,/ELOPED av .sc_... i..a�ur.rEnrsn rnP.v ao,w. sr �!' �—� uo0�ctc0. co munvnrzr rus acEw j�Ex nrsvv vvP waen ` l\ _-- � ` _ \ ,-� E% NG R(STORIC:AL ✓ � siow.nve >wcn aci -v® ..,.p..,,,, PHASE S S) ta _ /7 i �.�, ..r ai ri,RA�E AEC AF�RiC`AN F.NVRONML+NTAL CONHIII.TIIHG_ 1.1.C. ` 1 � I 1 a \ I 1 l_\ t ` 1 - - F E pIV CTU .W STE LIM TS TO BE �-� 1 �- •1 \ 1 - � NES WASTN NO 4 -- EXISTING PYiASE9 VNOEVELOPEO -) �\�y° - \ 1 - AREA (ACTUAL WASTE IIMIT3 TO BE � AL EXISTING SCRAP METHL I l --- _ FIELD VERIFIED OVRING CONSTRVGTIONY-1 ��1 EXIS'vygSTEIAREAG 1 �\ �,.... Wi:KSTE AREA 5"9'1 ac_ �� - i � � a9 -�• 4 rs LEACRA L E _ 1 CLEANOV 1 _ IyILE AREP V @��_� 6 EMENDED G BENCH GRAIN 1 CLEANO ` 1 - 1 g 1 � P \ scLn-as `� LEACHAT I - I I HAs b3 _ a EN MODIFlED. EXISTING HISTORI WASTE AREA LEGEND — s (� PT To.. INTERVAL) 2-2 o vam.mea wade u...w m. ce.xr ..• u oirvinvl�u.Ihem � o MENT ® o 0 oLe (APPrzoxHMATE) 8 vE wnv vALve �> g. TNREE_ (gPPROxIMArE) {\ , a�.�• _ -...PHASE 5 CELL " uonmuw IN•crrv�� s ��• WASTE AREA - _ ___-- ___ - V..g Fi//EE 6 EY1 TO EXIST;TG W M 3 %��-1 �TG1a1 FiE( En G --' - co1TRVGT )FI P+SASE 5 AOGEN " tJM ARE�4.- — TE IN TO 6W TREN TOUT ¢ - CLEAN LEGEND — s (� PT To.. INTERVAL) 2-2 o vam.mea wade u...w m. ce.xr ..• u oirvinvl�u.Ihem � o MENT ® o 0 oLe (APPrzoxHMATE) 8 vE wnv vALve �> g. TNREE_ (gPPROxIMArE) AEC o` .ESa�.. 31 /6 f ia�Nmm uEi uonmuw IN•crrv�� s AEC o` .ESa�.. WQ ni- • 1 l � I \ � i I 1 i y 1 t � m i I ' � 1 1 � - ASE 6 oEv6wPMENT TIE IN ro I -- 'j I ` EXIS ING PHA3 EVELOPEO � 1 wry\\ A (gCTU HTE LIMITS TO BE - 1 __ - Q ' � ' FIELo vERI IEOOU ING conlsTRUCTION > - WASTE AREA 1 .83 ac 1 _ 1 ♦ \ a �� \\I� ♦\ --- - ^'A 6OEVELOPMENT TIE IN TO � ��� e � EX STING PHASE 3 UNOEVELOP o H \ m— r.n FIELD VEORIF EO DURING COT TRVOTION EXISTING GSCRHP METAL I \ �� _� DROP FF' PREA � \\ - PHASE 3 1 \� per- �✓3Y� !f4 1 � PHASE B ♦ I 1 ♦ r, EXTENGEo Gw TREry I. �• :an-vm a.�56` TIE N� To TlE IN TO GW TRENCH DRAIN 9 -• \y a - - H TyOARICAL WA .PLREAOV PRESAENL _ _ NEW STE NOT bN0 IN THIS EA '��\� � _'. UNTIL THE CO � OARV H,AS BEEN Ik r \\\ \� EXISTING H19TORIGAL f w � i -. ���. � - � EXISTING HISTORICA \A. J� \ / /,y _ � � LIMITS OF APPROxIMA �aa A/ _.- / A HISTORICAL WASTE l_� - • \ I ��•'�� PHASE 5 GELL _I_ -� \ 1 ��• WASTE AREA _ - �` H B CELL TIE IN TO EXISTING _-- ' HA>E 5- (ACTVAL WASTE LIMITS "— _----------- - O.Br FIELD VERIFIED OVRING � -- _ -� -PHASE 5 AOO EN_DL/M AREAa'a_"- cea LEGEND e. - Rs a F -I TouR ALR) - a<=Fr-� oN INrEHVALI P� ® o 0 oLE (APPROx$MATE) % vE wwv VALVE TE) $a TRPEE_ tiwpNowmnTE) PE 3 J O u �o•••••••���E cenroua InTeavaL � ------------------------- 1 THIS AREA H`AS B£ oN 00( EXISTING HISTORICAL WASTE AREA - , • . WASTE -AREA 6.91 ac. / � a ---m-_--- • IFnCHA L E ; --- `• \ ELD VERIF __ CLEANOV _ � �� CB ELL N TO EXI3TN6 • "�+ ��� �� 'S.( C LEO OVRNGTs ___ TIE IN TO GW TRENCLEH OIUT •• -` ~�_�"� ate. -_tea � i �- ON-RVOTION) - �-� Nr4S' S A Q LEGEND ..ao � P aa= a INTER..AL) _ m.» NSB anb — — — — i R„»,..�o mos, n �.��. „ _'a'�.)m.., w.,.,.m.e w�..e um•.» w. ov Eua L�LEcrl ^�••• Eem.lme w..» Llml® a. creno. — � .a I+r o wELLMewi e wRPRoxI.aA�, �, TRREE ..AL..E ERoxIMAT6, 2 4' � f � 0 co.noua rN�ersvni s �Bmgn 0 AEC row. _ --T 1 1 �O 1 - \ I __ � • ATEa DEVELOP uIE.Io TIE wTD ds? 1 �_ _ i Y. Exls NG PRASE a EVELOPEO • � • EA(ACTVAL WASTE LIMITS TO BE FlEIO VERIFIED DURING ONSTRVCTION) � _I __ 1 . �s� � ___ _—� �. � IN •' ��� `. ) t \ � ala - �-- � -- • �- _ WASTE AREA 1 83 ac -_ _ ti I f ------------------ - \\' - \C HISTORICAL \ NEIJNTIpSTHENC 4� \ i ---- - u� P ASEBOEVEIOPMENT TIE O -I � �' --� \ ' EXISTING SCRp.AP METHL I ,I% - - -_ (ACTOAL WASTE LIMIT BE - -- PIELO VERIFIED UVRING CO 5 RVCTION) �\v '� EXISTING H19TORICAL nROP oFF' REA H � PHASE 3 ' -.�Y� -� � WASTE A(2EA 1 THIS AREA H`AS B£ oN 00( EXISTING HISTORICAL WASTE AREA - , • . WASTE -AREA 6.91 ac. / � a ---m-_--- • IFnCHA L E ; --- `• \ ELD VERIF __ CLEANOV _ � �� CB ELL N TO EXI3TN6 • "�+ ��� �� 'S.( C LEO OVRNGTs ___ TIE IN TO GW TRENCLEH OIUT •• -` ~�_�"� ate. -_tea � i �- ON-RVOTION) - �-� Nr4S' S A Q LEGEND ..ao � P aa= a INTER..AL) _ m.» NSB anb — — — — i R„»,..�o mos, n �.��. „ _'a'�.)m.., w.,.,.m.e w�..e um•.» w. ov Eua L�LEcrl ^�••• Eem.lme w..» Llml® a. creno. — � .a I+r o wELLMewi e wRPRoxI.aA�, �, TRREE ..AL..E ERoxIMAT6, 2 4' � f � 0 co.noua rN�ersvni s �Bmgn 0 AEC row. LEGEND wcE tma� rt t Fxa`rv�nON OR vau 1 -¢ tnoweu...vre .nm++auenr n+-e..rra o�ua _s (�a...su wnn a..arrw+roa..n o+ma rrusE s tp�.o=x..w..rua �vrres nrauw o.®) — peouauo wc�nrtve�tm�saE B B' CROSS SECTION B -B` ANL A' NOTES PO P Q�y.r o�E NON -WOVEN 6 O21S1e GEOTEXTILE --� 16" MIN. LEACHATE DRAINAGE MEDIA (CHIPPED TIRES) J �.a 1 BOTTOM LINER SYSTEM NOT TO SCALE 1' fNTERME OIATE SOIL COVER SOIL WECGE FOR CRAINAGE LINER TIE-IN ZONE _ ._COVERED WITH PLYWOOD FUTURE GEOTEXTILE OVER DRAItVAGE MTL (ABSENT ON SLOPES -3:1) - 16" THICK LEACHATE - MAX_ 2 CRAINi4GE LAYER 1 95it oil 12" MIN. PROTECTIVE SOILS BOTTOM LINER SYSTE M SLOPES �g�, SLOPES 3."1 OR GREATER o NOT TO SCALE 24" MIN_ SELECT WASTE 16" MIN. LEACHATE DRAINAGE MEDIA (CHIPPEC TIRES) BOTTOM LINER SYSTEM AGGREGATE GRANULAR MATERIAL (CLEAN GRAVEL) (K-1 CM/SEC) 1 FOOT MINIMUM OVER PIPE LEACHATE COLLECTION PIPE ti I f E� LEACHATE COLLECTION Ci--IEVRON DRAIN PIPE NOT TO SCALE MOTES: 1. GEOTEXTlLE (8 OZ/SY) "uURROUNCING GRAVEL ON ALL SIDES WITH A MIWIMUM OF 1 FOOT OF OVERLAP 2_ AGGREGATE MATERIAL IN TRENCH SHALL BE 1" TO 6" SC BEEN EC ROCK OR EQUIVALENT MATERIAL PHASE 6 I FU --RE EX PAN SdON APPROX. ITEMPORARY TERMINATION BERM (GENERAL FILL) o 0 MAX_ 2 �_ o 1 � � COMPACTEC SOIL LINER �� ENC OF THE COMPACTED SOIL LINER AND LEACHATE CRAIN MATERIAL TEMPORARY TERMINATION BERM NOT TO SCALE HDPE SCR 11 45 CEGREE LATERAL WYE WITH CAP PIPE EXTENDING TO THE SURFACE HCPE SCR 11 CAP FITTING - 6' CIA_ PERFORATED HDPE SCR 11 LEACHATE COLLECTION PIPE C 1 1 TRENCH ANO LEACHATE COLLECTION PIPE CLEANOUT NOT TO SCALE LIMIT OF LINER & LEACHATE DRAINAGE LAYER APPROX. 5' 6" EROSIOW AND VEGETATION SUPPORT LAYER CAILY COVER/ 18" MIN. COMPACTED SOIL LINER INTERMEDIATE COVER (MAXIMUM HYDRAULIC CONCUCTI VITY 1X1D-scm/sec) c� 1 FINAL COVER SYSTEM NOT TO SCALE NATURAL GROUND NON -WOVEN 6 OZ/SY GEOTEXTILE �D� BOTTOM LINER ANC FINAL COVER SYSTEMS �_ NOT TO SCALE 6" EROSION AND VEGETATION SUPPORT LAYER G STORM WATER DIVERSION BERM TERRACE NOT TO SCALE 6� DIA_ PERFORATEC HCPE SDR 11 LEACHATE COLLECTION PIPE NOMINALLY COMPACTED SOI L — GEOTEXT{LE (8 OZ/SY) SURROUNCENG _ GRAVEL ON ALL SIDES g• 6" 13• ADS N-12 3.5' PERFORATED PIPE 11 / ..{ \ GROUNDWATER TRENCH ORA1N SYSTEM NOT TO SCALE NO -FES: 1 . GEOTEXTILE (8 OZJSY) SURROUNCING GRAVEL ON ALL SICES OETA/L OR SECT/ON LETTER 2_ AGGREGATE MATERIAL IN TRENCH SHALL BE 1" TO 6" SCREENEC ROCK OR EQUIVALENT MATE REAL A DRAW/NG REFEf7ENCE ©RAW/NG WHERE OETA/L OR SECT/ON !S LOCATED \ILY COVER/ TERMEDIATE COYER PROTECTIVE SOILS 6" EROSION AIVC VEGETATION SUPPORT LAYER f e--1 \ PERFORATED LEACHATE COLLECTION PfPE NOT TO SCALE r4 �e—Ffl ✓ =.moo' _ 3'/a�J %� '2"."a sou RCE_ pETAII c. FROM CITY OF GLEN WOOp SPRINGS SOUTH CANYON SO LvO WASTE DISPOSAL SITE, ENGINEERING pESIGN ANO OPERATIONS PLAN MOp1 EICATION PHgSE 5 AppIT10N App ENOUM NO_2, OATEp JULY 2014_ PREP.4REp BY SCS Ap UATERRA SHEET 1 3 LINER, LEACHATE COLLECTION. Sc FINAL CLOSURE SYSTEM DETAILS SOUTH CANYON LANDFILLLOCATION GAR FIELD COUNTY. COLORADO