Loading...
HomeMy WebLinkAboutFoundation Excavation ObservationSeptember 28, 2015 Chevron Corporation 1400 Smith, Office 46194 Houston, Texas 77002 Attn: Mr. Daniel Lee P: (832) 317-1785 E: daniel.j.lee@chevron.com Re: Foundation Excavation Observation Delivery Point Communications Tower South of Piceance Creek Basin Northwest of Parachute, Colorado Terracon Project No. 20155046 Dear Mr. Lee: lrerracan Previously, Terracon Consultants, Inc. (Terracon) prepared a Geotechnical Engineering Report (Project No . 25155011A; report dated February 27, 2015) for the project referenced above. We were requested to perform and foundation excavation observation (open-hole) for the equipment shed adjacent to the communications tower. This report presents the results of the excavation observation . Upon arrival at the site, Terracon spoke with Josh Drews with Chevron . The excavation for the equipment shed had been completed to an approximate depth of 4 feet below the surrounding grade. The excavation was bottomed in sandstone bedrock. The soils above the bottom of the excavation were consistent with the soils encountered in our exploratory boring completed as part of our initial subsurface investigation. We observed loose soil and bedrock fragments at the bottom of the excavation and requested the loose soils be removed prlor to the placement of foundations concrete. Mr. Drews said he would remove the loose soils and bedrock fragments from the bottom of the excavation prior to concrete placement. The recommendations presented in this report should be used in conjunction with those presented in our initial Geotechnical Engineering Report for the project. The General Conditions should be reviewed and understood to apply to those engineering recommendations and opinions presented herein. Terracon Consultants . Inc. 1901 Sharp Point Drive , Su ite C Fort Collins, Colorado 80525 P (970) 484 0359 F (970) 484 0454 terracon .com Environmental El Fi!c:rlitics m Gcolcc:hnic:ill a Materials · Foundation Excavation Observation Delivery Point Communications Tower Garfield County, Colorado September 28, 2015 . Tenacon Project No. 20155046 lrerracan We appreciate the opportunity to continue to be of service to you on this project. If you have any questions or concerns regarding the content of this report, please feel free to contact us. Sincerely, Terracon Consultants, Inc. -~~ Bryce C. Reeves, E.I . Geotechnical Staff Engineer Coples to: Addressee (via e-mail) Responsive • Resourceful Reliable 2 I 3!0'.~INGH i1 •E111N£:SALES FACl.lll ' IND CONFORMS WITH TH~ FO ~ 20 t~ International Building Co6e 2012 Intenaatic;nal Mdlitanical Code 2014 National El eciri cal Code 201 2 IECC ctot~S .l EXEMPT SERIAi!. N! 17·4 7 7 6 SE!! DATA Pl!AT~