Loading...
HomeMy WebLinkAboutEngineer Report 01.08.169706258636 TALLY HO CONSTRUCTION West Slope Testing & Inspection LLC 3177 Glendarn Dr. Grand Junction, CO 81504 Phone:970-434-6988 Cell: 970-260-2844 01:19 '07p.m. 06-27 -2016 Report#2 Pagel of 1 Final Inspection Report Date: 1-8-16 Project: Metal Building Rich Broadhurst (KRB Investments LLC) Address: 1434 County Rd. I 07 Carbondale, CO Building Permit No: BLRE-10-15-3932 General Contractor: Tally Ho Construction Inspection of shop fabrication or field work at job site: Field Report: Inspected high strength A325 bolting at the Mezzanine level steel beam & column connections that were not yet installed & inspected on the l 11 visit. Also randomly tested/verified A325 bolts were adequately tightened. The high strength bolting inspected above appeared to be in substantial confonnance with the plans, and the AISC/RCSC Specification for A325/ A490 bolting. To the best of my knowledge this completes the special inspections of the high strength A325 bolting, as outlined in reports # 1 & #2 for the project. To the best of my knowledge no structural onsite welding was perfonned. Inspectorfl'ecbniciao: Douglas E Young + Douglas E Young CWI 96070131 0C1 EXP. 7/112017 2 12