No preview available
HomeMy WebLinkAboutApplication-PermitI Garfield County Building & Planning Department 108 8th Street, Suite #401 Glenwood Springs, Co. 81601 Office:970·945·8212 Fax: 970·384-3470 Inspection Line: 970-384-5003 Building Permit No. Parcel No: 2139-163-00-014 Locality: Use of Building: _. ···--···--····--irlstrum~J air buUding & skid Owner: Chevron USA Contractor: Elkhorn Cons!. Inc. Fees: Plan Check: $ 72.31 Septic: •• ~-··-··---•~M~ Bldg Permit: $ 111.25 Other Fees: Total Fees: $ 183.56 Clerk: Date: ·---····-- I 1 GARFIELD COUNTY BUILDING PERMIT APPLICATION 108 8• Street, Suite 401, Glenwood Springs, Co 81601 Phone: 970-945-8212 I Fax: 970·384-3470 I lnspeetion Line: 970'384-5003 www.garfield~countv.com Parcel No: (this infonnation is available at the assessors office 970·945·9134) 2139-163-00-014 2 Job Address: (if an address has not been assigned, please provide Cr, Hwy or Street Name & City) or and legal description 2700 Clear Creek Road, p .0. Box 296 1 De Beaue CO 81630-CPF located 2.5 miles north-northeast of end ofCR 211 -about 19.5 north-northeast of De Beaue 3 Lot No: Block No: Subd.l Exempti,Z: \) ~ NA <. );li.U. ' ~ ' 4 Owner: (property owner) Mailing Address: 11111 S. Wilcrest Drive Pl\':f"{~ .Qf!:.'l oiJS(. AltPh· Chevron U.S.A. Inc. Houston, TX 77099 ( 1 (970) 25Hl042 5 Contractor: Mailing Address:2181451/2 Road Ph: AltPh: Elkhorn Construction, Inc.• De BeQue, CO 81630 (970) 283-1009 (970) 625-4180 6 Architect I Engineer: Rodney Burrows Mailing Address: 12567 W. Cedar Drive, Ph: AltPh: ZAP Enor & Canst Services Inc. Suite 210, Lakewood, CO 80228 (720) 529-4430 (971) 533-6665 7 ~'lid'~:Pffouiri~in:f,j ft) Sl. Ft. or Acres of Lo!~,i Height: No. of Floors: 40,600 sq. ft. (CPF primary pad) 16.3 ft Single story 8 Use of Building: Instrument Air Building & Skid-houses air compressors and equipment (e.g., tanks, filters, dryers) required for facil~v I eauioment ooeration 9 Describe Work: Foundation installation, placement of modular unit, and utility hookups 10 Class of Work: wNew o Alteration o Addition 11 Garage: Septic: To be pe1111itted with CPF NA oAttacbed o Detached ti:l ISDS restroom bldg o CommunitY 12 Dri~Aay Pennit: 0· sr ..1\.QA \\. , "'/1\oJJ-.-Owners valuation of Work: $ 477,750 ,J, ,V V NOTICE Al!!J.L!!!:!tt, This application for a Building nnit must be signed by the Owner of the property, described above, or an authorized agent. letter of authority, signed by the Owner, must be provided with th.is Application. If the signature below is not that of the Owner, a separate l&Ra! A!:£tS!!. A Building Penni! cannot be issued without proof oflegal and adequate access to the property for purposes of inspections by the Building Department. Otbg Permits, Multiple separate permits may be required: (I) State Electrical Permit, (2) CoiUity ISDS Pennit, (3) another pennit required for use on the property identified above, e.g. State or CoWlty Highway/ Road Access or a Stale Wastewater Discharge Pennit. yPid Permit A Building Permit becomes null and void if the work aulhorized is not commenced within 180 days of the date of issuance and ifwod< is suspended or abandoned for a period of ISO days after commencement. CERTJFICA TION I hereby certifY that I have read this Application and that the information contained above is true and correct. I understand that the Building Department accepts the Application, along with !he plans and specifications and other data submitted by me or on my behalf(submittals), based upon my certification as to accuracy. Assuming completeness of the submittals and approval ofthls Application, a Building Permit will be issued granting pernrission to me, as Owner, to construct the structme(s) and facilities detailed on the submittals reviewed by the Building Department. In consideration oftlte issuance of the Building Permit, I agree that I and my agents wiU comply with provisions of any federal, stale or local law regulating the work and the Garfield County Building Code, ISDS regulations and applicable land use regulations (County Regulation(s)). I acknowledge that the Building Permit may be suspended or revoked, upon notice trom the County, if the location, construction or use of the structure(s) and facility(ies), described above, are not in compliance with County Regulation(s) or any other applicable law. I hereby grant perntission to the Building Department to enter the property, described above, to inspect !he work I further acknowledge that the issuance of the Building Permit does not prevent the Building Official from: (I) requiring the conection of errors in the submittals, if any, discovered after issuance; or (2) stopping construction or use of the structure(s) or facility(ies) if such is in violation of CoWlty Regulation(s) or any other applicable law. Review of !his Application, including submittals, and inspections of !he work by the Building Department do not constitute an acceptance ohesponsibility or liability by the County ofettors, omissions or discrepancies. As the Owner, I acknowledge that responsibility for compliance with federal. state and local laws and County Regulations rest with me and my authorized agents, including without limitation my architect designer, engineer and/ or builder. lHEREB:zl)t;ADANDUNDERSTANDTHE;;;~:I~CATION ABOVE OWNERS DATE "'Elkhorn Con¢trucf'on, Inc. will install foundation and place unit URS Washington Division assembled permit application (Contact: Sally .Q!!...ffi.Q'r URS WashiQgjon Division, 7800 E. Union Ave., Suite 100, Denver, CO 60237 Office: 303-843·2219, Cell: 303-526-6514) ST AJ<'J<' uSE ONLY Permit Fee: Manu home Fee: GARFIELD COUNTY BUILDING AND PLANNING 970-945-8212 MINIMUM APPLICATION REQUIREMENTS FOR CONSTRUCTION OF COMMERCIAL OR MULTI-FAMILY RESIDENTIAL BUILDINGS Including NEW CONSTRUCTION ADDITIONS ALTERATIONS And MOVED BUILDINGS In order to understand the scope of the work intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. When reviewing a plan and it's discovered that required information has not been provided by the applicant, this will result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor shall be required to provide this information before the plan review can proceed. Other plans that are in line for review may be given attention before the new information may be reviewed after it has been provided to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. Any project with more than ten (10) occupants requires the plans to be sealed by a Colorado Registered Design Professional. To provide for a more understandable plan and in order to determine compliance with the building, plumbing and mechanical codes, applicants are requested to review the following checklist prior to and during design. Plans to be included for a Building Permit must be on draft paper at least 18"x 24"" and drawn to scale. 1 Plans must include a floor plan, a concrete footing and foundation plan, elevations all sides with decks, balcony steps, hand rails and guard rails, windows and doors, including the finish grade and original grade line. A section showing in detail, from the bottom of the footing to the top of the roof, including re-bar, anchor bolts, pressure treated plates, floor joists, wall studs and spacing, insulation, sheeting, house-rap, (which is required), siding or any approved building material. Engineered foundations may be required. Check with the Building Department. A window schedule. A door schedule. A floor framing plan, a roofing framing plan, roof must be designed to withstand a 40 pound per square foot up to 7,000 feet in elevation, a 90 M.P.H. windspeed, wind exposure B or C, and a 36 inch frost depth. All sheets need to be identified by number and indexed. All of the above requirements must be met or your plans will be returned. All plans submitted must be incompliance with the 2003 IBC, IPC, IMC and IFGC. Applicants are required to indicate appropriately and to submit completed checklist at time of application for a permit: 1. Is a site plan included that identifies the location of the proposed structure, additions or other buildings, setback easements, and utility easements showing distances to the property lines from each comer of the proposed structure prepared by a licensed surveyor and has the surveyors signature and professional stamp on the drawing? Slopes of 30% or more on properties must be show on site plan. (NOTE: Section 106.2) Any site plan for the placement of any portion of a structure within 50 ft. of a property line and not within a previously surveyed building envelope on a subdivision final plat shall be prepared by a licensed surveyor and have the surveyors signature and professional stamp on the drawing. Any structure to be built within a building envelope of a lot shown on a recorded subdivision plat, shall include a copy of the building envelope as it is shown on the final plat with the proposed structure located within the envelope. Yes x 2. Does the site plan when applicable include the location of the I.S.D.S. (Individual Sewage Disposal System) and distances to the property lines, wells (on subject property and adjacent properties), streams or water courses? This information must be certified by a licensed surveyor with their signature and professional stamp on the design. Yes No x Not necessary for this project ___ ISDS will be permitted with permanent restroom bu1!dmg 3. Does the site plan indicate the location and direction of the State, County or private road accessing the property? Yes x 4. Is the I.S.D.S. (Individual Sewage Disposal System) designed, stamped and signed by a Colorado Registered Engineer? 2 Yes. __ _ No Not necessary for this project X ISDS will be permitted with permanent restroom building 5. Are the plans submitted for application review construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For permit issuance only" or similar language? Yes X No__ Not necessary for this project __ _ 6. Do the plans include a foundation plan indicating the size, location and spacing ofall reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes x No Not necessary for this project __ 7. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes_x_ No__ Not necessary for this project __ 8. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes__ No__ Not necessary for project_x_ 9. Do the plans indicate the size and location of the ventilation openings for the attic, roof joist spaces and soffits? Yes__ No__ Not necessary for this project_x_ 10. Do the plans include design loads as required under the IBC or IRC for roof snowloads, (a minimum of 40 pounds per square foot in Garfield County)? Yes_x_ No__ Not necessary for this project __ 11. Do the plans include design loads as required for floor'loads under the IBC or IRC? Yes_x_ No__ Not necessary for this project __ 12. Does the plan include a building section drawing indicating foundation, wall, floor, and roof construction? Yes_x_ No__ Not necessary for this project __ 13. Is the wind speed and exposure design included in the plan? Yes_x_ No__ Not necessary for this project __ 14. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Y es_x_ No__ Not necessary for this project __ 15. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes_x_ No__ Not necessary for this project __ 3 16. Does the elevation plan indicate the height of the building or proposed addition from the undisturbed grade to the midpoint between the ridge and eave of a gable or shed roof or the top of a flat roof? (Check applicable zone district for building height maximum) Yes_X_ No__ Not necessary for this project __ 17. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or Phase II EPA certification? Yes No Not necessary for this project_x_ 18. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the IBC or IRC? Yes__ No__ Not necessary for this project_X_ 19. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the IBC oriRC? Yes __ No Not necessary for this project_x_ 20. Does the plan include a window schedule or other verification that windows provide natural light and ventilation for all habitable rooms? Yes__ No__ Not necessary for this project_x_ 21. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes__ No__ Not necessary for this project_x_ 22. Do the plans include a complete design for all mechanical systems planned for installation in this building? Yes x No · Not necessary for this project. __ _ 23. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the IBC Chapter 3) Yes_x_ No__ Not necessary for this project'---- 24. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes_x_ No__ Not necessary for this project __ 25. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters indicated on the plan? This project will utilize two (2) Yes__ No__ Not necessary for this project_x_ wall-mounted natural gas fired 4 catalytic heaters. The building will not be air conditioned. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. Do the plans indicate the location and dimension of restroom facilities and if more than four employees and both sexes are employed, facilities for both sexes? Yes__ No__ Not necessary for this gr~~et x Restrooms located at separate facility uti mg Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes No Not necessary for this grej€G~ X Uilomg Restrooms located at separate facility Have two (2) complete sets of construction drawings been submitted with the application? Yes_x_ No Have you designed or had this plan designed while considering building and other construction code requirements? Yes_x_ No__ Not necessary for this project __ Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes_x_ No __ Do your plans comply with all zoning rules and regulations in the County related to your zone district? For corner lots see supplemental section 5.05.03 in the Garfield County Zoning Resolution for setbacks. Yes x No. __ _ Do you understand that approval for design and/or construction changes are required prior to the implementation of these changes? Yes_x_ No __ Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit" fee as . well as any "Septic System" or "Road Impact" fees required, at the time you pick up your building permit? Yes_x_ No __ Are you aware that you are required to call for all inspections required under the IBC including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes x No ---- Are you aware that the Permit Application must be signed by the Owner or a written authority be given for an Agent and that the party responsible for the project must comply with the Uniform Codes? Yes_x_ No __ 5 36. Are you aware that you must call in for an inspection by 3:30 the business day before the requested inspection in order to receive it the following business day? Inspections will be made between 7:30a.m. and 3:30p.m. Monday through Friday. Inspections are to be called in to 384-5003. 3 7. Are you aware that requesting inspections on work that is not ready or not accessible will result in a $50.00 re-inspection fee? Yes x No ___ _ 38. Are you aware that prior to issuance of a building permit you are required to show proof of a driveway access permit or obtain a statement from the Garfield County Road & Bridge Department stating one is not necessary? You can contact the Road & Bridge Department at 625-8601. Yes X No ____ _ 39. Do you understand that you will be required to hire a State of Colorado Licensed Electrician and Plumber to perform installations and hookups? The license number will be required at time of inspection. Yes X No·~--- 40. Are you aware, that on the front of the building permit application you will need to fill in the Parcell Schedule Number for the lot you are applying for this permit on prior to submittal of the building permit application? Your attention in this is appreciated. Yes x No. ___ _ 41. Do you know that the local fire district may require you to submit plans for their review of fire safety issues? x No (Please check with the building department about this requirement) 42. Do you understand that if you are planning on doing any excavating or grading to the property prior to issuance of a building permit that you will be required to obtain a grading permit? Yes x 43. Did an Architect seal the plans for your commercial project? State Law requires any commercial project with occupancy of more than 10 persons as per Section 1004 of the IBC to prepare the plans and specifications for the project. Yes No Not Necessary for this project __ x __ _ I hereby acknowledge that I have read, understand, and answered these questions to the best of my ability. 6 Signature ~~J ~~- Phone: 71J-3.::/f·6:7Z.}> (days); Date zh8/o~ .. . ________ (evenings) Project Name: Piceance Basin Natural Gas Development Program Project Address: 2700 Clear Creek Road, P.O. Box 296, De Beque, CO 81630 CPF located 2.5 miles north-northeast of end of CR 211 -about 19.5 north-northeast of De Beque Note: If you answered "No" on any of these questions you may be required to provide this information at the request of the Building Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without the issuance of the permit. *If you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please expect the · following: A. The application may be placed behind more recent applications for building permits in the review process and not reviewed until required information has been provided and the application rotates again to first position for review. B. Delay in issuance of the permit. C. Delay in proceeding with construction. *If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued or a "Certificate of Occupancy" not being issued. Bpcomm October 2006 7 August 29, 2007 Mr. Fred Jarruan, Director Garfield Cotmty Building & Planning Department 108 gth Street, Suite 401 Glenwood Springs, CO 8160 I Re: Authorization to Represent Chevron - Jame.!i s. Talbot Senior .Couns·el Sally Cuffin, Washington Group Iilterriational Iilc. Dear Mr. Bean: Law Depctrtment North America ExPloration and Prodt,~ction Company 11111 s. Wilcrest #N2006 Houston, Texas 77099-4397 Tel 2$1-561·3536 Fax 281-561-3515 jtalbot@chev·ron.com Chevron U.S.A. Inc~ (Chevron) has retained the services of Sally Cuffin of the Washington Group International Inc .. Ms. Cuffin will represent Chevron in facility permitting for our Piceance Project in Garfield County, a role in which she will prepare and submit Special Use Perruit Applications, ISDS, building, grading, pipeline, road crossing and other nmtine construction related applications and inforrrtation on behalf of Chevron. Ms. Cuffin is also authorized to participate in discussions before appointed and elected boards regarding the vatious applications, however at such meetings, her authority to legally bind Chevron is limited to the tenus set forth in the Pem1it Applications or other writte11 documents filed on our behalf. Sincerely, cc: Nicole Johnson Timothy Barrett Sally Cuffin From: To: CC: Subject: Date: Attachments: Jake Mall Cuffin, Sally; RE: Driveway permit exemption Thursday, November 06, 2008 1:25:38 PM Sally: you are exempt from the driveway access petmit requirement for this project. Jake -----Original Message----- From: Cuffin, Sally <Sally.Cuffin@wgint.com> Sent: Thursday, November 06, 2008 12:48 PM To: jmall@garfield-county.com <jmall@garfield-county.com> Subject: Driveway permit exemption Jake, I just realized that I never got an official driveway exemption email from you for buildings at Chevron's Central Production Facility. The facility is located about 2.5 miles north of the end of CR 211 (near the confluence ofT om Creek and Clear Creek). Let me know if you have questions. Thanks! Sally Cuffin (303) 843-2219 (303) 526-6514 (cell) 11246 No. ____________ __ Assessor's Parcel No. 2139-163-00-0i 4 Date ___ 3_14_12_0_09 __ BUU.IDI.NG PERMIT CARD Job Address ___ 2_7_oo __ C_le_a_r_C_re_e_k_r_d-'-, _D_e_B_eq...:.u_e ________ ...;._ ________________________ _ Owner _______ C_h_e_vr_o_n_U_S_A ____________ Address Contractor _____ E_Ik_h_o_rn __ c_o_n_st_._ln_c--'---------Address 111115. Wilcrest dr, TX Phone# 970-589-5036 2181 45 1/2 rd, D'beque Phone # 970-257-6042 Setbacks: Front Rear _____ RH _____ LH ________ Zoning ____ _ Instrument air building & skid INSPECTIONS Soils Test--------------- Footing ---------------------- Foundation ______________ _ Grout ________________ ___ Underground Plumbing _______ _ Rough Plumbing r At' 1 Framing j. -£'1 ~ {<2 lf}rii -s:ft/) ~-* · Insulation 'Z-. -f'7-fO /8wh U Roofing----------------- Drywall ------------------ Gas Piping--------------------- NOTES Weatherproofing ________________ _ Mechanical __________________ _ Electrical Rough (State)----:;;~...,---.,..--..--- Eiectrixal Final (State) 2--fo Final ;?-17-4 0 /Checklist Completed? Certificate Occupancy # -:-'!:(p~t..('::-9~.3:""'-:-=-~=----- Date !::>SUEQ 2.(Cf.{0 Septic System # ------------------ Date -------------------Final ____________ _ Other _____________________ __ (continue on back) UIL GARFIELD COUNTY, COLORADO INSPECTION WILL f\!01' BE MADE UNLESS THIS CARD iS POSTED ON TN!E JOB Datelssued __ ~---~"-----'-0""-~+----PermitNo._JJ~-"f-Q __ _ AGREEMENT In consideration of the issuance of the permit1 the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structured for which this permit is granted, and further agrees that ifthe above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building department and IMMEDIATELY BECOME NULL AND VOID. UseJ_Yl&ttU.Ment a\y Wi\dinf1~S~\d Address or Legal Description J-"100 C\GAY Cxe.f.k gd~""'(J'---­ Owner _ A \nc. _contractor 8\\.lhOrn Cdl_,._,.,St"--. _ Building Permit Type~~~~---------------------- This Card Must Be Posted So It Is Plainly Visible From The Street Until Final Inspection INSPECTION RECORD Footing Driveway Foundation I Grouting Insulation ftfrvt J--!1-I!J Underground Plumbing Drywall Rough Plumbing Electric Final (by State inspector) (Prior to Final) ?--Zs-(0 0 Rough Mechanical Septic Final Gas Piping FINAL 2--11-ro ;Q1v( Electric Rough (by State Inspector) (You Must Call For Final Inspection) (Prior to Framing) Notes Framing5{ .eJ f/fJt~ 01< :1-!1-lo~ (to include Roof in place & Windows & Doors installed & Firestopping in place) APPROVED Date THIS PERMIT IS NOT TRANSFERABLE For Inspection Call970-384-5003 Office 970-945-8212 108 8th Street, Suite 401 Glenwood Springs, Colorado 81601 DO NOT DESTROY THIS CARD 3-tt-o9 By-e, \~.tv-manr11iii)£L PROTECTPER~~EATHER ~~ (DO NOT LAMINATE) Inspection Report COLORADO STATE ELECTRICAL BOARD INSPECTION REPORT I CORRECTION NOTICE Date Received: 08-FEB-1 0 Permit Number: 671618 Contractor/HomeOwner: SPECIALIZED AUTOMATION SERVICES LLC Address: Type of Inspection: Action: 2700 CLEAR CREEK RD Complete Final Accepted Comments or Corrections: 1) 314.25 Cover, faceplate, luminaires or canopy required for boxes (gutter cover in control room) 2) 35 kv switchgear clerances must be maintained 3) 110.3(B) Listed and labeled equipment shall be installed and used per listing and labeling (em light not working) 4) 210.8 (B)(5) GFI required (Non residential) Sinks ~ where receptacles are installed within 1.8 m (6 ft) of the outside edge of the sink. 5) battety cover required 480.9(B) Batteries, Live Parts. Guarding of live parts shall comply with 110.27 6) Installer on site making corrections Inspectors Name: Cyrus Tuchscher Phone Number: 970-625-5085 Date: 08-FEB-1 0 COLORADO STATE ELECTRICAL BOARD DEPARTMENT OF REGULATORY AGENCIES 1580 Logan St. Suite 550 Denver, Colorado 80203-1941 Phone: (303) 894-2985 https://www.dora.state.co.us/pls/real/Ep_ Web_Inspection_GUI.Process_Page Page 1 of 1 219/2010 SEP 1 7 2009 THUNDER MOUNTAIN TESTING ••• 2973 F. Road + Grand Junction, CO 81504 (970) 256-9965/ Cell (970) 210..7008/ FAX (970) 314-7067 Elkhorn Construction 2181 45 Y, Road DeBeque, CO 81630 AITN: Mr.JolmDick RE: Instrument Air Building 2700 Clear Creek Road DeBeque,CO Dear Mr. Dick, Sepuonberii,2009 Permit #11246 As requested, structural steel special inspection was conducted per the IBC 2003 Edition • Chapter 17: Structural Tests and Special Inspection and Garfield Connty requirements. I arrived on site at 9:30 AM. I met with Mr. Tony Chiono with Elkhorn Construction to review project specifications and requirements. The steel erector on site is Dynamic Service Inc. in DeBeque, Colorado. While on site I received and reviewed a copy of engineering clarification accepting W' Tek screws in lieu of W' machine lmlts from Mr. Stephen P. Maslan, P.E. with Stephen P. Maslan & Co. in Kansas City, MO. Please refer to the attached report for ducumeotation. Visual inspection was conducted at the RoofFnuning Plan level on the 5/lf" ASTM A325 High Strengfu truss to column and truss to tmss bolted connections. Project bolt tension requirements indicate "tum-of-the-nuf' as referenced on the approvedjobsite drawings provided by Stephen P. Maslan & Co.: Drawing SI: General Notes dated 12112108. As a minimum, IOOA. of all connections, but not less than two bolts per connection were inspected for proper bolt tension requirements and match marking teclmiques as required for Periodic Inspection per Table 17043 • Item 2.a • Chapter 17 of the IBC. Inspection was conducted at grid line A-D & I • 10. Bolted connections inspected were observed to be adequately tensioned per project requirements. Thunder Mountain Testiog ENGINEERS DESIGNERS September 3, 2009 Dave Howard De Beque, CO SEP 17 2009 PLANNERS STEPBENP. MAS LAN &CO. 8011 PASEO SUITE 201 KANSAS CITY, MO. 64131 81$..444.-6260 ~Phone- 816-4#8789-Fax srnaatan@kc.rr.com Re: 20' wide x 12' eave Worldwide Steel Building for Chevron @ Piceance Fields in De Beque, CO. Dear Dave The use of Yo'' TEK screws instead of the Yo'' machine bolts noted on the plans is acceptable for the above mentioned building. If you have any questions, please feel free to call my office. Sincerely, Step en P. Maslan, P .E. Stephen P. Maslan & Co. Parcel Detail Garfield County Assessor IT rea surer Parcel Detail Information Page I of 5 fu;sessor/T reasur~r}roRerty_S~ilLi::_Q I As_~~ssor Subsetllu_ery I A~A~~A[]LS.ales Seac_~h GJI:lfk6 Re~::or_d!l.r Re~::e!J1jgi]_SJl.ar~::h Basj~_6ui)!ling_C_hllLili;t!'!risti~::~ I I ax lnfJJrm!l1ion JliJ~el D~1iltl I YilJ!J .. ~ Detail I Sales Detilil I Residenti.ai/CommetGLilLIIDRr!l.Yll.ment.[}]:!J<lii bJ1dJJetail I Photogragh~ I MilllllJYRevei!uesJ)~J!lil I Tax Area II Account Number II Parcel Number II2DDB Mill levy I I 029 II R290444 II 213916300014 II 32.108 I llwner Name and Mailing Address !CHEVRON USA INC IC/0 CHEVRON TEXACO PROPERTY TAX P 0 BOX 285 HOUSTON. TX 77001 Assessor's Parcel Description (Not to be used as a legal description) ISECT.TWN.RNG:IS-5-98 DESC: SEC.?: !THAT PT OF lOTS 12.14 AND NESENE !LYING DESC: BElOW THE ESCARPMENT I(NET 14.20AC) AlSO THAT PT OF DESC: ITRS. 50.51 AND 56 lYING BElOW THE !ESCARPMENT (NET DESC: 175.17). ISEC.8: THAT PT OF lOTS 2.4.7.8. http:! I www.garcoact.coml assessor I parcel.asp?Parce1Number=213SIS300014 I I I I I I I I I 2!2B/200S Parcel Detail Page 2 of 5 /SWNE. NW. DESC: NI/2SW. WI/2SE. II !LYING BELOW THE ESCARPMENT (NET I IDESC: 222.84AC). SEC.I7: THAT PT OT I !LOTS 1(23.18). 3( OESC: 8.57). I 14(8.80). 5(11.84). 8(15.00), I j7(13.84). OESC: (80.81 TOTAL 173.0 I jNET) LYING BELOW THE ESCARPMENT I IDESC: All OF TRACKS 80(180 AC). I /110(110 AC). 111(180 AC) DESC: AND I /THOSE PARTS OF THE FOLLOWING TRS I /LYING BELOW DESC: THE ESCARPMENT. I /TRS. 57(117). 80(35). 82(48). 84( I IDESC: 118), 83(80), 81(120). I 182(24). 87(48). 79(73). 88( OESC: I 145). 90(58). 77(103), 91(53). I 178(118). 75(118). DESC: 92(52). I 193(78). 94(121). 113(121). I 1112(137). DESC: 8-98 TR. 41(160). I lAND THAT PART OF TR. 109(108). I /DESC: LYING BELOW THE ESCARPMENT I !AKA: LUCKY STRIKE #9 DESC: GLEN I !BEULAH. GEN. JOFFRE #3 B 4 AND I !THOSE PARTS OF DESC: THE FOLLOWING I !LYING BELOW THE ESCARPMENT: GEN. I IOESC: JOFFRE 2.5-14. LUCKY STRIKE I 14-8. 10-14. AND GEN. DESC: PERSHING I II B 2. SUC:R290037 BK:0472 PG:0381 I /BK:0445 PG:D380 BK:I855 PG:I78 I IRECPT:S8S845 BK:0858 PG:0942 I http:! I www.garcoact.coml assessor I parcel.asp?ParceiNumber= 213816300014 212612DDS Parcel Detail location I Physical Address: IITWN 5 RGE 98 SEC IS I I Subdivision: I I Land Acres: 112840.21 I I Land Sq Ft: II 0 I Section II Township II Range I I IS II 5 II 98 I 2[)[)8 Property Tax Valuation Information II Actual Value II Assessed Value I I Land: II S0.30DII I Improvements: II oil I Total: II S0.30DII Most Recent Sale .~1 ====Sa=le D=at=le: I .· Sale Price: I Additio11al Si:JJ~s,D_etail Basic Building Characteristics Number of Residential lo Buildings: Number of Comm/lnd io Buildings: No Building Records Found http:/ I www.garcoact.coml assessor I parcel.asp? Parcel Number= 213918300014 17.4901 ol 17.4901 I I Page 3 of 5 212812009 Parcel Detail Page 4 of 5 Tax Information I Tax. Year II Transaction Type II Amount I I 2008 II Tax Amount II $561.56/ I 2007 II Tax Payment: Second Half II ($252.46)1 I 2007 II Tax Payment: First Half II ($252.46)1 I 2007 II Tax Amount II $504.921 I 2006 II Tax Payment: Second Half II ($236.20)1 I 2006 II Tax Payment: First Half II ($236.20)1 I 2006 II Tax Amount II $472.401 I 2005 II Tax Payment: Second Half II ($300.99)1 I 2005 II Tax Payment: First Half II ($300.99)1 I 2005 II Tax Amount II $601.981 I 2004 II Tax Payment: Second Half II ($343.98)1 I 2004 II Tax Payment: First Half II ($343.98)1 I 2004 II Tax Amount II $687.961 I 2003 II Tax Payment: Second Half II ($420.50)1 I 2003 Tax Payment: First Half II ($420.50)1 I 2003 Tax Amount II $841.001 I 2002 I Tax Payment: Second Half II ($422.10)1 I 2002 II Tax Payment: First Half II ($422.10)1 I 2002 II Tax Amount II $844.201 I 2001 II Tax Payment: Whole II ($837.02)1 I 2001 II Tax Amount II $837.021 I 2000 II Tax Payment: Whole II ($871.96)1 I 2000 II Tax Amount II $871.961 I 1999 II Tax Payment: Whole II ($1.080.26)1 I 1999 II Tax Amount II $1.080.261 http:! I www.garcoact.coml assessor I parcel.asp?ParceiNumber= 213916300014 212612009