Loading...
HomeMy WebLinkAboutApplication- PermitGARFIELD COUNTY BUILDING, SANITATION and PLANNING DEPARTMENT 109 8th. Street, Suite 303 Glenwood Springs, CO 81601(970) 945-8212 Job Address �Va—rJiding" �- D `7I]Nature of work Permit Use of Building_ ] ( 6 7 1-enfa, - J Owner r � ( f � .1 C k I° -Robert �.�/4_ 4 ),, f. No.7174 Contractor Amount of PeimitS p�M chock: q95% prm it r : j 532. 07 Date Clerk tcl oft GARFIELD COUNTY BUILDING PERMIT APPLICATION �y GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO TE1.EPi,+JNE: (1970) 945-8212 INSPECTION LINE: (970) 945-9159 Applicant to complete numbered spaces only. PERMIT NO. PARCEL/SCHEDULE NO. JOB ADDRESS: °Z -& if U 5 ` "" y 64--6)) 411.-i (i Go '/ I LOT NO, BLOCK NO. NNO. SUBDIVISION/EXEMPTION 2 own. ort //��V"// ir- ADDREss �} /� p L(/J� C f 64r 24- 1}y��j o /45730 WIC PK 3 A y 4.0.4,/ c [i_T /al. oZS 9 06,,,,,,,i- 4 �' z i eif « P :325 3,c.g. TIC. NO: 4 ARCM[EC`ClENWII ADOBE= PH: I]CNO: 5 IQ. Fr. OF BOLDING S / 3 44. 0 / /Q, FT. OP LOT MOM NO. OF FIA ORl 6 UBEOPBUILDING 6"1,op S - -- 2-- L 7 w8 J ENOLYITJJ� "G /°..'11' - AlsiVs�� 1, 64,e_ , IrI-S Nr CLASP of WORK: ® DADomoN DALTERATION oMOVE oLOdOVE 9 GARAGE: OBINCLE e000BLE CAAPOLT: GIIN0LI DDOUBLB 10 ` 0 DRIVEWAY PEPMC DON RCE SEWAGE DLIPOBAL (BUM) MITE PLAN 1 v/ /ADa:—V/�" :: VALUATION OF 1p011K: i 3 0' �v fi z /a �+o,"""I J SPECIALCONDMONI: NOTICE A SEPARATE ELECTRICAL PERMIT' IS REQUIRED AND MUST BE ISSUED BY THE STATE OF L, THIS PERMIT BECOMES NUAND VOID IF WORK OR CONSTRUCTION AUTHORIZED I5 NOT COMMENCED WITHIN Ito DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 110 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS HEREIN OR NOT.THE G THIS TYPE OF WORK GRANTING WILL A PERMIT DOESNOT PRESUME TO GIVE BE COMPLIED WITH WHETHER SPECIFIED AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGUTAT CONSTRU OR THE PERFORMANCE OF I�ONiZONING: PLANCII•CK�� �� P FEE:COLORADO. 13'3 gt2 TOTS FEE IT 553/5`i �' DATE PERMISSUED: OCC: GROUP: CONST: TYPE � SETBACKS: lgnature of Owner, CGLtractor or audl agent hiving road o . - Rbuv . i/ i�. i Ar :1 . iiik ►l ' .. r ISDS NO. &EE: 'S /:wigl . , pprovaUDat.. „T , F e. DEMENT .3fFe.p PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO REVIEWED BY THE BUILDINGDEPARTMENT. IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.21.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE TT SHALL. BECOME NULL AND VOID. THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON TIIEREUNDEK WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF TATS JURISDICTION. THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFIT.R DOES NOT CONSTITUTE AN ACCEPTANCE OF ANS' RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER COMMENTS ARE INTENDED TO B NSE IVE AND IN SUPPORT OF THE OWNERS INTEREST. L/ Garfo=m.003 1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. !INDUS.) The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector. 2. A permanent address assigned by the Garfield County Building Department posted where it is readily visible from an access road. 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing. 4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot & cold running water, all floors and walls finished and a privacy door. 5. All steps inside or outside over three (3) steps must have handrails. All balconies or decks over 30" high mush have guardrails constructed to meet all 1994 UBC requirements. 6. Outside grading done to where water will detour away from the building. 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e., weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY (C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATION PREMISES UNTIL ABOVE CONDITIONS ARE MET. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a Certificate of Occupancy for the dwelling under building permit # c:/cbw/final.wpd '6/3°r•fr Date • 7'.2 a _._'tea 3/V G c,V / 3 i 4+ e. 6 _ .r, o a .7 g ig0,0 0 .4t_4(-c7z8-„ei Applicants are required to indicate appropriately and to submit completed check list at time of application for a permit: 1. Is a site plan included that indicates the distance of the proposed building or addition to property lines, other buildings, set back easements and utility easements? Yes ,..r_ No c„ Not necessary for this project (2) 2. Are the plans submitted for application construction drawings and not drawings that are stamped or marked identifying them as "Not for construction, for permit issuance only", "Approval drawings only", "For per t issuance only" or similar language? Yes C No 0) Not necessary for this project (2) 3. Does the site plan include the location, including the distances to property lines, wells (on subject property and adjacent properties) , streams or water courses of the I.S.D.S. (Individual Sewage Disposal System) and has the system been designed, stamped and signed by a Colo do registered engineer? Yes _ No w Not necessary for this project l2, 4. Does the site plan indicate the location and direction of the State, County or private road accessing the property? Yes ,__ No a, Not necessary for this project (2) 5. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes _ No w Not necessary for this project (2) 6. If the building is a pre-engineered structure, is there a stamped, signed engineered foundation plan for this building? Yes__ No u, Not necessary for this project (2) 7. Do the plans indicate the location and size of ventilation openings for under floor crawl spaces and the clearances required between wood and earth? Yes No u, Not necessary for this project ,__cz, 8. Do the plans indicate the size an location of ventilation openings for the attic, roof joist spaces and soffits? Yes No („ Not necessary for this project .X__(2) 2 windows provide natural light and ventilation for all habita`bje rooms? Yes No co Not necessary for this project ___(2) 20. Do the plans indicate the location of glazing subject to human impact such as glass doors, glazing immediately adjacent to such doors; glazing adjacent to any surface normally used as a walking surface; sliding glass doors; fixed glass panels; shower doors and tub enclosures and specify safety glazing for these areas? Yes No c.) Not necessary for this project _Y._(2) 21. Do the plans include a complete design for all mechanical systems pla i • • for installation in this building? Yes _-- : No c,) Not necessary for this project _.X 2) 22. Have all areas in the building been accurately identified for the intended use? (Occupancy as identified in the Uniform Building Code Table 5-A) Yes No Y_(,) Not necessary for this project (2) 23. Does the plan indicate the quantity, form, use and storage of any hazardous materials that may be in use in this building? Yes No (1) Not necessary for this project ___(2) 24. Is the location of all natural and liquid petroleum gas furnaces, boilers and water heaters 'ndicated on the plan? Yes No ..(0 Not necessary for this project (2) 25. Do the plans indicate the location and dimension of restroom facilities and if more that four employees and both sexes are employed, facilities for both sexes? Yes No 0) Not necessary for this project _(2) 26. Do the plans indicate that restrooms and access to the building are handicapped accessible? Yes No ct) Not necessary for this project .!_L_(z, 27. Have two (2) complete sets of constructions drawings been submitted with the application? Yes _ No u) Not necessary for this project (2) 28. Have you designed or had this plan designed while considering building andther construction code requirements? Yes ic No (3) 29. Does the plan accurately indicate what you intend to construct and 4 9. Do the plans include design loads as required under the Uniform Building code for roof snow loads, ( a minimum of 40 pounds per squar oot in Garfield County)? Yes _ No (1) Not necessary for this project (2) 10. Do the plans include design loads as required for floor loads under Uniform Building Code Section 2304 and Tables 23-A and 3-B? Yes No w Not necessary for this project _(2) 11. Does the plan include a building section drawing indicating foundation, wall, floor and roof construction? Yes e4,__ No w Not necessary for this project (2) 12. Is the wind speed and exposure design included in the plan? Yes No a, Not necessary for this project (2) 13. Does the building section drawing include size and spacing of floor joists, wall studs, ceiling joists, roof rafters or joists or trusses? Yes No w Not necessary for this project >__(2) 14. Does the building section drawing or other detail include the method of positive connection of all columns and beams? Yes No („ Not necessary for this project ,_(2) 15. Does the plan indicate the height of the building or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing grade contours? Yes . No (() Not necessary for this project (2) 16. Does the plan include any stove or zero clearance fireplace planned for installation including make and model and Colorado Phase II certifications or phase II EPA certification? Yes No (() Not necessary for this project __ _(2) 17. Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code hapter 37? Yes No (u Not necessary for this project _ ___(2) 18. Does the plan include a window schedule or other verification that egress/rescue windows from sleeping rooms and/or basements comply with the requirements of the Uniform Building Code? Yes No (() Not necessary for this project _ __(2) 19. Does the plan include a window schedule or other verification that 3 what will receive a final inspection by the Garfield County Building Depanent? Yes _ No (3) 30. Do you understand that approval for design and/or construction chaps are required prior to the implementation of these changes? Yes _2L_ No (3) 31. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time of application and that you will be required to pay the "Permit Fee" as well as any "Septic system " fees requred, at the time you pick up your building permit? Yes _ No (3) 32. Are you aware that you are required to call for all inspections required under the Uniform Building Code including approval on a final inspection prior to receiving a Certificate of Occupancy and occupancy of th uilding? Yes _ No (3) 33. Are you aware that the person signing the Permit Application whether the "Owner", "Agent of the Owner", "General Contractor", "Contractor" or otherwise, signing the application is the party responsible for the projcomplying with the Uniform Codes". Yes _ No (3) I hereby acknowledge that I have read, understand and answered these questions accurately to the best of my ability. a ure Phone: 9 70 '6's' 3 (days); Project Name: Project Address: "- 41 /99"9 date 970 - 3 7 V. -C1 evenings) (c)4, r 4g5- //u -/1y G /2 4C 8 /6 50 (Refer to notes on next page) 5