HomeMy WebLinkAboutApplication- PermitGARFIELD COUNTY
BUILDING, SANITATION
and PLANNING DEPARTMENT
109 Sth. Sheet, Suite 303
Glenwood Springs, CO 81601(970) 945-8212
1 No. 7111
i
od`b-r3
Job Address / iettrr3(
Nature of Work Building Permit o r
Use of Buil ' O•k.L Qk
Owner
07' al:14/17
Contractor
Amount of Pemmit$ �t , 9 Date ce
1k- iso. / cy
-)s
'A\ 4-(Zzt b=olOo
Clerk
GARFIELD COUNTY BUILDING PERMIT APPLICATION
GARFIELD COUNTY (OLENWOOD SPRINOS), COLORADO
TEMPHONE: (970) 945-$212
Applicant to complete numbered spaces only.
PERMIT NO. "71 1 I
INSPECTION LINE: (970) 945-9159
PARCEL/SCHEDULE NO.
JOB ADDRESS: ,aZ 0/ a x. . T 2' 5 %LT
SUBDIVISION/EXSl�i70N ,��,
.
I� c.,5- j%I�%QY(/
1
,
LOT NO. BLOCK NO.
2
OWNERof c ,eT n 4 m
"Dm"
//` ) a/WI-i 1) AIS, 5 i Lrr�'X
-27,r)
'94 X6.0
3
CONTRACTOR
5 l9,7
ADDRESS
PIE el q5..- 53
' LIC No:
4
ARCID1ECTIDICIREEl
ADOBFJ!
Pa:
LTC NO:
v
5
. �. /`f 93 I>I aOUG�9-+_
.,�' � r r,,-� i 9,,3 ,�IAs�nlavr
w..r. mar
?.4e e Es
,mart t I!
1 i 1?
wo. or FLOOR.
6
USE opswMa g / g/i/G' E
7
Da""�'"O"" C7 Wi ne ver G1/A4, Ka07-41.5-44/7-- 4v...i/0 :y3i o t' 9,< 9
p
E c'! .cX.
8
OARS OF WOKS: $w 0ADDTTION °AL7�MONS MNS =
/`DMN=
9
OARAfB ODOURS CARPORT: DRaN:E DDOWLS
10
0DRTRMAYPERROT i,p614 tare SEWAGE DWOaALwpm //enErim
VALUATION OF WORE I 9D ODD
AD.R161ED VALUATIONS re y cilif . P
O ry
SPECIAL COMMONS
NOTICE
A SEPARATE ELECTRICAL PERMIT IS REQUIRED AND MUST BE ISSUED
COLORADO.
THIS PERMIT BECOMES NULL ANI) VOID IF WORK
AUTHORIZED IS NOT COMMENCED WIDEN 110 DAYS. OR IF
WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF Ito
AFTER WORK IS COMMENCED.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS
KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS
OOVERNTNO TEES TYPE OF WORK WILL BE COMPLIED WITH
HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT
AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY
LOCAL LAW REGULATING CONSTRUCTION OR THE
CONSTRU ON.
4?� Date
BY THE STATE OF
OR CONSTRUCTION
CONSTRUCTION OR
DAYS AT ANY TIME
APPLICATION AND
OF LAWS
WHETHER SPECIFIED
PRESUME TO GIVE
OTHER STATE OR
PERFORMANCE OF
3/g rA?
aove.
r,%
PLAN CHECK FEE:
.79350,/ T
PERMIT FEE:
. Of S '3 Fi. T S-4
TOTAL FEE: DATE PERMIT ISSUED:
A 3 K. q
OCC: GROUP:
a / 3
CONST: TYPE:
_ 4/
20G;
SETBACKS:
,
Siss*tme of Owner. Coatractoc ot nuhodz d igalt htvia6 -
0.1
HO t � 1� • V 1J
ISDS NO. do FEE:
I e CO
'Building Dept. Appru J/Dsto "T.% r .. ..wglrr mr
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER. HEREBY AGREES TO COMPLY wrni ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.21.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WITH IN TIE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, TEE PERMIT MAY THEN BE REVOKED BY NOTICE FROM
THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN
VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS TURLSDICTION.
THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY
RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION
DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT
OF THE OWNERS INTEREST.
/)
Pe formoo3 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INITIAL)11? /I • i 9'
1
� 49 3j -W49
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector;
2. Permanent address assigned by Garfield County Building Department posted where readily
visible from access road;
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent
kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all
necessary plumbing;
4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot and cold running
water, non-absorbent floors and walls finished and a privacy door;
5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or
decks over 30" high constructed to all 1994 UBC requirements;
6. Outside grading done to where water will detour away from the building;
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all
the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
* * * *CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATION
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit # 7 II 1 .
f'64,12- A- J.fi1a-4a-7( 3A//97
Signature Date
bpcont
-4:111.40A-4
=. -2128 J.1. ' - 3,. o_
tt
�f s_45Z-__•Qo.
"1;3 7f-.
3 0 ...L..
,e»tS 00, o 0
sTs,f
h1AR•-25-1999 16132
Z00(11
Summit Crest Homes 970 532 4352 P.01/01.
Summit Crest
NOMES'
Colorado Built
February 23rd, 1999
Factory Direct Housing
2489 Hwy 6 & 30
Grand Junction, Co 81505
Re: Garfield County Building Department
To Whom It May Concern'
The w h0a hobs ow load anit d will meet H'UD Zone thermal coder customer Graham, at 5201 Co. Rd 3and theHUD
will
be built with a 401b
Zone l wind requirement.
Sincerely,
Sales Manager
Summit Crest Homes
2221 Clayton Law • P.O. Box 10 • Bccthc ud. Colorado 50513
(970) 532-2632 • Fax (970) 532-4352
ID2 S I a A4.LDY3
TOTAL P.01
L481, LIZ OLO 1 10/3 00:CT Ilia 66'9Z/C0
• 1,
Is a site plan included that indicates the distances of the proposed building or addition to property lines,
• other buildings, setback easements and utility easements?
Yes
2. Does the site plan include the location of the I. S.D. S. (Individual Sewage Disposal System) and the
distances to property lines, wells (on subject property and adjacent properties), streams or water
courses?
Yes ✓
3. Does the site plan indicate the location and direction of the County or private road accessing the
property? ✓
Yes
4. Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel
in accordance vith the uniform building code or per stamped engineered design?
Yes ,/
5. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain
written permission from the association, if required by that association, prior to submitting an
application for a building permit? If you do not have written permission from the association, do you
understand that the plan check fee will not be refunded should the architectural committee deny or
reject your byilding plans?
Yes ✓ No
6. Will this be the only residential structure on the parcel?
Yes ✓ No If no -Explain:
7. Have two (2) complete sets of construction drawings been submitted with the application?
Yes
8. For the placement of a manufactured home, have the following been specified?
The size of the unit (min. 20ft. x 20ft.); live roof load (min. 40#); wind design (min. wind speed of 80
mph & 15 lb. wind load); foundation design; method of anchoring?
Yes ✓
9. Have you designed or had this plan designed while considering building and other construction code
requirements?
Yes l/ No
10. Does the plan accurately indicate what you intend to construct and what will receive a final inspection
by the GarfieldCounty Building Department?
Yes No
11. Do you understand that approval for design and/or construction changes are requiredDrior to the
application 9f these changes?
Yes I/ No
2
• •A
• • 2. Do you understand that the Building Department will collect a "Plan Review" fee from you at the time
.of application and that you will be required to pay the "Permit Fee" as well as any "School Impact"
or "Septic Sy tem" fees required, at the time you pick up your building permit?
Yes No
13. Are you aware that twenty four (24) hour notice is required for all inspections? Inspections will
be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs
to Carbondale in the afternoon. Morning inspections must be called in by 12:00 p.m. the day
before; afternoon inspections must be called in by 4:00 p.m. the day before. Failure to give
twenty four (24) hour notice for inspections will delay your inspection one (1) day. Inspections
are to be called in to 945-9159.
Yes 1/ No
14. Are you aware that you are required to call for all inspections required under the Uniform Building
Code including approval on a final inspectionarior to receiving a Certificate of Occupancy and
occupancy of the building?
Yes r/ No
15. If you are accessing a County Road and do not have an existing driveway you will need to acquire a
driveway permit from Garfield County Road and Bridge. The phone number is 945-6111. You will
need to show proof prior to issuance of the building permit.
16. Attached is information for placement of a manufactured home. Please review. If you have any
questions, please call this office.
I hereby acknowledge that I have read, understand and answered these questions to the best of my
ability.
fir. Jd)ictLI„,t
signature date
Phone: 943- ,5)4,30 (days);a17970 (evenings)
Ptoject Name: /LEA)C E
Project Address:
5,2o/ e,E' 34/6
3
MANUFACTURED HOME
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issue #i Zoned Area
Permit NoT7 1
AGREEMENT
In consideration of the issuance of this permit the applicant hereby agrees to comply with all laws and
regulations related to zoning, location, construction and erection of the proposed structure for which
this permit is granted, and further agrees that if the above said regulations are not fully complied with
in the zoning, location, erection and construction of the above described structure, the permit may
then be revoked by notice from the County Building Official and IMMEDIATELY BECOMES NULL
AND VOID.
Use
Add r al Description
Own
Footing r j Rg' 4P0
Aot C .* G. i fi '
Contractor
Foundation or Blocking4 .
Rough Plumbing
Electrical Final
(by State Inspector) (c7 / cn7
O i 1Uj4 L Le,
.1/4.12,t)
•
Gas Piping ,a,
Septic Final ‘, 9 2-y ', j , -e—
Notes:
THIS PERMIT IS NOT TRANSFERABLE
Phone 945-9159 109 8th Street County Courthouse Glenwood Springs,Colorado
APPR VED
Date
(W PLACED OUTSIDE, COVER WITH CLEAR PLASTIC)