HomeMy WebLinkAboutConstruction Observation & Testing Completion Letter 09.14.16H-P~KUMAR Geotechnical Engineering I Engineering Geology Materials Testing I Environmental 5020 County Road 154 Glenwood Springs, CO 81601 Phone: (970) 94S.798B Fax:(970)945-8454 Email: hpkglenwoodO kumarusa.com Office Locations : Parker, Glenwood Springs, and Sllverthome, Colorado Seprember 14, 2016 Silich Conslnlction, Inc . Aun: Scott Henriksen 303 AABC. Suite J Aspen, Colorado 81612 scott@silichhomcs .com Project No. 16-7-438 Subject: Construction Observarion and Testing Completion Letter, Proposed Residence, Lot 74, Ironbridge Development, 1171 River Bend Way, Garfield County, Colorado Gentlemen: As requested, we are providing a summary of our observation and testing services provided for the above referenced project. The reports of the services requested and performed for the subject project are attached. Hepworth-Pawlak Geotechnical (now H-P/Kumnr) previously conducted a subsoil study for design of foundations at the site and presented our findings in a report dated May 29, 2015, Job No. 113 471E. The foundation bearing soils within the building excavation were observed and lested for compaction on April 8 and 14, 2016 and are suitable for the recommended bearing pressure of 1,500 psf. Grade beam reinforcement steel was observed on May 19, the post-tensioned slab tendons were observed on May 20 and the fresh concrete for the foundation was sampled on May 24, 2016. Tensioning of the tendons was observed on May 27, 2016 according to the projecl specifications. The results of the tendon tensioning were submitted to Fuhrmann & Graf for their approval. We did not observe placement of rigid foam insulation along the building perimeter, but since the perimeter grade beam has a minimum depth of 36 inches, it provides adequnle frost protection rather than by insulation. Silich Construction, Inc. September 14, 2016 Page 2 Based upon inferences drawn from our observations and testing, as documented by the attached daily field and laboratory reports, it is our professional opinion that the referenced construction has achieved the specified conditions. Please recognize that construction observation and testing are sampling functions that involve direct observation and testing of very limited amount of the overall work to evaluate the construction compJiance. If you have any questions or need further assistance, please call our office. Sincerely, H-P~KUMAR SLP/ksw Attachments: cc: Silich Construction -John Silich (john@silichconstruction.com) H-P ~KUMAR Project No. 1&7·436 ~tech 6020 County Road 154 Glenwood Springs, Colorado 81601 Phone: 170-145-7988 Fax: 970-941-8454 HEPWORTH·PAWLAK GEOTECHNICAL hpgeqCilhDgeotecb,cqm Earthwork Compaction Testing Report Client: Sillch Construction Inc. Job No .: 115 066L Day: Friday Attn: Attn: Scott Henriksen Date: 4/8/16 303 AABC, Suite J Page: 1 of 1 Aspen. Colorado 81611 Project: Proposed Residence, Lot 74, lronbridge Development, 1171 River Bend Way, Garfield County, Colorado Weather. Overcast. calm, dry Temperature: 57D at 11 :00 am, 70° at 2:35 pm Earthwork Contractor: Logan Equipment Used. Dump truck, track hoe, walk behind double drum roller Description of Earthwork Jn the morning we observed the building area had been suitably stripped of Tested: vegetation and under slab fill was being imported from other lots, placed and compacted to raise the area about 2 feet to design slab subgrade. Tests performed in the afternoon Indicated acceptable compaction at about 2 to 3% below optimum moisture content. Verbal Communication: Logan was Informed or our test results. Placement and Compaction Not observed by HP Geotech. Procedure: ' ift Thickness : Max. Rock Size : Moisture Conditioning , Compactor(s) Used· walk behind vibratory double drum roller Number of Passes: not observed Nuclear Gauge Moisture/Densit'l' Test Results Location Field Dry Field Field Min Test Depth or Elev. Density Moisture Comp. Comp. Proctor No. Under Slab Fifi (pcf) Content (%) Req. Lab No. % (%) 1 10' S, 10' E of building NW 1' below slab 113.8 9.6 99 98 006·15 corner subarade 2 10' S, 12' Wof building NE 1' below slab 114.1 9.3 99 98 006·15 comer subarade 3 8' E, 4' N of building SW 1' below slab 115.2 9.0 100 98 006·15 corner subarade Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. Dens. Def Moist.(%) 006·16 ASTM 0698 Sandy Silt with Gravel 114.9 12.3 THIS RtPORJ PRESEHlS gPlff~ AS A RESULT Of OUR ~RV"TucSOF fll.LPLACEMENT, WI! Ho\\IE RELIED OH THE CONTRACT\m 10 COlillNl.I! N'1'L YING ntE RECOMMENDED CDNPM:TM! EFFORT ANO MOISTURE TO F-.L DUAINO THE TIME& WHEN OUR OllSERVER IS HOT O~ Ol'ERATIOHS ltt~ NUCLENI DEHSOMETER METllOO OF TESllNO WAS USEO Ill SU8ST.VITIAI. ACCOIUWl\:E Willi ASTMD 6'3le Distribution· Aspen Signature Homes of lronbrtdge, UC· Llwyd Eccleston• Oecdestone@pblhft.neU Slllch Constructlon -John Slllch ~=-= Sllich Construction -Scott Henriksen Slllch Construction • Amand:i Jenkins <mnffllhl!ch:C pnstrvctknLcgnl V/ Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By ~£tech 5020 County Road 154 Glenwood Springs, Colorado 81601 Phone: 970·945-7988 Fax: 970·945-8454 HEPWORTH· PAWLAK GEOT£CHNICAL hDQeo@hooeolech .cpm Earthwork Compaction Testing Report Client Sfllch Construction Inc. Job No.: 115 066L Day: Thursday Atln: Attn: Scott Henriksen Date: 4/14/16 303 AABC, Suite J Page: 1 of 1 Aspen, Colorado 81611 Project: Proposed Residence, Lot 74, lronbridge Development, 1171 River Bend Way, Garfield County, Colorado Weather~ Overcast, light wind, dry Temperature: 63D at 3:55 pm Earthwork Contractor: Logan Equipment Used: Dump truck, track hoe, walk behind double drum roller Description of Earthwork The building area had been filled and compacted in 2 lifts with material beJng Tested: imported from other lots to raise the area about 2 feet to design slab subgrade. Tests indicated acceptable compaction at about 2% below optimum moisture content. Verbal Communication: Logan was informed of our test results. Placement and Compaction Procedure: Not observed by HP Geotech. Lift Thickness : Max Rock Size. Moisture Conditioning : "'ompactor(s) Used: walk behind vibratory double drum roller Number of Passes: not observed Nuclear Gauge Moisture/Density Test Results Location Field Dry Field Field Min. Test Depth or Moisture Comp. Proctor No. Elev. Density Content Comp. Req. Lab No. Under Slab Fill (pcf) % (%) (%) 1 24' S, 6' E of building NW corner stab 114.2 10.2 99 98 006-15 subgrade 2 15' N, 12' E of building SW slab 115.1 10.3 100 98 006-15 corner subgrade 3 Center of building area slab 114.8 10.4 100 98 006-15 subgrade Proctor Sample Reference: Lab No. Method Description Max. Dry Opt. Dens. pcf Moist.(%) 006-16 ASTM D 698 Sandv Silt with Gravel 114.9 12.3 TlllS REPORT PRESEtHS OPINIONS AS A RESULT OF OUR OBSERVATIONSOF Fill PLACEMENT WE 11AVE RELIEO ON Tt1~ COllTAAClOR TO CONTINUE APPL YIHG THE RECOJ.1f,1eNOE D COMPACTIVE EFFORT ANl>t.IOtSTURE TO Fl\.l DUrtlllG TH!: TIMES VIHEN OUR OBSERVER IS HOT OBSERVING OPERATCONS THE NUCLEAR DENSOMETEll METHOD OF TESTING WAS USED ltf SUBSTANTIAL ACCORDANCE WITH ASTM 0 6SlC Distribution : Aspen Signature Homes of lronbrldge, LLC • Llwyd Ecc:lestone llecc:lestone@pblhn.nat) Slllch Construction -John Slllch Oohn@sllichconslructlon.com I Slllch Construction -Scott Henriksen lscott@sllh:hhomes.comJ Sllich Construction· Amanda Jenkins (amanda@slllchconstructlon.com) TJW/ Thomas J . Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By ~tech 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 870·845·7988 HEPWOR1lf ·PAWLAK GEOTECHNICAL Fax: 970·945-8454 hpgeo@hpg90tecb.com REINFORCEMENT STEEL INSPECTION REPORT Client: Sillch Construction Inc. Attn: Scott Henriksen 303 AABC, Suite J Aspen, Colorado 81611 Job No.: 115 066L Day: Date: Page: Thursday 5/19/16 1 or 1 Project: Proposed Residence, Lot 74, lronbridge Development, 1171 River Bend Way, Garfield County, Colorado Area of Inspection: Foundation Grade Beams Reference Documents Structural Plans, Sheets F1.0L, FD1, dated 10/14115 Used Inspection Notes: Two #4 bars with corner bars were observed in place on 3" concrete chairs. Radon sheeting and exterior insulation was also observed in place. Inspection Status: 0 Preliminary IB} Final IE) Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. D Exceptions Noted: Verbal Communication: D~slributlon: George with S2M and Scott with Silich were infonned of our inspection results. Aspen Signature Homes of lronbridge, LLC -Uwyd Ecclestone UKclfttondpblbDdl!J SIUch Construction -John Sllich OgbntblQcbconstruct!gn.c.qmJ Sfllch Construction-Scott Henriksen ~='ctr Slllch Construction -Amanda Jenkins . Jn.gRm> TNJt Thomas J. Westhoff, CET Steven L. Pawlak, P.E. Field Technician Reviewed By G~ech 5020 County Road 154 Glenwood Springs, co 81&01 Phona: 970°145·7988 HEPWORTH· PAWLAK GEOTECHNICAL Fax: 970·945-8454 hpqeo@hpq90tecb.com REINFORCEMENT STEEL INSPECTION REPORT Client: Sillch Construction Inc. Attn: Scott Henriksen 303 AABC, Sui te J Aspen, Colorado 81611 Job No.: 115 066L Day: Date: Page: Thursday 5/20/16 1 of 1 Project: Proposed Residence, Lot 74, lronbridge Development, 1171 River Bend Way, Garfield Count y , Col orado Area of Inspection: Foundation Post-Tension Slab Ref ere nee Documents Structural Plans, Sheets f 1 .OL, FD1, dated 10/14/15 Used. Inspection Notes : Cables and reinforcing were observed to be installed per plans. Inspection Status: 0 Preliminary (BJ Final ~ Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents . 0 Exceptions Noted. Verbal Communication: Distribution Scott with Silich was informed of our inspection results. Aspen Signature Homes cf lrcnbridge, LLC • llwyd Ecclestone Uts:clotton !Opb!bD.ntfl Sllich Construction-John Slllch ftohnCbJ!!ch!;ontlnlcfon.com> Slllch Construction-Scott Henriksen ~ Slllch Construction • Amanda Jenkins on.com> U NI Thomas J. Westhoff, CET Steven L. Pawlak, P .E. Field Technician Reviewed By ~tech HEPWORTH ·PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970·945·7988 Fax : 970·945·8454 hpgeo@hpgeotech.com CONCRETE TEST REPORT Silich Construction Inc. Attn: Scott Henriksen 303 AABC, Suite J Aspen, Colorado 81611 Job No. 115 066L Date Cast: 05/24/16 Sheet: 1 of 3 Project: Proposed Residence, Lot 74, lronbridge Development, 1171 River Bend Way, Garfield County, Colorado Placement Location: Grade Beams and Post-Tension Slab Foundation Supplier: United Time Batched: Truck No: 6374 Time Arrived: Ticket No: 33307256 Time Placed: Mix Design: 37010551, COOT Class D Method of Placement: Pump Time Sampled: Air Temp: Concrete Temp : Water Added: 7:38 am 40° 64° None Wet Unit Wt: Slump: Air Content: 6:53 am 7:30 am 7:34 am Sample Point: 142.8 pcf 41/z inches 5.4% Load Size (Yds): 1 O Yds Delivered: 10 Yds Ordered: 150 Truck discharge Communication : The Supplier was informed of our field test results. Notes: Distribution Aspen Signature Homes of lronbrldge, LLC • Llwyd Ecclestone (lecclestone@pblhfl.net) Silich Construction -John Slllch flohnm?silichconstruclion.com) Silich Construction -Scott Henriksen (scott@silichhomes.com) Sillch Construction. Amanda Jenkins (amanda@silichconstruction.com) United Companies Oistribulion List Justin Orgill Field Technician /ksw Thomas J. Westhoff, CET Reviewed By c.sdrtech HEPWORTH -PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-94 5-7988 Fax : 970-945-8454 hpgeo@hpgeotech.com CONCRETE TEST REPORT Silich Construction Inc. Attn: Scott Henriksen 303 AABC, Suite J Aspen, Colorado 81611 Job No. 115 066L Date Cast: 05/24/16 Sheet: 2 of 3 Project: Proposed Residence, Lot 74, lronbridge Development, 1171 River Bend Way, Garfield County, Colorado Placement Location: Grade Beams and Post-Tension Slab Foundation Supplier: United Time Batched: Truck No: 0000 Time Arrived: Ticket No: 33307261 Time Placed : Mix Design: 37010551, COOT Class D Method of Placement Pump Time Sampled : Air Temp: Concrete Temp: Waler Added: 9:15am 60° 65° None Wet Unit Wt: Slump: Air Content. 8 :26 am 9:02 am 9:10 am Sample Point: 140.1 pcf Sinches 6.6% Load Size (Yds)" 10 Yds Delivered: 60 Yds Ordered: 150 Truck discharge Communication: The Supplier was informed of our field test results. Time Cylinders Cast: 9 :25 am Initial Cure Time On Site: 1 day Field Storage: Insulated Cure Box Dale in lab: 05/25/16 Cylinder Temperature at Pick Up: 95° Min/Max : 71°/98° [ Compressive S.,!!:ngth Dc;,t!._. .. __ ~----------1 ··2~~6 l Age I Load Diameter 1 Area Compressive 28 Day I Number I Days .' Date i----lb_s_. ---in. I in2 _s_ir_e_ng-lh_(_p_s_i)-;.....-A-v_g ._(_p _si_) ~ I '342A I 3 ~ 51,200 __1_4.01 T 12.63 f 4050 t 3420 1 1 os-31-1s ~6,9oo I 4.01 J_ 12.63 · j--4-s1-o--· 342C 28 I 06-21-16 1 ~8,200 I 4.01 l 12.63 l 6190 6090 L 3420 2a 06-21 -1s 75,soo I ~ ·L 12.63 I s9.~ _J ___ _ Specified Strength for Structure: 4500 psi at 28 days Spec1f1ed Strength for Mix: 4500 psi at 28 days Notes : D1stnbution Aspen Signature Homes of lronbridge, LLC -LJwyd Ecclestone (lecclcstone@pblhfl.net) Slllch Construction -John Sillch Ciohn@silichconslruction .com) Sillch Construction -Scott Henriksen (scott@silichhomes.com) Silich Construction ·Amanda Jenkins (amanda@s ilichconstruction.com) United Companies Distribution List Justin Orgill Field Technician /ksw Thomas J. Westhoff, CET Reviewed By ~tech HEPWORTH ·PAWLAK GEOTECHNICAL 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970·945·7988 Fax : 970-945-8454 hpgeo@hpgeotech.com CONCRETE TEST REPORT Silich Construction Inc. Attn: Scott Henriksen 303 AABC, Suite J Aspen, Colorado 81611 Job No. 115 066L Date Cast: 05/24/16 Sheet: 3 of3 Project: Proposed Residence, Lot 74 , lronbridge Development, 1171 River Bend Way, Garfield County, Colorado Placement Location: Post-Tension Slab Foundation Supplier: United Time Batched : Truck No: 6393 Time Arrived : Ticket No: 33307266 Time Placed: Mix Design: 37010551, COOT Class D Method of Placement: Pump Time Sampled: Air Temp: Concrete Temp: Water Added: 10:50 am 65° 66° None Wet Unit Wt: Slump: Air Content: 10:10 am 10:40 am 10:44 am Sample Point: 138.8 pcf 5inches 7.2% Load Size (Yds)· 10 Yds Delivered: 110 Yds Ordered : 150 Truck discharge Communication: The Supplier was informed of our field test results. Time Cylinders Cast: 11:00 am Initial Cure Time On Site: 1 day Field Storage: Insulated Cure Box Dale in Lab: 05/25/16 Cylinder Temperature at Pick Up: 95° Min/Max: 71°/98° ----~·· .... ----·----~~ -Com pressive Strength Data - rea Compressive 28 Day Strength (psi) 2016 Lab Age Date Loa -;-1~ Dia?1ele~-~ Number Days lbs '"· I in2 Avg. (psi) .63 4080 .63 4670 .63 6160 6270 .63 6370 343A 3 05·31·16 51,5 3438 l 7 05·31-16 59,0 343C 28 06·21·16 77,8 - 3430 28 06-21-16 80,4 :: -r~ ::~-=r :: 00-i 4 .01 i -12 -oo -~ 4 .o~ Specified Strength for Structure: 4500 psi at 28 days Specified Strength ror Mix: 4500 psi at 28 days Notes: Distribution Aspen Signature Homes of lronbridge, LLC • Llwyd Ecclestone (lecclestone@pblhfl.net) Sillch Construction -John Silich (john@silichconstruction.com) Slllch Construction -Scott Henriksen (scott®sllichhomcs.com) Silich Construction ·Amanda Jenkins (amanda@silichconstruction.com) United Compani es Distribution List Justin Orgill /ksw Field Technician Thomas J. Westhoff, CET Reviewed By ~ech HEPWORTH· PAWLAK GEOTECHNrCAL POST TENSIONING FJELD REPORT 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970·945·7988 Fax: 970·945-8454 hpgeo@hpgeotech.com Client: Silich Construction Inc. Job No .: 115 066L Day: Friday 05/27/16 1 of2 Attn: Scott Henriksen Date: 303 AABC, Suite J Page: Aspen, Colorado 81611 Project. Proposed Residence, Lot 74, lronbridge Development, 1171 River Bend Way, Garfield County1 Colorado Partly Cloudy Temperature : 58°F at 9:00 am Weather. Field Notes · Cable tensions by Gary & Don with K&G Rebar. Advancing from southwest corner to northeast corner. Tendon A was W' short of minimum using gauge #539 at 5400 psi calibrated 03/06/16 T d I Location Jacking Gauge Length en on Force Reading Calculated Elon oation (in } Measured Elongation (in ) No I (ki osl Co si) (ft.) Min Max. 22 1 SW Corner 33 5400 12% % 1 % I % 21 West Side I 33 5400 19% 1o/a 1Ya 1% 20 I West Side 33 5400 50 3% 4% 3% 19 I West Side 33 5400 50 3% 4% 3~ 18 !' West Side 33 5400 50 . ___ 3Y._. __ +-__ 4_% __ -T--__ 3_~-·---t 17 West Side =iH3 · 5400 50 3% 4% 3Y. 16 I_ West Side __J_ 33 ___ 5_4o_o_-+-_...,.s _o _-t ___ 3_Y. __ -f ___ 4_o/._, __ _l __ ._33_Y.. ___ -t 15 1 West Side I 33 5400 54 3}• 4% --i 4 ~ 14 _:=.!_ West Side I_ 33 ~ 5400 -54 3-r.-~ 4o/.H~--4 --·-~ _ : . _West Side -1 1 _ 33 _ 5400 __ 54 __ __ 3r.. ,_~ _4_l-4 __ ,_ 1_2 ·l -West Side__ 33 5400 54 3r. 4% 1 -· 4}~ · 11 WestSide I -ail 5400· I 46 3% --4--,--_-3-~----=== · ~-1· No~ha~ide-.I 33 t 54001 =-14 .~ --~-~ ---+--13_v. _______ % __ --i 10 West Side i 33 5400 42 3 3% 3 ---i ----9 West Side 1 33 5400 42 3 3~~ 3% -·---------1 ---------t -·--~----i ~-• West Side _J. 33 5400 42 3 ___ 3_~-·-·-t---3----t 7 West Side 33 5400 42 3 3~~ 3~ -G · West Side 33 -·-5-40_0 __ , ___ 4_2 _·~--3---1 3~~-_____ 3_% ___ , --li------+----"------1 5 West Side 33 5400 42 3 3% 3% ~ 41 yvestSide -·33 540~---4~-___ 3 _~,_-_-_-3%-.--_-!j_ ___ 3_% ___ _, 3 I NW Corner 33 5400 42 3 3% I 3% Oistribuhon Aspen Signature Homes or lronbrldge, LLC • Uwyd Ecclestone OecaJ!;!loQeOpb!hf!.nt.ll Slllch Construction -Scott Henriksen (1cott@slllchconstructfon.com1 Sflleh Construction -John Slllch UohnfbDlchCO!}!budl2!!&oml •:Ulich Construction. Amanda Jenkins ====n com) =uhrmann & Graf. Nathaniel Graf t nea~aiDn:»;c'O@ lksw Joe Benedict Field Technician Steven L. Pawlak, P .E. Reviewed By obMYtech 5020 County Road 154 Glenwood Springs, CO 81601 Phone: 970-945-7988 Fax: 970-945-8454 hpgeo@hpgeotech.com HEPWORTH· PAWLAK GEOTECHNfCAL POST TENSIONING FIELD REPORT Client: SUfch Constructlon Inc. Job No.: 115 066L Day: Friday Attn: Scott Henriksen Date: 05/27/16 303 AABC, Suite J Page : 2 of 2 Aspen, Colorado 81611 Project. Proposed Residence. Lot 74, lronbrldge Development, 1171 River Bend Way, Garfield County, Colorado Weather: Partly Cloudy Temperature: 58 11F at 9:00 am Field Notes: Cable tensions by Gary & Don with K&G Rebar. Advancing from southwest corner to northeast corner. Tendon A was Xi" short of minimum using gauge #539 at 5400 psi calibrated 03/06/16 Tendon No Localton I Jacking Force (kios> Gauge I Reading {osi) length (ft ) Calculated Elonaetion (in ) Mm Max Measured Elongation (in ) B NW Side, North Side 5400 56Yz 4 5 4% 33 C North Side 33 5400 56Yz 4 5 4 Yz · D -North Side 33 5400 __ 5..;..61.;..;Vz;.._-1---4--~---...;.5 __ -f-__ 4.;..;}1..;;;.2 __ -1 EF I North Side 33 5400 56Yz -l 5 4Yz North Side 33 5400 54 3¥.i -t ~ , 4% -e .I ~~~~-~::: -, !~ ::~~ ---5~-~-.. ----;~-:---t---~-:·-~ --1 ·~ __ :_~_:_-----t ! _Nort~ Side _ , __ 33 __ , __ 5_4_00_-il 50~ -!--__ 3_:• _____ 4_Yl_a __ 1-__ 4 __ __ ----~-------1 --~-_ -\~c-s~:c_. ~~J -3_3_ 5400 J _.13Y._ ---~-' --i 1 West Silk NF 33~ 5400 13Y.i 'Ii 11, 1 ~~ -_.luh --33 ----r----+------------.-------1 J Norlh Si1k 5400 58% 4% 5Ya 4% ·--K-· No11h Sktc -· 33 I 5400 SBY.i -U~ 5% ---4-Yz----1 =~~-~ =N<;.t 1 ;-s~ 33 -1_ s400 58% __ ol_r._._-l::_-_-sY._._-l __ 4~• M Nurlh Sid.: 33 J 5400 58% ..JY. SY. 4Y. N Nl ~lmi;r a3 1 s400 s8Y. .m sr. ----4,-~-·- ~-o -· _N_._Si1fo <.ia.~ 33 I 5400 25 _____ 13_/, __ 1 ___ 2_%_ 1¥. P N . Sh.le <.iumgc 33 I 5400 25 1 ~~ 21/1 1% Oislnbution Aspen Signatur~ Hom us of lronbrldge, LLC • Llwyd Ecclestone UecdntontOoblhR.nrj) Slllch Construction -Scott Honriksen C1E2ll@!llld)C9D1tn1cti2n.coml Sllieh Construction -John Slllch C lobnfts1Qcbconstruetfo~ Silich Construction -Amanda Jenkins ttm1n<'iiblllchcm!lt7uctlon.som) Fuhrmann & Graf· Nathaniel Grar l nPSJAJafuhm!tnntnalnnrinq&gm) Joe Benedict ·"S .v Field Technician Steven L. Pawlak1 P.E. Reviewed By