HomeMy WebLinkAbout6.0 CorrespondenceStatus of Follow-up on Resolution 2011-44 (Cerise Mine)
Resolution Item
Condition Requiring No
Action Prior to Issuance of
Land Use Change Permit
Status of Conditions Requiring
Action Prior to Issuance of Land Use
Change Permit
1. That all representations made by the Applicant in the application, and at
the public hearing before the Planning Commission, shall be conditions
of approval, unless specifically altered by the Board of County
Commissioners.
X
2. That the operation of the facility be done in accordance with all
applicable Federal, State and local regulations governing the operation
of this type of facility.
X
3. Site operations shall not emit heat, glare, radiation, dust or fumes which
substantially interfere with the existing use of adjoining property or which
constitutes a public nuisance or hazard.
X
4. All equipment and structures associated with this permit shall be painted
with non -reflective paint in neutral colors to reduce glare and mitigate
any visual impacts.
X
5. Ali lighting associated with the property shall be directed inward and
downward towards the interior of the property.
X
6. The Applicant shall install all signage as specified in Gene Coppola's
Traffic Study including: 1) stop sign (R1-1) placed on the access road
approach to County Road 103; and 2) two truck warning signs (VV8-6) on
the County Road 103 approach to the site access road. The Applicant
shall also install 10 mile per hour speed limit signs on the access road
and the haul roads within the site.
7. All vehicles using County Road 103 to access the Cerise Mine shall
abide by Garfield County's oversize/overweight system. Ail vehicles
requiring oversize/overweight permits shall be obtained from the Garfield
County Road and Bndge Department.
X
8. Prior to the issuance of Land Use Change Permit, the Applicant shall
obtain a Driveway Access Permit from the Garfield County Road and
Bridge Department. A copy of this permit shall be submitted to the
Garfield County Planning Department.
Permit application states that the
driveway must be completed within 30
days of pulling the permit; Lafarge will
pull permit upon completion of item 9.
(Tetra Tech)
9. Prior to the issuance of a Land Use Change Permit, the Applicant shall
conduct a geotechnical investigation of County Road 103 and based on
this analysis, provide a pavement section design to the Garfield County
Planning Department for review. The portion of County Road 103 that is
to be analyzed commences 200 feet north of the Cerise Mine's access
road to State Highway 82 and this portion of road shall be reconstructed
to the proposed engineered design.
HP Geotech completed drilling along
CR 103 and will provide a pavement
section design for review by the
County.
(Tetra Tech)
Resolution Item
Condition Requiring No
Action Prior to Issuance of
_ Land Use Change Perm it
Status of Conditions Requiring
Action Prior to Issuance of Land Use
Change Permit
10. Prior to the issuance of a Land Use Change Permit, the Applicant shall
enter into an agreement with the County pursuant to the Garfield County
Road and Right-of-Way Use Regulations regarding the improvement of
Count Road 103.
Lafarge will complete this in
coordination with item 9.
(Tetra Tech & Lafarge Land
De•artment
11. Prior to the issuance of a Land Use Change Permit, the Applicant shall
obtain the appropriate State Highway Access Permit from the Colorado
Department of Transportation. All conditions of the access permit shall
be conditions of this permit.
Sopris Engineering is awaiting CDOT's
issuance of permit. We will provide a
copy of the permit once it is issued.
(Tetra Tech & Lafarge Land
Department)
12. Prior to the issuance of a Land Use Change Permit, the Applicant shall
provide Garfield County Planning Department with an APEN Permit from
Colorado Department of Public Health and Environment for the entire
mining site.
X
APEN Permit number assigned; APEN
Permit to be provided by Lafarge once
it is issued by the State.
(Lafarge Environment Department)
13. The reclamation plan of the site shall include using hydro-seeding with
hydro-mulching and tackifier for all slopes greater than 5:1 as required
by Section 7-840 of the Unified Land Resolution for 2008, as amended.
14. The gravel pit shall be allowed to operate Monday through Satruday from
7:00 a.m. to 8:00 p.m. with crushing, digging and heavy hauling only
occurring between 7:00 a.m. to 5:00 p.m. Monday through Friday; heavy
hauling from 7:00 a.m. to 5:00 p.m. on Saturday; and crushing and
digging from 8:00 a.m. to 5:00 p.m. on Saturday. There shall be no
operations on Sunday except in the case of an emergency or for
standard maintenance purposes.
X
15. All noise generated from the operation shall not exceed the maximum
permissible limits set forth in C.R.S. § 25-12-103, except that noise shall
not exceed 80 dB(A) during construction. The adjacent land uses for
purposes of determining the maximum permissible noise levels that may
radiate from the site depicted in Exhibit A, page 1 of 13, are measured
25 feet from the site boundary. The adjacent land uses to the subject
site are: residential to the north; industrial to the east and west; and, light
industrial to the south as shown in Exhibit D.
X
Resolution Item
Condition Requiring No
Action Prior to Issuance of
Land Use Change Permit
X
Status of Conditions Requiring
Action Prior to Issuance of Land Use
Change Permit
16. The Applicant shall implement the following noise mitigation standards:
A. The two berms shown on the "Mining. Sheets" must be
constructed early in the project. The northern berm must be
approximately 50 feet tall and the western berm is
approximately 17 feet tall;
B. While constructing these berms, earth moving equipment such
as scrapers cannot operate for more than 15 minutes in any
one hour while within approximately 100 feet of the permit
boundary;
C. Place a silencer on the dust collector blower that is situated on
top of the concrete batch plant (or build a sound abosorbing
barrier around it);
D. Equip the electrical generators (gen-sets) with commercial
grade silencers or better (at least 20 dB(A) of insertion loss);
E. Use white noise back up alarms on all Lafarge mobile
equipment. Backing up by contractor vehicles not outfitted with
these alarms should be minimized;
F. Conduct all construction activities during the daytime (7:00 am
to 5:00 pm); and,
G. Conduct all noise-producing activities associated with
operations during the daytime (7:00 am to 5:00 pm).
17. Garfield County can request a site inspection with 24 hour's notice to the
operator or property owner. Full access to any part of the site will be
granted. On request, all paperwork must be shown.
X
18. A full list of all other permits shall be provided to Garfield County within
24 hours of its request. Any person at any time can call the following
agencies directly and request an inspection if he or she believes a
condition of that agency's permit is being violated.
A. Colorado Department of Public Health — Air Quality Control
303-692-3150
B. Colorado Department of Public Health — Water Quality Control
303-692-3500
C. US Army Corps of Engineers 970-243-1199
D. Division of Reclamation, Mining and Safety 303-866-3567
E. Colorado Department of Transportation, Grand Junction office
970-248-7000
X
" `"
Resolution Item
Condition Requiring No 1
Action Prior to Issuance of
Land Use Change Permit
Status of Conditions Requiring
Action Prior to Issuance of Land Use
Change Permit
19. The property owner and operator acknowledge that Garfield County has
the following performance standards, and failure to comple with such
standards could lead to revocation of the Land Use Change Permit:
A. All fabrication, service and repair operations shall be conducted
within an enclosed building or obscured by a fence, natural
topography or landscaping;
B. All operations involving loading and unloading of vehicles shall
be conducted on private property and shall not be conducted on
a public right-of-way;
C. All industrial wastes shall be disposed of in a manner consistent
with statutes and requirements of Colorado Department of
Public Health and Environment:
D. Every use shall be operated so that the ground vibration
inherently and recurrently generated is not perceptible without
instruments at any point of any boundary line of the property;
and,
E. Every use shall be operated so that it does not emit, heat, glare,
radiation, dust or fumes which substantially interfere with the
existing use of adjoining property or which constitutes a public
nuisance or hazard. Flaring of gases, aircraft warning signal
and reflective paining of storage tanks, or other legal
requirements for safety or air pollution control measures shall
be exempted from this provision.
X
20. The Garfield County Planning Department shall be invited to any bond
release inspection of the State Division of Reclamation, Mining and
Safety. The County will have the opportunity to demonstrate that any
item of the permit has not been complied with and that bond should not
be release.
X
21. The reclamation bond that shall be held by the State Division of
Reclamation, Mining and Safety shall be for the reclamation plan
approved by the Board of County Commissioners. No Land Use Change
Permit shall be issued until proof of the bond is in place.
Lafarge will post bond upon completion
of item 22.
(Lafarge Land Department)
22. Prior to the issuance of a Land Use Change Permit, the Applicant shall
provide a cost estimate for the irrigation system to the Garfield County
Planning Department for review. The State Division of Reclamation,
Mining and Safety financial security bond shall be updated to reflect this
cost and a copy of the revised bond submitted to the Garfield County
Planning Department.
Lafarge is obtaining irrigation estimates.
(Lafarge Land Department)
Resolution Item
Condition Requiring No
Action Prior to Issuance of
Land Use Change Permit
Status of Conditions Requiring -
Action Prior to Issuance of Land Use
Change Permit
23. All of the conditions of the Garfield County permit and the State Division
of Reclamation, Mining and Safety are binding. The State Division of
Reclamation, Mining and Safety can withhold the reclamation bond if the
final reclamation is not executed according to the plans.
X
24. The Applicant shall be required to submit a report annually of the gravel
operation for Garfield County Planning Staff review, until such time as
the release of the reclamation bond. Upon review of any deficiencies
pursuant to conditions of approval or other local, state, or federal
permits, Staff may forward the report to the Board of County
Commissioners for full review of the Major Impact Review Permit. This
report shall include GPS measurements shown on a map showing the
current disturbance, what areas have been backfilled, where topsoil
stockpiles are located, all site structures, what areas have been seeded,
mulched and what is planned for the ensuing 12 months. This map shall
be overlain on the approved site plan which includes the approved
phasing area locations, and mine permit boundary. Copies of annual
reports required by and submitted to other agencies will be attached to
the annual report submitted to the Garfield County Planning Department.
25. The Applicant shall provide a copy of the applicable 404 permit to the
Garfield County Planning Department prior to the issuance of a Land
Use Change Permit.
Lafarge is obtaining approval of a
Nationwide 404 permit.
(Lafarge Environment Department)
26. The Applicant shall meet all applicable Colorado Department of Public
Health regulations for a non-transient, non-community water system with
the number of individuals using the potable water well is more than 24.
X
27. Prior to the issuance of a Land Use Change Permit, the Applicant shall
submit copies of all equipment relocation notices to the Garfield County
Planning Department.
Lafarge will provide equipment
relocation notices.
(Lafarge Environment Department)
Prior to the issuance of a Land Use Change Permit, the Applicant shall
provide the Garfield County Planning Department a will serve letter from
Qwest.
Already provided to the County.
29. Prior to the issuance of a Land Use Change Permit and Emergency
Preparedness Plan shall be submitted to the Garfield County Planning
De•artment for review.
Lafarge will provide an Emergency
Preparedness Plan.
(Lafarge Safety Department)
30. Prior to the issuance of a Land Use Change Permit, the Applicant shall
submit to the Garfield Planning Department a final Stormwater
Management Plan.
Lafarge is preparing the Stormwater
Management Plan.
(Lafarge Environment Department)
Resolution Item
Condition Requiring No
Action Prior to Issuance of
Land Use Change Permit
Status of Conditions Requiring
Action Prior to Issuance of Land Use
Change Permit
31. Prior to the issuance of a Land Use Change Permit, the Applicant shall
drill the two permanent permitted wells (Permit Numbers 74795-F and
74796-F) and provide the results demonstrating quantity and quality of
both wells to the Garfield County Planning Department for their review.
Lafarge is in the process of designing
the two permanent wells and will
provide the results demonstrating
quantity and quality.
(Tetra Tech / Lafarge Environment
Department)
32. After drilling the permanent water wells as described in Condition 31, the
water system design for the office/scale house shall be evaluated and
any modifications to the proposed design shall be submitted to the
Garfield County Planning Department for review. This task shall occur
prior to the issuance of Land Use Change Permit.
Lafarge will submit design information
for evaluation by the County.
(Tetra Tech f Lafarge Environment
Department)
33. Prior to the issuance of a Land Use Chang_ a Permit, the Applicant shall
have the two wells installed as Monitoring Hole Notice 40396 (TW-1 and
TW-2) permitted as monitoring wells, and provide Garfield County
Planning Department with the new permits.
X
Note: While not required
prior to issuance of the
Permit, this wilt be
completed in conjunction
with the County driveway
access permit -- item 8 -
since the driveway will cross
Crystal Spring Creek.
(Tetra Tech)
Lafarge will install the wells and provide
the new permits.
(Tetra Tech / Lafarge Environment
Department)
34. The Applicant shall contact Bili Blakeslee, Water Commissioner, when
development of the Cerise Mine impacts Crystal Spring Creek.
35. The site shall have wildlife proof dumpsters.
X
1 Resolution Item
Condition Requiring No
Action Prior to Issuance of
Land Use Change Permit
Status of Conditions Requiring
Action Prior to Issuance of Land Use
Change Permit
36. The Applicant shall implement the following Best Management Practices
to ensure air quality impacts are minimized.
A. Exposed areas will be vegetated or stabilized to limit wind
erosion;
B. Frequent watering by water trucks of gravel as it is removed
and transported;
C. Use of a conveyor system rather than trucks to transport the
material on-site;
D. Install, operate, and maintain water spray bars within the
conveyor system and all crushing and screening equipment;
E. Limit drop heights of gravel for conveyor loading, transfer
points, screening and crushing;
X
F. Limit on-site vehicle speeds to 10 mph;
G. Treat frequently travelled on-site roadways with stabilizers or
suppressants and watering to minimize re -entrainment of dust
from road surfaces, and pave the entrance road to the weigh
station;
H. Minimize dust from loaded haul trucks by covering and/or
watering material as necessary; and,
I. Construction of berms and/or mine walls to serve as wind
breaks.
37. Atl trucks operating in the gravel mining operation (including third -party
trucks not operated by the property owner or operator, shall be subject to
the following;
A. Alt trucks shall have and maintain stock muffler systems that
are performing to original manufacturer's specifications. This
can be determined and verified by simple visual and auditory
inspection of the truck:
B. All trucks ascending or descending the haul route shall not
exceed speeds of 10 mph;
C. All trucks descending the access road on-site and County Road
X
103 approaching State Highway 82 shall not use engine Jake
Brakes to decelerate;
D. All truck drivers, independent or employed by the Applicant
shall be briefed on the conditions above and shall agree to
operate within the requirements of these stipulations; and,
E. The Applicant shall set up a series of progressive
consequences for drivers that fail to comply with the above
conditions; after three violations any trucker shall be prohibited
from entering the pit for a time period of not less than one year.
Resolution Item
Condition Requiring No
Action Prior to Issuance of
Land Use Change Permit
Status of Conditions Requiring
Action Prior to Issuance of Land Use
Change Permit
38. The mining of the Cerise Mine shall not start until the Powers Pit has
been closed,
X
39. An asphalt batch plant shall not be allowed within the property unless
approved by Garfield County pursuant to an application for "substantial
modification" of the Land Use Change Permit as that process is defined
by the Garfield County Unified Land Use Resolution of 2008, as
amended, or pursuant to a separate application for a Land Use Change
Permit.
X
Qwe st! �.
Spirit of Service
07/25/2011
Attn: Pamela Franch Hora
Tetra Tech, Inc. 1 Engineering and Architecture Services
1900 S. Sunset Street, Suite 1-F 1 Longmont, CO 80501
Re: Cerise Mine
Qwest Communications will provide telephone facilities to Cerise Mine as defined
by the current PUC Tariffs.
Jason Sharpe
Senior Field Engineer
970-384-0238