HomeMy WebLinkAbout4.0 Resolution 86-43lY
STATE OF COLORADO
ss
County of Garfield )
At a
Commi:,sioners
Meeting Room
the 5th
when
MAY 0 6 1986
ate CG®
GARFL L) COUNTY, COLOR
&ooK 687 FAGE899
regular meeting of the Board of County
for Garfie!-d County, Colorado, held at the Commissioners'
at the Garfield County Courthouse in Glenwood Springs on
May A.D. 19 86 , there were present:
day of
Larry Schmueser
(absent) , Commissioner Chairman
Robert Richardson
Flaven J. Cerise
Don DeFord
Mildred Alsdorf
Roger Ludwig
, Commissioner (Chairman Pro T --em).
, Commissioner
, County Attorney
, Clerk of the Board
, Administrative Assistant
the following proceedings, among others were had and done, to -wit:
RESOLUTION NO. 86-43
A RESOLUTION CONCERNED WITH THE APPROVAL OF A SPECIAL USE PERMIT
APPLICATION BY BARRETT ENERGY COMPANY.
WHEREAS, the Board of County Commissioners of Garfield County,
Colorado, has received an application from Barrett Energy Company for a
Special Use permit for a natural gas pipeline and compressor station on
the following described tract of land:
Legal Description: See Exhibit A.
(in the State of Corrado and the County of Garfield); and
WHEREAS, the Board held a public hearing on the 12th day of November,
1985, upon the question of whether the above-described Special Use permit
should be granted or denied, at which hearing the public and interested
persons were given the opportunity to express their opinions regarding the
issuance of said Special Use permit; and
WHEREAS, the Board on the basis of substantial competent evidence
produced at the aforementioned hearing, has made the following
determination of fact:
1. That proper publication and public notice was provided as
required for the hearing before the Board of County
Commissioners.
2. That the hearing before the Board of County Commissioners was
extensive and complete, that all pertinent facts, matters and
issues were submitted and that all interested parties were heard
at that hearing.
3. That for the above stated and other
in the best interest of the health,
order, prosperity and welfare of the
reasons, the proposed use is
safety, morals, convenience,
citizens of Garfield County.
NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of
Garfield County, Colorado that the Special Use permit be and hereby is
authorized permitting the use of the above described tract of land for a
natural gas pipeline and compressor station upon the following specific
conditions:
1. All proposals of the applicant shall be considered conditions
approval unless stated otherwise by the Board.
BGOK ES? PAGE9OO
2. The applicant, cc:itractor and subcontractor shall notify the
County Clerk's office and the Assessor's office to ensure proper
licensing and assessment of equipment and vehicles based in the
op(:ation, prior to final approval.
3. The applicant shall comply with all regulations of Garfield
County relating to industrial operations in the zone districts in
which the properties are located, and shall construct and operate
the pipeline in accordance with all applicable State and Federal
Regulations, including but not limited to the Department of
Transportation Safety Regulations.
4. The applicant shall apply for and receive any road cut permits,
access permits, building permits and septic permits, as required
by the County Road and Bridge Supervisor & Chief Building
Official.
5. The applicant shall submit agreements with all property owners
including the BLM authorizing the construction of the pipeline
and addressing restoration of the site. All agreements shall be
submitted prior to any Resolution of Conditional Approval.
6. The applicant shall submit documentation of approval from the
Army Corps of Engineers authorizing the proposed Colorado River
crossing by the pipeline in Section 4, T7S, R95W and Section 33,
T6S, R95W.
7. The applicant shall submit proof of compliance with all
applicable regulations of the Town of Parachute.
8. A single mobile home, for use as office space, shall be allowed
on the site adjacent to the compressor site. The lease agreement
for the mobile home site shall authorize the placement of the
mobile home or written confirmation from the property owner must
be submitted.
9. The applicant shall have 120 days from the date of the Resolution
of Conditional Approval to meet all conditions set forth in the
Resolution. The Special Use permit shall be issued when all
conditions are met and shall be valid for a period of 120 days
from the date of issuance, and shall expire, unless construction
or use has commenced within this period.
Dated this 5th day of May
ATTEST:
C .ek of the Board f
, A.D. 1986 .
GARFIELD COUNTY BOARD OF COMMISSIONERS
GARFIEL!,�CO YCOLORA'O
Upon motion duly made and seconded the foregoing Resolution was
adopted by the following vote:
Larry Schmueser (Absent)
Robert Richardson
Flaven J. Cerise
Aye
Aye
STATE OF COLORADO
County of Garfield
Co'nty Clerk and ex -officio Clerk
of the Board of County Commissioners in and for the County and State
aforesaid do hereby certify ,that the annexed and foregoing Resolution is
truly copied from the Records of the Proceedings of the Board of County
Commissioners for said Garfield County, now in my office.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal
of said County, at Glenwood Springs, this day of , A.D.
19
of the Board of County Commissioners.
County Clerk and ex -officio Clerk
BOOK 687 P4E901
EXHIBIT A
Legal Description:
Beginning in SW 1/4 Sec 33, T6S, 95w, Bence easterly alr^g north
side I-70 to Rulison Overpass, thence southerly under 1-70 to
south side I-70 thence easterly along south side I-70 to Anvil
Points Overpass, thence northerly under I-70 to north side 1-70
thence easterly over Webster Hill to Mountain Fuel Meter in NE 1/4
NE 1/4 Sec 13, T6S, R94W, Garfield County, Colorado.
Gathering system to hook up 9 Wasatch Wells in T6S, R95W: SE 1/4
Sec 32; NE 1/4, SE 1/4, SW 1/4, Sec 33; SW 1/4, SE 1/4, NW 1/4,
Sec 34; T7S, R95W: NW 1/4, NE 1/4 Sec 4 with 2", 3", 4", 6" steel
pipe.
Hook up two Mesa Verde Wells in T7S, R96W: SE 1/4 Sec 3; NW 1/4
Sec 10; with 3" gathering line from NW 1/4 Sec 10 to SE 1/4 Sec 3,
thence 8" line from SE 1/4 Sec 3 easterly to county road, thence
southeasterly along county road to outskirts of Parachute, thence
easterly along north side I-70 to SW 1/4 Sec 33, T6S, R95W.for
tie-in to compressor.
Compressor station and yard in SW 1/4 Sec 33, T6S, R95W, Garfield
County compressor building to be 50 x 60 (3000 ft ) and yard to
be 300' x 300'.