HomeMy WebLinkAboutEngineer ReportSGM Inc.
118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
CONSTRUCTION OBSERVATION REPORT
DATE: 10/1712016
PROJECT: Fidel Munoz Foundation
PURPOSE: Wall support observation
BY: John Partch
CONTRACTOR:
WEATHER: Sunny
CONSTRUCTION ACTIVITIES:
SSIGM
TIME: 9:00 a.m.
SGM JOB NO. TBD
Observed west end wall of modular home placement on foundation. Rim joist overhangs foundation wall by 1" to 2" and is not
supported.
DISCUSSION AND ACTION ITEMS:
Rim joist shall be supported by installation of 2x10 ledgers attached to wall below. Ledgers to be attached to wood framing with (2)
rows of screws attached to the wood framing or concrete foundation below, as applicable. Each row of screws shall be one of the
following:
1. Timberlok fasteners at 16" on center
2. Simpson SDWS timber screws at 16" on center
3. 3/16" Tapcon concrete screws at 16" on center
4. '/" concrete expansion anchors at 32" on center
Page 1 of 2
SGM Inc.
118 West Sixth Street, Suite 200
Glenwood Springs, CO 81601
CONSTRUCTION OBSERVATION REPORT
CONSTRUCTION PHOTOS - PAGE 1:
Rim board overhanging foundation.
Distribution:
SGM File
Document$
Page 2 of 2
SSGM