Loading...
HomeMy WebLinkAboutEngineer ReportSGM Inc. 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 CONSTRUCTION OBSERVATION REPORT DATE: 10/1712016 PROJECT: Fidel Munoz Foundation PURPOSE: Wall support observation BY: John Partch CONTRACTOR: WEATHER: Sunny CONSTRUCTION ACTIVITIES: SSIGM TIME: 9:00 a.m. SGM JOB NO. TBD Observed west end wall of modular home placement on foundation. Rim joist overhangs foundation wall by 1" to 2" and is not supported. DISCUSSION AND ACTION ITEMS: Rim joist shall be supported by installation of 2x10 ledgers attached to wall below. Ledgers to be attached to wood framing with (2) rows of screws attached to the wood framing or concrete foundation below, as applicable. Each row of screws shall be one of the following: 1. Timberlok fasteners at 16" on center 2. Simpson SDWS timber screws at 16" on center 3. 3/16" Tapcon concrete screws at 16" on center 4. '/" concrete expansion anchors at 32" on center Page 1 of 2 SGM Inc. 118 West Sixth Street, Suite 200 Glenwood Springs, CO 81601 CONSTRUCTION OBSERVATION REPORT CONSTRUCTION PHOTOS - PAGE 1: Rim board overhanging foundation. Distribution: SGM File Document$ Page 2 of 2 SSGM