Loading...
HomeMy WebLinkAbout1.0 ApplicationJULY 2, 2007 BOCC MEETING BUILDING AND PLANNING - CONSIDER A SPECIAL USE PERMIT FOR UP TO 31 TEMPORARY EMPLOYEE HOUSING FACILITIES LOCATED NORTH OF THE TOWN OF PARACHUTE OFF COUNTY ROAD 215 AND WITHIN THE NORTH PARACHUTE RANCH — APPLICANT; ENCANA OIL AND GAS USA, INC. — DAVID PESNICHAK Brenda Lin —Kenny, Jim Jackson, David Pesnichak and Michael Howard were present. Michael Howard reviewed the noticing requirements and advised the Board they were entitled to process. Planner David Pesnichak submitted the following exhibits: Exhibit A; Proof of Mail Receipts, Exhibit B; Proof of Publication; Exhibit C; Garfield County Zoning Regulations of 1978 as amended, Exhibit D; Staff Memorandum, Exhibit E; Application, Exhibit F; E-mail from Jim Sears of the Garfield County Sheriff's Office dated June 13, 2007, Exhibit G; Memo from Jake Mall of the Garfield County Road and Bridge Department dated June 11, 2007, Exhibit H; Memo from Roy McClung of the Town of Parachute dated June 13, 2007 and Exhibit I; E-mail from Jim Rada of the Garfield County Public Health Department dated June 18, 2007; Exhibit J — proof of mineral ownership. Chairman Martin entered Exhibits A — J into the record. The Building and Planning Department received a Special Use Permit (SUP) application for "Temporary Employee Housing" on property owned by Chevron USA, Inc located on an 17,013 acre property approximately 15 miles North West of the Town of' Parachute "as the crow flies" (See location maps). By vehicle, this property is 55.5 miles North West of the City of Rifle (See proposed emergency services map route, P.9). More specifically, the Applicant, represented by PVCMI Land Planning Division, requests approval for one Temporary Employee Housing site to house personnel for the purpose of winter natural gas drilling operations. The field in which this facility is to be located is known as "Trail Ridge" and has been in "operation" by Williams for 5 years. Williams plans on constructing 1,500 wells in this region over the next 20 years. Temporary Employee Housing will be in use from November to May and will be managed by PTI/Camp Crown Services for housing, catering and laundering services. Williams is requesting two renewal cycles for this permit (2007 and 2008) in order to bring the housing through two full winter seasons. The maximum number of people to be housed at the site will be 24. Housing Structures The Applicant is proposing a 6-unit side-by-side (total of 72' X 54') which will include a kitchen, dining room and recreation room. The plans anticipate a total of 13 rooms that can sleep up to two people each per the 2003 IBC. The facility will have three, 4000 gallon potable water storage tanks; three, 70 kW generators; and an ISDS system for sewage. Proximity to Permanent Available Housing: As this site is over 55 miles from the City of Rifle, the nearest municipality by car, staff has concluded that this is a very remote site which is not proximate to any permanent housing. Renewal: The Applicant is proposing to renew this annual permit twice (2007 and 2008) to allow for two full winter seasons at the site. STAFF RECOMMENDATION Due to 1) the limited nature of potential impacts to surrounding properties, 2) by proceeding with this proposal there will be an overall decrease in traffic on unimproved roadways and county roads which will promote safety and well being, 3) the fact that the site itself will be situated on an existing well pad with an active gas operation, 4) and that the Temporary Employee Housing facility meets the requirements set forth in Section 5.02.21, Staff recommends the Board approve the request for a Special Use Permit for Temporary Employee Housing on in the Resource Lands — Plateau (RL) zone district with the following conditions: 1. That all representations of the Applicant, either within the application or stated at the hearing before the Board of County Commissioners, shall be considered conditions of approval unless explicitly altered by the Board. 2. That the operation of the facility be done in accordance with all applicable federal, state, and local regulations governing the operation of this type of facility. 3. Emissions of smoke and particulate matter: every use shall be operated so as to comply with all Federal, State and County air quality laws, regulations and standards. 4. Emission of heat, glare, radiation and fumes: every use shall be so operated that it does not emit heat, glare, radiation or fumes which substantially interfere with the existing use of adjoining property or which constitutes a public nuisance or hazard. Flaring of gases, aircraft warning signals, reflective painting of storage tanks, or other such operations which may be required by law as safety or air pollution control measures shall be exempted from this provision. 5. Water pollution: in a case in which potential hazards exist, it shall be necessary to install safeguards designed to comply with the Regulations of the Environmental Protection Agency before operation of the facilities may begin. All percolation tests or ground water resource tests as may be required by local or State Health Officers must be met before operation of the facilities may begin. 6. If applicable, the Applicant shall provide a copy of the appropriate bond supplied to the Colorado Oil and Gas Conservation Commission (COGCC) intended to guarantee reclamation of the Temporary Employee Housing site prior to the issuance of a Special Use Permit. If the COGCC does not require reclamation and revegetation bonding, the applicant shall work with County Staff to establish a bond appropriate to guarantee reclamation and revegetation of the Temporary Employee Housing facility. 7. All Special Use Permits for Temporary Employee Housing is subject to all applicable building code, state and federal permit requirements, fire protection district requirements and fire code requirements. 8. Water and wastewater systems proposed to service temporary employee housing must comply with all applicable state and local laws and regulations. 9. Applicants must keep appropriate records, to be provided to the County upon request to demonstrate that water supplied to a site is from an approved source and that wastewater is disposed at an approved facility. For facilities serving twenty-four (24) people or less, the operator must conduct monthly tests (or quarterly if an on-site disinfection system is installed) and maintain records of stored potable water samples specific for coli form. Any tests indicating coli form contamination must be disclosed to the Garfield County Board of Health or designee. 10. In no case shall unsafe water be used for drinking nor shall raw sewage or used water be discharged on the ground surface. 11. The maximum allowable time length of the Special Use Permit for Temporary Employee Housing is one (1) year. For good cause shown, the permit may be renewed annually in a public meeting with notice by agenda only. Annual renewal review shall be based on the standards herein as well as all conditions of the permit. A permit may be revoked anytime through a public hearing called up by staff or the Board of County Commissioners. 12. Inhabitants of the temporary housing shall be applicant's employees and/or subcontractors, working on the related construction or mineral extraction operation, and not dependents of employees, guests or other family members. 13. Temporary employee housing sites shall be maintained in a clean, safe and sanitary condition, free of weeds and refuse. Any hazardous or noxious materials that must be stored on site for operational or security reasons must be managed in accordance with all applicable federal, state and local laws and regulations. 14. Fire Protection General Requirements: Provisions shall be made for giving alarm in case of fire. It shall be the responsibility of the duly authorized attendant or caretaker to inform all employees about means for summoning fire apparatus, sheriff's office and resident employees. All fires are subject to §307 of the 2003 International Fire Code (IFC) including but not limited to permits, attendance, open fires, coal grills, fire bans and bon fires. One (1) or more approved extinguishers of a type suitable for flammable liquid or electrical fires (Class A, Class B and Class C), carbon dioxide or dry chemical, shall be located in an open station so that it will not be necessary to travel more than one hundred (100) feet to reach the nearest extinguisher. 15. Outdoor food storage is prohibited unless facilities that prevent the attraction of animals to the temporary employee housing site are provided. 16. The applicant shall provide a detailed map and GPS coordinates to the Garfield County Sheriff's Office and the relevant Fire Protection District which is sufficient for emergency response purposes, including location of the temporary employee housing site; private and public roadways accessing the site, marked as open, gated and/or locked; and detailed directions to the site from a major public right-of-way. The map is subject to approval by the Garfield County Sheriff's Office and relevant Fire Protection District. 17. If a Special Use Permit for Temporary Employee Housing is granted, the applicant shall notify the County when site development begins. The applicant shall verify in writing, by site plan and through photo documentation that the site, water system, and sewage disposal system were designed, installed and inspected in accordance with the said special use permit and comply with all applicable regulations, permits, and conditions. All written documentation and site plans verifying compliance must be stamped by a certified Colorado Engineer. The County also reserves the right to inspect a site, without notice, to assess compliance with the Special Use Permit for Temporary Employee Housing. A determination of noncompliance with any Special Use Permit for Temporary Employee Housing, or condition approval thereof, is grounds for revocation or suspension of said permit, in accordance with Section §9.01.06. 18. No animals shall be allowed at temporary employee housing sites. 19. The maximum number of occupants permitted under this Special Use Permit for Temporary Employee Housing is twenty-four (24). 20. Each wastewater storage tank shall be on an adequate capacity to accommodate a minimum of 75 gallons/person/day for a 3 -day period. The capacity shall be based on the maximum number of occupants for the proposed facility. Type of Unit Minimum Wastewater Storage Capacity Stacked Units 8820 gallons Connected units 5400 gallons Individual units 2700 gallons 21. Each portable water storage tank shall be on an adequate capacity to accommodate the maximum number of occupants for the proposed facility. Based on maximum occupancy, the operator shall provide the minimum level of potable water storage capacity for the proposed units based on a 5 -day refill schedule. Type of Unit Minimum Wastewater Storage Capacity Stacked Units 9640 gallons Connected units 6920 gallons Individual units 3000 gallons 22. Sewage systems shall be installed and maintained in accordance with the Garfield County ISDS regulations with all pipes and connections water tight and lids kept securely in place at all times except during normal cleaning operations. Brenda stated she recognizes the magnitude of their proposal for these man camps. Chris Hale — helped with sewer and septic design. Chairman Martin — stressed law enforcement, first aid, etc. to be in place. Jim Jackson — stated they do have an on-site emergency plan and have on-going relationship with Sheriff Lou Vallario; they have lowered the speed limit on the road as per his request; and have on -going fire protection from DeBeque and the Rifle Fire District and they have helped with donated funds to make their programs better. They have had training for staff for two days on Emergency aid and employees up there. Drug enforcement — there is a zero tolerance. Any contractors not in compliance will not be given a second change — drugs are not allowed. Random test are done for drugs and alcohol. They also do a post incident testing and have certified dogs throughout the ranch. If employees have an ATV they have to go through training. There is an on-going relationship with the wildlife personnel at DOW and an on-going tracking of wildlife and the impacts of drilling. Training of personnel is done stating they represent EnCana and this is your home. They keep the cooks with the camps and generate a sense of pride in what each employee is doing — every drilling rig in the county should have a man camp. Vehicles stored on site: they have provided on site for parking. They are looking at a central parking site and transportation. Usually the employees are there for one week or two weeks and they provide recreational areas, Internet and good food to entice them to stay. A motion was made by Commissioner McCown and seconded by Commissioner Houpt to close the Public Hearing; In favor: Houpt — aye McCown — aye Martin — aye Commissioner McCown made a motion that we approve the Special Use Permit for the North Parachute Ranch Temporary Employee Housing for up to 31 employees with conditions 1— 22 sticking No. 23 "the applicant shall NOT install wastewater and/or sewage overflow tanks, but shall install overflow alarms on all wastewater and sewage vault tanks. Commissioner Houpt seconded. In favor: Houpt — aye McCown — aye Martin - aye IIIWPIFlRAIMIINI,141/l10+1C144'NA IIII Reception#: 730269 08/08/2007 10:19:02 RM Jean Rlberioo 1 of 1 Rec Fee:$0.00 Doc Fee:0.00 GARFIELD COUNTY CO SPECIAL USE PERMIT for Up To 31 "Temporary Employee Housing" Facilities Located at the North Parachute Ranch And Within A Property Owned By Encana Oil And Gas (USA), Inc, Garfield County Parcel Number: 213527300015 In accordance with and pursuant to the provisions of the Garfield County Zoning Resolution of 1978, as amended, and Resolution No. 2007 - 61 of the Board of County Commissioners of Garfield County, State of Colorado, hereby authorizes, by Special Use Permit, the following activity: "TEMPORARY EMPLOYEE HOUSING" CONCERNING THE INSTALLATION OF UP TO 31 TEMPORARY EMPLOYEE HOUSING FACILITIES LOCATED WITHIN THE NORTH PARACHUTE RANCH The Special Use Permit is issued subject to the conditions set forth in the above-mentioned resolution, and shall be valid only during compliance with such conditions and other applicable provisions of the Garfield County Zoning Resolution, Subdivision Regulations, Building Code, and other regulations of the Board of County Commissioners of Garfield County, Colorado. ATTEST: 061gIA M Cjk of the Bo 0g./AC•"'• o��� ih i i *IAA, GARFIELD COUNTY BOARD OF COMMISSARFTELD COUN tY: COLO O Cha' /1111 RIII l�pra1111 , 3t4li $N��,�+�,l �rd�Ivlf�INd,l�i� iN'� 06/08/2007 10:19:02 RM Jean Rlberico 1 of 6 Rec Fee:$0.00 Doc Fee:0.00 GRRFIELD COUNTY CO STATE OF COLORADO ) )ss County of Garfield At a regular meeting of the Board of County Commissioners for Garfield County, Colorado, held in the Commissioners' Meeting Room, Garfield County Courthouse, in Glenwood Springs on, Monday, the 2nd day of July A.D. 2007, there were present: John Martin Larry McCown Tresi Houpt Michael Howard Jean Alberico Ed Green , Commissioner Chairman , Commissioner , Commissioner , Assistant County Attorney Clerk of the Board , County Manager (Absent) when the following proceedings, among others were had and done, to -wit: RESOLUTION NO. 2 0 0 7 - 61 A RESOLUTION CONCERNED WITH THE APPROVAL OF A SPECIAL USE PERMIT REQUEST FOR UP TO 31 "TEMPORARY EMPLOYEE HOUSING" FACILITIES LOCA FED AT ITIS NORTH PARACHU 1'L RANCH AND WITHIN A PROPERTY OWNED BY ENCANA OIL AND GAS (USA), INC, GARFIELD COUNTY PARCEL NO# 213527300015 WHEREAS, the Board of County Commissioners of Garfield County, Colorado, received a Special Use Permit request for up to 31 "Temporary Employee Housing" facilities located at the North Parachute Ranch and within a property owned by EnCana Oil and Gas (USA), inc, Garfield County; and WHEREAS, the Temporary Employee Housing facilities are to be located at up to 31 locations throughout the 27,000 -acre property owned by EnCana Oil & Gas USA, Inc located at the end of County Road 215 north of Parachute, CO which is also formerly known as the old UNOCAL property and presently called the North Parachute Ranch; and WHERERAS, the subject property is zoned Resource Lands (Gentle Slopes & Lower Valley Floor) where such use is permitted as a SpecialUse; and WHEREAS, each Temporary Employee Housing facility is to be completely contained within an approved Colorado Oil and Gas Conservation Commission (COGCC) approved natural gas well pad; and 1111 I((I %�Mi 1MI�,P��Ui� l��lh't il#h'IF4 lid iNf� 11111 Reception#: 730268 08/08/2007 10:19:02 AM Jean Rlberico 2 of 6 Rec Fee:60.00 Doc Fee:0.00 GRRFIELD COUNTY CO WHEREAS, each Temporary Employee Housing facility is to accommodate a maximum of 24 individuals at any one given time; and WHEREAS, each Temporary Employee Housing facility is to be on location for no more than a cumulative of one (1) calendar year; and WHEREAS, the Board of County Commissioners opened a public hearing on the 2°d day of July, 2007 upon the question of whether the above-described SUP should be granted or denied, during which hearing the public and interested persons were given the opportunity to express their opinions regarding the issuance of said SUP; and WHEREAS, the Board of County Commissioners closed the public hearing on the god day of July, 2007 to make a final decision; and WHEREAS, the Board on the basis of substantial competent evidence produced at the aforementioned hearing, has made the following determination of fact as listed below: 1. Proper posting and public notice was provided as required for the meeting before the Board of County Comniissioners. 2. The meeting before the Board of County Commissioners was extensive and complete, that all pertinent facts, matters and issues were submitted and that all interested parties were heard at that meeting. 3. The above stated and other reasons, the proposed special use permit has been determined to be in the best interest of the health, safety, morals, convenience, order, prosperity and welfare of the citizens of Garfield County. 4. The application has met the requirements of Special Use (Sections 5:03 and 5.02.21) the Garfield County Zoning Resolution of 1978, as amended. NOW THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Garfield County, Colorado, that a Special Use Permit for up to 31 "Temporary Employee Housing" facilities located at the North Parachute Ranch and within a property owned by EnCana Oil and Gas (USA), inc, Garfield County is hereby approved subject to compliance with all of the following specific conditions: 1. That all representations of the Applicant, either within the application or stated at the hearing before the Board of County Commissioners, shall be considered conditions of approval unless explicitly altered by the Board. 2. That the operation of the facility be done in accordance with all applicable federal, state, and local regulations governing the operation of this type of facility. 2 1111ril117A6N11,141,1V,l414111flfh:l lialili 11111 Recep tionti: 730268 08/08/2007 10:19:02 PM Jean Flberico 3 of 6 Rec Fee:$0,00 Doc Fee:0.00 GARFIELD COUNTY CO 3. Emissions of smoke and particulate matter: every use shall be operated so as to comply with all Federal, State and County air quality laws, regulations and standards. 4. Emission of heat, glare, radiation and fumes: every use shall be so operated that it does not emit heat, glare, radiation or fumes which substantially interfere with the existing use of adjoining property or which constitutes a public nuisance or hazard. Flaring of gases, aircraft warning signals, reflective painting of storage tanks, or other such operations which may be required by law as safety or air pollution control measures shall be exempted from this provision. 5. Water pollution: in a case in which potential hazards exist, it shall be necessary to install safeguards designed to comply with the Regulations of the Environmental Protection Agency before operation of the facilities may begin. All percolation tests or ground water resource tests as may be required by local or State Health Officers must be met before operation of the facilities may begin. 6. The Applicant shall provide a copy of the appropriate bond supplied to the Colorado Oil and Gas Conservation Commission (COGCC) intended to guarantee reclamation of the Temporary Employee Housing site prior to the issuance of a Special Use Permit. If the COGCC does not require reclamation and revegetation bonding, the applicant shall work with County Staff to establish a bond appropriate to guarantee reclamation and revegetation of the Temporary Employee Housing facility. 7. All Special Use Permits for Temporary Employee Housing are subject to all applicable building code, state and federal permit requirements, fire protection district requirements and fire code requirements. 8. Water and wastewater systems proposed to service Temporary Employee Housing must comply with all applicable state and local laws and regulations. 9. Applicants must keep appropriate records, to be provided to the County upon request to demonstrate that water supplied to a site is from an approved source and that wastewater is disposed at an approved facility. For facilities serving twenty-four (24) people or less, the operator must conduct monthly tests (or quarterly if an on-site disinfection system is installed) and maintain records of stored potable water samples specific for coli form. Any tests indicating coli form contamination must be disclosed to the Garfield County Board of Health or designee. 10. In no case shall unsafe water be used for drinking nor shall raw sewage or used water be discharged on the ground surface. 11. The maximum allowable time length of the Special Use Permit for Temporary Employee 3 NI KAJi MRPith le Mil 5111 Receptgon#. 730268 08/0812007 10:18:02 RM Jean Rlberico 4 of 6 Rec Fee :$0.00 Doc Fee :0.00 GARFIELD COUNTY CO Housing is one (1) year. For good cause shown, the permit may be renewed annually in a public meeting with notice by agenda only. Annual renewal review shall be based on the standards herein as well as all conditions of the permit. A permit may be revoked anytime through a public hearing called up by staff or the Board of County Commissioners. 12. inhabitants of the temporary housing shall be applicant's employees and/or subcontractors, working on the related construction or mineral extraction operation, and not dependents of employees, guests or other family members. 13. Temporary employee housing sites shall be maintained in a clean, safe and sanitary condition, free of weeds and refuse. Any hazardous or noxious materials that must be stored on site for operational or security reasons must be managed in accordance with all applicable federal, state and local laws and regulations. 14. Fire Protection General Requirements: Provisions shall be made for giving alarm in case of fire. It shall be the responsibility of the duly authorized attendant or caretaker to inform all employees about means for summoning fire apparatus, sheriff's office and resident employees. All fires are subject to §307 of the 2003 International Fire Code (IFC) including but not limited to pet wits, attendance, open fires, coal grills, fire bans and bon fires. One (1) or more approved extinguishers of a type suitable for flammable liquid or electrical fires (Class A, Class B and Class C), carbon dioxide or dry chemical, shall be located in an open station so that it will not be necessary to travel more than one hundred (100) feet to reach the nearest extinguisher. 15. Outdoor food storage is prohibited unless facilities that prevent the attraction of animals to the temporary employee housing site are provided. 16. The applicant shall provide a detailed map and GPS coordinates to the Garfield County Sheriff's Office and the relevant Fire Protection District which is sufficient for emergency response purposes, including location of the temporary employee housing site; private and public roadways accessing the site, marked as open, gated and/or locked; and detailed directions to the site from a major public right-of-way. The map is subject to approval by the Garfield County Sheriff's Office and relevant Fire Protection District. 17. The applicant shall notify the County when site development begins for each facility. The applicant shall verify in writing, by site plan and through photo documentation that the site, water system, and sewage disposal system were designed, installed and inspected in accordance with the said special use permit and comply with all applicable regulations, permits, and conditions. All written documentation and site plans verifying compliance must be stamped by a certified Colorado Engineer. The County also reserves the right to inspect a site, without notice, to assess compliance with the Special Use Permit for Temporary Employee Housing. A determination of noncompliance with any Special Use Permit for Temporary Employee Housing, or condition approval thereof, is grounds for revocation or 4 MillMI Q $ 1 1111 Reception#: 73026 08/08/2007 10:19:02 PM Jean Plberico 5 of 6 Rec Fee:$0.00 Doc Fee:0.00 GRRFIELD COUNTY CO suspension of said permit, in accordance with Section §9.01.06. 18. No animals shall be allowed at temporary employee housing sites. 19. The maximum number of occupants permitted under this Special Use Permit for Temporary Employee Housing is twenty-four (24). 20. Each wastewater storage tank shall be of an adequate capacity to accommodate a minimum of 75 gallons/person/day for a 3 day period. The capacity shall be based on the maximum number of occupants for the proposed facility. Type of Unit Stacked Units Connected Units Individual Units Minimum Wastewater Storage Capacity 8820 Gallons 5400 Gallons 2700 Gallons 21. Each potable water storage tank shall be of an adequate capacity to accommodate the maximum number of occupants for the proposed facility. Based on maximum occupancy, the operator shall provide the following minimum level of potable water storage capacity for the proposed units based on a 5 day refill schedule: Type of Unit Stacked Units Connected Units Individual Units Minimum Potable Water Storage Capacity 9640 Gallons 6920 Gallons 3000 Gallons 22. Sewage systems shall be installed and maintained in accordance with the Garfield County ISDS regulations with all pipes and connections water tight and lids kept securely in place at all times except during normal cleaning operations. Dated this 64± day of A11EST: atreAALO clerk of the Board , A.D. 20 0 i . GARFIE�OUNTY BOARD OF COM i c SION ' S, GRRFIELD COUNTY, COLO,. 5 1111KPlWItiiNgliAwiiiirri�Miliii:liti.46 ili 11111 Recepticntl: 730268 08/00/2007 10:19:02 PM Jean Plberico 6 of 6 Rec Fee:$0.00 Doc Fee:0.00 GPRFIELD COUNTY CO Upon motion duly made and seconded the foregoing Resolution was adopted by the following vote: COMivIISSIONER CHAIR JOHN F. MARTIN , Aye COMMISSIONER LARRY L. MCCOWN , Aye COMMISSIONER TRESI HOUPT Aye STATE OF COLORADO ) )ss County of Garfield ) County Clerk and ex -officio Clerk of the Board of County Commissioners, in and for the County and State aforesaid, do hereby certify that the annexed and foregoing Resolution is truly copied from the Records of the Proceeding of the Board of County Commissioners for said Garfield County, now in my office. IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of said County, at Glenwood Springs, this _ day of , A.D. 20 . County Clerk and ex -officio Clerk of the Board of County Commissioners 6 NPR Temporary Employee Housing. SUP AMENDMENT Permit Coordinator: Renata Busch (970) 285-2825 February 2010 COPY Application Form Payment Agreement Form Statement of Authority Pre -Application Conference Summary Written Statement Supporting Documents: Proposed Sites / Location Layout / Driving Directions North Parachute Ranch Assessors Map Certifying Stamp Photos (anticipated trailers) GARFIELD COUNTY Building & Planning Department 108 8'" Street, Suite 401 Glenwood Springs, Colorado 81601 Telephone: 970.945.8212 Facsimile: 9703843470 www.qadield-county.com RECEIVED FEB 0 0 2010 GARFIELD COUNTY BUILDING & MANNING D MAJOR IMPACT REVIEW O MAJOR IMPACT REVIEW [AMENDMENT] D SUP AMENDMENT [Issued under the Zoning Resolution of 1978, es Amended] GENERAL INFORMATION (Please print legibly) ) Name of Property Owner: Encana oil & Gas (USA) Inc. b Mailing Address: 2717 County Road 215, Suite 100 Telephone: (970"")"2$8-686 > City: Parachute State: CO Zip Code: 81635 Cell: ( ) > E-mail address: FAX: ( 970) 285-2691 b Name of Owner's Representative, if any, (Attorney, Planner Consultant, etc): EnCana Oil & Gas (USA) Inc. (EnCana) - Renata Busch, Permit Coordinator > Mailing Address: 2717 County Road 215 Telephone: ( 970 ) 285-2825 > City: Parachute State: CO Zip Code: 61635 Cell: ( 970 ) 319-8890 )> E-mail address: renata.busch@encana.com FAX: (1!10 )x•285-29&3-- Requested Use from Table 3-501 or 3-502: Minor Temporary Mousing Facilities (Administrative) .... » Street Address / General Location of Property: North Parachute Ranch / approx. 10 mi north of Parachute by way of C.R. 215; reference site specific locations (attached) » Legal Description: SGo B36 496, 6'25 496, M30 495, D36 496 / Sec 30, T4S, R95 17 Sec 25,26,34,35&36, T4S, R96W, Sec 3, T5S, R96W & WF N26 596/Sec 26, TSS, R96W Assessor's Parcel Number: 2 1 7 1 - 1 8 2_ 0 0_ 0 0 8 - -' 1 9 1 7 2 7 4 0 0 0 1 2 Existing Use: Natural. Gas Development b Property Size on acres) 45,000 Zone District -se"' *ands., Last Revised 10/6/09 I. GENERAL SUBMITTAL REQUIREMENTS [The following general application materials are required for all Major Impact Review Applications in Garfield County. Application materials and review standards that are specific to an individual use (Mass Transit Facility, Extraction, Solid Waste Facility , etc,) are detailed in Sections 3-301 of Article III and Article VII of the Unified Land Use Resolution (ULUR) of 2008.1 A. Submit a completed and signed Application Form, an application fee, and a signed Agreement for Payment form. B. A narrative explaining the purpose of the application and supporting materials that address the standards and criteria found in Articles III and VII of the Unified Land Use Resolution of 2008. C. Copy of the deed showing ownership. Additionally, submit a letter from the property owner(s) if the owner is being represented by another party other than the owner. If the property is owned by a corporate entity (such as an LLC, LLLP, etc.) Please submit a copy of recorded "Statement of Authority" demonstrating that the person signing the application has the authority to act in that capacity for the entity. D. Submit a copy of the appropriate portion of a Garfield County Assessor's Map showing the subject property and all public and private landowners adjacent' to your property (which should be delineated). In addition, submit a list of all property owners, private and public, and their addresses adjacent -to -or withi.n 200 ft. of the site. This information can be obtained from the County Assessor's Office. You will also need the names (if applicable) of all mineral interest owners of the subject property, identified" in the Cdunty Clerk and Recorder's records in accordance with §24-65.5-101, et seq. (That information may be found in your title policy under Exceptions to Title): E. Vicinity map: An 8 i/2 x 11 vicinity map locating ithe. pairceliwitheiiCounty2 The vicinity map shall clearly show the boundaries of the subject property and all property within a 3 -mile radius of the subject property. The map shall be at a minimum scale of 1"=2000' showing the general topographic and geographic relation of the proposed land use change to the surrounding area for which a copy of U.S.G.S. quadrangle map may be used. F. A copy of the Pre -Application Conference form completed during the original Pre -Application Conference. G. Submit 3 copies of this completed application and all the required submittal materials to the Building and Planning Department. Staff will request additional copies once the application has .been. deemed. techncalty.complefe.. I. Major Impact Review Process The following section outlines and describes the Major Impact Review process for the variety of uses that are governed by the Board of County Commissioners by the Unified Land Use Resolution of 2008 (ULUR). Please refer to Articles III and VII in the regulations themselves for a higher level of detail. [The following process is required for applications for land use changes that are subject to Major Impact Review as defined in Table 3-501 or 3-502 in Article 111.] A. Outline of Process. The Major Impact Review process shall consist of the following procedures: 1. Pre -Application Conference (4-103 (A)) 2. Application (4-103 (B)) 3. Determination. of Completeness (4-103 (C)) 4. Evaluation by the Director/Staff Review (4-103 (E)) 5. Public Hearing and Recommendation by the Planning Commission (4- 103 (G)) 6. Public Hearing and Decision by the Board of County Commissioners (4-103 (G)) B. Submittal Materials'. The following materials shall be submitted with a Limited Impact Review application and are more fully defined in Section 4-502 of Article IV of the ULUR. The Director may waive or alter any of these requirements if they are determined to be inappropriate or unnecessary to determining if the application satisfies applicable standards. 1. Application Form and Fees 2. Site Plan (4-502(C)(3)) 3. Erosion and Sediment Control plan (4,502(C)(4)y. 4. Landscape Plan (4-502(C)(5)) 5. Land Suitability Analysis (4-502(D)) 6. Impact Analysis (4-502(E)) 7. Improvements Agreement, if appropriate (4-502(1)) II. Major Impact Review Amendment Process Any proposal to change conditions of approval or a site plan approved under these Regulations as a Major Impact Review permit shall..requ.ire..application...to.the.Dire.ctoc,. for Amendment of a Major Impact Permit Approval. The Director shall review the application to determine whether the proposed change constitutes a substantial change to the Major Impact Permit approval pursuant to Section 4-107 of Article IV. A. Outline of Process. The review process for a proposed Amendment of an Approved Major Impact Review shall consist of the following procedures.. Pre -Application Conference (4-103 (A)) 2. Application (4-103 (B)) 3. Determination of Completeness (4-103 (C)) 4. Evaluation by the Director/Staff Review (4-103 (E)) 5. Decision by Director (4-104(B)(51),, 6. Public Hearing and Decision by the Board of County Commissioners (4103 (G)) B. Submittal Materials'. The following materials shai be submitted -with, a,11liajer Impact Review Amendment application and are more fully defined in Section 4-502 of Article IV of the ULUR. The Director may waive or alter any of these requirements if they are determined to be inappropriate or unnecessary to determining if the application satisfies applicable standards. 1. Application Form 2. Supporting documents necessary to evaluate the proposed revision(s) 3. Written Statement of proposed amendment(s) which includes how the requested amendment does not result in a substantial change defined here: Substantial Change. A change to and existing approved land use resulting in one or more of the following: 1. A change in land use category. 2. A change in site design which increases a, The number of dwelling units. h. The maximum square footage of structures less than 10,000 sq. ft. over 100% and structures over 10,000 sq. ft. by 10%, if a maximum has been specified in. a. permit.or.apprm.vak c. Projected traffic such that a highway access permit or an amendment to a highway access permit is required as a result of the change. d. The size of the land which is the, subject.. of the. perrnit..or. approval 3. A change in land use which creates or increases the incompatibility of the use. I have read the statements above and have provided the required attached informat+on.. which is correct and accurate to the best of my knowledge. /. (Signature of Property Owner) Date GARFIELD COUNTY BUILDING AND PLANNING DEPARTMENT FEE SCHEDULE Garfield County, pursuant to Board of County Commissioners ("Board") Resolution No. 98-09, has established a fee structure ("Base Fee") for the processing of each type of subdivision and land use applications. The Base Fee is an estimate of the average number of hours of staff time devoted to an application, multiplied by an hourly rate for the personnel involved. The Board recognized that the subdivision and land use application processing time will vary and that an applicant should pay for the total cost..of the. review which, may. require..., additional billing. Hourly rates based on the hourly salary, and fringe benefits costs of the respective positions combined with an hourly overhead cost for the office will be used to establish the actual cost of County staff time devoted to the review of a. particular project. Actual staff time spent will be charged against the Base Fee. After the Base Fee has been expended, the applicant will be billed based on actual -staff hours accrued: Any - billing shall be paid in full prior to final consideration of any land use permit, zoning amendment or subdivision plan. If an applicant has previously failed to pay application fees as required, no new or additional applications will he accepted for processing until the outstanding fees are paid. Checks, including the appropriate Base Fee set forth below, must be submitted with each land use application, and made payable to- the Garfietd County- Treasurers Applications will not be accepted without the required application fee. Base Fees are non-refundable in full, unless a written request for withdraw from the applicant is submitted prior the initial review of the application materials. Applications must include a Payment Agreement Form ("Agreement") set forth below. fhe Agreement establishes the applicant as being responsible for payment of all costs associated with processing the application. The Agreement must be signed by the party responsible for payment and submitted with the application in order for it to be accepted. The following Base Fees shall be received by the County at the time at submittal of any procedural application to which such.. fees. relate.- Such..Base-Fees.sh.att be,..in,. addition to and exclusive of any cost for publication or cost of consulting service determined necessary by the Board for the consideration of any application or additional County staff time or expense not covered by the Base Fee, which have not otherwise been paid by the applicant to the County prior to final action upon the application tendered to the County. GARFIELD COUNTY BUILDING AND PLANNING DEPARTMENT BASE FEES TYPE OF LAND USE ACTION Vacating Public Roads & Rights -of -Way Sketch Plan Preliminary Plan / Conservation Subdivision Preliminary Plan Amendment Final Plat Final Plat Amendment / Correction Plat Combined Preliminary Plan and Final Plat Minor Exemption / Amendment Major Exemption / Amendment Rural Land Development Option Exemption / Amendment General Administrative Permit Floodplain Development Permit Pipeline Development Plan / Amendment Small Temporary Employee Housing Minor Temporary Employee Housing Limited Impact Review / Amendment Major Impact Review / Amendment Rezoning: Text Amendment Rezoning: Zone District Amendment Planned Unit Development (PUD) / Amendment Comprehensive Plan Amendment Variance Interpretation Takings Determination Planning Staff Hourly Rate u Planning Director • Senior Planner • Planning Technician Li Secretary BASE FEE $400 $325 $675 + application agency review fees and outside consultant review fees, as authorized pursuant to the Regulations, such as the Colorado Geologic Survey $325 $200 $100 $1,075 $300/$300, $400 / $300 $400• $300 $250 $400 $400 / $300 $50 $250 $400 / $300 $525 / $400 $300 $450 $500 / $300 $450 $250 $250 NO FEE County Surveyor Review Fee (includes review of Amended $50.50 $'40.50 $33.75 $30.00 Plats. Final Plats, Exemption Plats) Determined by Surveyor$ Mylar Recording Fee Page 2 a1.1.. --- .1st page..,. $10 each additional page The following guidelines shall be used for the administration of the fee structure set forth above: 1. All applications shall be submitted with a signed Agreement for Payment form set forth below. 2. County staff shall keep accurate record of actual time required for the processing of each land use application, zoning amendment, or subdivision application. Any additional billing will occur commensurate with the additional costs incurred by the County as a result of having to take more time that that covered by the base fee. 3. Any billings shall be paid prior to final consideration of any land use permit, zoning amendment, or subdivision plan. All additional costs shall be paid to the execution of the written resolution confirming action on the application. 4. Final Plats, Amended or Corrected Plats, Exemption Plats or Permits will not be recorded or issued until all fees have been paid. 5. In the event that the Board determines that special expertise is needed to assist them in the review of a land use permit, zoning- amendment, or subdivision application, such costs will be borne by the applicant and paid prior to the final consideration of the application. All additional costsshallbe paid priori() the execution of the written resolution confirming action on the application. 6. If an application involves multiple reviews, the Applicant shall -be charged the... highest Base Fee listed above. 7. Types of "Procedures" not listed in the above chart will be charged at an hourly rate based on the pertinent planning staff rate listed..above._ 8. The Planning Director shall establish appropriate guidelines for the collection of Additional Billings as required. Page 3 GARFIELD COUNTY BUILDING AND PLANNING DEPARTMENT PAYMENT AGREEMENT FORM (Shall be submitted with application) GARFIELD COUNTY (hereinafter COUNTY) and Encana Oil & Gas {USA) Inc. (EnCana) Property Owner (hereinafter OWNER) agree as follows: 1. OWNER has submitted to COUNTY an application for SVP Amendment North Parachute Ranch Minor Temporary Employee Housing (hereinafter, THE PROJECT). 2. OWNER understands and agrees that Garfield County Resolution No. 98-09, as amended, establishes a fee schedule for each type of subdivision or land use review applications, and the guidelines for the administration of the fee structure. 3. OWNER and COUNTY agree that because of the size, nature or scope of the proposed project, it is not possible at this time to ascertain the full extent of the costs involved in processing the application. OWNER agrees to make payment of the Base Fee established for the PROJECT, and to thereafter permit additional costs to be billed to OWNER. OWNER agrees to make additional payments upon•notifcation.bythe COUNTY when they are necessary as costs are incurred. 4. The Base Fee shall be in addition to and exclusive of any cost for publication or cost of consulting service determined necessary by the Board of County Commissioners for the consideration of an application or additional COUNTY staff time or expense not covered by the Base Fee. If actual recorded costs exceed the initial Base Fee, OWNER shall pay additional billings to COUNTY to reimburse the COUNTY for the processing, of the. PROJECT mentioned above. OWNER acknowledges that all billing shall be paid prior to the final consideration by the COUNTY of any land use permit, zoning amendment, or subdivision plan. PROPERTY OWNER (OR AUTHORIZED REPRESENTATIVE) • SignaUire Renata 'Busch Date Print Name Mailing Address: 2717 Comity Road 215, Suite leo Parachute, CO 81635 Page 4 Reeeptlont{: 760312 21ber ice of 82Rc l 03 $11nJeane 12eFoe,00Doc Fe000 GARFIELD COUNTY CO STATEMENT OF AUTHORITY Pursuant: to C.R.S. s38-30-112, the undersigned executes this Statement of Authority on behalf of EnCana Oil & Gas (USA) Inc., a corporation (corporation, limited liability company, general partnership, registered limited liability partnership, regi stared limited liability limited partnership, limited partnership association, government agency, trust or other), an entity other than an individual, capable of holding title to real property (the "Entity"), and states as follows: The name of the Entity is EnCana Oil & Gas (USA) Inc. and csmeo under the laws e:L i.t:e State of Delaware. ng ddtess for the Entity is 370 17'" Street, Suite 1700; Denver, CO 80202. execute name and/or: position: of the person(s) authorized no i.nst rumen t.s conveying, encumbering, or otherw;. sing title to real property on behalf of. the Entit.y..../a.r' nda Linster, Kent Lindberg, Renata Busch, Brett Crabb, Jascn Eckman, Chris Putnam and Khe;m Suthiwan. he limitations the authoriC;r.-. o.L'.. •...:ze• person. nt>.mecii above or holding the position described above to bind the Entity are as follows: sign Carrie d County -permits..., nwl_thd W9r cit _invited to Special .Use ?emits; Pipeline Development PLan Administrative Permits; 'r 1a or and Minor Permits and Srnai: Facility Checklists fm?` lennorary, Employee Housing,,.._. ne-mits; building permits; ISDS permits; utility installation s; driveway permits; h ?.,r Irnpac Permits; Limited in -c-.. i Administrative erm_ts vied Other rna: t eero ccncerninr the • :iat nnc;c t<7.. arlri h uH ::h any interest in real prooer:y are: [11118FarehRIPVIIMIIMII h Milbi,11111% Ad/ [11111 Receptiontl: 760312 12r10/2008 C3,14,00 FA Jean Riberioo 2 of 2 Rec Fee Gil 00 Doc Fee 0 00 GARFIELD DOUAI'? co page 2 of Statement of Atthori ty EXECUTED t:his .! day Of _J::,1tco.1.111:.:;f 2011,t. Name (t yped or p r I r',.teci: i ) SS . roY.ETy 6 , , IDALY0MAAF was ankqoyledred hefDre•me-Lh.:5,..,-,• , c' uv ( , out E.,cha', f.-)1 HY. WitF.O00 my hand and official seal. • . . ;Not.ary 10144,./ GARFIELD COUNTY Building & Planning Department 108 8th Street, Suite 401 Glenwood Springs, Colorado 81601 Telephone: 970.945.8212 Facsimile: 970.384.3470 www. g a rf i e l d -co u nt y. co m PRE -APPLICATION CONFERENCE SUMMARY PLANNER: Molly Orkild-Larson PreApp DATE: January 21, 2010 PROJECT: North Parachute Ranch: 5 Proposed Sites for Minor Temporary Employee Housing PARCELS: 191727400012 217118200008 OWNER: Encana USA, Inc. COMPREHENSIVE PLAN: Study Areas 3 and 5 REPRESENTATIVE: Renata Busch, Encana USA, Inc. ZONING: Resource Lands — Plateau PRACTICAL LOCATION: Well Pad F25 496: SE% NWA, Section 25, T4S, R96W; Well Pad M30 495: SW% SW%, Section' 30, T4S, R95W; Well Pad B36 496: Section 36, T4S, R96W, Lot 2; Well Pad D36 496: NV J % NW%; Section 36, T4S, R96W; Well Pad H26 596: SE% NE%, Section 36, T5S, R96W TYPE OF APPLICATION: Minor Temporary Employee Housing to be permitted through either a SUP Amendment or Area Wide Development Plan GENERAL PROJECT DESCRIPTION — The five proposed well pad locations are located in the North Parachute Ranch property north of the Town of Parachute. The property is 45,000 acres in size and zoned Resource Lands - Plateau. The Applicant plans to locate temporary employee housing on each well pad site and house 9 to 24 employees. The Resource Lands — Plateau Zoning District allows Minor Temporary Employee Housing. Two permit processes were discussed with the Applicant including: 1) Special Use Permit (SUP) amendment; or, 2) Minor Temporary Employee Housing (Minor Permit) - Area Wide Development Plan (AWDP). In 2007, a Special Use Permit for 31 sites for temporary employee housing facilities located within North Parachute Ranch was approved through Resolution 2007-61. With the proposal of five (5) additional minor facilities/sites, this SUP could be amended (Section 4- 107). The other review process discussed was an AWDP which would review an overall plan of the proposed facilities (Section 4-108). Once the AWDP is approved, each Minor Facilities would then need to be submitted and reviewed under the Minor Temporary Housing Facility process (Section 4-108). Both regulatory provisions and review processes are discussed below. I. REGULATORY PROVISIONS APPLICANT IS REQUIRED TO ADDRESS: Special Use Permit (SUP) Amendment • Garfield County Comprehensive Plan 2000 as amended • Garfield County Unified Land Use Resolution of 2008 as amended o Article III, Zoning ■ Resource Lands Zone District, Sub -district Plateau (Section 3- 210) o Article IV, Application and Review Procedure for Amendment of a -.Major Impact or Limited Impact Permit (Section 4-107) Area Wide Development Plan (AWDP) • Garfield County Comprehensive Plan 2000 as amended - . mended. Garfield County Unified Land Use Resolution of 2008 as amended o Article III, Zoning ■ Resource Lands Zone District, Sub -district Plateau (Section 3- 210) o Article IV, Application and Review Procedure for Minor Temporary Housing Facilities (Minor Permit).— AWDP (Section 4-108)._ o Article VII, Standards ■ Additional Standards Applicable teGroup Home Facilities (Section 7- 808) II. PROCESS Special Use Permit (SUP) Amendment In summary, the process will be the following Review Process (Section 4-107). 1. Pre -application Conference (held"01/21/2010)" 2. Submittal of Complete Application (Section 4-501(H)) a. Application Form and Fees. t';�t b. Written statement of proposed amendment(s) c. Supporting documents necessary to evaluate the proposed revision(s) (such as revised traffic analysis, recl'amation plan, grading plan, re -vegetation -plan). 'K -d. Payment Agreement Form e. Statement of Authority and/or Letter of Authorization 3. Determination of Compteterress (Section 4 103 (C)1 4. Evaluation by Director/Staff Review (Section 4-103 (E)) 5. Director's Decision No Substantial Change • Substantial Change 6. Written Notice of Decision 7. Request by Applicant for Reconsideration of Decision • Schedule Public Hearing • Decision by BOCC Area Wide Development Plan (AWDP) In summary, the process will be the following Review Process (Section 4-108): 1. Pre -application Conference (held 01/21/2010) 2. Submittal of complete Application (Section 4-501(J)) a. Application Form and Fees b. Identity of the Applicant. Provide a Statement of Authority and/or Letter of Authorization if representing surface property owner. c. Public Notice: Provide evidence of mailing notice to adjacent property owners within 200', and separated estate mineral owner(s) of subject lot or Permitted Site d. Payment Agreement Form e. Master map/site plan (Section 4-501(J) (3) (a)) f. Sign -offs from Sheriff's Office, applicable Firs Protection -District, and Garfield County Building Department g. Legible photos of the state or federal` certifying stamp for each housing unit anticipated to be used on-site h. General description of infrastructure and services (water; wastewater/sewage; trash removal, etc.) that will be provided for the subject lot or Permitted Site. 3. Determination of Completeness 4. Evaluation by Director/Staff Review: Determination is sent to the Applicant, adjacent property owners within 200'. andseparated estate mineral owners of subject lot or Permitted Site, and BOCC 5. Reconsideration Hearing: A public hearing is-scheduled.if the Applicant, adjacent- property owners within 200' and separated estate mineral owners of subject lot or Permitted Site requests the Director's decision .to..be.reconsidered_ • Decision by BOCC 6. Call -Up by BOCC: Board may request a public hearing • Decision by BOCC 7. Once AWDP is approved submit Individual Minor Facilities for review through Minor Temporary Housing Facility (Minor Permit) process III. APPLICATION REVIEW Special Use Permit (SUP) Amendment a. Review by: Director/Staff for completeness and evaluation,. b. Public Hearing: X Director _ Planning Commission X Board of County Commissioners (if requested by Director or Applicant) Board of Adjustment 3 Area Wide Development Plan (AWDP) a. Review by: Director/Staff for completeness and evaluation. b. Public Hearing: X Director _ Planning Commission X Board of County Commissioners (if Reconsideration Hearing or Call -Up by BOCC is requested) Board of Adjustment IV. APPLICATION REVIEW FEES Special Use Permit (SUP) Amendment a. Planning Review Fees:$ 400.00 b. Referral Agency Fees: $ (Separate Check, see attached fee schedule) c. Total Deposit: $ 400.00 (additional hours are tufted at "$ 40.50 /hour) Area Wide Development Plan (AWDP) a. Planning Review Fees:$ 250.00 b. Referral Agency Fees: $ (Separate Check,see attachedfee schedule), c. Total Deposit: $ 250.00 (additional hours are billed at $ 40.50 /hour) General Application Processing Planner reviews case for completeness and sends to referral agencies for comments. Case planner contacts applicant and sets up a site visit. Staff reviews application to determine if it meets standards of review. Case planner makes a recommendation of approval, approval with conditions, or denial to the appropriate hearing body. Disclaimer The foregoing summary is advisory in nature only and is not binding on the County. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be.accurate. •This :summary does not. -create. -a.. legal or vested right. 4 Pre -application Summary Prepared by: Molly Orkild f Larson, AICP, RLA Date Senior Planner na Oil & Gas (USA) Inc. EnCana Oil & Gas (USA) Inc. tel: (970) 285-2825 2717 County Road 215, Suite 100 fax: (970) 285-2691 Parachute, CO 81635 irenatabuschlj encana.com February 8, 2010 Molly Orkild-Larson / Senior Planner Garfield County Planning Dept- Rifle Airport Office 0375 Count Road 352 - Building #2060 Rifle, CO 81650 RE; Special Use Permit (SUP) Amendment North Parachute Ranch Minor Temporary Employee Housing (5 Proposed Sites) Written Statement of Proposed Amendment Dear Ms. Orkild-Larson: As requested, EnCana Oil & Gas (USA) Inc. (EnCana) is providing the following information so that you may continue to process our application. Thiswritten statement is .addressing, Minor Temporary Employee Housing (MTEH) associated with drilling operations in the North Parachute Ranch (NPR). EnCana has the need for additional MTEH facilities at the B36 496, F25 496, M30 495, 036 496, H26 596 sites. Facility requirements, general' description or infrastructure and services have all been previously addressed in the original NPR Temporary Employee Housing SUP, as reviewed during our Pre -Application Conference. The temporary facilities will be located on well pads, permitted, by the Colorado .011,and Gas Conservation Commission (COGCC) and will be located on the well pad during duration of drilling activities. A survey package for each site, including estimated dates for install and removal of temporary facilities is included with this submission, as well as being provided at the Pre -Application Conference. The survey package includes a location map, location layout and detailed driving directions. Photos of "certifying stamp" for each housing, unit anticipated_to..be.. used, are. also enclosed in this submittal. EnCana will provide a copy of each survey package to the Garfield County Sheriff's Office and to the Grand Valley Fire Protection District. The North Parachute Ranch (NPR) is located approximately 10 miles north of Parachute on Garfield County Road 215. The NPR is a 45,000 acre parcel owned by EnCana and includes the Story Gulch and North Parachute Ranch units. EnCana does it hest to limit traffic on County Road 215 and ensure the integrity of security in and out of the North Parachute Ranch. These MTEH facilities help EnCana do both while providing the workforce with excellent working conditions. The MTEH facilities help keep weary drivers off the roadways and helps maintain the quality of safety within the work environment. EnCana feels it is an integral part of daily operations in the natural gas extraction process. Written Statement Page 2 Installation of temporary housing facilities will reduce the vehicle traffic on County Road 215 by an estimated 15 vehicles per day per rig. Mitigation Measures with regard to Stormwater Management and Reclamation are also addressed in the original Special Use Permit. In short, EnCana will complete interim reclamation of the well pad in accordance with COGCC rules and . regulations.. After drilling, fracturing, and completions operations have been completed for all of the wells permitted on the well pad, EnCana will complete final reclamation in accordance with COGCC rules and regulations. Furthermore, since no substantia! change characteristics are involved, EnCana looks forward a timely Determination of Completeness and written notice of. Director Appro.vai with. _this. submittal. Please feel free to contact me if you have any questions. Thank you for your time. Sincerely, Renata Busch" Permit Coordinator Encl: Pre -Application Conference Summary (Jan. 21, 2010) Location Information / Install / Removal Dates Certifying Stamp Photos NORTH PARACHUTE RANCH 5 PROPOSED SITES FOR MINOR TEMPORARY HOUSING: Est. Install Date: Est. Removal Date: Est. # of Days: Story Gulch Unit: 836 496 03/15/2010 11/25/2010 255 Story Gulch Unit: F25 496 03/30/2010 12/10/2010 255 Story Gulch Unit: M30 495 Story Gulch Unit: D36 496 West Fork: 1-126 596 12/23/2010 05/17/2011 145 TIE=.IN=,'i• P PINT LEGEND: ]N OPOSFD&CCESS G9rutarr Qeeaiag&LaudSurveying S' Saaat&a 2O0 E 3.0 \'.ttttar_ "[Stoll 54078 (435) 7S4-11017 w FAX (435) 7S51_HSt3 EnCana OIL & GAS (USA) INC. SOO (DP (4 AM OON° SYSTEM SECTION 30, DOS, R9:W, 61h PIU.,. SECTIONS 25, 85, 3-L 35.N 36, T-15. P96W, 61h PIM., SECTION 3,T'S,1196'% tII PAL S}IEE7'8 TOPOGRAPHIC 1811209 I Dar � �" SCALE I'= ictio( Mall BY 11.:a (REAM: CM TOP O";: EnCana OIL & GAS (USA) INC. WELL PAD B36 496 SECTION 36, T4S, 1(96W, 6th P.M. PROCEED IN A NOR'T'HERLY, THEN NORTHWESTERLY, THEN NORTHERLY DIRECTION FROM THE POST OFFICE IN RIFLE, COLORADO ALONG HIGHWAY 13 APPROXIMATELY 18.5 MILES TO THE JUNCTION OF THIS ROAD AND PICEANCE CREEK ROAD OR COUNTY ROAD 5 TO THE WEST; TURN LEFT AND PROCEED IN A WESTERLY, THEN NORTHWESTERLY DIRECTION APPROXIMATELY 11.9 MILES TO THE JUNCTION OF THIS ROAD AND THE EXISTING SPRAGUE GULCH ROAD TO THE SOUTFh TURN LEFT AND PROCEED IN A SOUTHERLY. THEN NORTHWESTERLY, THEN SOUTHERLY DIRECTION APPROXIMATELY 9.7 MILES TO THE JUNCTION OF THIS ROAD AND EXISTING COUNTY ROAD 401 TO THE SOUTHEAST; TURN LEFT AND PROCEED IN A SOUTHEASTERLY UIREC'PION APPROXIMATELY 300' TO THE BEGINNING OF THE PROPOSED ACCESS/ROAD RE-ROUTE FOR THE F25 496 TO THE SOUTH; FOLLOW ROAD FLAGS IN A SOUTHERLY, THEN SOUTHEASTERLY DIRECTION APPROXIMATELY 0.1 MILES TO THE BEGINNING OF THE PROPOSED ACCESS ROAD TO THE SOUTHEAST; FOLLOW ROAD FLAGS IN A SOUTHESTERLY DIRECTION APPROXIMATELY 0.8 MILES TO TIIE JUNCTION OF THIS ROAD AND EXISTING COUNTY ROAD 401 TO THE SOUTHEAST; TURN RIGHT AND PROCEED IN A SOUTHEASTERLY DIRECTION APPROXIMATELY 0.1 MILES TO THE JUNCTION OF THIS ROAD AND AN EXISTING ROAD TO THE SOUTHWEST; TURN RIGHT AND PROCEED IN A SOUTHWESTERLY DIRECTION APPROXIMATELY 0.25 MILES TO THE BEGINNING OF THE PROPOSED ACCESS ROAD TO TIIE SOUTH; FOLLOW ROAD FLAGS IN A SOUTHERLY DIRECTION APPROXIMATELY 195' TO TFIE PROPOSED LOCATION. TOTAL DISTANCE FROM RIFLE, COLORADO TO THE PROPOSED WELL LOCATION IS APPROXIMATELY 41.35 MILES. "?Aq1 41' PROPosim tOc AVON: WEI.1..1'AD 1330 496 EGEND: Q EXISTING LOC.al7oN T,tinlnh Engineering & Laud Surveying aaYn ZOO Est ti esnn:,o®, tiara& 9-107 14 -1027 F.A.X 4 V, ) 1SO llS9 t EnCana OIL & GAS (USA) INC. V4 ELL PAD 636 <196 SECTION 36.. THIS, R96W, 61h Phi. Lot SHEETS of 11 T O P 0 G Al A PILI 813100 'iC,BH i,A1' MI SCAL tovuol IY. 1 RIO BLANCO 21.6 MI. +A MEEKER 44.6 MI. 4). RIFLE 40.1 MI. 4!- RANOELY 74.6 MI. 411. COU TY ROAD 403 MINOR UPGRADED 300'+{ 4$11 (1 PROP4 ED AOC /�4FlB / iROAD 087vt:,*1 INOR UPGRADED 0.1 MI EXi'..`TING 2. T4flAhlK JP G HAMP.,,g y0'�"29tM PRDP09..D".., 000' RAD PRUI OSED LOCI TION Xirl?t.l. PAD B36 196 8MP [`1J WING DITCH • 19" CPAP ® CHECK DAMS ® 1B" CMP CHECK DAMS 0 ',rum° DBBCDI NAD 83 560"31.6$" N,100 8798.41" W 35 40'29.24" N, 108 07'10.22" V3 39 4010.81" N, 108 07"02,22'° Vd 394018.23" N, 108 06-05, W 35 40'10.68" N, 108 06"51.85" W 32 30'00.61-10, 106 011`43004:' b4 R It 96 95 Ex .i INC+PoAD thMAEngineering Land Sun'evolg 35 South 3)00 Fi:i \'sa, 1f 131:4 1J-50?C J3,1 78 ,. 1417- FAX .4o„tS-jJ AS83 NO Stlignit WATER AND IUMRIIP4 OREAS WITNUa tome-00>PAPPOSEO WRIT READ EnCana OIL & GAS (USA) INC. 'WELL PAD B36 196 SECTFtC)N 36.'1'45, R96W. 6th P.M. Lot 2 SNrr.t9rill t)NOCIItAPII C MAP �>v12 sux ..':12 "p`-•'.:r4'I E)LV:S't3 B'i'LLu I CEVLID. CAMOa-6S-06 Dern tbe OSLO. be OB -11-o6 OJta 0B-31-09 0.08. C Pow 00-10-09 PAS Sec 00-91-09 0.80. I EnCana OIL & GAS (USA) INC. LOCATION LAYOUT FOR /WELL PAD 836 496 ,\ SECTION 36, TIS, R06W, 616 D.M, / L 2 / 1`1\x' II \. Slope nw \ v� mm6 ®>XI 1, 11160511-30 9 ewe -30 1•p mmo-x x ceR eeoza168 -zr®i oseiva rm�9exist‘ cid; \ Bl�3e& � L'-.-.311 Po `1 a c, nem y° c-& TIM% SBL • AC; e,W an ` tl6L L C-SOO' ryryop o 'pr ,s cc a JCL p W ®LO oilA, 11/10 _ •9l 9 GL' sit. wLc Ma.MMbtlSflW? wL•nate •Bie mi et••m. nnM Y ( $01140 0355. ,./ "- aw' /--_ U/NT AN goad • SfiR[NC I N6 SUas) 780-1017 a -t G ,t ae-ra a we ps x8357.7' /"�/'J%f _� s: seg sole • 6+BBBe. MI BTma • tris! 9a9-rorr EnCana OIL & GAS (USA) INC. WELL PAD F25 496 SECTION 25, T4S, R96W, eh P.M. PROCEED IN A NORTHERLY, THEN NORTHWEST'ERLY, 'THEN NORTHERLY DIRECTION FROM THE POST OFFICE IN RIFLE, COLORADO ALONG HIGHWAY 13 APPROXIMATELY IRS MILES TO THE JUNCTION OF THIS ROAD AND PICEANCE CREEK ROAD OR COUNTY ROAD 5 TO THE WEST; TURN LEFT AND PROCEED IN A WESTERLY, THEN NORTHWESTERLY DIRECTION APPROXIMATELY 119 MILES TO THE JUNCTION 01' THIS ROAD AND THE EXISTING SPRAGUE GULCH ROAD TO THE SOUTH; TURN LEFT AND PROCEED IN A SOUTHERLY, THEN NORTHWESTERLY, THEN SOUTHERLY DIRECTION APPROXIMATELY 9.7 MILES TO THE JUNCTION OF Tins ROAD AND EXISTING COUNTY ROAD 401 TO TILE SOUTHEAST; TURN LEFT AND PROCEED IN A SOUTHEASTERLY DIRECTION APPROXIMATELY 300' TO THE BEGINNING OF THE PROPOSED ACCESS/ROAD RE. -ROUTE '1'O THE SOUTH; FOLLOW ROAD FLAGS IN A SOUTHERLY, 'THEN SOUTHWESTERLY DIRECTION APPROXIMATELY 0.1 MILES TO THE BEGINNING OF THF, PROPOSED ACCESS ROAD TO THE NORTHEAST; FOLLOW ROAD FLAGS IN A NORTHEASTERLY DIRECTION APPROXIMATELY 100' TO THE PROPOSED LOCATION. TOTAL. DISTANCE. FROM RIFLE, COLORADO TO THE PROPOSED WELL. LOCATION IS APPROXIMATELY 402 MILES. PROPOSED LOCATION: WELL PAD 125 496 Cl EXISTING LOCATION IIIItlah EnghtCtI MIt & i.,uudl''Snrvep+inc 85 SaN.....^..00 tit -r> 0.4 -sZ. '4416U2.1 SMIWS (435 7'C+- SIOD 7 ESA% UR:?S 7.b0- flUSt EnCana OIL& GAS (USA )INC. WELL PAD F25 496 SECTION 25, T4S, R96WY, bila P.:M. SE 114 NW 114 SFIEETSoFJ!I I'b) I'0c,Ii.' 1'I1! c ECALF; P[IL1 HAb( 8tV+IH:5 9 £\ t @ � :A iliL16YI BY:.1L.G j P, EMT) <-% RIO BLANCO 21.5 MI. +p MEEKER 45.6 MI. +1. RIFLE 40.1 MI. 11 RANGELY 76.6 MI. fhb MINOR UPG66.WED 300° th PR(61K)SED tocATICIN 1�IliLl. PAD 1 25.196 1000" RADIOS al WING DITCH isr may g..) tweak omas 1&"GP a SHE6. DAMS a WING DITCH NAO 83 39`40'31.52" N,100°0710.43'":N 39'40'23.24' N,1 DO07•*c.321VV 39°40'16.8t" N. 100'07'02.22"W 30'40'16.28" 6,1 oess-sttar W4 39"40'10.58" N, 108'85"61.35-W 39'40'0931"N. 10£#'C0'4334" w RBACE WATER IN THE ORM O6 A DRAINAGE THAT %MST APPROXIMATELY 800' of THE PROPOSED WELL HEAD EnCana OIL & GAS (USA) INC. =STING PO! 13606111 6 ng1Utel mg .F Laval S mr%eging tl,rt V':. a S0-1417 P:At I .c.+.151+ WELL PAD F25 496 SECTION 25.'1'43. R96W. (ills P NI SE 1;4 NAV Ili SHEET9ern 1'0PaoRAPif LC' NIA1' P.`EV1SED: I:ds1'p. EnCane OIL & GAS jUSA INC. LOCATION LAYOUT FOR /sheet 3 of Iff WELL PAO F25 496 SECIIUN 25. 14S, 1290W, BID Y.M. SE 1/4 NW 1/4 AWL ..-:I Ars ntsr>w' .a xn.0 BW 24 G-31air1 n134-2, isBArje9.2 wn-0 ai n o-1' mwercto fa 114C-111.02 I) A C-25' telt 7Br LLBCttlL BRa 1)[It C-l.tl' ¢ m !LL B(IQtBPal 9) ouJAW p (0 on or r) unt kn. tit 2 AMA r X e7 ,Ste. 3 76 rases St. ✓ s X Maya St 010 -to &Air twat en ."""'"' °i.. a wNss,u'"av'2'ma "ewe OWN .WSW I >: P9. /l - tor seem pe ...`i - WISP W417E , s—r .r -RR 9.a Sad' _ESW; 1- ' *-C t� J OR Pe Pa (1f� 5..4 NOTES 11/4 C$ AS 8500-?SOIPent P 8301S ADE EILI.' AT 15060-25 or Ped p 8298:41 • I fsa fi �.. ° E � iUINTA 4 144 1�N1.2tit 44 Wn LAND• � SURVEYING COUNTY CO ®• 01 PRti OP IR r, 1y1 fj sl• $ I'R )POSED LOC':YPIi )N WELL PAD X1317 -195 PROPOSED ACCESS ROADS EUO1'. OS' O1TCN UP_Y0_ 12^ S PHASE UP T016" FRAC WATER UP TO 1993AS LIFE ..__EUGE 06 OfTCfl _. \ritRoNI [.ars:: rl i. I'I( LiDIsTV>cc:[ $.v f - ENTsrg4'GPWEILME -----.---•- S3,7MOOo PIPE1321 •tIttihEttgiltewiaig, F i.rultel 6rtrveytng ::10 YS, EnCana OIL & GAS (USA) INC. WELL. PAD M30 495 NEC 11( JN 11) 1IS. R95 W. 61l17°M SW 1/4 SWI1<I stmttntcu EnCana OIL & GAS (USA) INC. LOCATION LAYOUT FOR WELL PAD M30 495 \7110N 30, 745, R95W, 6th P.M. •, \ D5W t/4 SW 1 4 . �. \ \ 'Sheat 3 of HI 11/IIS/!/ 1j Crag CO Il:"rw0da tau?,C-4S \. ¢ on\ mi all[ aaa 0nn a its aC 7' tat Lse/L1�. CU alai rat no 51 mala—m. & all San mai •mL'' 4 was Ac—tr -+ 0(a1¢ta/W7 •C -O' 11 a a vas 'M¢mt ONO 91 aattC—AY/ •� �efa®t/a na0 a ql a8 van a(a "It aa¢A ass a C—.15' ma oat mu 0103 1 G :Hats: WrggrtO Croats 4t FNW 6R ADE WM 417 WOTA 9 RU$INW` RSNC S 85 Si, Min haL a Stni t WNh EnCana OIL & GAS (USA) INC. WELL PAD D36 496 SECTION 36, T4S, R96W, 6th P.M. PROCEED IN A NORTHERLY, THEN NORTHWESTERLY, THEN NORTHERLY IDIKECI'ION FROM THE POST OFFICE IN RIFLE, COLORADO ALONG HIGHWAY 13 APPROXIMA'T'ELY 18.5 MILES TO THE JUNCTION OF THIS ROAD AND PICEANCE CREEK ROAD OR COUNTY ROAD 5 TO THE WEST; TURN RIGHT AND PROCEED IN A WESTERLY, THEN NORTHWESTERLY DIRECTION APPROXIMATELY 11.9 MILES TO TIIE JUNCTION OF TMS ROAD AND TIIE EXISTING SPRAGUE GULCH ROAD TO THE SOUTH; TURN LEFT ANI) PROCEED IN A SOUTHERLY, THEN NORTHWESTERLY, THEN SOUTHERLY DIRECTION APPROXIMATELY 9.7 MILES TO THE JUNCTION OF THIS ROAD AND EXISTING COUNTY ROAD 401 TO THE SOUTHEAST; TURN LEFT AND PROCEED IN A SOUTHEASTERLY DIRECTION APPROXIMATELY 300' TO THE BEGINNING OF THE PROPOSED ACCESS/ROAD RE-ROUTE FOR F25 495 TO THE SOUTH; FOLLOW ROAD FLAGS IN A SOUTHERLY, THEN SOUTHEASTERLY DIRECTION APPROXIMATELY 0.1 MILES TO THE BEGINNING OF THE. PROPOSED ACCESS ROAD FOR THE B36 496 TO THE SOUTHEAST; FOLLOW ROAD FLAGS IN A SOUTIIEASTERLY DIRECTION APPROXIMATELY 0.3 MILES TO THE JUNCTION OF 'PHIS ROAD AND AN EXISTING ROAD TO TIIE SOUTHWEST; TURN RIGIIT AND PROCEED IN A SOUTHWESTERLY DIRECTION APPROXIMATELY 0.3 MILES TO THE BEGINNING OF THE. PROPOSED ACCESS ROAD TO THE SOUTHWEST; FOLLOW ROAD FLAGS IN A SOUTHWESTERLY DIRECTION APPROXIMATELY 250' TO TIIE PROPOSED LOCATION. TOTAL MS -LANCE FROM RIFLE, COLORADO '1'O THh PROPOSED WELL LOCATION IS APPROXIMATELY 40.8 MILES. eritC, Ei CRIVINSRRKTiO310 UW OS IROCEEONANCONOtt MEN ACRPMESTEIT, THEN NCN164t D SCCiIPY (PCL tit 1Y4T CMCC M ptlt. COLPADOMONGNRIMM 13 APPRO NAaq IBA MIBTOPf JtKtICNCFMSNC DANOPCEANCE nine WW1 CW COHMV MUM TOW Wig: if RN MCMI MIDINtCEEORNAWENERtt INFO NCRNMES7ERII aRCPCNMPRONMMRf Mt MIES IOMEJINt'NCNOFTNSR AOMD Elf RISING *NA'REcU.CM MCAD TOM! 30LEltTPNl6TMV: EROCEDINA$C4JTH AELP*NNY1NIWESIEIO ION SOVMEGI QRCIA'.N MvRJ)AMMa14.i NLES TO THE ANCR.:N SINIO'RD Ab OlitottiO MeV ROAD 40I EC•ME SA HI %*ENNERARDPROCED :NA SCERIOASlEa1 DRECIIONW±RCAIWAEU 0.1 MEA IU fit Etti1NttiN INE IYCWEAWMLEN+ RCADI0MEEDASM1 10Elf SOUTMEAN: MOW RCADRA3$ NIASCESNEASRMf DOWN IRCSSEN8IO.1 ASA1S TOM INCINN4ADCF ME t*CtCETDAtCEESRCSOVOR ME WN 49310 THE SWNEASt FatOtt REND RAGS IN ASCUPEARERIf CUEC1477NMnQ.zMNEL, oa MLa I0 MF IIAC tICF CEINSRCADJSCLP nS*MSRCADEOIIE SCAIIW tS:RWM$MATO RROCEED INA SCNIMEREGISQRECIMNMELOODMATRIO.901IIES T01RSEG:70417a OF NEE PRCVCRO ACC ESS ROAD 70 INE Y.JElm01i £ALCM 15010 RANSINA OUTWOESIOITCIRECTlCRS MINC#MAsaat ]4O 10 114ONOEC:FD EOCMINt TCVt EVS W:. E ERLPA &5R& CCIGRADOIO TFE MOOD Mil IDNAXOE OFIONNNIT 63.N NrE3 EGENJ�: Q EXISTING LOCALION Mutat rrginse'aing & Land Surveying SCS Scotto +. MOO E'fant «nem%. Et matt SA4974E 44.0..5) ISO -1017 " FAX (435) 739-1213 ''F P1 OP(DSE[) LCfl';Yi i(.N: WELL P\t) 1 6196 nfl A SEE ?OPO"Er E1iCaAS (USA) INC. WELL PAD D36 496 - i(: 3N 36, fiS,'R96W., 6h Pt NW 1/(1 NW till SHEETSDf11 11 P h (T 12 P rf r E 11 :\ I' 5 1O ) 9-1011FxR iY1( *EtAVell J PF '/I a/ 111+3' RIO ELAND© 24.6 ARI. a MEEKER 44.0 ML «- RIFLE 40.4 MI. 41- RANOELY 7.6.0 MA. Oa P06C1 r D✓E 0AO R.P254SG 0.1 Pollv I PlG 2-TRA4I• ADE005f. PROYOSEO.ACCHSS 000' RADIO f?K3.07SED Lot 7V7d.)N: WELL PAD 1)36 -196 UAEAtE WATER IN THE FORM OF A DRAINAGE THAT AS 'ROAST APPROXIMATELY 960` OF THEPHOPOSED VWELL HEAD LEGE TT..:ICFED,cs::-•P.: ,n EXSSMINOP.OAD It Engineering & Land Stuveyiug .m.Nla ZOO Ett:.t \;:.ava3. UHnta S' U675: (di'11S" 19i- F J4") EnCana OIL & GAS (USA) INC. WELL PAD D36.196 ...SE( `ICH AN IS, 'f AS. Koh W.. ban I)M. N'WL'4 NW IA SHEET ofaSIMUMENNEII TOPOGRAPHIC M A P 8 (09 .,:;(:),ALE) I R:iT.!H H'i A..7. {REVI:ED t_".u!.ft scMr: 1 •• 60 uA t: 011-03-06 Dmm OF 020. Rev: 03-11-6g DAB Rev: 06-31-00 DA.0 Cana OIL & CAS (USA) IMC. LOCATION LAYOUT FOR WELL PAD D36 496 SECTION 36, 745, R9SW, 6th P.M. atI4i u 1 o.IV sofPrr 13 L i I 91Ii I``' `rte.' p0'�ui -.2v; as ; AVIV cmwx ae i1 t� rNEEI; & Genn SURVEYINGs.mSeat • Yawn; MA 8,070 (486) aa-11:07 PROPOSED LOCATION: WELL PAD 1126 596 LEGEND: 0 PROPOSED LOCATION Uintah Engineering & Land Surveying 85 South 200 East 'Vernal, Ural' 84078 (435) 789-1017 FAX (435) 789-1813 r EnCana OIL & GAS (USA) INC WELL PAD H26 596 SECTION 26, TSS, R96W, 6th P.M. SE 1/4 NE 1/4 T0P0CRAPH1C M A P 12 MONTH 1 () DAY 08 YEAR SCALE: HOODOOI DRAW BY: Z.L (REVISED: 000000 PROPOSEACCESS 310' +! PRrarada OPOSED LOCATION: WELL PAD 1126 596 PROPVSEDACCESS ROAD EXISTING ROAD Uintah Engineering & L and Surveying S=. Sauna 200 East venni. Utah 84078 (835) 789-1017 "' FAX(435) 789-1813 EnCana OIL & GAS (USA) INC:. WELL PAD 1126 596 SECTION 26, TSS, R96W, 6th P.M. SE 114 NE 114 TOPOGRAPHIC 1I A P 12 eronrx 1908 atv vena v SCALE: 1"= 20001 DRAWN BY: Z.L. REVISED: IX400-00 ;: TOPO \Dm:SDMF: 011.440-19 . 4DW Damn BD D.R.a ILI Re11xd 04-15-09 P. fArAsock 0--419 RNR RS: 09-02-09 - 10-13-09 D.P.& C-3&0 EnCana OIL & GAS (USA) INC. LOCA IION LAYOUT FOR _-_..96 WELL PASO0269B96 SECTION 26, T55, R9bW, 6th P t `I ISE 1/4 NE t/4', Npfao e1 11 / lel Hy l-, et J orII Tigul Pl M'urcf/J', W/1' of IreeAaard - 1 R.:G OW& Tafel Pfl Yalu 0220 CL. I'. ' VFA`Jl�ul I,i IiOelll(I(((( tank. 0- 1LW1.1,I x/0EEDet /U. -s1, 1 ro oro- ata /// area dotomtoc the^/)aj//tope /Nj/�h/RYJ&- 1111 gs - 010'x1111 Sat MOUND r Pao I f„ MEF SIONVer est s.asrr �: K. MINNOW CALCULATIONS REDWa 4 or ono 1110.1A -RS LSCAtWI STALL Mt RnLACC. ALL rt o 70 et COMPACTED 10 A ROOM OF OR or 11C WOMAN CAT ODEON COT/DED7 mat TO WHOA o -9P NOTES S C ALE/01W / 7/th • Y cps*, stoamfe .• . E .. £7eM. Ungraded Ground .4t RTP3A-25 of Pod 4 - 6092.7 "-"->-_-- '-" FINISHED MADE. SEV AT Iff&L4-25 of Pad 4 =6092.2' ° u n all SxCffinn 7 A LAND Suan sc 70*7 Ya t RW 01010•(Ibj M}plr M M' ___ ( 1 —=;':-,_. co Still I SEESHEET2�s ' E - Pi-oo-ne-rcu i 1 B w W X ,� • Y O -1 o " x - ( u5.rh s S 1• •1 i ® '� K ' a i• L 1 - S Ai__ M S ( 4 . r � Z JJg p S ]f h r - s 9ri O W a i r 1. i : w 4 W W s 4 o 0 �. ^ 1 & w ..w° W ib i ci W i L, ' W 6 W fp"a �• 4 ®3 f 1°S bq 11 7 i U W zti ® U 1 I ONN fANMFOJON - ' EnCana Property EnCana Oil & Gas (USA) Inc. 0 1600 "0° North Parachute Ranch Garfield County, Colorado (OCAL0 N FEST) ii—t✓ OY DATE PRiPANfcar M7E Fmnsvy M. an7 RErERENCES "\ SCAM 1•.200P SiiEE71 OF 3 GARf7E10 COUNTY PARCEL &AIS r N; ,,,,,, A 1 ,.k,.i.; `Fle..lopwrmus wrJr/.wt PROJECiNa.OS-0455 Exhibit 0 .J W f (JY )A1 - REFERENCES CARFIELD COUNTY PARCLL MAPS EnCana Property KOMAR) CA EnCana Oil & Gas (USA) Mc. 1000 3200 (SCALE 14 FEET) er OWL tY .7.1 a.10+1 (XV) /10.11 DATE: f.t uay IA 2001 BGLE: 1' .9110r_ PROJECT Nal 0101.65 North Parachute Ranch Garfield County, Colorado 000 HAW 1SHEET2OF3 Exhibit ffY OA ft REFERENCES GARFIELD CDUNIY PARCEL NAPS EnCana Property EnCana Oil & Gas (USA) Inc. --.— -- 0 1000 sZ% (SCALE N FEET) ranNAIa.Y. Itca OWN... euRY[YINat ri=47,n I �wwaollmen DATE • F.biury fa 200f SLUE: I' • 7000' North Parachute Ranch Garfield County, Colorado FSREET rnorcr NO.. 00.004 DAD NAut ExhlbW 303 EnCana OIL & GAS (USA) INC. K22 596 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 22, TSS, R96W, 6th F.M. PATTERSON TRAILER #1 LOOKING 910 PHIS INSIGNIA IS. THE PROP? TE OA, onisioN oF HousiNG i 3 ^t t7?i51 G. S?DE i{P4.4L 9'fA=11,{iJ}iE CQieP i^51vt?H irtc sin .-n� Uinlalu Engiinleening,C Land Surveying 85 Saudi 200 East Vanal. Utah 34073 (435) 739-1017FAX (435) 789-1813 na 1964, LOCATION PHOTOS 0112 5 BIIMMq a.rc 10 YEAH PHOTO TAKEN BY: Lt 1 DRAWN BY: J.LG !REVISED: 0600.00 EnCana OIL & GAS (USA) INC. K22 596 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 22, TSS, R96W, 6th P.M. 1RESti`1F„ NTIAL S T RiJt�T C+ENTiAL STRUCtW3E. ::OFHCOLORADOH 9 IN iiI4E COMPLlE9I itti THE FACfo, y IIU5L1 TAt IARDR ISE THE TA SFF OF Gdi q#3Ai3C M ANU4=11u^'ruREj rE 3. z=t :S HE FOI FOIA IS Tl poop ATE , F COL A, PiAE$3 E�x #� 6's'R4tL`711 AE DOMPOES WITH Tf is PACTO+i tlfn M1i TiAi S:.^.kL9TR14f,'T!q'N 9TH^. NDiRDS S Uintah Engineering & Land Surveying 85 South 200East Vernal, Utak 84078 (435) 789-1017 *FAX (435) 789-1813 LOCATION PHOTOS 0 I. MONTH 25 DAV 1 0 Vf.1A pxoyro TAKEN BY: B.J. 1 DRAWN BY: J.L.6 REVISED:00-00-O0 EnCana OIL & GAS (USA) INCA K22 596 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 22, TSS, R96W, 6th P.M. COLPRAM )IVISION OF OUSING • TIAL STRUCTURE COMPLIES YIITH THE FACftiliY Dulc. SNS•RUCTION STANDARDS !}P THE STATE. OP G'OLDRA'. THIS INSTG NIA IS Tf'IB PROP€ATY OF THE STATE OF COLORADO DIVISION OF HOUSING ,TRUCTURE COMWltEs. W1TN THC P0.0 tow/ AU+iY Uuttalt Engitteeting c% Laud Stttveying 85 South 200 East Venal, Utah 84078 (435) 789-1017 • FAX (435) 789-1813 9 LOCATION PHOTOS 19 1 t0xnt 25 DAY 1 0 YEAR PHOTO TAKEN BY: Bi. I. DRAWN DY: JL.O IREVISED:00-0000 EnCana OIL & GAS (USA) INC K22 596 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 22, T5S, R9GW, 6th P.M. PICTURE OFTRAILER 7 LOOKING SOUTHWESTERLY THIS INSIGNIA LS THE PROPERTY OF THE STATE OF COLORAD DIVISION OF HOUSING EHTIA.L. STRUCTURE COMPLIES WITH THE F'Iq'TQ Y.1 L ST t T R Tail Uintah Engineering & Land Surveying 85 South 200 East Vernal. Utak 24078 (435) 789-1017 ° FAX (435) 789-1813 -Sal 1 LOCATION PHOTOS Ilt) ` N25 w nu 1 0 YEAR PHOTO TAKEN BY:DJ. I DRAWN BY:J1.G IREVISED:0000-00 70 Ca EnCana OIL & GAS (USA) INC. C28A 59.5 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 2S, TSS, R95W, Gth P.M. STATE' a }iff COLORADO AO DIVISION O}},,OUNG S NONRESIDENTEAL STRUCTURE COMPLIES 4Y1Tt4 TREFACTOR?Y.&H4T ESIDENTEAL .CONSTR tlCTVON STANDARDS OF THE. STATE OF COLORAD BOTTOM WESTERLY MAN CAMP TRAILER TAG T iSS 3NSIGNI S i F#s P ERT OF 3E E OF CO oRAT 33�i1ION OF HOUSING. ('tR S RON fiESl:JEPi 't!i`i S?E56C 4:45'i LA. C6 BOTTOM EASTERLY MAN CAMP TRAILER TAG Iiintalt Engineering & Land Sluveying 85 South 200 Fast 4anal, Utah 84078 435-789-1017 oelsr@uelsinc.com LOC ATM N PFIOT'OS 0 1 EICEITH 18 DAY 1 0 YEAR PHOTO TAKEN KU 1 ORAWN BY: J.L.C. [RL+R ISHD: 00.00.00 1a EnCana OIL & GAS (USA) INC. C28A 595 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 28, T5S, R95W, 61h P.M. THIS INSIGNIA IS THE. PFIQPESTY -OFTHE .. • Divisior4 OE Ha 'tHk%WONi StetnAL 7S'nUC ifi:3E GJ'MPUgS.Wf '?.'i fi{S kitt R T1 tk, C,C "Lf TOP WESTERLY MAN CAMPTRAILER TAG COLO OF HOUSING tD G C3AIYa.sDB 41001, t P� 'IDP EASTERLY MAN CAMPTRA! LER TAG Uintah Engineering & Latin Stuve}ing YSS South 200 East Vernal, Utah &4078 435-789-1017 ttels@uelshu.caIt LO('XIION PH °T03 0 11 18 '_ () NONEk DAY YEAR PHOTO TAKEN BY: BJ. 1 DRAIVN BY:J.L.C.DEVISED:0000-00 EnCana OIL & GAS (USA) INC C28A 595 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 28, T5S, R95W, 6th P.M. 1.NISrINSIG IA 15 Tut PROPERTY OF T FE TATE OF ADC 3E:Yd'PfA lig Es COUP L 'M'S W1 i THE FkC:.YORB BERM G51 N$7 ii tEC fd9?4 STMItI AD$ 0? T7ifF, T t 0 ..0111R AI ON TRAILER BY DUMPSTER WATER TANKS ON NORTHERLY SIDE 0 A CAMPTRAILERS Uintah Eutgineeeing & Land Surveying 85 South MMD1Zs-t Vernal. Utah 84078 Since 19Si 435-789-1017 «els@uelaBre.com LOCATION PI [OTOS 0111.8 MOM DA4 1.0 nee TAKEN BY: BJ. 1 DRAWN BY:J.L.G IREYISED:OO-00O0 PHOTO EnCana OIL & GAS (USA) INC C28A 595 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 28, T5S, R95W, Gth P.M. MAN CANH'FROM SOVTUK.ASTERLY CORNER LOOKING NORTHERLY �l NRESWs MiAL, "f :4i`14 5! "ll i3 "tl i aTA DA rices a.�rs _rup 31.014 FIOUSIN� i l li sir iliff fA 1Y ¢CET£3t, TAU a L # 1 A OA`..l ?AEA i E AGF El.4'a,4 TAG OFTRAILE Uintah Engineering & Land Surveying 85 South 200 East Venial, Utah 8:078 435.789.1017 uels@itelsiatc.con 1 ON LOCATION LOCATION PHOTOS 01 BIOME 18 DAY 1.0 YEAR TAKEN BY: B.J. 1 DRAWN BY: J.L.G !REVISED:0 40-00 P¢ioTo EnCana OIL & GAS (USA) INC. C28A 595 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 28, TSS, R9$W, 6th P.M. TRUCtRE ;y TOREJSITANDA.ii TAG OF TRAILER 2 ON LOCATION 51146 C0 4:e4 wp,1,,611/ s a'#a CUtrc TAG OF TRAILER 3 ON LOCATION Uintah Engineering & Land Surging 85 South 200 East Venial. Utah 84078 435.789-1017 cels uelsinc.com LOCATION PT JOTOS 1 MONT 18 DAY 1 0 YEAR TAKE" BJ. I DRAWN BY: JIG JRE41SFD: 00004 PHOTO EnCana OIL & GAS (USA) INC. C28A 595 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 28, TSS, R9SW, 6th ENL STATE rac-rut�ly ��s�' itE ;TANDAaHD TAG OF TRAILER 4 ON 1°41 ;> BION U ra 0..,1.taasY 43:701 1:.At42' blASdp Pi.;t it R9�!12iYAi ..�. TAG OF TRAILER 5 ON LOCATION z Uintah Engineering Land Surveying 35 Sculh 200 East Vernal Utah 34078 435_759-1017 eels@uelsuc.com MCAT! ON PHOTOS 01- MOVIa [. O DAV 1 0 YEAR PHOTO TAKEN BY: BJ. J DRANK BY:&L.G IRE ISED:000000 EnCana OIL & GAS (USA) INC. A2SB 595 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 28, T5S, R95W, 6th RM. T1tis 11 1 MA 13 THE PROPERTY -6F Tiff' TATE OF COLORADO !VISION OOU I FUi# "CCS. WLIES ?Pm The FAC' OF Y#{ MATE BOTTOM WEST MAN CAMPTRAILER TAG #15848 STATETHIS INS COLORA .. VISION OF HOUSING rnUeltig COMPLia Win T#i Fga'rCr.Y >,: :Taoti STAti1 ARlrs or T1il sine e BOTTOM EAST MAN CAMP TRAILER TAG #15849 Ullltall Estginzeting i@'. Land Surveying 85 South 200 East Venal, Utah 84078 (435) 789-1017 ° FAX (435) 789-1813 9me RERESSIORRNORASEDY LOCATION Pi 'OTOS 1 1 MOM 13 DAV 08 YEAR TAKEN BY: D.S. 1 DRAWN BY: Z.L. IRE% ISED: OI -18-106., PHOTO EnCana OIL & GAS (USA) INC. A2SB 595 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 28, T5S, R95W, 6th P.M. TWIN ft a ti P7A+ 9�i thriRr€y 17ta)� i41� . TOP WEST MAN CAMPTRAiLER TAG #156S1 TOP EAST MAN CAMP TRAILER TAG #15850 Uintah Engineering & Land Surveying 85 south 200 East Venni. Utah 84073 (435) 789-1017 * FAX (435)7E9-1813 Sme IP rifieradiffiElaffigiantegla LOCATION PI IIITOS 1 1. HORRI 1. 3 DAY 08 YEAR PH©4'O TAKEN D1: D.B. 1 DRAWN BY: Z.L !REVISFD:01-1310 LOC',VIOYPtIOTOS 11 UO T1I 30 D DAY AR TEAR prom TAKEN BV: D.S. J DRAWN BV: Z:L 'REVISED:0418-l0 EnCana OIL & GAS (USA) INC. A28B 595 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 2% TSS, R9SW, 6th P.M. TRAILER#1 TAG#14805 DF HOUSING FAPLres `AlJTH i'HE' FAG'TO TRAILER #9 TAC #16491 Uintah Engineering 43c Land Surveying 85 South 200 East Vernal, Utah 84078 (435) 789-1017 *FAX (435) 789-1813 EnCana OIL & GAS (USA) INC A2SB 595 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 28, TSS, R9SW, 6th P.M. M I S OF HOUSING flUURE COMPLIES WITH THE FACTO £sTAA1rAGiDS OF THE STATE o Cf0 RAP TRAILER #5 TAG #14168 THIS INSIGNIA IS:THE .P STATE F COLORADO pini ION Ptip I .E81n E.8t1IAL t'r WCTU$YE C QMPLi01-W#7114 ' VTIAL CONSTADCTION 3TAN1Sa&%MDS Ods klAtAWACIOWERI 9,tAtt APPR OWil}' OATE'A1.5t6Y...,.- TRAILER #4 TAG =17597 Uintah Engineering & Land Surveying 85 South 200 East Vernal, Utah 84078 (435) 789_1017 *FAX (435) 789-1813 LOCATION'PI'OTOS 11 Mafltz 13 DAY 08 YEAR PHOTO TAOS BY: D.S. 1 DRAWN BY: Z.E IRBVISED:01-18-10 EnCana OIL & GAS (USA) INC. A28B 595 MAN CAMP LOCATED IN GARFIELD COUNTY, COLORADO SECTION 28, T58, R95W, 6th P.M. IN IGNIA IS HE PROPERTY 0E dr E "` OFE COLORADO 'VISION OP HOUSING IMRE COMPLIES WITH THE FACTOR o! . STAN OS OF TkiE'ST TE,OF CO TRAILER #3 TAG #15440 ATE OF COLORADO- IVISION OF HOUSING iElf3CTR)"tib COMP LB WITH THE FACTOR 8U11 st vi43#.° 5'3'ta6l A.3&OS,Ot'TH 'STATE' .OF CO1»ty#IAl!T TRAILER #2 TAG #13976 Ltuuah Engineering ft Land Surveying 85 South 200 East Vernal. Utah 84078 (435) 789-1017 • FAX (435) 789-1813 • 9me 1964 • InCATTONPFIOTOS 11_ MYTH 13 DAY 08 YEAR PHOTO TAKEN BY: D.S. 11 DRAWN BY: Z.L .(REVISED: 01-18-10 Form 3)60-3 (August 2007) UNITED STATES DEPARTMENT OF nm INTERIOR BUREAU OF LAND MANAGEMENT APPLICATION FOR PERMIT TO DRILL OR REENTER KAM APPROVED OMB No. 1004-006 &piles Jay 11, 1010 5, tease Sepal No. C 8461 6. If Indian, Allottee ItUnto3XAhgerrxt.NaneandNo, taryptotW DRfu (�kEb44x CONFIDENT I b. Type of Well: Q fir Weif Gas We4 D,, Ohcr jSing1eZnne. AL7. Multiple Zone 8. lyase Name and Wdl tib; 5Ti1RY GULCH UNIT8515A-24 F28496 2, NamC of Operator UDI1 N W AL TER ENCANA OIL& GAS NSA) C. Utl AL/EROENCANA.COM 9. All Well No. 3a. Address- 370 171H STREET, SUITE 1700 DENVER, CO 80202 lis, f5mnc No,(include Pk 720-676-3702 arta Cade)..._ 10. Frold anri Pewl, or Pxpincatnry WILDCAT 4, L ca[1on of Well {Report tocadon rleatry mid in aarar-' we mals asry State rce)u2rcnremt. Ataurfacc SENW 2276FNL 1930F4VL 39.a7432 N Lai, 108.11968 At proposal prod, rune SWSE 1100FSL.19791-EL 59 N Let, 108.11470 *f W Lan W Lo i I1. Sec., T.,.R.. M., qr art: and Survey or Area Sec 25 T4S R96W Mer 6PM 14 Dulancein mdecand duectton trom iteanrsttuwi of pc8tofhce* 30.4 MILES FROM RIFLE POST OFFICE i2. CoupryqrnPadah GARFIEL.D l3. Stan CO 15. D,siance from proposed tncatron to nearest P or lease line, ft. (Also to nearest drip. unit line, if app 1930' 16. No. of Arns to Lsasc 2425.10 19. $pacing Unit dedicattd to dus wen 1$. Uistancthnmpwpossd tocauon to neamslwdli, dnfltne:.. completed, applied for, an this Inst. ft, 1'}. Propos td Depth 14726 MD 13930 WC 20. RLM/BL4 Bond Nn: an hk C0130002351390 24 11evauons (Show whethex OP KB. K I, 4L ac:. 8298 GL ?t. Approximate date 02/012010 work w II staff 23. bsumated dumbon 30 DAYS 24. Attachments 'Che fo@awing, cotnpleled is ancotdancc with the erquen[s otOrnbore..0if and Gas Order 1. Wed plat ccnifnlby n registered surveyor: Z. A Drilling Plan: 3. A Surface Use PIan (if the location is on National frons. System lands',. the SUPO shall be filed with the appropriate Forest Service UtiiceI. No. 1, shall , anached to ibis lomat 4. Ruud to coopc- runs.unless covcltd by an C%iuldgbond an rile(see Item 20 alio e). S. Operator •• I6cahori 6. Such other s ificinformation and/or plansas may required by the authorized o freer. 25. Signature... (Electronic Submission) Hama (fkinfS?fyped) JUDITH WALTER Ph: 720-c 76-3702. Date 12/31 009 Erie AUTHORIZED REPRESENTATIVE A ved byfS atua2) { sY 7�✓ Name(Pnntedy fypedl F. Maw Date s�- Jrde P ,SOCIATE FIc . � ask s k{ office rf Application approval does not warrant otcernsy IiC appliamlt ha ds.7egat ur egaitnble talc operations theeon. Conditions of approval, if any, areattached, m those ngbtsi the sweet lease which wtwW en4Yfe Clic applicant to conduct it Ct '. Guon J' -gni IIC• 1. On "r ma CII acoznt toi any person.. States any false, finitious orfraudutent statements orropits aitatinns as to any manor within .Wing)'7Ti. Wi I y 10 ,, a 110 ,-, airmen(nrageney o inti-. its junsdieri . Additional Operator s (Poe rep ,f Page) Electronic Sutlmiss"on 1779465 verified by the BLM Well Information Si, For ENCANA OIL & GAS (USA) INC., sen to the Meeker CoSthittad to AMISS /�(f�orapocessing by JEANNE fNCWMAN an :01104/201 Ae" Plir li-rl r" .)I �i F- ate:: i )t �1, X -//a%stag, " OPERATOR -SUBMITTED r" OPERATOR-SUBMITTEt °° OPERATOR -SUBMITTED " FORM z Rev 12105 Drill Sfate of Colorado Oil and Gas Conservation Commission 1120 Unwin Slreel, Suile 801, Denver, Colorado 80205 Phone: (303) 894-2100 Fax: (303) 894-2109 APPLICATION FOR PERMIT TO: r Deepen, '' Re-enter, Document Number; Recomplete and Operate 2. TYPE OF WELL OIL i"i GAS COALBED OTHER SINGLE ZONE ;. MULTIPLE ZONE FR I COt Refiing Sidetrack 400018427 Plugging Bond Surety 20050043 3. Naive of Operator: ENCANA OIL & GAS (USA) INC 5. Address: 370 17TH ST STE 1700 City: DENVER 6. Contact Name: Judith Walter Email: Iud ith. W alter(C17encana.com 7. Well Name: Story Gulch Unit 8. Unit Name (if appl): Story Gulch Unt 9. Proposed Total Measured Depth: 13828 State: CO 4 COGCC Operator Number: 100t85 Zip: 80202-5632. Phone: (720)876-3702 Fax: (720)876-4702 Well Number: 8507D-25 F25496 Unit Number: 00069333X WELL LOCATION INFORMATION 10. Qtr0tr: SENW Sec: 25 Twp: 4S Rng: 96W Meridian: 6 Longitude: -108.119808 FNLJFSL FEUFWL Footage at Surface: 2308 FNL '1894 FWL Field Number: 13. County: GARFIELD. Latitude: 39,674231 11, Field Name: Wildcat 12. Ground Elevation: 8298 99999 14, GPS Data' Date of Measurement: 08/07/2009 PDOP Reading: 2.0 Insimr ent Operator's, Name:. Robert: Kay 15. If well is (X': Directional Footage at Top of Prod Zone Horizontal (highly deviated) FNUFSL FELfFWL 2828. Fit 2010 FEL submit deviated drilling plan. Bottom Hole: FNLJFSL FEUFWL 2628 FNL 2010 FEL. Sec: 25 Twp: 48. Rng: 96W Sec: 25 Twp: 4S Rng: 96W 16. Is location in a high density area? (Rule 603b)? Yes IR- No 17. Distance tothe nearest building, public road, above ground utility or railroad: 333 ft 18. Distance to nearest property line: 1894 ft 19. Distance to nearest well permitted/completed in the same formation: 350 ft 20. EASE, SPACING AND POOLING INFORMATION Objective Formations) Formation Code Spacing Order Number(s) . Unit Acreage Assigned to Wen Unit Configuration (N/2, 3614, etc.) Iles ILES William Fork WMFK 510-13 10' Date Run: 2/21/2010 Doc (64000184271 Well Name: Story Gulch Unit 85070-25 F25496 Page 1 of 3 21. Mineral Ownership: -:Fee . State X Federal ; Indian Lease k: COC61^I36 22. Surface Ownership: Fee State . Federal Indian 23. Is the Surface Owner also the Mineral Owner? i.... Yes WX No Surface Surety ID#i 0 23a. If 23 Is Yes: Is the Surface Owner(s) signature en the lease? Yes T No 23h. If 23 is Nn -Surface Owners Agreement Attached or i-"$25,000 Blanket Surface Bon 1—$2,000 Surface Bond $S,OOffSudabe 9onci' 24. Using standard. QtrQtr, Sec, Twp, Rng formatenter entire mineral lease description upon which this proposed wellsite is located (attach separate sheet/map if you prefer): T4S, R96W, Section 25: ALL 26. Distance to Nearest Mineral Lease Liner 2010 ft 26. Total Acres in Lease:. 640 DRILLING PLANS AND PROCEDURES 27. Is H2S anticipated? Yes IX No If Yes, attach contingency plan. 28. Will salt sections be encountered during drilling? Yes rsz No 29. Will salt (>15,000 ppm TOS CL) or oil based muds be usedduring drilling? 1'Yes f No 30. If questions 27 or 28 are yes, isthis location in a sensitive area (Rule 903)7 i Yes No If 28, 29, or 30 are "Yes" a pit permit may be required. 31 „Mud disposal Offsite (R. Onsite Method: Land Farming )K -Land Spreading. ..'. Disposal Facility Other: Recycle. Amendand.bury Note: The use of an earthen pit for Recompietion fluids requires a pit permit (Rule 905b). If air/gas drilling, notify local fire officials. Casing Type Size of Hole Size of CSing W�ight Per Foot Setting Depth Sacks Cement CementBottom Cement Top CONDUCTOR 26 20 Line Pipe 120 176 120 0.. SURF 144-3/4 0+6/8 36 3,000 2,069 3,000 0 2ND 8+3/4 4+1/2 11.6 13,828 857 13,828 .. .8167 32. BOP Equipment Type: 5t Annular Preventer ) Double Ram 33. Comments Surface hole: 12-1/4" or 13-1)2" or 14-3/4", Production hole: 7-7/8"or8-3/4",, Production-CmtTop talc -500' above- TOG. On-site was 8/12/2009 with BLM and COOW both from Meeker, Colorado. I Rotating Head II' None 34. Location ID: 0 35. Is this application in a Comprehensive Drilling Plan ? .-. Yes jR. No. 36. Is this application part of submitted Oil andGas Location Assessment? liSe Yes -'No, I hereby certify all statements made in this form are, to the best of my knowledge, true,correct, and complete.. Signed: Title: Regulatory Analyst Print Name:. Judith Walter Date:. 1211/2009 Email: judith.walter@encana.com Based on the information provided h and is hereby approved. COGCC Approved: API NUMBER 05 045 19137 00 rein, this Application for Permit -to -Drill complies with COGCC Rules and applicable orders 4 7/00.L. Director of COGCC Date: 2/11/2010 Permit Number: Expiration Date: 2/10/2011 CONDITIONS OF APPROVAL, IF ANY: Date Run: 2/21/2010 Doc (#4000184271 Well Name: Story Gulch Unit 8507D-25 F25496 Page 2 of 3 Form 3160-3 011g031 2007} UN .S"IATES. DEPARTMENT OFTHE ENT ERIOR BOREAL). OF LAND MANAGEMENT APPLICATION FOR PERMIT TO DRILL OR REENTER rc *M APPIWvhtJ OMB Nu t*0t.D136 Donee; ioly 31, 2010 >. L S i 1di Na. CO /s. It Indsm>, Aslo ueerts tcokName la.typcofWork:® DRILL 2F.L-Nt1-k 'u p �„. # 1 g ❑ $ 3 ��i`d EI'"3 F.:-. lb. pe of Well: O Oil Well ra Gas Welt t:wtir © Single Zone. MuhTie Z J. If Urines CA.Agaecm C69333k errt, Name and No. g:I.nase Namcam3 Well No. 5T0RY G 0111T 85(}28.36 R35496 2. Hamc ofUpaator Contact JUUI.1 Id WAL.I UR ENCANA OIL & GAS (USA) INC. E-rpt-JULA1H..NALIbriOENGAPIACOM 9. APl WclI ;n. Address 370177H STREET, SUITE 1700 DENVER, CO 80202 313. Phone No. (Include area cod) Ph: 720-876-3702 10. Meld and Pool, or kxp1ora[ory WILDCAT d. Lo attonol Wet1 (Report loco um d7ew4yrand iaaccadance with OP Stare requi renrenn, ") AtSur1'acc Lot 2649FL 1581FEL 39 66428 N Lat, 108.11333 W Lon At proposed prod. zone Lot 2 522E NL 20211- EL 39 bb4b2 P4 Lal, 1011114815 W LOG 11. Sec; 1.; 1L; M., ar Hlk. and Survey or Area Sec 36 T45 R96W Mer 6PM Id. Dmlance in miles and diremwn from nearest town or post olhcee 30.4 MILESEROM RIFLE POST OFFICE 12. County or Parish GARFIELD 13. State CO 15. Umber a fromproposed locauon.ro nearest properryor lease line, ft. (Also to nearest Brigunit lime, if any) 649' T6.. No. til. Ae,ei iri t.t.sc 485.13 11. Spas ne dant dcdi n, -d to dns well (8. DLhance €ram psoposod locationto oea,e t we0, deilhng, compkted, applied for, on this ltasc;C1: 620' - L9.. Proposed I)epth 13581 MD 135614 TVD 22. Appmxtmate dale work. will slap 03/01/2010 20.: HLM]131A Oan No. on tile' COB000235 d3. hstunattd dmanon 30 DAYS 21. Elevations (Show wbethsffDE K1Y,"RT, ..etc: 8351 GL 24. Attachments The following, completed in accordance with the requimnemts of Onshore 031 and. Gas Order No. 1, shall be altached to this form: 1. Well plat =tilled !by a registered surveyor. 2. ADnlling Plan. 3, A Surface Use Plan (if the location is en National Forest System Lands, the SUPO shall be toed with Me appropriate Forest Service Office). 4. Bond to corer the operations unless covered by sm cRisting bond on file (see Item 20 above). 5. Operator certification 6. Such other site specific information andior plans as may he required by the authorized officer, 25. Signature (Electronic Submission) Name (Pnntedel'ypcd) JUDITH WALTER Ph: 720.876-3702 Dvtc 11111/2009 Title AUTHORIZED REPRESENTATIVE Applicators approval cines nett warrant er ec operations thercuo. Conditions of approval, if any. are attached. e fe sable hd0 to those tightsInthe subject lease which wou Id'enntle the sop leant to conduu any false, ftctft os15 a 0 any o knowingly and wWlhally to snatccto any dcpanment or agency of the United its jurisdiction. Additional Operator Remarks (see nr:'xxt Pagel. x . tt. t Electronic Submission #77166 verified by the BLAH Well Information System For ENCANA 01L 8 GAS (USA) INC., sent to the Meeker Q rilL2�2 p PET 0 O}sU ,E1 INKS AFM1MSSS: •` OPERATORSUBAMITTEO " OPERATOR -SUBMITTED '° OPERATORS ED ". FORM 2 Rev 12/05 1. (X Drill, State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80205 Phone: (303) 894-2100 Fax: (303) 894-2109 APPLICATION FOR PERMIT TO: L' Deepen, ' Re-enter, Recomplete and Operate 2. TYPE OF WELL OIL . GAS f COALBED OTHER SINGLEZONE; '' MULTIPLE ZONE R COMMINGLE ZONE Name of Operator: ENCANA OIL 8 GAS (USA) INC 5. Address: 370 1771-157 STF 1700 City: DENVER State: CO 6. Contact Name: Judith Walter Email: iudith.walter@encana.com Refiling Sidetrack Ia' 0E ET OE Document Number: 400017273 Plugging Bond Surety 20020026 4. COGCC Operator Number: 10018 Zip: 80202-5632 Phone: (720)876-3702 7. Well Name: Story Gulch Unit 8. Unit Name (if apply: Story. Gulch Unt 9. Proposed Total Measured Depth: 58 Fax (720)878-4-702 Well Number: 8502B-36 B36496 Unit Number: COC69333X WELL LOCATION INFORMATION 10. QIrQIr: Lot 2 Sec: 36 Twp: 45. Rng: 96W Meridian: 6 Longitude: -108.113325 FNUFSL FEL/FWL Footage at. Surface: 649 FNL .1591 FEL 11. Field Name: Wildcat Field Number: 99999 Latitude: 39,664275 12: Ground El.evation: 8351 13. County: GARFIELD 14. GPS Data: Dale of Measurement:. 08/06/2009 PDOPReading: 2_0 Instrument Operator's Name:. Robert Kay 15. If well is IX Directional "' Horizontal (highly deviated) submit deviated drilling plan. Footage at Top of Prod Zone: FNUFSL FEUFWL Bottom Hole: FNUFSL FEUFWL 522 FNL 2022 FEL 522 FNL 2022 FEL Sec: 36 Twp: 44S Rng: 96W Sec: 36 Twp: 45 Rng:. 96W 16. Is location in a high density area? (Rule 603b)? ) 'Yes FR No 17, Distance to the nearest building, public road, above ground utility or railroad: 1608 ft 18. Distance to nearest property line: 649 0 19. Distance to nearest well permitted/completed in the same (urination: 620 ft 20. LEASE, SPACING AND POOLING INFORMATION Objective Formations) Formation Code Spacing Order Number(s) Unit Acreage Assigned to Well Unit Configuration (N/2, SE/4, etc.) lies ILES William Fork WMFIS 51da9 10 Date Run: 1(20/2010 Doc (1149001 7 2 7 31 Well Name: Story Gulch Unit 85028.36 836496 Page 1 of 3 21. Mineral Ownership: '. Fee State IX Federal Indian Lease #: COC65557 22. Surface Ownership: iv( Fee ' State ' Federal --, Indian 23. Is the Surface Owner also the Mineral Owner? Yes (X No Surface Surety ID$: 0 23a. If 23 Is Yes: Is the Surface Owner(s) signature on the lease? ,'' Yes 23h, If 2$ is No ; ::Surface Owners Agreement Attached or � $25,000 Blanket Surface Bon : $2,000 Surface Bond i• "$5,000 Surface Bond 24. Using standard QtrQtr, Sec, Two, Rng format enter entire mineral lease description upon which this proposed welisite is located (attach separate sheettmap if you prefer): T4S, R96W, 6th P.M., Lot 1-6, 82N2, N2SW 25. Distance to Nearest Mineral Lease Line: 522 26. Total Acres in Lease:: 485. -. DRILLING PLANS AND PROCEDURES 27. Is H2S anticipated? ' Yes f No If Yes. attach contingency plan. 28. Will salt sections be encountered during drilling? ' Yes (X No 29. Will salt (>15,000 ppm TDS CL) or oil based muds be used during drilling? i -' Yes Fi No 30. If questions 27 or 28 are yes, is this location in a sensitive area (Rule 903)? ,,,' Yes f No If 28, 29, or 30 are' Yee a pit permit may be required. 31. Mud disposal: .' Offsite ig Onsite Method: ' ''. Land Farming (X Land Spreading Disposal Facility - Other: Recvole amend and.bury Note: The use of an earthen pit for Recompletion fluids requires a pit permit (Rule 905b). If air/gas drilling, notify local fire officials. Casing Type Size of Hole Size of Casing Weight Per Foot Setting Depth Sacks Cement Cement Bottom Cement Top CONDUCTOR 26 20 Line Pipe 120 - 176,- 120. 0 SURF 14+3/4. 9+5/8 36 3,000. 2,069. 3,000 0 219D 8+3/4 4+1/2 11.6 13,581 . 857 13,581. 7,921. 32. BOP Equipment Type: I' Annular Preventer X Double Ram I ', Rotating Head s` "_None 33. Comments Surface Csg 12.1/4", 13-1/7, 143/4",Producfon Csg 7-7/8", 8.3(4", Productionsmt top footage Gala ab590'- above - TOG. Onsite inspection was 8/12/2009 with BLM and CDOW from Meeker Co. 34. Location ID: 0 35. is this application in a Comprehensive Drilling Plan ? Yes (X:No 36. Is this application part of. submitted Oil and Gas Location Assessment ? I Yes ! Nu. I hereby certify all statements made in this form are, to the best of my knowledge, true, correct, and complete. Signed. Print Name: Judith Walter Title: Regulatory Analyst Date: 11/21/2009 Email: judith.walter@encana.com Based on the information provided he rein, this Application for Permit -to -Drill complies with COGCC Rules and applicable orders and is hereby approved. COGCC Approved: API NUMBER. 05 045 19002 00 Permit Number: Director of COGCC CONDITIONS OF APPROVAL, IF ANY: Dale: 1/10/2010 Expiration Dale: 1/9/2011 bate Ron: 1/20/2010 Doc (#400017273] Well Name: Story Gulch Unit 8502B-361336496 Page 2 of 3 1 1 1 1 1 1 1 1 1 1 9ccC N r C.' iNDENSrTL 1 ANK / L. HEAR PROOF IRA SH CONTAINER POTABLE WATER SEPTIC SKID irlyATERLE ti •• ■ • • • ••4x.! •• •• FLOWBACK SKID re 0 1 CONSTRUCT BLQQFE PIT JL F % 6O --i4 F'FN,SILN F'. L V. 8396.4 I 1 1 T:NE INSTALL POTABLE WATER ONTAINER DRILL CAMP NAD 83 POSITION: 3827'59.0" NORTH 1O8"17.15.6" WEST INSTALL BEAR PROOF TRASH CONTAINER INSTALL 5 UNIT DRILL CAMP INSTALL \ SEPTIC SKID INSTALL GENERA T¢ INSTALL FUEL TANK PROPOSED DRILL CAMP AND RIG LAYOUT 0 100 SCALE; - 1 -=100' DRIVING DIRECTIONS FROM THE TOWN OF DEBEQUE: BEGINNING AT THE INTERSECTION OF ROAN CREEK ROAD (MESA COUNTY ROAD 45) AND INTERSTATE HIGHWAY NO. 70 AT EXIT NO. 62 SOUTH OF THE TOWN OF DEBEQUE, MESA COUNTY, COLORADO; TRAVEL NORTHERLY ON ROAN CREEK ROAD (MESA COUNTY ROAD 45) FOR 4.0 MILES TO THE MESA-GARFIELD COUNTY LINE. CONTINUE ON ROAN CREEK ROAD (GARFIELD COUNTY ROAD 204) FOR 4.35 MILES TO CONN CREEK ROAD (GARFIELD COUNTY ROAD 213). TURN RIGHT AND TRAVEL EASTERLY AND NORTHERLY FOR 3.9 MILES TO THE OXY ROAD ENTRANCE AND GUARD SHACK. END TRAVEL ON PUBLIC ROADS AND BEGIN TRAVEL ON PRIVATE ROADS. THEN CONTINUE NORTHERLY AND NORTHEASTERLY 8.65 MILES TO A "T" INTERSECTION WITH AN EAST -WEST ROAD. THEN TURN LEFT AND TRAVEL NORTHERLY AND WESTERLY FOR 3.75 MILES TO A "Y" INTERSECTION. THEN BEAR LEFT AND TRAVEL SOUTHWESTERLY AND SOUTHERLY 0.6 MILES TO ANOTHER "Y' INTERSECTION. THEN BEAR RIGHT AND TRAVEL WESTERLY 0.12 MILE TO THE ACCESS FOR THE EXISTING CC 60914 PAD. THEN TURN LEFT ON THE ACCESS AND TRAVEL 0.1 MILE TO THE LOCATION. SURVEYOR'S STATEMENT I, RONALD C. RENNKE, AN EMPLOYEE AND AGENT FDR D. R. GRIFFIN & ASSOCIATES, INC. STATE THE SITE PLAN SHOWN HEREON IS A CORRECT REPRESENTATION OF THE RESULTS OF A SURVEY MADE UNDER MY AUTHORITY ON DECEMBER 14, 2009 FOR THE PROPOSED CASCADE CREEK 609-14 DRILL CAMP_ COLORADO PLS No, 37065 FROM THE TOWN OF PARACHUTE: BEGINNING AT Th -IE INTERSECTION OF GARFIELD COUNTY ROAD 315 AND INTERSTATE HIGHWAY NO. 70 ON THE EAST SIDE OF PARACHUTE, GARFIELD COUNTY, COLORADO; TRAVEL NORTHWESTERLY ON GARFIELD COUNTY ROAD 315 FOR 7.3 MILES TO THE GARDEN GULTCH ROAD TURNOFF. END TRAVEL ON PUBLIC ROADS AND BEGIN TRAVEL ON PRIVATE ROADS. TURN LEFT AND TRAVEL NORTHERLY AND WESTERLY FOR 0.65 MILE TO TI -IE LOWER WILLIAMS GUARD SHACK_ THEN CONTINUE WESTERLY 5.6 MILES TO THE UPPER WLLIAMS GUARD SHACK AND A "Y" INTERSECTION. BEAR LEFT ON AND TRAVEL 2.1 MILES TO A "T" INTERSECTION. CONTINUE STRAIGHT (BEARING RIGHT AT THE "T") FOR 2.85 MILES TO A "Y" INTERSECTION. BEAR LEFT AND TRAVEL 0.55 MILES TO A "T" INTERSECTION. CONTINUE STRAIGHT (BEARING RIGHT AT THE "T") 3.75 MILES TO A "Y" INTERSECTION. THEN BEAR LEFT AND TRAVEL SOUTHWESTERLY AND SOUTHERLY 0.6 MILES TO ANOTHER "Y' INTERSECTION. THEN BEAR RIGHT AND TRAVEL WESTERLY 0.12 MILE TO THE ACCESS FOR THE EXISTING CC 609-14 PAD.. THEN TURN LEFT ON THE ACCESS AND TRAVEL 0.1 MILE TO THE LOCATION. SURFACE AND MINERAL OWNERSHIP OXY USA WTP LP 760 HORIZON DRIVE, SUITE 101 GRAND JUNCTION, COLORADO 81506 (970) 263-3637 INSTALLATION AND REMOVAL DATES 1. INSTALLATION DATE: APRIL 1, 2010 2_ REMOVAL DATE: FEBRUARY 21, 2011 3. CUMULATIVE TIME: 327 DAYS VICINITY MAP SCALE: 1"=51000' 24 HOUR RESPONSE CONTACT INFORMATION: 1. ALDNZO HERNA,NDEZ (HES SUPERINTENDENT), OXY USA WTP LP (970) 263-360)9 (970) 980-6055 2. BRETT KENNEDI', (Sr. HES SPECIALIST), OXY USA WTP LP (970) 263-36011 (970) 201-23(15 .3. ST, MARY'S HOSPITAL, GRAND JUNCTION, CO. (970) 244-7050 4_ ST. MARY'S CAREFLIGHT HELICOPTER, GRAND JUNCTION, CO. (970) 332-492'3 SHEET 1 OF 1 JOB No. 10841 DATE: 7126/2070 - DEH 5. GARFIELD COUNTY SHERRJFF'S OFFICE, RIFLE, CO. (970) 625-8095 6. DEBEQUE FIRE PROTECTION DISTRICT P.O. BOX 180, DEBEQUE, CO. 81630 7. DEBEGUE VOLUNTEER RESCUE DEPARTMENT, DEBEQUE, 00. (970) 283-5907