Loading...
HomeMy WebLinkAbout1.0 ApplicationGARFIELD COUNTY Building and Planning Department 108 8th Street, Suite 401 Glenwood Springs, Colorado 81601 Telephone: (970) 945-8212 Facsimile: (970) 384-3470 www.ciarfield-county.com Small Temporary Employee Housing Administrative Checklist GENERAL INFORMATION — Submit 1 paper 81 CD copy of the completed application to Planning Department wfin 48 hours following occupation (To be completed by the Small Facility Operator — e.g. well pad operator) Section/Township/Range Location of Housing Site: Sec 35-T7S-R96W Well Pad Number: SG 13-35 Tax Parcel Number for Parcel Containing Housing Site: 2409-353-00-130 GPS and/or Lat-Long Coordinates of Housing Facility Site (Often included in APD): Lat: 39.390836 Long: -108.083278 Zone District: Rural Maximum Number of Occupants at Permitted Site (e.g. well pad): Tess than 8 Cumulative Amount of Time (in Days) The Facility Will be at Location: 60days State or Federal Permitting Agency Overseeing Reclamation, Restoration and Revegetation and Relevant Permit Number: COGCC 400083971 Date of Installation: November 17`h 2011 Date of Removal: January 17`h 2012 Name of Landowner: Basely Spring Creek Ranch LLLC Street Address: PO Box 26 Telephone: (970)923-8999 Email: City: Woody Creek State: CO Zip Code: 81656 Name of Operator's Compliance Officer: Williams Production RMT Company LLC Bryan S. Hotard Street Address: PO Box 370 Telephone: 970-285-9377 ext 2754 Email: Brvan.Hotard(a�william s.com City: Parachute State: CO Zip Code: 81635 Company 24 -Hour Emergency Contact: Williams Production RMT Company LLC Phone Number: 970-285-9377 This Administrative Cheddist must be received by the Gafaeld County Planning Department hours following occupancy of the Small Facility. within 48 be delivered to within 48 hours Office and or verified is the Operator's been received by A copy of this completed Administrative Checklist and all associated submittals shall the Garfield County Sheriff's Office and relevant Fire Protection District (if applicable) following occupancy of the Small Facility. Additionally, the Garfield County Sheriff'sreceipt) relevant Fire Protection District (if applicable) must be notified in writing (return email (return receipt) within 48 hours following removal of the Small Facility. It responsibility to confirm and obtain verification that the Administrative Checklist has 1 Fire Suppression Requirements (Per Performance Standard L) "A water storage tank is required to provide water to the sprinkler system (if applicable) and initial suppression activities. The size of the water tank shall be determined based on sprinkler calculations and initial suppression demands. The relevant fire protection district shall be responsible for determining the size of the water storage tank. If the Small Facility is not within a fire protection district, the Operator shall provide at least 2500 gallons of water dedicated to initial fire suppression which is accessible with a dry hydrant." Required Size of water storage tank for sprinkler system and initial suppression activities: 500BBLI 21,000 gallons A. Outline of Process. The Small Temporary Housing Facility(ies) Review process shall consist of the following procedures as more fully outlined in Section 4-109 of Article IV of the Unified Land Use Resolution of 2008. 1. Application to relevant protection districts and the Garfield County Sheriffs Office. 2. Application to the County B. Review Process. Prior to submittal of any forms to the Planning Department, the applicant shall submit all documents to the relevant fire protection district(s) and the Garfield County Sheriffs Office. All forms shall be accurately completed, signed, dated and submitted to the Garfield County Planning Department within 48 hours following occupation of the Small Facility. C. Submittal Requirements. The application submitted to the County shall contain the following information: i. A vicinity map indicating the section, township, and range of the subject lot and the location of Small Facility within the subject lot and the Permitted Site; general relation to surrounding public roads, private roads, adjacent utility systems, residential development, other actively permitted Small, Minor and Major Facilities, natural drainage courses and municipalities within one (1) mile of the proposed Small Facility; north arrow and scale; GPS coordinates and current surface ownership of the subject lot. The vicinity map shall be presented on a USGS 7.5 minute series quadrangle at a scale of 1"2000' or equivalent, with a topography depicted at a minimum of 40' intervals. ii. Surveyed layout of the proposed Small Facility within the surveyed boundaries of the Permitted Site, including at a minimum: sewage and wastewater disposal, trash receptacles, potable water storage, all other associated infrastructure and all other equipment located within the Permitted Site. (See Section 4-502 (C )(3) for site plan definition) iii. Identification of the private and public roadways accessing each Small Facility. Roadways shall be marked as open, gated, and/or locked (include combinations). Detailed directions, with mileage, shall be given from the nearest town within Garfield County, nearest Garfield County Sheriff's Office dispatch location and responsible fire district headquarters to each Small Facility, along each roadway. iv. Name, address and phone number of surface owner of the subject lot. v. Name, address and phone number, including a 24-hour emergency response number of at least two persons responsible for Operator's emergency field operations contact numbers for local hospitals, emergency response, fire protection 2 districts, Garfield County Sheriff's Office, Life/Care Flight, and applicable regulatory agencies; site safety/evacuation plan; and any other written response plan for potential emergencies at the Permitted Site. vi. Identification of the anticipated dates of installation and removal of the Small Facility. The site plan shall include a notation of the total cumulative length of time (number of days) that the Small Facility will be installed at the Permitted Site. ELIGIBILITY Requirement (Section 7-808 (D)(3) — All Requirements Must be Satisfied to be Eligible as a Small Facility Applicant Planning Department Complies (Y/N) Complies (YIN) The Small Facility and any associated infrastructure must be completely contained within a state or federally permitted parcel (such as a Colorado Oil and Gas Conservation Commission (COGCC) approved oil/gas well pad) in which reclamation and revegetation are secured with the permitting agency (Permitted Site); and, YES The Small Facility is located at the Permitted Site for less than a cumulative of one (1) year and at the end of the utilization period, all structures, foundations and associated infrastructure are completely removed; and, YES The Small Facility shall have an occupancy of eight (8) or fewer people within a Permitted Site (e.g. well pad) who are employees, contractors or sub-contractors of the operator of the small facility and are needed for onsite safety of the related commercial, industrial, extraction or highway operation. Temporary employee housing facilities that do not have the three characteristics listed above, or consist wholly or in part of Recreational Vehicles as defined above, are subject to the administrative permit requirements or the Major Impact Permit process, standards and requirements contained in this document. YES 3 Building Information (Per Unit) Unit 1 Make: ATCO Structures (USA) Inc Serial Number or Unit ID Number: 30-3321 Manufacture Year: 2008 Size of Unit (Square Feet): 14X56 Unit 2 Make: ATCO Structures Serial Number or Unit ID Number: 354085938 Manufacture Year: 2008 Size of Unit (Square Feet): 14X56 Unit 3 Make: Serial Number or Unit ID Number: Manufacture Year: Size of Unit (Square Feet): Unit 4 Make: Serial Number or Unit ID Number: Manufacture Year: Size of Unit (Square Feet): Unit 5 Make: Serial Number or Unit ID Number: Manufacture Year: Size of Unit (Square Feet): ISDS Permit ISDS Permit Number: Submitted 11-16-11 - Requested and have not received as of 11-17-11 SP+- aar4- Signature of Operator's Compliance Officer: ��'/�) this checklist is correct and accurate to (By signing this form, 1 verify that all informa on provided in the best of my knowledge) Print Name: Bryan S. Hotard Title: Attorney -In -Fact 4 Eligibility, Submittal and Performance Standards Certification Section 7-808(D)(3) - Small Temporary Employee Housing Facilities (Small Facility(ies)) in Article VII -- Standards, requires the that the following performance standards be met with each facility: Small Facilities, in the nature of Factory Built Nonresidential Structures [as defined under C.R.S. 24-32-3302(a)] but NOT recreational vehicles [as defined under C.R.S. 42-1-102 (61), including truck, truck tractor, motor home or camper trailer], may be utilized for housing of workers on projects related to commercial, industrial, mineral extraction or highway operations, pursuant to the standards for Small Facilities contained in sub- section (2), below. Such facilities are not subject to Garfield County building and fire codes (building code, fire code). However, Small Facilities are subject to all pertinent state (i.e. electrical permits), federal permits and relevant fire protection district(s) code requirements. Small Facilities shall have all of the following basic characteristics: A. The Small Facility and any associated infrastructure must be completely contained within a state or federally permitted parcel (such as a Colorado Oil and Gas Conservation Commission (COGCC) approved oil/gas well pad) in which reclamation and revegetation are secured with the permitting agency (Permitted Site); and, B. The Small Facility is located at the Permitted Site for less than a cumulative of one (1) year and at the end of the utilization period, all structures, foundations and associated infrastructure are completely removed; and, C. The Small Facility shall have an occupancy of eight (8) or fewer people who are employees, contractors or sub -contractors of the operator of the small facility and are needed for onsite safety of the related commercial, industrial, extraction or highway operation. Temporary employee housing facilities that do not have the three characteristics listed above, or consist wholly or in part of Recreational Vehicles as defined above, are subject to the administrative permit requirements or the Major Impact permit process, standards and requirements contained in this document. The Small Facility shall adhere to the following Standards: All required submittals (as outlined in (2), above) shall be submitted to the Planning Department within 48 hours following occupation of the Small Facility. Enforcement shall be in accordance with this Resolution. The Small Facility shall demonstrate and certify compliance with the following standards: A. Small Facility must comply with all applicable federal, state and local laws and regulations. B. The Small Facility shall NOT contain recreational vehicles as defined in Section 7- 808 (D). 5 C. In no case shall unsafe water be used for drinking nor shall raw sewage or contaminated water be discharged on the ground surface. The operator shall conduct monthly tests (or quarterly if an on-site disinfection system is installed) and maintain records of stored potable water samples specific for coli form bacteria. Any tests indicating coli form contamination must be disclosed to the Garfield County Board of Health or designee within 72 hours from the time the contaminated water was tested. D. Each Small Facility shall be maintained in a clean, safe and sanitary condition, free of weeds and refuse. Any hazardous or noxious materials that must be stored at the Small Facility for operational or security reasons must be managed in accordance with all applicable federal, state and local laws and regulations. E. At least one thirty (30) gallon (4 cubic feet) wildlife -proof refuse container shall be provided for each Factory Built Non -Residential Structure unit. Said container(s) must be durable, washable, non-absorbent metal or plastic with tight -fitting lids. F. Refuse shall be disposed of weekly, at a minimum. Operators must keep appropriate records, to be provided to the County or any interested third party upon request, to demonstrate that refuse is collected in a timely fashion and disposed of at a licensed facility. G. Outdoor food storage is prohibited. H. Factory Built Non -Residential Structures equipped by the manufacturer with a fire sprinkler system, fire detection system, and/or alarm system shall be inspected, tested, and maintained in accordance with the requirements of the relevant fire protection district(s) and the Colorado Division of Housing. I. Single -station carbon monoxide alarms shall be placed in each Factory Built Non - Residential Structure. J. One (1) or more approved fire extinguisher(s) of a type suitable for flammable liquids, combustible materials and electrical fires (Class ABC), or dry chemical, shall be located in each Factory Built Non -Residential Structure and placed in accordance with applicable fire protection district and/or Colorado Division of Housing codes. K. Domestic animals are prohibited at all Small Facilities. L. A water storage tank is required to provide water to the sprinkler system (if applicable) and initial suppression activities. The size of the water tank shall be determined based on sprinkler calculations and initial suppression demands. The relevant fire protection district shall be responsible for determining the size of the water storage tank. If the Small Facility is not within a fire protection district, the Operator shall provide at least 2500 gallons of water dedicated to initial fire suppression which is accessible with a dry hydrant within each Permitted Site for a Small Facility. M. The operator shall document all emergency situations requiring action by any government agency or fire protection district, in writing, and such documentation shall be presented to the Planning Department within 24 hours of the occurrence. N. All required Access Permits shall be obtained from the Garfield County Road and Bridge Department or the Colorado Department of Transportation. 6 O. The Garfield County Sheriff's Office and relevant fire protection district(s) shall be notified and provided with all documentation as outlined in these regulations, within 48 hours following occupation of each Small Facility. In addition, the Garfield County Sheriff's Office and relevant fire protection district(s) shall be notified either by hard -copy or electronically within 48 hours following removal of all Small Facilities. The Planning Department shall be copied on all such notification, whether hard copy or electronic. P. The Operator shall maintain records identifying workers, whether employees, contractors or sub -contractors, and document the dates that each worker is housed at the Small Facility. Such records shall be provided to the County or any additional third party upon request. Q. The Operator shall obtain a certification inspection conducted by a third -party Professional Engineer Licensed in the State of Colorado. The certification shall verify that at the time of inspection the identified Small Facility meets or exceeds the standards set forth in Article 7.808 D. 2. of the Garfield County Land Use Code of 2008, as amended. This certification shall be on forms provided by the Garfield County Planning Department. The certification shall be provided to the Garfield County Planning Department within 48 hours following occupation of the Small Facility. R. The Operator shall accurately complete all required forms provided by the Garfield County Planning Department identifying the location of the facility (Section/Township/Range, relevant Tax Parcel Number, and GPS coordinates or Latitude/Longitude coordinates); relevant zone district; maximum number of occupants; cumulative amount of time (in days) that the Small Facility will be at the specified location; identification of the State or Federal permitting agency overseeing reclamation, rehabilitation and revegetation of the Permitted Site and relevant permit number; date of installation; date of removal; name and contact information of the landowner; name and contact information of the Operator's Compliance Officer; 24-hour emergency contact information for the Operator; building information (make, manufacture year, serial number, size (square feet)); signature and contact information of the Operator's Compliance Officer. S. Wastewater Disposal: 1) Vault System: All vault systems shall be designed and installed to accommodate the maximum number of persons (eight or less individuals), who will inhabit the Small Facility. In addition, all vault systems shall be equipped with an overflow alarm device. Vault systems shall be designed to accommodate a minimum of 75 gallons of wastewater per person per day. If a vault system is proposed or has been approved, the Operator must: a. Demonstrate that year-round vehicular access is available and maintained for safe and regular access for sewage hauling vehicles. b. Maintain all sewage disposal records including but not limited to trip logs/reports and landfill receipts as public records, available to the County and/or any other interested third party upon request. c. (b) Individual Sewage Disposal System (ISDS): If an ISDS is proposed, then it shall be designed, installed and operated to accommodate the maximum number of persons who will inhabit the Small 7 Facility (eight or less individuals) and shall otherwise be permitted and operated in accordance with the Garfield County ISDS regulations as contained in BOCC Resolution Number 1994H-136. I hereby attest that I am the designated Compliance Officer for the aforementioned Small Temporary Employee Housing Facility(ies). I attest that I have read and understand the standards to which the Facility(ies) shall be installed and operated. I attest that the Facility(ies) will be constructed and maintained in accordance with all applicable Garfield County, State of Colorado and Federal regulations and standards. In addition, I attest that I have read and understand the enforcement provisions as described in Article 12 of the Garfield County Unified Land Use Resolution of 2008. Further, I understand that non-compliance with any of the provisions as outlined in Article 7-808 (D) (3) of the Garfield County Unified Land Use Resolution of 2008 shall be enforced in accordance with Article 12. Signature of Operator's Compliance Officer: Print Name: Bryan S. Hotard Title: Attorney -In- Fact Phone Number: 970-285-9377 ext 2754 Email: Bryan.Hotard a(�wiiliams.com Bob.Caughlin(a�williams.com I hereby attest that I am a Licensed Professional Engineer in the State of Colorado. I attest that I have conducted a visual inspection of the Small Facility identified in this Administrative Checklist, as installed, and, based on information from that inspection I certify that the Small Facility complies with the standards set forth in Article 7-808 (D) (3) of the Unified Land Use Resolution of 2008. PE Certification Number PE Stamp See Summary Date of Inspection See Summary Print Name and Title: David Fox of Fox Engineering Solutions Signature See Form 8 Inspection Report for: Prepare for: Location: Conducted By: Date Conducted: Paragraph Reference Fox Engineering Solutions LLC 670 Canyon Creek Drive, Grand Junction, CO 81507 Ph: (970) 250-5505 / Fax: (626) 784-0667 Email: coloradofox@bresnan.net SG 13-35 Well Pad - Small Temporary Employee Housing Williams Production RMT Company NW 1/4 SW 1/4 of Section 35, T7S, R96W, 6th P.M. Garfield County David Fox, P.E. November 17, 2011 Garfield County Article 7-808(0)(3) Land Use Resolution 2008 Characteristic or Standard Description 3.a. Small Facilities, in the nature of Factory Built Nonresidential Structures [as defined under C.R.S. 24-32-3302(a)] but NOT recreational vehicles [as defined under C.R.S. 42.1-102 (61), including truck, truck tractor, motor home or camper trailer], may be utilized for housing of workers on projects related to commercial, industrial, mineral extraction or highway operations, pursuant to the standards for Small Facilities contained in subsection (2), below. Such facilities are not subject to Garfield County building and fire codes (building code, fire code). However, Small Facilities are subject to all pertinent state (i.e. electrical permits), federal permits and relevant fire protection district(s) code requirements. 3.a.(1) 3.a.(2) 3.a.(3) The Small Facility and any associated infrastructure must be completely contained within a state or federally permitted parcel (such as a Colorado Oil and Gas Conservation Commission (COGCC) approved oil/gas well pad) in which reclamation and revegetation are secured with the permitting agency (Permitted Site); and, The Small Facility is located at the Permitted Site for less than a cumulative of one (1) year and at the end of the utilization period, all structures, foundations and associated infrastructure are completely remove& and. The Small Facility shall have an occupancy of eight (8) or fewer people who are employees, contractors or sub -contractors of the operator of the small facility and are needed for onsite safety of the related commercial, industrial, extraction or highway operation. Page 1 of 5 Inspection Comments Colorado Division of Housing certifications noted on Driller's trailer, Unit ID. 30-3321 with FBNR Certification No. 20533 manufactured by Ameritech Building Systems on October 13, 2008; and Company trailer, Unit ID. 354085938 with FBNR Certification No. 19708 manufactured by ATCO Structures on July 14, 2008. All other aspects not subject to visual inspection and certification by third party Professional Engineer. Not subject to visual inspection and certification by third party Professional Engineer. Not subject to visual inspection and certification by third party Professional Engineer. Not subject to visual inspection and certification by third party Professional Engineer. SG 13-35 inspection Fox Engineering Solutions LLC Williams Production RMT Company November 17, 2011 1 Small Facility must comply with all applicable federal, state and local laws and regulations. 2 The Small Facility shall NOT contain recreational vehicles as defined in Section 7-808 (0). 3 In no case shall unsafe water be used for drinking nor shall raw sewage or contaminated water be discharged on the ground surface. The operator shall conduct monthly tests (or quarterly if an on-site disinfection system is installed) and maintain records of stored potable water samples specific for coli form bacteria. Any tests indicating coli form contamination must be disclosed to the Garfield County Board of Health or designee within 72 hours from the time the contaminated water was tested. 4 Each Small Facility shall be maintained in a clean, safe and sanitary condition, free of weeds and refuse. Any hazardous or noxious materials that must be stored at the Small Facility for operational or security reasons must be managed in accordance with all applicable federal, state and local laws and regulations. 5 At least one thirty (30) gallon (4 cubic feet) wildlife -proof refuse container shall be provided for each Factory Built Non -Residential Structure unit, Said container(s) must be durable, washable, non- absorbent metal or plastic with tight -fitting lids. 6 Refuse shall be disposed of weekly, at a minimum. Operators must keep appropriate records, to be provided to the County or any interested third party upon request, to demonstrate that refuse is collected in a timely fashion and disposed of at a licensed facility. 7 Outdoor food storage is prohibited. 8 Factory Built Non -Residential Structures equipped by the manufacturer with a fire sprinkler system, fire detection system, and/or alarm system shall be inspected, tested, and maintained in accordance with the requirements of the relevant fire protection district(s) and the Colorado Division of Housing. 9 Single -station carbon monoxide alarms shall be placed in each Factory Built Non- Residential Structure. 10 One (1) or more approved fire extinguisher(s) of a type suitable for flammable liquids, combustible materials and electrical fires (Class ABC), or dry chemical, shall be located in each Factory Built Non - Residential Structure and placed in accordance with applicable fire protection district and/or Colorado Division of Housing codes. Page 2 of 5 Not subject to visual inspection and certification by third party Professional Engineer. No recreational vehicles observed on site. One potable water tanks of approximately 4000 gallons and one 4000 -gallon sewage holding tank onsite. All tanks and piping located above ground. No on-site disinfection systems installed. Site appeared to be maintained in clean, safe and sanitary condition, free of weeds and refuse. One wildlife -proof trash recepacle with a capacity of approximately 20 cubic yards each onsite. Individual refuse containers in each office/housing structure. Not subject to visual inspection and certification by third party Professional Engineer. No outdoor food storage observed on-site. No active fire sprinkler systems observed in any of the factory built non-residential structures. Smoke detectors observed in all factory built non- residential structures. Colorado Division of Housing (CDH) compliance tags on all factory built non- residential structures stating compliance with nonresidental construction standards of the State of Colorado. Carbon monoxide detector located in all factory built non-residential structure (FBNR). Fire extinguishers observed in all structures. SG 13-35 Inspection Fax Engineering Solutions LLC Williams Production RMT Company November 17, 2011 11 Domestic animals are prohibited at all Small Facilities. 12 A water storage tank is required to provide water to the sprinkler system (if applicable) and initial suppression activities. The size of the water tank shall be determined based on sprinkler calculations and initial suppression demands. The relevant fire protection district shall be responsible for determining the size of the water storage tank. If the Small Facility is not within a fire protection district, the Operator shall provide at least 2500 gallons of water dedicated to initial fire suppression which is accessible with a dry hydrant within each Permitted Site for a Small Facility. 13 The operator shall document all emergency situations requiring action by any government agency or fire protection district, in writing, and such documentation shall be presented to the Planning Department within 24 hours of the occurrence. 14 All required Access Permits shall be obtained from the Garfield County Road and Bridge Department or the Colorado Department of Transportation. 15 The Garfield County Sheriffs Office and relevant fire protection district(s) shall be notified and provided with all documentation as outlined in these regulations, within 48 hours following occupation of each Small Facility. In addition, the Garfield County Sheriffs Office and relevant fire protection district(s) shall be notified either by hard- copy or electronically within 48 hours following removal of all Small Facilities. The Planning Department shall be copied on all such notification, whether hard copy or electronic. 16 The Operator shall maintain records identifying workers, whether employees, contractors or sub -contractors, and document the dates that each worker is housed at the Small Facility. Such records shall be provided to the County or any additional third party upon request. 17 The Operator shall obtain a certification inspection conducted by a third -party Professional Engineer Licensed in the State of Colorado. The certification shall verify that at the time of inspection the identified Small Facility meets or exceeds the standards set forth in Article 7.808 D. 2. of the Garfield County Land Use Code of 2008, as amended. This certification shall be on forms provided by the Garfield County Planning Department. The certification shall be provided to the Garfield County Planning Department within 48 hours following occupation of the Small Facility. Page 3 of 5 No domestic animals observed on-site. One potable aboveground water tank of approximately 4000 gallons capacity on-site. Potable water demand is estimated to be 300 gallons/day gallons (4 individuals x 75 gpcd). Required fire suppression demand is 2500 gallons. Total potable and fire suppression volume required is estimated to be 4000 gallons. Water supply appears adequate with 4000 gallons of storage with refills scheduled at 5 -day intervals. Dry hydrant observed on water tank. Not subject to visual inspection and certification by third party Professional Engineer. Not subject to visual inspection and certification by third party Professional Engineer. Not subject to visual inspection and certification by third party Professional Engineer. Not subject to visual inspection and certification by third party Professional Engineer. This inspection was conducted by a third -party Professional Engineer licensed in Colorado and certifies compliance only with applicable standards set forth in Article 7.808 D. 3. of the Garfield County Land Use Code of 2008, as amended, that are subject to visual inspection. SG 13-35 Inspection Fox Engineering Solutions LLC Williams Production RMT Company 18 The Operator shall accurately complete all required forms provided by the Garfield County Planning Department identifying he location of the facility (Section/Township/Range, relevant Tax Parcel Number, and GPS coordinates or Latitude/Longitude coordinates); relevant zone district; maximum number of occupants; cumulative amount of time (in days) that the Small facility will be at the specified location; identification of the State or Federal permitting agency overseeing reclamation, rehabilitation and revegetation of the Permitted Site and relevant permit number; date of installation; date of removal; name and contact information of the landowner; name and contact information of the Operator's Compliance Officer; 24-hour emergency contact information for the Operator; building information (make, manufacture year, serial number, size (square feet)); signature and contact information of the Operator's Compliance Officer. 19(a) Vault System: All vault systems shall be designed and installed to accommodate the maximum number of persons (eight or less individuals), who will inhabit the Small Facility. In addition, all vault systems shall be equipped with an overflow alarm device. Vault systems shall be designed to accommodate a minimum of 75 gallons of wastewater per person per day. If a vault system is proposed or has been approved, the Operator must: 19(a)(1) Demonstrate that year-round vehicular access is available and maintained for safe and regular access for sewage hauling vehicles. 19(a)(2) Maintain all sewage disposal records including but not limited to trip logs/reports and landfill receipts as public records, available to the County and/or any other interested third party upon request. 19(b) Individual Sewage Disposal System (1505): If an ISDS is Facility (eight or less individuals) and shall otherwise be permitted and operated in accordance with the Garfield County 1505 regulations as contained in BOCC Resolution Number 1994H-136. proposed, then it shall be designed, installed and operated to accommodate the maximum number of persons who will inhabit the Small Facility (eight or less individuals) and shall otherwise be permitted and operated in accordance with the Garfield County ISDS regulations as contained in BOCC Resolution Number 1994H-136. Page4of5 November 17, 2011 Not subject to visual inspection and certification by third party Professional Engineer. One aboveground sewage holding tank with 4000 - gallon capacity on-site. Sewage flows estimated to be 300 gallons/day (4 individuals x 75 gpcd). Sewage holding tanks need to be emptied approximately every 13.3 days (4000 gallons / 300 gallons per day). Wastewater vault equipped with overflow alarm device. Not subject to visual inspection and certification by third party Professional Engineer. Not subject to visual inspection and certification by third party Professional Engineer. Not subject to visual inspection and certification by third party Professional Engineer. SG 13-35 Inspection Fox Engineering Solutions LLC Williams Production RMT Company November 17, 2011 1 hereby attest that 1 am a Licensed Professional Engineer in the State of Colorado. l attest that 1 have conducted a visual inspection of the Small Facility identified in this Administrative Checklist, as installed, and, based on information from that inspection 1 certify that the Small Facility complies with the standards, subject to and limited to visual inspections items as identified above; set forth in Article 7-808 (D) (3) of the Unified Land Use Resolution of 2008, for Garfield County, Colorado. PE Certification Number: No. 25420 (Colorado Date of Inspection: November 17, 2011 Print Name and Title: David J. Fox, Princi al Engineer Signature: -r Page 5 of 5 PE Stamp Williams Production RMT Company SG 13-35 Well Pad r -s!_ 1 -SSI r° :77. •• FiNCIE 7;)r P*01.056o ACCM.5 [ .ren ��4ir�9iri Slre., Lta JIT.Tf1T.Tr LEGEND: VIC IMAM tlry x+rrnnx.n mrr: 111,ITY e - - - - nerr1YnaTiOr 0 mi.1LLcarrial r.1aD t lietah lineincari.=- 1..nd Surveying ,1.9,710.2•117 - VA.., cases -r-...s XX 11.1.1.1\ii PRODUCTION R\Tr ('OMP NY N SG 13-35 SECTION A<. T7` R90 6110 P.\I. Tri P (1 G 1t .L 1' IC NI .l t• 03 TIT Djce_ctions to Site' WILLIAMS PRODUCTION RMT COMPANY PLAT #4_TYPICAL RIG LAYOUT FOR SC 13-35 SECTION 35, 175, R96W, 61h P.M. SCALE, ep' Ii VkAWi: Je 1e,3 n.4—.1-11 113 -. a la Approximate Drill Rig 6 Equipment Ares E M PRDUCIION EOUlPtrENT AREA (t5250) -'x Thee Portable Toilets Identification & Location K.o 1. Wastewater Aboveground Tank (4000 gal.) 2. Potable Wates Aboveground Tank (4000 gal) 3. Tutee Portable Tait, 4. W ildefe-proof drnnpstor 5. Company Man Offi<»Aldairg 6. Onllers Officee4or,wrg 7. Shed Subject to relocetron for construction activities. .Eo)ltgenlev Contact Litt; Main Omoe- 970-285.9377 answered 24 Hours Lyn Cass Wiilams Production 970-755-0083 Cell Scott Brady- Williams Drilling Sup -070-270-9187 Cef Kevin McGowan.- Wilpams Satery-970300,1105 Cell Mark Murnby - Spill Contractor 970.260-1578 Cell 0 50 Ft. Ft. 100 150 Ft. Ft. Williams. The well pad site is located in the NW 114 SW 174 of Section 35, T75. R96W. 6th P.M. (NAD83 N39.3909° W108.0633°) The site will temporarily office and house up to a maximum of four individu3 0 during natural gas drilling activities and is expected to be completed in one year or less. The individuals will occupy two individual trailer offices/houses located on the well pad. Office/houses have Colorado Division of Housing compliance tags. One aboveground sewage holding tank with 4000 -gallon capacity on-site. Sewage flows estimated to be 300 gallons/day (4 individuals x 75 good). Sewage holding tank needs to be emptied approximately every 13.3 days (4000 gallons 1 300 gallons per day). Wastewater vault equipped with overflow alarm device. Williams utilizes the services of a licensed contractor to remove and haul the wastewater to a State certified treatment/disposal facility. One potable aboveground water tank of approximately 4000 gallons capacity on-site. Potable water demand is estimated to be 300 gallons/day (4 individuals x 75 gpcd). Required minimum fire suppression demand is 2500 gallons. Total potable and fire suppression volume required is estimated to be 4000 gallons. Water supply appears adequate with 4002 gallons of storage with refills scheduled at 5 -day intervals. Dry hydrants Observed on water tank. Road access to the site is maintained year-round through the services of private road maintenance and construction contractors. Base mapping by Uintah Engineering and Land Surveying. Site features including housing trailers, water and wastewater tanks. portable toilets and dumpster were field located. Site features including housing trailers. water and wastewater tanks. portable toilets and dumpster surveyed with Trimble Geo -XT GPS equipment. Please note that this is a construction site and that the locations of drill equipment and other items are subject to change. All Factory -Built Nonresidential Structures (Office/Housing) have a minimum separation distance of 28 ft. SG 13-35 Site Plan Garfield County, Colorado Small Temporary Employee Housing and Septic Permit Application Applicant: Williams Production RMT Date: November 17. 2011 Checked: [If Fox Engineering Solutions LLC 670 Canyon Creek Drive, Grand Junction, CO 81507 Ph: (910) 250-5505 f Fax' (1129) 78443567 Fr1ta'I: coloradofox@brssnan.nst Verori 071 GARFIELD COUNTY BUILDING AND PLANNING DEPARTMENT FEE SCHEDULE Garfield County, pursuant to Board of County Commissioners ("Board") Resolution No. 98-09, has established a fee structure ("Base Fee") for the processing of each type of subdivision and land use applications. The Base Fee is an estimate of the average number of hours of staff time devoted to an application, multiplied by an hourly rate for the personnel involved. The Board recognized that the subdivision and land use application processing time will vary and that an applicant should pay for the total cost of the review which may require additional billing. Hourly rates based on the hourly salary, and fringe benefits costs of the respective positions combined with an hourly overhead cost for the office will be used to establish the actual cost of County staff time devoted to the review of a particular project. Actual staff time spent will be charged against the Base Fee. After the Base Fee has been expended, the applicant will be billed based on actual staff hours accrued. Any billing shall be paid in full prior to final consideration of any land use permit, zoning amendment or subdivision plan. If an applicant has previously failed to pay application fees as required, no new or additional applications will be accepted for processing until the outstanding fees are paid. Checks, including the appropriate Base Fee set forth below, must be submitted with each land use application, and made payable to the Garfield County Treasurer. Applications will not be accepted without the required application fee. Base Fees are non-refundable in full, unless a written request for withdraw from the applicant is submitted prior the initial review of the application materials. Applications must include a Payment Agreement Form ("Agreement") set forth below. The Agreement establishes the applicant as being responsible for payment of all costs associated with processing the application. The Agreement must be signed by the party responsible for payment and submitted with the application in order for it to be accepted. The following Base Fees shall be received by the County at the time of submittal of any procedural application to which such fees relate. Such Base Fees shall be in addition to and exclusive of any cost for publication or cost of consulting service determined necessary by the Board for the consideration of any application or additional County staff time or expense not covered by the Base Fee, which have not otherwise been paid by the applicant to the County prior to final action upon the application tendered to the County. GARFIELD COUNTY BUILDING AND PLANNING DEPARTMENT BASE FEES TYPE OF LAND USE ACTION BASE FEE Vacating Public Roads & Rights -of -Way $400 Sketch Plan $325 $675 + application agency review fees and outside Preliminary Plan / Conservation Subdivision consultant review fees, as authorized pursuant to the Regulations, such as the Colorado Geologic Survey Preliminary Plan Amendment $325 Final Plat $200 Final Plat Amendment / Correction Plat $100 Combined Preliminary Plan and Final Plat $1,075 Minor Exemption / Amendment $300 / $300 Major Exemption / Amendment $400 / $300 Rural Land Development Option Exemption / Amendment $400 / $300 General Administrative Permit $250 Floodplain Development Permit $400 Pipeline Development Plan / Amendment $400 / $300 Small Temporary Employee Housing $50 Minor Temporary Employee Housing $250 Limited Impact Review / Amendment $400 / $300 Major Impact Review / Amendment $525 / $400 Rezoning: Text Amendment $300 Rezoning: Zone District Amendment $450 Planned Unit Development (PUD) / Amendment $500 / $300 Comprehensive Plan Amendment $450 Variance $250 Interpretation $250 Takings Determination NO FEE Planning Staff Hourly Rate • Planning Director $50.50 • Senior Planner $40.50 • Planning Technician $33.75 • Secretary $30.00 County Surveyor Review Fee (includes review of Amended Determined by Surveyor$ Plats, Final Plats, Exemption Plats) $ 1 1 — Mylar Recording Fee st $10 each additional page Page 2 The following guidelines shall be used for the administration of the fee structure set forth above: 1. All applications shall be submitted with a signed Agreement for Payment form set forth below. 2. County staff shall keep accurate record of actual time required for the processing of each land use application, zoning amendment, or subdivision application. Any additional billing will occur commensurate with the additional costs incurred by the County as a result of having to take more time that that covered by the base fee. 3. Any billings shall be paid prior to final consideration of any land use permit, zoning amendment, or subdivision plan. All additional costs shall be paid to the execution of the written resolution confirming action on the application. 4. Final Plats, Amended or Corrected Plats, Exemption Plats or Permits will not be recorded or issued until all fees have been paid. 5. In the event that the Board determines that special expertise is needed to assist them in the review of a land use permit, zoning amendment, or subdivision application, such costs will be borne by the applicant and paid prior to the final consideration of the application. All additional costs shall be paid prior to the execution of the written resolution confirming action on the application. 6. If an application involves multiple reviews, the Applicant shall be charged the highest Base Fee listed above. 7. Types of "Procedures" not listed in the above chart will be charged at an hourly rate based on the pertinent planning staff rate listed above. 8. The Planning Director shall establish appropriate guidelines for the collection of Additional Billings as required. Page 3 GARFIELD COUNTY BUILDING AND PLANNING DEPARTMENT PAYMENT AGREEMENT FORM (Shall be submitted with application) GARFIELD COUNTY (hereinafter COUNTY) and Bosely Spring Creek Ranch LLLC Property Owner (hereinafter OWNER) agree as follows: 1. OWNER has submitted to COUNTY an application for SG 13-35 pad location STEH &1SDS (hereinafter, THE PROJECT). 2. OWNER understands and agrees that Garfield County Resolution No. 98-09, as amended, establishes a fee schedule for each type of subdivision or land use review applications, and the guidelines for the administration of the fee structure. 3. OWNER and COUNTY agree that because of the size, nature or scope of the proposed project, it is not possible at this time to ascertain the full extent of the costs involved in processing the application. OWNER agrees to make payment of the Base Fee, established for the PROJECT, and to thereafter permit additional costs to be billed to OWNER. OWNER agrees to make additional payments upon notification by the COUNTY when they are necessary as costs are incurred. 4. The Base Fee shall be in addition to and exclusive of any cost for publication or cost of consulting service determined necessary by the Board of County Commissioners for the consideration of an application or additional COUNTY staff time or expense not covered by the Base Fee. If actual recorded costs exceed the initial Base Fee, OWNER shall pay additional billings to COUNTY to reimburse the COUNTY for the processing of the PROJECT mentioned above. OWNER acknowledges that all billing shall be paid prior to the final consideration by the COUNTY of any land use permit, zoning amendment, or subdivision plan. PROPERTY OWNER (OR HORIZED REPRESENTATIVE) Signat e Bryan S. Hotard Print Name Mailing Address: Dat Williams Production RMT Company LLC PO Box 370, Parachute, CO 81635 Page 4 Bonuales, Gia From: Bonuales, Gia Sent: Friday, November 18, 2011 10:04 AM To: 'Rob Ferguson'; 'Julie Taylor' Cc: Reed, Gary Subject: SG 13-35 Rig Move On Notification Attachments: SG 13-35 GVFPD Letter & Map dated 11-17-11.pdf I am notifying you on the attached pad location we will be commencing drilling operations in the next few days and these operations will continue for approximately 60 days. At which time i will notify you of the removal of the Employee housing. This notification is per the GARCO Regulations for our pad located in Sec 35-T75-R96W. Attached please find a map with directions to the pad, a pad lay out and emergency contact information. Should you have any questions please let me know. Have a great weekend! bib Bonu&lcz� Land Data Technician 1 Williams Production RMT Company LLC 1058 County Road 215/PO Box 370 Parachute, Co 81635 970.263.2746 -Office 970.216.8537 -Cell 970.285 -2047 -Fax gia.bonuales@williarns.com 1 Willi ms® Williams Production RMT Company LLC 1058 CR #215 P.O. Box 370 Parachute, CO 81635-0370 970/285-9377 9701285.9573 Fax November 17th, 2011 Grand Valley Fire Protection District Emergency Operations Attn: Rob Ferguson 1777 S. Battlement Parkway Parachute, CO 81635 Ph: 970-285-9119 RE: Emergency Response Notification SG 13-35 pad Dear Rob: This letter is to inform the Grand Valley Fire Protection District that Williams Production RMT Company LLC will soon commence drilling operations on the above mentioned drilling location. Williams will provide rig site housing accommodations for the duration of the drilling operation approximately 60 days, In accordance with Garfield County Planning and Zoning Regulations, the attached documentation provides emergency response information and driving directions for the Williams SG 13-35 pad. Should you have any further questions or concerns regarding this notification, feel free to contact me at (970)263-2754. Sincerely, Bryan S. Hotard Field Land Team Lead-Piceance District gb Williams Production RMT Company SG 13-35 Well Pad 5_1:01:1811 LEGEND: •-Ivr.rrnre 9 L'11.,LL CA/MS c:i'.tab I lintah y:ngmrcring Land 5urva;'in6 N t; 1335 SECTION 35. Tis. R96W. 6tft P-\1. Ntil.1.I.\ 1S PRAM l4 I'IOV Rill' t'O11P\N\ i1-1.11 •6.7 Y}Lr'i'•Zs, I PRAtt\041'1.11 1 RF1•11.15Is.1.1 t•t...t t'11YU GRAPHIC 51.51 03112 10 Directions to Site' 1 WILUAMS PRODUCTION RMT COMPANY PIAT 414_T0'1001. RIG LAYOUT FOR SG '3-35 SECTto5 35, T7S, R96W. 6th P -u. 11111 SfaLE • - 80' 3e7E, 07-te--0 lthArd. al 04.4.8 w;e.J •c -1.1 -"Li ).PI! + w. --.c11 14-"1-11 n4 a r-------- gia Nal r 1 s'; 1 i s .a -•rt r'7 Appo /male 04,11 Rig 0 O d Eg4/pmerr, Arm •rw PRDU PON EAPPrrEN AREA (rw,so) Three Portable Toilets Fn'•w .8He -ed. Identification 6 Location Key' 1 Wastewater Aboveground Tank 14000 gal.) 2 Potable Water Aboveground Tank {41700 gal) 3, Twee Portable Toilets L Wildlife -pouf dumpster 5. Company Men OffeatHousirg 6. Grillers Of0oelHousirg 7. Shed Subject to relocation for construction activities, Lamrvencv Contact 1.151' Main Office 970-7A5-0377 anpvered 21 Hdlrs Lyn Cass Wuliann Production 970-155-0083 Cell Scott Brady- Williams Dnnirlg Sup -970-270-9197 Cell Kevin McOennoe- Williams Safely -970-309-l' g5 Ce11 Mark Mumby - 5911 Contractor 970.2601578 Cell 0 Ft. 50 Ft. 100 Ft. Ft. 150 Rolex The well pad site is located in the NW 114 SW 114 of Section 35. T7S, R98W, 6th P,M. (NADB3 N39.3909' W108,08331 The site will temporarily office and house up to a maximum of four individuals during natural gas drilling activities and is expected to be completed in one year or less. The individuals will occupy two individual trailer offices/houses located on the well pad. OffiCelhouses have Colorado Division of Housing compliance tags. One aboveground sewage holding tank with 4000 -gallon capacity on-site. Sewage Bows estimated to be 300 gallonslday (4 individuals x 75 gpcd). Sewage holding tank needs to be emptied approximately every 13.3 days (4000 gallons! 300 gallons per day). Wastewater vault equipped with overflow alarm device. Williams utilizes the services of a licensed contractor l0 remove and haul the wastewater to a Stale certified treatmenUdisposal facility. One potable aboveground water tank of approximately 4000 gallons capacity on-site. Potable water' demand is estimated to be 300 gallons/day (4 individuals x 75 gpcd). Required mimmum fire suppression demand is 2500 gallons. Total potable and fire suppression volume required is estimated to be 4000 gallons. water supply appears adequate with 4000 gallons of storage with refills scheduled at 5 -day intervals. Dry hydrants observed on water tank. Road access to the site is maintained year-round through the services of private road maintenance and construction Contractors. Base mapping by Uintah Engineering and Land Surveying. Site features including housing trailers, water and wastewater tanks, portable toilets and dumpster were field located. Site features including housing trailers. water and wastewater tanks. portable toilets and dumpster surveyed with Trimble Geo•1(f GPS equipment. Please note that this is a construction site and that the locations of drill equipment and other items are subject to change. ASI FaClory-Built Nonresidential Structures (Office/Housing) have a minimum separation distance of 28 ft. SG 13-35 Site Plan Garfield County, Colorado Small Temporary Employee Housing and Septic Permit Application Applicant: Williams Production RMT Date. November 17. 2911 Checked- OF version, 00t Fox Engineering Solutions LLC 570 Canyon creek Drive, Greed J/arctan, CO 81507 Ph. 1670253-5506 r Fan:1825) 784-0887 Ener. eoforadafox0bresnan.nel Bonuales, Gia From: Bonuales, Gia Sent: Friday, November 18, 2011 10:02 AM To: 'jsears@garcosheriff.com'; 'Julie Taylor' Cc: Reed, Gary Subject: SG 13-35 Rig Move On Notification Attachments: SG 13-35 Sheriff Letter & Map dated 11-17-11. pdf I am notifying you on the attached pad location we will be commencing drilling operations in the next few days and these operations will continue for approximately 60 days. At which time 1 will notify you of the removal of the Employee housing. This notification is per the GARCO Regulations for our pad located in Sec 35-T7S-R96W. Attached please find a map with directions to the pad, a pad lay out and emergency contact information. Should you have any questions please let me know. 616 Bonu 1-$ Land Data Technician 1 Williams Production RMT Company LLC 1058 County Road 215/PO Box 370 Parachute, Co 81635 970.263.2746 -Office 970.216.8537 -Cell 970.285 -2047 -Fax gia.bonualest williams.com 1 November 17th, 2011 Garfield County Sheriff's Office Emergency Operations Attn: Jim Sears 108 8th Street Glenwood Springs, CO 81601 Ph: 970-945-0453 RE: Emergency Response Notification SG 13-35 pad Dear Jim: Willia s® Williams Production RMT Company LLC 1058CR#2!5 PO. Box 370 Parachute, CO 81635-0370 970/285-9377 970)285-9573 fax This letter is to inform the Garfield County Sheriff's Department that Williams Production RMT Company LLC will soon commence drilling operations on the above mentioned drilling location. Williams will provide rig site housing accommodations for the duration of the drilling operation approximately 60 days. In accordance with Garfield County Planning and Zoning Regulations, the attached documentation provides emergency response information and driving directions for the Williams SG 13-35 pad. Should you have any further questions or concerns regarding this notification, feel free to contact me at (970)263-2754. Sincerely, Bryan S. Hotard Field Land Team Lead-Piceance District gb Williams Production RMT Company SG 13-35 Well Pad R ?fl, 96 • 1 .\Y s'0 1%S T8 it r K'ATION:' % T' PROPOSED L( � i SG 13.30 MOB s, 0110045110 400151 40. areo s.A(eerr9rrey Ieaanan wncr 3. DETAIL ".A" ti LEGEND: ge ■ r eerier El Lti".LL rvr 1E010* F:spark-Her & Lend Oorvevree V 11.1.1.\111 PROD[ l("1'IO\ 11311' ['O\(P.1N1 N 1( .13-35 SECTION .35. T75,,1196W, rich P.31. rrIPo C10 FIdie 41 .SP gig 1OI 5 Cs11142 • iv..1R�J6339[lf'IiClAMMO ry-s1 Directions to Site. 0 c, WILLIAMS PROI3UC'IION RMT COMPANY PLAT 4.4_T1QICA1. RIC LAYOUT FOR 5C 13-35 SECTION 35, 17S. R96W, 6th P.N. _ATE Or -'U TWO: dY axa keeled. •e -l.1-.•0 J.11 il sa_ _ 1 " - 0 7- Apposimale Drill Rig & & Eglapmerd Area 7.7 vPrWCPW 4'at(1up7 Apr/ 41x8! arae Ara • Three Portable Toilers r+ 5777150 pet -.1 • Identification & Location Key I. wastewater Aboveground Tank (4000 gel.) 2. Potable W atm Aboveground Tank (4000 oat) 3. Three Portable Toilets 4. Wildlife-oroof dumpster 5. Company Man abcelHotnmg 6. Drillers Office/Housing 7. Shed ` • Subject to reiocaIIOf for construction 84.11.1as. f rneraencs Contort L101 Main Office_ 570.285.8377 answered 24 Hours Lyn Cass Williams Production 970-755-0083 Gell 5000 Wady- Williams Drtllitlg Sup.970-2750187 Cell K evin MrDennert- WiIliams Safety -570-3041'85 Cell Made Mlwabr - Spill Contractor 870-250-1570 Cell 0 10 100 150 Ft, Fl. Ft. Ft. Willis s.. Rates: The well pad site is located in the NW 174 SW 1 f4 of Section 35. T7S. R96W. 6th P.M. (NAD83 N39.3909° W106.0833°) The site will temporarily office and house up to a maximum of four indlviduais during natural gas drilling activities and is expected to be completed in one year or less. The individuals will 000upy two individual trailer offices/houses located on the well pad. Office/houses have Colorado Division of Housing compliance tags. One aboveground sewage holding tank with 4000 -gallon capacity on -site - Sewage flows estimated to be 300 gallons/clay (4 individuals x 75 geed). Sewage holding lank needs to be emptied approximately every 13.3 days (4000 gallons / 300 gallons per day). Wastewater vault equipped with overflow alarm device. Williams utilizes the services of a licensed contractor to remove and haul the wastewater to a State certified treatment/disposal facility. One potable aboveground water lank of approximately 4000 gallons capacity on-site. Potable water demand is estimated to be 300 gallons/day (4 individuals x 75 gpcd). Required minimum fire suppression demand is 2500 gallons. Total potab4e and fire suppression volume required Is estimated to be 4000 gallons- Water supply appears adequate with 4000 gallons of storage with refills scheduled at 5 -day Intervals Dry hydrants observed on water tank. Road access to the site is maintained year-round through the services of private road maintenance and construction contractors. Base mapping by Uintah Engineering and Land Surveying. Site features including housing trailers, water and wastewater tanks, portable toilets and dumpster were field located. Site features including housing trailers, water and wastewater tanks, portable toilets and dumpster surveyed with Trimble Geo -X1 GPS equipment. Please note that this is a construction site and that the locations of drill equipment and other items are subject to change. All Factory -Built Nonresidential Structures (Office/Housing) have a minimum separation distance of 28 ft. SG 13-35 Site Plan Garfield County, Colorado Small Temporary Employee Housing and Septic Permit Application Applicant Williams Production RMT Date: November 17,2011 Checked' D.F Version: 001 Fox Engineering Solutions LLC 870 Carryon Creek ()eve, Grand Juneton. CO 81507 P11: (070) 250.5505/ Fax. (628) 784-0657 Erred: csloradefo,lbrasnan. net WILLIAMS PRODUCTION RMT COMPANY PLAT #2_CONSTRUCTION LAYOUT FOR SG 13-35 SECTION 35, T7S, R96W, 6th P.M. 3 / CO/ 40 F-4.4'1 .y Reserve Pit Backfill El. 374.3' ....:.& Spoils Stockpile SCALE: 1" = 60' DATE: 03-12-10 DRAWN BY: D.R.B. Rev: 07-16-10 D.R.B. Rev: 10-13-10 D.R.B. Rev: 04-11-11 D.R.B. x C-2.8' n-. El. 381.5 • • Sta. 3+65 F-10.0' /El. 368.7./r In n N N El. 379.0' iV Z / CurnNG PIT rota! Pit Capacity W/2' of Freeboard = 17,850 8b1s. Total Pit Volume = 4,540 Cu. Yds. C-2.9' E!. 381.6' , x •• • '•h F-59' El. 3728'. 7 N i Approx. Toe of Fill Slope '. Sta. 2+68 F-0.9' Proposed SG 13-35 0 E1. 377.8' Proposed SG 23-35 ci :5,i Proposed 50 313-35 p7 5S roposed SG 323-3 O Proposed SG 413-3�5 07.'5': 150' Proposed SG 423–'350'. 5. Et. Proposed SG 523-35 _ GRADE N7T33'40"E 187• Cut/Fill Transition Line 90' C-3.8' El. 382.5' 5 I C-28' EL 381.5', 7A F-3.0' El. 375.7' 0 to C-4.7' El. 383.4' PRDUC11ON. EQUIPMENT AREA (.200'x60) Round Corners as Needed Sta. 0+00 60' Sta. 1+00 Flare Pit 7 Proposed Access C-2.3' Road \ \EI. 381,0' Existing s Drainage ` Existing Fenceline 5374 5372 Buried Pipeline�153�"�� Elev. Ungraded Ground At Loc. Stake = 5378.7' UINTAH ENGINEERING & LAND SURVEYING FINISHED GRADE ELEV. A T LOC. STAKE = 5378.7\ 85 So. 200 East ; Vernal, Utah. 84078 * (485) 789-1017 — x � x 'Sta. 1+93 x C-7.4' . El. 386.1' Existing Fenceline Approx. Top of Cut Slope i x x x 1 x rn x C-9.4' \K El. 388.1' NOTE: \ Flare Pit is to be located a min.' of 100' from the Well Head. Existing able Line • • • • a a m 1 d Wit I J •' §/14 ; • !. -5700 j g. •. v i l �L PROPOSE() LOCATION: SG i3-: V", • • 0.6MI.r!- 1T7SJ T8S r*S r II I -„ fir • 'r,. ./. .•S •• ,.•r' .. taco. •\\ .'. I , j \ f \ LEGEND: EXISTING ROM) PROPOSED ROAD • • • • ••• — EXISTING UTILITY 11 M K N EXISTING FENCE [# INSTALL CATTLE GUARD Uintah Engineering & Land SuFw'eying 88 South 200 Ens. \'eva■nl, L7eoh 84078 (435) 789-1017 * FA_Y (438) 789-1813 N i.0 ��ti J:-•..• 1 `EXISTING PENCE & .OVERREAD POWERLIN PROPOSED ACCESS 60' +1 - (BURIED TELEPHONE LINE c"I"+ (EXISTING PEHCE� } i `� DETAIL "A"'IRC— ti __ \-��"Niter'_ {�C WILLIAMS PRODUCTION RMT COMPANY SG 13-35 SECTION 35,175, R96W, 6 h P.M. T(}P0GRAP111C M A P r 03 ROMA 12 RAY 10 YEAR SCALE: 1" =20901 DRAWN BE: J.H. I REV fl -I0 -IO J.J. 5 PLAT PL 11111f1111111111111.1Ni 1iii11111111111 'ell! Ilii 578744 07/22/20Z;37P 81708 l20B K RLSDORF 1 of 1 R 6.08 .10 . O CARFIELD COUHTY CO STATEMENT OF AUTHORITY NAME OF ENTITY: The name of the entity to which This Statement relates is Bosely Spring Creek Ranch LLC. TYPE OF ENTITY: The entity Is a Limited Liability Company formed under the laws of the State of Colorado. MAILING ADDRESS: The mailing address for the entity is P. 0. Box 26, Woody Creek, Colorado 81656. AUTHORIZED PERSON: The names and positions of the person authorized to execute instruments conveying, encumbering or otherwise affecting title to real property an behalf of the entity are as follows: Name Position Mary Anne Basely Manager LIMITATIOS: None. Dated this 1st day of July , 2005. STATE OF COLORADO ) ss, COUNTY OF GARFIELD ) The foregoing Instrument was subscribed, sworn to and acknowledged before me this 11t day of , ,ful Y , 2005, by Mary Anne Basely as Manager of Basely Spring Creek Ranch LLC. WITNESS my hand and official seal. My Commission expires: 10/32/2007 0.4.4u.4iM1 MOI# 1t Notary Public MYI:1t KIC[Ylall F(1 iirri'fl$ i[l. SP IRJ(, WCP41 # IIM17 \iT}ll 102 'Brio Hi•., 1,1,N. 730. (3L11.YWO1111 HI.RINfill, CC) h10f41 September 21't, 2011 Mr. Fred Jarman, Director Garfield County Building and Planning Department 108 8'" Street, 4th Floor Glenwood Springs, CO 81601 RE: SG 43-27, 5G 13-35 Drilling Pad Locations, Garfield County, Colorado Dear Mr. Jarman: This letter authorizes Williams Production RMT Company LLC to represent me in the submittal and processing of the required Garfield County Small Temporary Employee Housing (STEN} and Individual Sewage Disposal System (ISDS) permits on the above drilling pad locations. Sincerely, osQ� Spring Creek By: --•--- Title: SMI V%MA 111114fflifinlin i en lh°.r a w �^ow''1".�p;1eh�ierhex a ori MVV m uncrrED POWER OF ATTORNEY WILLIA?&I PRODUCTION RMT COMEANY LLC ("Company") s Delaware limited liability company, having ha principal place of badinage in the Citi of litlse, Cowrie, of Ulu, Stet. of Oklahoma, does hereby make, aaasnitote and eppoirt Roan S. Huard with the full authority hereinafter provided, the true and lawful Ate rney--inPact of the Company, eat prized and empowered on behalf of the Company and in tho Company's name, and &t tha sola and exclusive benefit of the Company and not on behalf of any other person, corporation or association, in whole or in pat, to enter into, womuta, deliver, Ste end accept all hoslnunarts and documents affecting the real property or reel carte rights of the Connolly inc]udiog bid not limited to, the lbilowing described inanimate and doapnyits; 1, Applications and doe uaentedon associhhrad with Garfield County err Rio Blanco peanlntng requirements, iauludiag, but not 'index! to, Independent Sewage Disposal Systems, Small Tzporaly Employee Souring, Major Impact Reviews, Limited impact Reviews, Oil and Gu well permitting, Driveway Atoms, Calmly Road Maintecmne, Temporary Living Qom, Temporary Use Permit", Suthec Use Permits, Sixtus Use Lieceses, Utilities, %ow Removal end Private Connived= of County Ronde; 2. Apeman and other documentation ibat grant eaaemenn, tights of way, licer>scs, or permits to Company and ilia inaItvrnerds where the Company grub such rights to otherm 3. Agreement' and assign eascreeeotr, rights of wan, licenses, pectens or surface leased in coaaeetioa with the Company'a operations; 4. Releases and Partial R+ele ssea of easements end rights awry; 5. Avernus& allowing enorotehmeeds mato essearoda sad tights of way owned by Company and landiovner instruments and couveyenees on others wasernends; 6, Agreements aabordinatiug easement or lease to mortgage sigh* 7. Agreements relating to the modiliration and relocation of Company Scabies; ti. Renal or lease agrearhents far surface use or other surface use agreements and all notices relatcdto the pipeline agreemer ts; 9. Aglow eons for the puraMaa or ale egged property and for the teams dila! property fur residential purposes or othci use in connection with the Consp 's awaken; s 10. Agra:mann to obtain watax ecnloat, electrloal, gas or ell services or the prvvisia a of other utUlty services ut!lised by Company's ihcilitiea; 11. Agreements modifying, amending, mewing, a handing, rat ung ibrfeiting, canceling and terminating any and all of the aforementioned typal of instruments and decease:a. The Company hereby declares that each end every act, matter and thing which shall be given, made and done by Bryan 8. Rand In unneetioa with the aerobe of tiny or all a the aforesaid powers dull be as good, valid and eilbc*uei to all interne sad purposes ea if the acme had boas given, made add done by the Company in its limited liability company prompt and it hereby retina whatsoever Anatomy -in -Pace shall laws dlyr do or canoe to be done by virtue hereof This Limited power of Attorney shall mein in hall Race and east we terminated by Company. SI FirM1101401C1000110101.141.1 :. � r..•r a$"ooa r,.:.ea uwF�etu aaartr m IN WrrNES8 WHEREOF, the Company hu caused this Limited Power of Attorney to be signal by one ens Vice $iraidalts, duly authorized by it' MMolgaaent Comtttlttce to gtint powers of attorney this , day of July, 2011. ACKNOWLEDGMENT TATS OF OKLAHOMA y )as COUNTY OF TULSA BEFOREMB, the tmdasigncd authority, allotary Public in and lbr said County end State, on this day personally appeased, hay D. Emus penmonally known In me to be the Vice Preaidost of WJLUAMS PRODUCTION RMT COMPANY LLC a Delaware Ihnifed liability company, w5o aaimowlredged to me that be has euautod the above LIMITED POWER OF ATTORNEY tlatboiized by Company's Management Committee, IN WITNESS WHBRBOF, I have hainunto set my band and &taut my notary real, the IL day ofJuly, 2011. My Cammiadah Heplroe: 2-2.3- 2314 �t alcittEP4.1 AIMILELECOIWaritaigitmamatim IMLLIAAIS PRODUCTION CO RMT LLC ATTFk LAND DEPT. P.O. BOX 370 PARACHUTE, CO 81835 2 Project Address Garfield County Building 8, Planning Department 108 8th Street Suite 401 Glenwood Springs, CO 81601 - Phone: (970)945-8212 Fax. (970)384-3470 Parcel No. Permit NO. SEPT -11-11-2287 Pemiit Type: Septic Permit Work Classification: New Permit Status: Active Issue Date: 11/18/2011 Expires: 11/17/2012 Subdivision Section Township Range SG 13-35 PARACHUTE, CO 240935300130 Owner Information Address Phone CeII BOSELY SPRING CREEK RANCH LL CO Contractor(s) Phone Primary Contractor Williams Production RMT (970)285-9377 Yes Proposed Construction 1 Details Septic for STEH FEES DUE Fee Amount Septic Fee - New Total: $73.00 $73.00 Valuation: Total Sq Feet: $ 0.00 0 FEES PAID Inv Total Paytype Amt Paid Amt Due Inv # SEPT -11-11-21530 $ 73.00 Check # 00007185 $73.00 $ 0.00 Required Inspections: For Inspections can : 1(888)868-5306 Inspection IVR See Perm it Record Building Department Copy Friday, November 18, 2011 2 64, GARFIELD COUNTY SEPTIC PERMIT APPLICATION 1088"'Street, Suite401, Glenwood Springs, CO 81601 Phone: 970-945-8212 / Fax: 970-384-34701 Inspection Line: 970-384-5003 www.earl field -county com 1 4)ci Parcel No:(this information is available at the assessors office 970-945-9134) • ". r ' sr ' " l 2409-353-00-130 2 Job Address: (if an address has not been assigned, please provide Cr,Hwy or Street Name & City) or legal description SG 13-35 See the attached plat for description. 3 Iii Lot Size: Lot No: Block No: Subd/Exemption: See Attached Survey Plat 4 / Owner: (property owner) Bosely Spring Creek Ranch LLLC Mailing Address PO Box 26 Woody Creek, CO 81656 Ph: 970-923-8999 Alt Ph: 5 //// „ /I I Contractor: Williams Production RMT Company LLC PO Box 370, Parachute, CO 81635 Ph: 970-285-9377 ext 2754 Alt Ph: 6 Engineer: N/A Mailing Address Ph: Alt Ph: 7 Permit Request For: (X 1 New Installation f }Alteration ( 1 Repair 8 17 J ) DATE Waste Type: ( X ) Dwelling ( ) Tranient Use ( ) Commercial or Industrial ( ) Non- Domestic Wastes ( ) Other- Describe 9 Building Or Service Type: Number of Bedrooms: 2 Garbage Grinder ( ) Yes (X )No 10 Source & Type of Water Supply: ( ) Well ( } Spring ( ) Stream Or Creek ( ) Cistern If supplied by COMMUNITY WATER, give name of supplier: Down Valley Septic and Waste 11 Distance to Nearest Community Sewer Was there an effort to connect to the System: N/A community System? NIA YOUR INDIVIDUAL SEWAGE DISPOSAL SYSTEM PERMIT WILL NOT BE ISSUED WITH OUT A SITE PLAN 12 Ground Conditions: Depth to 1st Ground Water Table N/A Percent Ground Slope NIA 13 Type of Individual Sewage System (ISDS) Proposed: ( ) Septic Tank ( }Aeration Plant ( X }Vault ( ) Vault Privy ( )Composting Toilet ( ) Recycling, Potable Use ( )Recycling, Other use ( ) Pit Privy ( ) Incineration Toilet ( ) Chemical Toilet (X) Other- Describe: Hauled to Down Valley Waste for their disposal 14 Final Disposal By: ( ) Absorption trench, Bed or Pit ( ) Underground Dispersal ( }Above Ground Dispersal ( ) Evapotranspiration ( ) Sand Filter ( ) Wastewater pond (X )Other -Describe Hauled to Down Valley Waste for their disposal 15 Will effluent be discharged into waters of the state'? ( )Yes (X )No 16 Percolation Test Result: (to be completed Minutes per by Registered Professional Engineer, if the inch in hole No.1 in hole No.2 made soil absorption test: N/A Engineer does the Percolation Test) Minutes per inch in N/A hole No.3 No.4 Minutes per inch Minutes per inch in hole Name, address & telephone of RPE who Name, address & telephone of RPE responsible for design of the system: NIA 17 Applicant acknowldges that the completeness of the application is conditional upon such further mandatiory and additional test and reports as may be required by the local health department 10 be made and furnished by the applicant or by the local health department for purposed of the evaluation of the application; and the issuance of the permit is subject to such terms and con'ons as deemed necessary to insure compliance with the rules and regulations made, information and reports submitted herewith and required t...e subm tied by the applicant are or will be represented to be true and correct to the best of my knowledge and belief and are designed to be relied on ' local -p. ment of health in evaluationg the same for purposes of issuing the permit applied for herin. I further understand t any falsification or ' s - .: ntaimay result in the denial of the application or revocation of any permit granted based upon said application and action for perju -' p . ...- Girl.? %` -) // /4 , Owners Sign re: Bryan -. otard Dat Permit f 4)ci ' Perk Fee: Total ccs: Iii Building rcrn,lt t!_ Septic Permit #: / Pif .1 B7 Issue Date: //// „ /I I Building Se Pi nning cpl: APPROVAL..,. 17- 17 J ) DATE