Loading...
HomeMy WebLinkAboutMechanical System Update Correspondence 11.21.16BCER..-. ane,xi-oxine- November 21, 2016 Mr. Jim Wilson Professional Inspector/ Mechanical Office of Plans and Construction Rifle, CO. RE: FIXED BASE OPERATIONS FACILTY FOR ATLANTIC AVIATION RIFLE, CO. Dear Mr. Wilson, The mechanical systems, and subsequent air distribution updates, have been reviewed for conformance with design intent, code compliance, and adherence to the building construction documents and specifications. With consideration for the completion of the remaining final punch list items per our site investigation on the 14" of November, BCER takes no exceptions to the mechanical equipment, associated components, system configuration, or current installation. Sincerely, BCER Engineering, Inc. Michael D. Schroeder, P.E. Senior Mechanical Engineer/ Associate Principal BCER ENGINEERING, INC 4511 NORTH HIMES AVE. SUITE 200 TAMPA, FLORIDA 33614 613.449,4324