HomeMy WebLinkAboutPermitINSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
HOURS NOTICE FOR INSPECTIONS
BUILDING PERMIT
GARFIELD COUNTY, COLORADO
Date Issued�' (41
.. !�'..`� ..: Zoned Area Permit No ‘12
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building..
Inspector and IMMEDIATELY �MMBECOME NULL AND VOI
Use O 4i4tl1 le b W(!a
4
Address o a De 'ption - rill W T it4 Cli 1 NIZII .IIS Il /i
• 1• 1 If . jt 1 ■ 'la VP t l .t - -• .. .
rr,
,Setbacks Front Side Side Rear
This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection.
INSPECTION RECORD
Footing 10 __2/45g Al -
Foundation tfl_,D-9�
Underground Plumbing q___/5 --y Insulation ,gyp n 9 7
Rough Plumbing / - 7 Drywall
Chimney & Vent Electric Final (by State Inspector)5 4 `]o[
Gas Piping / -4;47(,) 9.C76;16-3-/
Final
Electric Rough (By State Inspector -617 Septic Final
Framing _..qty Notes:
(To include Roof in place and indows
and Doors installed).
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
WHETHER INTERIOR OR EXTERIOR; UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 945-9159 109 8th Street County Courthouse Glenwood Springs, Colorado.
DO NOT DESTROY THIS CARD
CEp OUTSIDE 11"OVER WITH' CLEAR PLASTIC