HomeMy WebLinkAbout1.0 General Application Materials1517 Blake avenue, suite 101 Glenwood Springs, CO 81601 970-945-8676  phone 970-945-2555  fax www.hceng.com An Employee-Owned Company MEMORANDUM To: Garfield County Community Development Dept. From: Matthew Langhorst Revised: August 13th, 2015 Project: 482 County Road 315, Silt. Eagle Springs Meat Processing Center Subject: Updates to Packet Memo The purpose of this letter to is to review the updates to the packet from the last submittal date in June of 2015. Below is a list of the changes to the packet information. 1. Cover letter to include items 15 thru 20 that have been added as additional information to the packet replacing several County Staff Exhibit items. 2. Update to site plan to include fire truck turning radius information, line sizing for hydrant supply line, additional roadway access information for proposed road improvements to the site, addition of a fence around the OWTS field locations. 3. Update to grading plan with additional fire hydrant supply line information as requested by the fire marshal. 4. Site access, utility and solid waste report has had additional access information added, fire pond information added, updated OWTS design information, updated water consumption information, updated water supply chart, solid waste disposal connection information and west divide creek conservancy permit added to the packet for well augmentation.   Please let me know if you have questions pertaining to this Land Use packet update comment letter. Thank you, Matthew Langhorst, P.E. High Country Engineering, Inc. Civil engineering Land surveying March 20, 2015 Karl Hanlon Karp Neu Hanlon PC 201 14th Street, Suite 200 P.O. Drawer 2030 Glenwood Springs, CO 81602 kjh@mountainlawfirm.com Reference: Sack Animal Processing Facility – File Number MIPA8246 Dear Karl; Community Development is in receipt of the above application for an Animal Processing facility submitted March 6, 2015. This material has been reviewed to determine if the required submittal information satisfies the 2013 Land Use and Development Code, as amended (LUDC). Please provide additional information, explanation, clarification, and/or plans and reports as follows: 1. Please provide information on how the mineral rights owners, if any, were identified. 2. A copy of the access easement over Eagle Springs Organic property must be provided to demonstrate legal access. 3. Water to serve the use is proposed to be hauled from the Town of Silt and stored in 3-2,000 gallon water tanks located on the adjacent Eagle Springs Organic property. The following information is required for this proposal: a. A contract with or a ‘will serve’ from a licensed hauler, and demonstration of availability of water from the Town , is needed to determine that a dependable legal and physical water supply to serve the use. b. Please provide a copy of the Access Utility and Drainage easement that is noted in the vicinity of the water tanks on Eagle Springs Organic property. 4. A water distribution system, transporting the water from the storage tanks to the processing facility, was not provided. This is a requirement of the Water Supply Plan. Kenneth J. Sack - Animal Processing Facility March 20, 2015 2 | P a g e 5. Insufficient information was provided regarding the disposal of solid waste. It appears that the primary method of disposal is to transport the solid waste to the Garfield County landfill. This is proposed to occur once a week based upon the traffic study information provided. How will the solid waste be stored until it is transported to the landfill? In what cases will the on-site waste disposal area be utilized? 6. The site plan is required to provide: a. Dimensions of roadways; b. Dimension of parking areas; c. Parcel number and zone district of the subject site; d. Dimension and square footage of existing buildings e. The site plan should provide dimensions of easement and reference recording information. 7. Response to the Standards contained in Article 7, Divisions 1, 2 and 3, as well as 7-602, are required. You may refer to supporting documentation in the application submittal however response to each standard is required. If the response to the standard is “not applicable” then an explanation must be provided. Please refer to the supplemental documentation to support the responses to the individual standards. As far as demonstration of compliance with 7-602 we have documentation from the USDA, dated January 29, 2015, that the prior application for a USDA facility is no longer valid and therefore the application process will need to be started again. Please provide some demonstration or documentation that an application is pending with the USDA. 8. Impact Analysis a. Number 2, site features refers to the site plan, however this plan does not include existing vegetation of the site. Please provide a response to this item. b. Number 3, soil characteristics are required to be evaluated. The OWTS and the solid waste disposal facilities, in particular, require analysis of the soils to determine if there will have an influence on the project. c. Number 6, Environmental Impacts must be evaluated, specifically for the proposed solid waste disposal area. The project narrative i s referenced however that document does not provide an environmental analysis of the proposal. d. Number 7, nuisance impacts are those impacts specifically related to noise and odors associated with an operation as proposed. Please provide demonstration that the site will be in compliance with statutory noise standards and that odors from the operation will not cause impacts. Kenneth J. Sack - Animal Processing Facility March 20, 2015 3 | P a g e Section 4-101.B(2) states that if the Applicant fails to correct the deficiencies within 60 days the application shall be deemed withdrawn. I am available to discuss these technical compliance issues at your convenience. Sincerely, Kathy Eastley, AICP Cc: Tamra Allen, Planning Manager Kelly Cave, Assistant County Attorney