HomeMy WebLinkAboutApplication- PermitJob Address
No. 6764
GARFILLD COUNTY
BUILDING, SANITATION and PLANNING DEPARTMENT
109 8th Street Suite 303
Glenwood Springs, Colorado 81601
(303) 945-8212
Nature of Work
Use of Building
�
Owner
Contractor
Building �Permit
6y7 Y1
Amount of Permit $
/&-ce -233 462 Ei6s-z:)
p2.4.444.4t. - /9g- 75
= lags y
f(71/H
-sem.<a
Date C)afdt.."rt-(- / 99
Clcrk
GARFIELD COUNTY BUILDING PERMIT APPLICATION
• GARFIELD COUNTY (GLENWOOD SPRINGS), COLORADO
TELEPHONE: (970) 945-8212
Applicant to complete numbered spaces only, PERMIT NO.
INSPECTION INE: (970) 945-9159
PARCEL/SCHEDULE NO,
JOB ADDRESS:
C: C!2 ,,Z- 3 0. U 4 'tP C.V 7ri_31 R,. -4-1,-e_
�
LOT NO. BLOCK NO. IUBDIVLSION/EXEMPAON �y `,
! ; �1 �-�Ir J �� lam' �S!"i��
2
�1+ �.� o '`' ' -
7D ?- rn f31 -)1
�
b -So Lk X47
4 6 ' aS' Lf lam,
3
� /, `
0\ t�( ck l
ADDPBas
�:
Tic No:
4
`� 1
j- bie`-1` I �a1-
�} �,,, { ,
1 � b. Li U l\ Lf r i A CI)
rn:
crcNo:
5
aR 1T, OFBeapnlQ q�
r�/1 `V`1
SQ. FC. OFLOT /� .. 3 aiekO (j
/J��7c� 11�
Lo
HM ORT
N4 OF 7.3
6
-
CfyV`i t f /�
ME OF MEWING T I`/1R Y^ ANI
(KJik
7
DESCRIBE WORK:
8
LIARS OFWORL mom ((ADDITION orELTERATION o310VE oREMOVE
9
oARAGE: .EUNGE aDOUBLE CARPORT cMINGE =DUPLE
10
v DRIVEWAY PEn6Q1' i�N EnE SEWAGE. DIPPOPAL (EMETIC) VIMPLAN
n
VATJM1I NOFWORL 1 ADJUSTED VALUATION:1
SPEUAi CONDMON8:
NOTICE
A SEPARATE ELECITIiCAL PERMITIS REQUIRED AND MUST BE ISSUED BY THE STATE OF
THIS PERMITBECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED
IS NOT COMMENCED WITHIN 120 DAYS, OR IF CONSTRUCTION OR WORK IS
SUSPENDED OR ABANDONED FORA PERIOD OF 120 DAYS AT ANY TIME AFTER WORK
IS COMMENCED-
HEREBY CERTIFY THAT I HAVE READ AND EXAM[ ED THIS APPLICATION AND
KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS
GOVERNING TELLS TYPE OF WORK WILL BE COMPLIED WTIH WHETHER SPECIFIED
HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE
AUTHORITY TO VIO TE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOC LAW .' G TING CONSTRU. ON OR THE PERFORMANCE OF
CO CTIO
61pate 4--g7 _-
t
PLAN CHECK �� JIPERMIT
/.J1 7 ��f
�% J � 9 / may?I 7COLORADO.
TOTAL FEE: DATE PERMIT ISSUED:
/67 ?'y�'yfr7I
OCC: GROUP:
t CONST: TYPE:
3 N
ZONING:
SETBACKS:
of Owner, .. � . . or authorized agent having and understood notice above.
,
.�a1.) , . , IO 6r r
MANIJ. HOME: O Q6 CI -
]
15D5 Na &FEE: Q o
BLLIIding 1 4L „ . IatE ri+f�n' 1 .
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE. APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT 114E STRUCTURE AS
DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT.
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT, THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY
GARFIELD COUNTY PURSUANT ID AUTHORITY GIVEN IN 30.21.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY
COMPLIED WITH IN THE LOCATION, ERECTION. CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE, TILE PERMIT MAY TIIEN BE REVOKED BY NOTICE FROM THE
COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THERE -AFTER REQUIRING THE
CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FRO PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION
OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION.
THE REVIEW OF THE SUBMEFIED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES
ORLIABILITES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. T.T1E RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION
RESTS SPECIFICALLY WHIT THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
Gerform.003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE. (INITIAL)
pin cnQ.al
-�c.12-�-cfB
The following items are required by Garfield County for a final inspection:
1. A final Electrical Inspection from the Colorado State Electrical Inspector.
2. Permanent address assigned by the Garfield County Building Department posted where
readily visible from access road.
3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows
installed, a complete kitchen with cabinets, a sink with hot & cold running water, kitchen
floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary
plumbing.
4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot & cold running, water,
floors and walls finished an a privacy door.
5. All steps outside or inside over three (3) steps must have handrails, guardrails on balconies
or decks over 30" high constructed to all 1994 UBC requirements.
6. Outside grading done to where water will detour away from the building.
7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of
extenuating circumstances, i.e., weather, but a Certificate of Occupancy will not be issued
until all the required items are completed and a final inspection made.
A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE
ITEMS HAVE BEEN COMPLETED.
****CANNOT OCCUPY OR USE DWELLING UNTIL A CERTIFICATE OF OCCUPANCY
(C.O.) IS ISSUED. OCCUPANCY OR USE OF DWELLING WITHOUT A C.O. WILL BE
CONSIDERED AN ILLEGAL OCCUPANCY AND MAY BE GROUNDS FOR VACATING
PREMISES UNTIL ABOVE CONDITIONS ARE MET.
I understand and agree to abide by the above conditions for occupancy, use and the issuance of a
Certificate of Occupancy for the dwelling under building permit # (9 7 ( Y
Signature Date
prmtcond.lst
Q 14:2 4 9702567851 PRESTIGE 02
...e.6JUN-10-1999 24"�1 ��lill! t Crest Homes Jlbr ��d ' J? r PAGE rx
Summit Crest
HOMES
Colorado Built
10 June 1998
To whom it may concern:
Summit Creast Homes constructed the home, serial #22988634927, ,to meet the standards set forth
by the standard Uniform Building Code as adopted by the Colorado Division of Housing. Summit
Crest Homes has assigned the FB number — FB 21305, provided by the Colorado Division of
Housing, to this home. That number certifies that this home was built in compliance with the
Colorado Division of Housing and the standard Uniform Building Cede, including a 401b. snow
load,
Glen it Alessandra
Sales Manager
2221 Clayton Lane • PD. Box It) • B .rttHRJ L. Colora4.ko .40i14
(970) 512-202 • Fax (970) 5324352
TOTAL P.02
%%Ld-.moi RevLi.e.?„,,44
-,l gi y0.5, d 6.
LOO,��
L-0,6 C-
GARFIELD COUNTY BUILDING AND PLANNING
970-945-8212
MINIMUM APPLICATION REQUIREMENTS
for
MANUFACTURED HOMES
In order to understand the scope of the work intended under a permit application and expedite the issuance
of a permit it is important that complete information be provided. Adequate and complete information will
prevent delays in the plan review process. Reviewing a plan and the discovery that required information has
not been provided by the applicant may result in the delay of the permit issuance and in proceeding with
building construction. The owner or contractor may be required to provide this information before the plan
review may proceed. This causes delays because other plans that are in line for review may be given attention
before the new information may be reviewed after it has been provided to the Building Department.
Please review this document to determine if you have enough information to design your project and
provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a
book titled "Dwelling Construction under the Uniform Building Code". This book is available to you
through this department at our cost. Also, please consider using a design professional for assistance
in your design and a construction professional for construction of your project.
To provide for a more understandable plan in order to determine compliance with the building, plumbing and
mechanical codes, applicants are requested to review the following check list prior to and during design.
Applicants are required to indicate appropriately and to submit the completed check list at time of application
for a permit.
1
Is a site plan included that indicates the distances of the proposed building or addition to property lines,
other buildjgs, setback easements and utility easements?
Yes
2. Does the site plan include the location of the I.S.D.S. (Individual Sewage Disposal System) and the
distances to property lines, wells (on subject property and adjacent properties), streams or water
courses?
Yes
3. Does the site plan indicate the location and direction of the County or private road accessing the
property?
Yes \/
Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel
in accordance with the uniform building code or per stamped engineered design?
Yes V
5. Do you understand that if you belong to a homeowners association, it is your responsibility to obtain
written permission from the association, if required by that association, prior to submitting an
application for a building permit? If you do not have written permission from the association, do you
understand that the plan check fee will not be refunded should the architectural committee deny or
reject your building plans?
Yes ✓ No
6. Will this be the only residential structure on the parcel?
Yes X No if no -Explain:
7 Have two (2) complete sets of construction drawings been submitted with the application?
Yes
8. For the placement of a manufactured home, have the following been specified?
The size of the unit (min. 20ft. x 20ft. ); live roof load (min. 40#); wind design (min. wind speed of 80
mph & 15 lb. wind load); foundation design; method of anchoring?
Yes V
9. Have you designed or had this plan designed while considering building and other construction code
requirement ?
Yes No
10. Does the plan accurately indicate what you intend to construct and what will receive a final inspection
by the Garfie)d County Building Department?
Yes t/ No
11. Do you understand that approval for design and/or construction changes are required prior_ to the
application,4f these changes?
Yes ��// No
2
12. Do you understand that the Building Department will collect a "Plan Review" fee
from you at the time of application and that you will be required to pay the "Permit
Fee" as well as any "School Impact" or "Septic System" fees required, at the time
you pick up your building permit?
Yes V. No
13. If you are accessing a county road and do not have an existing driveway you will
need to acquire a driveway permit from Garfield County Road and Bridge. The
phone number is 945-6111. You will need to show proof prior to the issuance of
the building permit.
14. Are you aware that twenty four (24) hour notice is required for all
inspections? Inspections will be made from Battlement Mesa to West
Glenwood in the mornings and from Glenwood springs to Carbondale in the
afternoon. Morning inspections must be called in by 12:00 p.m. the day
before; afternoon inspections must be called in by 5:00 p.m. the day before.
Failure to give twenty four (24) hour notice for inspections will delay your
inspection one (1) day. Inspections are to be called in to 945-9159.
Yes V No
15. Are you aware that you are required to call for al inspections required under the
Uniform Building Code including approval on a final inspection prior to receiving
a Certificate of Occupancy and occupancy of the building.
Yes ✓ No
16. Attached is information for placement of a manufactured home. Please review. If
you have any questions, please call this office.
3
f hereby acknowledge that f have read, understand and answered these questions to
the best of my ability.
-0)-(0 -9e)
signature date
Phones'7o 3; -11 (42
Project Name:
ays)
cwt g� Cj l --evenings}
Project Address:
Notes:
If you have answered "No" on any of the questions, you may be required to provide this information at the
request of the Building Official prior to beginning the plan review process. Delays in issuing the permit
are to be expected. Work may not proceed without the issuance of a permit. If it is determined by the
Building Official that additional information is necessary to review the application and plans to determine
minimum compliance with the adopted codes, the application may be placed behind more recent
applications for building permits in the review process and not reviewed until required information has
been provided and the application rotates again to first position for review, delay in issuance of the permit
or delay in proceeding with construction.
4