Loading...
HomeMy WebLinkAboutConditions of Permit2CONDITIONS OF PERMIT BLCO-2-12-2364 Caleb Edelman/MCGI 1, LLC 2 Story Storage Building 6690 Hwy 82 GWS, Colorado 1) ALL WORK MUST COMPLY WITH THE 2009 IBC, IMC, IPC, IFGC, IECC, IFC, AND THE MANUFACTURERS INSTALLATION SPECIFICATIONS. 2) ALL WORK SHALL COMPLY WITH THE CURRENT "CL" ZONE DISTRICT REGULATIONS. 3) BUILDING IS APPROVED AS TYPE V -B CONSTRUCTION, S-2 OCCUPANCY. 4) CHANGE IN USE, OCCUPANCY, AND/OR ALTERATIONS TO BUILDING REQUIRES A SEPARATE BUILDING PERMIT. LAND USE CHANGE PERMITS MAY BE REQUIRED. 5) CONTACT LOCAL FIRE DISTRICT FOR PERTINENT IFC REQUIREMENTS PRIOR TO CONSTRUCTION. FIRE DISTRICT APPROVAL IS REQUIRED FOR CO/FINAL INSPECTION. 6) EXCAVATION OBSERVATION REPORT REQUIRED AT FOOTING INSPECTION, 1500 PSF. 7) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR. PROVIDE APPROVAL REPORT AT FRAME INSPECTION. 8) ELECTRICAL ROUGH IN APPROVAL IS REQUIRED AT FRAME INSPECTION. 9) ELECTRICAL FINAL APPROVAL I5 REQUIRED FOR CERTIFICATE OF OCCUPANCY. 10) LIGHT AND VENTILATION PER 2009 IBC, CHAPTER 12. 11) LOCKS, LATCHES, AND LANDINGS PER 2009 IBC, SECTION 1008. 12) GARFIELD COUNTY FINAL INSPECTION REQUIRED FOR CO/FINAL APPROVAL. A / -c copy