Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-11-16-4482 and SEPT -11-16-4483 Ernesto Cuc — Office & Mfg. Shop Coke Ovens Exemption, Lot 2 — TBD Sec27, TO6S, R89W Glenwood Springs, Colorado 1) ALL WORK SHALL COMPLY WITH THE 2015 IBC, IMC, IPC, IFGC, IFC, 2009 IECC, AND IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS & REQUIREMENTS. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS, PLAN REVIEW COMMENTS/REDLINES, AND INSPECTIONS POLICY. 3) WORK SHALL COMPLY WITH "COMMERCIAL GENERAL" ZONE DISTRICT REGULATIONS PER GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE. 4) BUILDINGS ARE APPROVED AS TYPE V-A NON-SPRINKLERED CONSTRUCTION WITH MODERATE HAZARD FACTORY INDUSTRIAL SHOP (OCCUPANCY GROUP F-1) AND OFFICE (GROUP B) SINGLE TENANT OCCUPANCY. SUBSEQUENT TENANT FINISH IMPROVEMENTS MAY REQUIRE ADDITIONAL BUILDING PERMITS. 5) CONTACT LOCAL FIRE DISTRICT FOR INTERNATIONAL FIRE CODE (IFC) REQUIREMENTS AND PROVIDE COPY OF BUILDING PERMIT DRAWINGS TO FIRE DISTRICT FOR REVIEW AND SIGN -OFF. FIRE DISTRICT'S FINAL APPROVAL REPORT REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 6) ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) TO COMPLY WITH ALL SETBACKS AND OTHER REQUIREMENTS PER GARFIELD COUNTY OWTS REGULATIONS. ENGINEER TO PROVIDE FINAL INSPECTION REPORT FOR SEPTIC SYSTEM PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 7) ACCESSIBILTY REQUIREMENTS PER 2015 IBC, CHAPTER 11, AND ICC/ANSI A117.1-2003. 8) LOCKS, LATCHES & LANDINGS PER 2015 IBC, SECTION 1010. 9) LIGHT AND VENTILATION PER 2015 IBC, CHAPTER 12. 10) ALL HIGH STRENGTH BOLTING AND FIELD WELDING REQUIRES SPECIAL INSPECTOR PER IBC, CHAPTER 17. PROVIDE APPROVAL REPORT AT FRAME INSPECTION. 11) BUILDING MECHANICAL SYSTEMS INCLUDING: COMBUSTION AIR, DUCTWORK & VENTING REQUIREMENTS PER INTERNATIONAL MECHANICAL CODE (IMC) AND IECC, SECTION 503. MECHANICAL ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAMING INSPECTION. 12) PLUMBING REQUIREMENTS PER INTERNATIONAL PLUMBING CODE (IPC). PLUMBING ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 13) ELECTRICAL REQUIREMENTS, PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL REQUIRED FOR FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 14) ELECTRICAL POWER AND LIGHTING SYSTEMS TO ALSO COMPLY WITH IECC, SECTION 505. 15) VERIFY DIRECTIONAL EXIT SIGNS & EMERGENCY LIGHTING LOCATIONS PRIOR TO ELECTRICAL ROUGH -IN INSPECTION.