HomeMy WebLinkAbout6.0 Land Use Change Permit!ltll[l+ll'&{, lllll
f'T?qtBrfl H,'.t##fu ".,ffl,tlB8"atf; ,rr.DoouNryco
,-,4^ND USE CHANGE PERMIT
for
A Portion of a Parcel of Land Owned by Eva C. Uphoff Trust and Timothy
James Uphotf (Opented byWPX Energy) Located North of the Town Of
Debeque and in Secfibn 3, Township 7 South, Range 95, West of the 6th P.M.,
Gafield County with a Project Area of Approximately 1.5 acres ltWthin an
Ovemll 598.78 acre Property
(Assessor's Parcel No. 21 37-01 2-0-001 )
ln accordance with and pursuant to provisions of the Garfield County Land Use and
Development Code of 2013, as amended, and a Resolution of Approval (Resolution_
Number 2015-30) of the Board of County Commissioners of Garfield County, State of
Colorado, the following activity is hereby authorized by Land Use Change Permit:
MAJORTEMPORARY EMPLOYEE HOUSING FACILIry HOUS'NG UP TO 24
PERSONSAND ONSITE FOR MORE THAN ONE YEAR, AND A STORAGE
FACIL|TY (LAYDOLIVN YARD), ONA 1.5 ACRE PORTION OF A 598.78 ACRE
PROPERTY (LtPA-81e1)
This Land Use Change Permit - Limited lmpact Review is issued subject to conditions of
approvat as set forth in Exhibit oB" and shalt be valid only during compliance with such
conditions and other applicable provisions of the Garfield County Land Use and
Devetopment Code, as amended, Building Code, and other regulations of the Board of
County Commissioners of Garfield County, Colorado.
0..r..-. nt-, dlJu*
EiAMiihe Board
BOARD OF COUNTY
Page 1 of 5
WPXENERGYROCIff
TRAIL RIDGE EMPLOYEE HOUSING FACILITY & ACCESS ROAD
A PARCEL OF I.AND SIruATED IN SECTIO{ 3, TOI''JT.ISHIP 5 SOUTI, MNGE S7 I1'E8T OF IHE 6IH P.M,,
COIJNTY OF GARFIEI.O, STATE OT COLOMOO
LIMITED IMPACT REVIEW SUBMITTAL
qxrxM@a
Ptr'PETTY
sEc:t4 -a-
//
G€n/TIOT'
d }ldAtlD
t5,e7ol€lrior usaptotEttY I
I
EEIIIEIE
-6.6E6-U
a not.reaFE.l.IF--os.
tuBEdnrr-
a rffirpi
. Easa-*€ EEdE
, BE'E"E
q4BilrH+t-al.Fl
$ .aadloli
a aGxaEo -rr-EM, &e D.araE,E. -.suapuaE ra or-u.-lrair- r-
o 5rffiM
sE llgrrg
!3glliIEEEB@-
ETIEI&N
E!!99!4g'
{- --
ifiriri
r{ iE0rOotrP.OPts.P.5rtQ
pt
5o
brtort
q,
|.qo
FY\oot^tq,oP.oo <(0otni
o
N9,oIQE
'38 -
#$rE
t8*=L'**=
EbE=
sE-Eor.I
"ri'It3#oD :r
bE =ftG'I B$f;#=FE"lEET
=E8E
I
=
TIF€io\ot-
=i.o($
B>5
ru
OJrAo
N
otn
ul
lll ilrrtiltlill Ull't$t l[Lhlilh'l ltilJ III ]l{lhl' ll ll I
RaceotionB: 888801itztortzo17 &l:35:23 Pll Jean Alberlggr---.5-;i'5-il; FEiii6l6o' iioc-Fad,6.6o GARFIEU) GoutfiY co
r-Emtrlf,EE-l,!lBr3 ms
:-
ir,N,l\.tt. t-t-1t-, .llr tt'. ! l-t'!I
(ti
<_
EI . .!
)o I
_.
t_
F=r.
I
I
1
I
Temporary Employee
Housing FacilitY.'t
I
)iij
I
I
fr Storage
Facility
--ilffi
[Jlilugfftltlft t$rttilrljll']ilphtlil'hltl
fft'clHf pi iffir".'p*, alBa"lffi ,,ELD oouNry co
Exhibit B
Conditions of Approval
Conditions Prior to Issuance of Permit
l. The Applicant shall improve the access road as proposed to meet SectionT-707 ,
*Semi-Primitive" standards prior to issuance of the Land Use Change Permit.
The Applicant shall provide evidence that the roadway has been upgraded and
meets the standards set forth in Section 7-107 -This evidence shall be reviewed
by the Garfield County Community Development Department and the County
Contact Engineer.
Other Conditions
2. That all representations made by the Applicant in the application shall be
conditions of approval, unless specifically altered by the Board of Counf
Commissioners.
3. That the operation of the WPX Trail Ridge Temporary Employee Housing and
Storage Facility shall be done in accordance with all applicable Federal, State,
and local regulations goveming the operation of this type of facility.
4. The facility shall maintain compliance with Storm Water Management Plan,
Drainage and Grading Plans and Reclamation for the site.
5. The Applicant shall contol fugttive dust during the operation of the site.
6. The facility shall maintain compliance with SectionT-306 Lighting, with all
lighting to be directed inward and doward toward the interior of the site.
Facilities and storage tanks sbatl be painted a non-glare neutral color to lessen
any visual impacts.
7. The Applicant shall comply with their Noxious Weed Management Plan
including the best management practices.
8. Within 9 months ofthe issuance of the Trail Ridge Employee Housing Facility
Certificate of Occupancy, the Applicant shall install an Onsite Wastewater
Treahent System (OWTS) to serve the proposed facility. The installation of
the System shatl be in accordance with the design and specifications as outlined
in the Application.
Page 4 of 5
lll tr r.,llllElllll{ H} lfe hfl hL'fi ittlltuI'hlr'lhl ] ll I
:accotlon$: EEESOIzto'ltzo17 [}3:35:29 P[i] J.an AlbarlcoRaccotlon$: EEESOIoztof 12017 [}3:35:29 P[il J.an AlbarlcqE-i,i 5-iio Faa;40:00 Doo Fcc,0.6@ G-ARFIEu) couNTY c0
9. All industrial wastes shall be stored in accordance with all State and Federal
laws and regulations.
10. The facility is perrritted to operate 7 days per week, 24 hours per day.
11. The Temporary Employee Housing Facility, Major, shall comply will all
standards for this type of facility as outlined in the Land Use and Development
Code, as amended.
Page 5 of 5