HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
B LCO-02-17-4588
Aspen Equity Group/All Valley Storage
Employee Housing + Office (Commercial Manufactured Housing)
82 County Road 113 - Carbondale, CO
1) WORK SHALL COMPLY WITH THE FOLLOWING BUILDING CODES: 2015 INTERNATIONAL
BUILDING CODE (I.B.C.) AND MANUFACTURER'S REQUIREMENTS.
2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS
AND INSPECTIONS POLICY.
3) ALL WORK TO COMPLY WITH "COMMERCIAL LIMITED" ZONE DISTRICT REGULATIONS
PER GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE.
4) FACTORY -BUILT MODULAR BUILDING APPROVED AS NON-SPRINKLERED, TYPE V -B
CONSTRUCTION WITH LIVE/WORK USE (RESIDENCE/OFFICE), OCCUPANCY GROUP (R-2).
5) A LOT IMPROVEMENT CERTIFICATE, SEALED BY A COLORADO LICENSED SURVEYOR, IS
REQUIRED TO VERIFY THAT PLACEMENT OF FACTORY -BUILT MODULAR BUILDING
COMPLIES WITH SETBACK REQUIREMENTS, SPECIFICALLY 25 -FOOT FRONT YARD
SETBACK.
6) NEW WASTE LINE CONNECTION TO EXISTING SEPTIC TANK TO BE INSPECTED BY
GARFIELD COUNTY BUILDING DEPT. TO VERIFY COMPLIANCE WITH O.W.T.S.
REQUIREMENTS.
7) PROVIDE ACCESSIBLE ENTRANCE TO OFFICE AREA, ALONG WITH ACCESSIBLE ROUTE
CONNECTING TO PARKING & PASSENGER LOADING AREAS PER I.B.C., CHAPTER 11
(SECTION 1104, 1105 AND 1106).
8) LIGHT AND VENTILATION PER 2015 I.B.C., CHAPTER 12.
9) STAIRS, LANDINGS, HANDRAILS PER I.B.C., CHAPTER 10.
10) VERIFY SMOKE ALARM ADJACENT TO BEDROOM IN FACTORY -BUILT MODULAR
BUILDING (SEC. 907.2.11.2)
11) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL FINAL APPROVAL IS REQUIRED PRIOR TO FINAL INSPECTION & CERTIFICATE
OF OCCUPANCY.
12) GARFIELD COUNTY FINAL BUILDING INSPECTION IS REQUIRED FOR FINAL CERTIFICATE
OF OCCUPANCY.