HomeMy WebLinkAboutApplication- Permit:aa
GARFIELD COUNTY
BUILDING, SANITATION and PLANNING DEPARTMENT
109 81h Street Suite 303
Glenwood Springs, Colorado 81601
(303) 945-8212
N: Q 4
Job Address 0096 County Road 160
Nature of Work Building Permit
Use of Building Foundation Only
Owner Rocky Mountain Gas
Contractor Alco Building Co,
Amount of Permit: $ 371.?.. Date July 10, 992
White - Treas.
Canary - Office
Pink - Applicant
Gold - Duplicate
Permit: 225.00
Plan : 146.25 S. Archuleta
Clerk
GARFIELD COUNTY
APPLICATION FOR BUILDING PERMIT
please print or type
fTO BE FILLED OUT BY APPLICANT
ADDRESS OCX3&J C r/ q� `6,6,
SUBDIVISION �"�
FILING # LOT # BLOCK #
PAX SCHEDULE # 421150[000Cc7
LEGAL (SEC/TTN/RNG) /L'1 - _ eci
3
NAME
MAILING ADDRESS. +� 2:1
CITY !,-9 rs.-,L, PHONE c14G,-,
CONTRACTOR
PERMIT NUMBER 44V7 d�
DATE % "/(? -
PLOT PLAN
NAME v i�
ADDRESS --24:7 CITY 1_,_� ; L
/ am,
.
NAME A4 --(---C:=1 LLD
ADDRESS /?-v- t2.c
CITY
PHONE/IA/2:1 t LICENSE
CLASS OF WORK
NEW
DEMOLIS
ALTERATION
REPAIR
MOBILE HOME (make/model)
ADDITION
MOVE
S.F. OF BLTILDING S.F. OF LOT 4-a(
# OF FLOORS HEIGHT Vico.
# OF .FAMILY UNITS # OF BEDROOMS
INTENDED USE OF BUILDING 4`r
GARAGE: SINGLE DBL CARPORT: SINGLE DBL
FIREPLACE
DOCUMENTS ATTACHED
WATER SUPPLY We f/
DRIVEWAY PERMIT.x t C pLt p't_3
SITE PLAN
BUILDING PLANS F` A�
SANITARY SEWER CLEARANCE /�
ON SITE SEWAGE DISPOSAL PERMIT t
OTHER DOCUMENTS (specify)
,61)/64 7704/ PAIL Y = 5.00
NOTE: Show easements, property line dimensions,
all other structures, specify north, and street
name. For odd shaped lots, or if space is
too small, provide separate plot plan.
# OF BUILDINGS NOW ON PARCEL /re)
USE OF BUILDINGS NOW ON PARCEL
Rcft1 /letif_.
13tobheit
FRONT PROPERTY LINE
STREET NAME/ROAD NUMBER
CHECK IF CORNER LOT
DESCRIPTION/ OF WORK PLA
� ST1-L/c /- -a
I hereby acknowledge that I have read this
application and the above is correct and I
a to comy with all county ordinances
st to la egu •tiny building construction
SIGNAT
RE
VALUATION 1 / 4Q, p Q
FOR OFFICE
USE ONLY
PERMIT FEE $ ,?j po PLZ CHECK FEE $ / - Z5'
TOTAL FEE $ 3 7L 2 -r` SCHOOI, IMPACT FEE $ N
DATE PERMIT ISSUED
ZONING DISTRICT e -162" -
TYPE YPE QF OCCUPANCY B -1 R - rf-
TYPE OF CONSTRUCTION ) v- ,J
-S.F_ OF BUILDING (p (9 0 S.P. OF LOT
)
MAX. HEIGHT
ig
ROAD CLASS.
SETBACKS FROM PROPERTY LINE: FRONT
REAR RIGHT LEFT
OFF STREET PARKING SPACES REQUIRED
4- (3-z
FLOOD HAZARD
CERTIFIED BLDG ELEVATION
SPECIAL CONDITIONS
PROBLEMS WITH PERMIT
ADDITIONAL INFORMATION NEEDED
CERTIFIED BY COLORADO REGISTERED LAND SURVEYOR
OR ENGINEER
OOP!
APPROVED
ih4t .
NG DEP,R 'NT
APPROVE
‘zr-frz
PLANNING DEPA ME'T DATE
-
fps
/r/ Al.k , ) / 7/1)/- ' Ci_Ce (c' 27,
V 0
f1
•
r't
•
7-0 r L C7-5- ). (4 7: /
L
7
r C.'
it 77-•4 c.;_C (.7 i=2
11 ; 1
C
C:1)
;
- ,/1 Le 5-,
30 , i '(,-;7',.-) ----:, / _S7 0/...- ,A,,,, ,( 4 7L...)1:' --/'-- /1 7- - - 2-
t
/ST 17,2,i? PV7i. -(9,/-----.7(Z5-- '----.L 2 r ,/' / ? . I. ------ 3 ZS z:-" e'--. ...). L /
7--/-/A?t(
/:. .0 cc.._•.,, i, c ,' .... c: y-, -.7 ./7(/ .'S .)..- e.. ,;:--i 11/4) - 7
In r'
/0 .,-/c) ,7 4V ----,.--L.) s– (7 7'c)----- — /
,_.._.. ,..„.:c„,,-,, C4/:
L. i
C7 °
3 .4 t / 2
9
PRO`OSED
BLDG. SITE
,
GLENWOOD SPRING
VICINITY MAP
N.T.S.
REVISED
BY: DATE
2/20/92
J.Q.F.
J.b,F,
2/25/92
ROCKY MOUNTAIN N,
DIVISION OF KNENEPI
D'flfVY PHP' !HTATt! PIAT'
D
Cr)
w
0
X
x
PIPE
STORAGE
o.
X
x
LJ
N 0r22'43
NEW CUT INTO
EXIST. GRADE
YARD AREA
EQUIPMENT STORAGE
N 89'53'00" W 210.80'
): )C X X
EXIST. WATER WELL
70'
S 26'46'00" E 70.00'
N 89'5.3'00" w 20.00'
FUTUPE
EXPANSION
PROPOSED
BLDG. SITE
N 89'53'00" W
257.69'
N
A
ACCESS
Qag
-OAD
r1 -I Ti
X c-
U —�
Z
(Rrn
M ,00,�S.62 N
113M 2131 d
..00,91%9Z S
Fri
st-
CTL/THOMPSON, INC.
CONSULTING GEOTECHNICAL AND MATERIALS ENGINEERS
SOILS AND FOUNDATION INVESTIGATION
ROCKY MOUNTAIN NATURAL GAS TRANSMISSION BUILDING
Glenwood Springs, Colorado
Job No, 18665
aRJ
Prepared For: t O ,..
Rocky Mountain Natur-1 nos 27429
VI:5 II% i c.k If
401 S -ss -Street -�-
Glenwood Springs, Color-tsdf.,.
234 CENTER DRIVE -' GLENWOOD SPRINGS, COLORADO 81601 • (303) 945-2809
May 21, 1992
TABLE OF CONTENTS
. SCOPE 1
SUMMARY OF CONCLUSIONS 1
SITE CONDITIONS 1
PROPOSED CONSTRUCTION 2
SUBSURFACE CONDITIONS 2
SITE PREPARATION 3
BUILDING FOUNDATION 4
SLAB -ON -GRADE FLOOR 5
SURFACE DRAINAGE 6
LIMITATIONS 7
FIGURE 1 - LOCATION OF TEST HOLES
FIGURE 2 - SUMMARY LOGS OF TEST HOLES
SCOPE
This report presents the results of our soils and foundation investigation for the
proposed .Rocky Mountain Natural Gas Transmission building to be adjacent to the
Glenwood Springs airport in Glenwood Springs, Colorado. We explored the subsurface
conditions to provide foundation recommendations for the proposed building. This report
includes a description of the subsurface conditions found in our test holes, a
recommended foundation system and geotechnical and construction criteria for details
influenced by the subsoils. Our report was prepared from data developed during our field
exploration, laboratory testing, engineering analyses and our experience with similar
conditions. A summary of our conclusions is presented below.
SUMMARY OF CONCLUSIONS
1. Our test holes penetrated 0,5 feet of "topsoil" over 0.5 to 3.5 feet of
medium dense silty sands underlain at 1 to 4 feet by dense sandy gravels
with cobbles. A 1 foot layer of debris fill was found over the sands at our
TH-3 location. Free groundwater was not found in our test holes at the
time of drilling.
2. The building can be founded with spread footings bearing on the natural
sands and/or gravels. Footings bearing on a combination of the sands and
gravels can be designed for a lower bearing pressure and entirely on the
gravels for a higher bearing pressure as discussed herein. ,
3. Floors will be slab -on -grade. Fill will be required below a portion of the
floor to raise the site grade to the desired finished grade. The warehouse
floor can bear on the natural soils or on densely compacted granular
structural fill. Floors should not be placed on "topsoil".
SITE CONDITIONS
The site is on the floor of the Roaring Fork Valley at the far southern part of
Glenwood Springs. Red Mountain and Lookout Mountain form the valley sides to the west
and the east respectively. The valley meanders between moderately to steeply sided
mountains to the north and south.
The Glenwood Springs Airport runway is east of the site and the Roaring Fork
River is farther to the east. Small commercial warehouse/office type buildings were to the
north, south and west. The ground surface sloped down from the southwest to northeast
visually estimated at about 5 percent or less, A 4 to 6 foot high bench was located in the
southeast part of the building location. A low area formed by previous excavation was
east of the building location. Greasewood, sage and grasses were growing on the site.
Debris from a coke oven was placed in a layer over part of the site.
PROPOSED CONSTRUCTION
The building will be 130 feet by 50 feet in plan dimensions with no basement and
will house warehouse, shop, office and vehicle maintenance areas, The building will have
a steel rigid frame with steel roof joist. and a steel exterior skin. The bents will be pinned
at the bottom. We assumed maximum interior column loads of 40 kips. The warehouse
floor will be subjected to 125 psf loads from stored piping equipment (e.g. valves and
elbows) and fork lift wheel loads. If the design loads differ from our understanding and
assumptions we should be advised to permit us to reevaluate our conclusions.
SUBSURFACE CONDITIONS
Four (4) test holes were drilled with a 4 -inch diameter continuous flight power
auger at the locations shown on Figure 1 to investigate the subsurface. We directed the
drilling, logged the soils and obtained samples. Summary logs of the soils found in our
test holes and results of field penetration resistance tests are shown on Figure 2.
Our test holes penetrated 0.5 feet of "topsoil" over medium dense silty sands
underlain at 1 to 4 feet by dense sandy gravels with cobbles. No free groundwater was
found in our test holes,
Atterberg limits on a sample of the sands were a liquid limit of 20 percent and a
plastic index of 3 percent, The sample had 29 percent silt and clay size particles (passing
the No, 200 sieve).
SITE PREPARATION
Site grading plans were not available at this writing, however, it appears that up
to 6 feet of fill will be needed to raise the ground surface elevation to slab -on -grade
subgrade elevation. All fill beneath the building should be constructed of sands or
gravels. These soils will compact into a dense high 'strength subgrade for the warehouse
floor.
All topsoil, existing fill, and other deleterious materials should be removed from the
building "footprint". The subgrade should be scarified at least 6 inches deep, moisture
conditioned to within 2 percent of optimum moisture content and compacted to at least
90 percent of standard Proctor maximum dry density (ASTM D 698). The fill should be
structural fill, constructed with sands and/or gravels with 100 percent finer than 4 inches,
a maximum of 30 percent passing the No. 200 sieve, a maximum liquid limit of 25 percent
and a maximum plastic limit of 10 percent placed in 8 inch maximum loose lifts at 2
percent below to 2 percent above optimum moisture content and compacted to at least
3
98 percent of the standard Proctor maximum dry density (ASTM D 698) with a heavy
sheepsfoot vibratory compactor or heavy tractor towed vibratory roller.
Samples of soils proposed for structural fill should be submitted to our office for
approval prior to transporting to the site. Placement and compaction of fill should be
observed and tested by a representative of our firm during construction.
BUILDING FOUNDATION
Our test holes show the soils at footing elevations will be natural medium dense
sands and dense sandy gravels based on the floor level we assumed (Figure 2). In our
opinion, considering foundation movement and cost, the more feasible foundation for the
building is spread footings bearing on the natural sands and/or gravels. Footings bearing
on a combination of the sands and gravels will need to be designed for a lower bearing
pressure controlled by the weaker sands and can be designed for a higher bearing
pressure if they bear entirely on the stronger gravels.
Footings designed for the bearing pressures recommended below should result
in total settlement of 1 -inch and differential settlements between isolated pads of one-half
of the actual total settlement.
Suggested design criteria for footings;
1. Footings should bear on the natural sands and/or gravels. Footings
bearing on a combination of the sands and gravels should be designed
for a maximum bearing pressure of 2500 psf. Footings bearing on natural
sandy gravels can be designed for a maximum bearing capacity of 5000
psf. If footings bear on other than natural gravels, all footings should be
designed for a maximum bearing pressure of 2500 psf. Footing
excavations should be checked by a representative of our firm to confirm
soils conditions are those we anticipated from our test holes.
Foundation walls on continuous footings should be reinforced top and
bottom. We recommend the reinforcement necessary for a simply
supported span of 12 feet or at least two continuous No. 5 bars, top and
bottom, whichever is greater;
3. Maximum footing widths are desirable. We suggest a width of at least 16
inches for continuous footings and at least 2 feet by 2 feet for isolated
column pads. Greater sizes will likely be required based on column and
wall loads;
4. The soils beneath exterior footings need to be protected from freezing.
The depth normally assumed for protection in the Glenwood Springs area
is 36 inches.
SLAB -ON -GRADE FLOOR
The topsoil, existing fill, and other deleterious materials should be removed from
under floors because they are not suitable for slab -on -grade subgrade, Part of the
subgrade will be structural fill at the elevation we assumed for the floor elevation (Figure
2). Structural fill should be constructed as we recommended under "Site Preparation".
Water will likely be used in the part of the building which will house the vehicle
maintenance area. The floor slab joints in this area must be sealed with a flexible caulk
to prevent water leaking through the joint into the subgrade. The joints will need to be
inspected as part of routine maintenance. Floor drains should also be sealed and
frequently inspected.
The vertical movement of the floor slab must not be restricted. Non -load bearing
partitions founded with footings may bear on thickened slab "footings". Load bearing walls
should be founded with footings independent of the floor slab. Frequent control joints
should be provided. The American Concrete Institute (ACI) recommends minimum joint
spaces of 15 to .20 feet.
5
•
r:
We recommend the following design and construction criteria for the slab -on -
grade floor:
1. Provide 4 inches of densely compacted base course under the floor slab
to distribute wheel loads;
2. Slabs should be separated from exterior walls and interior bearing
members with a joint which allows free movement of the slabs;
3. • Slabs in areas subject to vehicle traffic should be moderately reinforced
with reinforcing bars (not wire mesh) carried through slab joints;
4. Interior backfill along foundation walls and interior utility trenches should
be compacted to at least 95 percent of ASTM D 698.
SURFACE DRAINAGE
Rapid runoff of surface water is important for better performance of foundations
and slab -on -grade floors. The risk of wetting of soils below the building can be reduced
by carefully planned and maintained surface grading. We recommend the following
precautions be observed during construction and at all times after the building is
completed.
1. Wetting or drying of excavations should be avoided;
2. The ground surface surrounding the exterior of the building should be
sloped to cause rapid run-off of surface water away from the building in ail
directions. Pavements adjacent to the building should be sloped to cause
water to drain away from the building;
3. Exterior backfill of foundation walls should be moistened and compacted
to at least 90 percent of standard Proctor maximum dry density (ASTM D.
698). The top 2 feet of backfill should be of the more clayey soils found at
the site. Interior backfill should be compacted to 95 percent of ASTM D
698.
4. Roof downspouts should discharge well beyond the limits of all backfill.
Splash blocks or extensions should be provided at all downspout and
discharge points.
.�F
LIMITATIONS
Our test holes were spaced to obtain a reasonably accurate picture of the
subsurface. Variations in the subsurface conditions not indicated by our test holes will
occur. We should observe all completed excavations to confirm the soils are as we
anticipated from our test holes and observe and test fill placement.
Our report is based on conditions disclosed by our test holes, results of laboratory
testing, engineering analyses and our experience. Criteria presented reflects the
proposed building as we understand. it, We should be advised if the final design differs
from our assumptions to permit us to reevaluate our conclusions.
This investigation was conducted in a manner consistent with the level of care and
skill ordinarily exercised by the members of the profession currently practicing under
similar conditions in the locality of this project. No other warranty, express or implied, is
made.
if we can be of further service or if you have questions regarding this report,
please call.
CTUTHOMPSO
echiin, P.E.
ch Manager
. Reviewe
Fran , •
cip'1`
.f ng"ee
JM:FJH:gs
(3 copies se
7
0
TO
GLENWOOD
SPRINGS
L V
r
t
EXISTING
WATER
WELL
•
PROPOSED
FUTURE
EXPANSION
1 U's
1 5"
1
1
1
1
MIDLAND
AVE. --11".
1
1
S
JOB N0,18,865
TH-2
TH-4
L
3RD CT -
2ND ST.
IC60
LSLTE
t DARROW ST.
VICINITY MAP
NO SCALE
SCALE I" = 44'
ASSUMED
EL,
=100.N
LOCATION OF TEST HOLES
FIG, I
ELEVATION - FEET
mi.. 104
102
- 100
m. 98
✓ 96
94
.- 92
LEGEND:
b
TH-1
EL.=101
TH-2
EL.=99
ASSUMED FLOOR
LEVEL (BY CTL/T)
We = 3.4
LL = 2.0
PI = 3
-200 = 29
TOPSOIL, SAND, SILTY, LOOSE,
SLIGHTLY MOIST, RED -BROWN
50/5
DEBRIS FILL, BRICKS, CINDERS
CLINKER
SAND, SLIGHTLY SILTY TO SILTY,
MEDIUM DENSE, SLIGHTLY MOIST,
RED -BROWN CSP,SM)
GRAVEL, .SANDY, WITH COBBLE,
DENSE TO VERY DENSE, SLIGHTLY
MOIST, BROWN OR RED -BROWN (GP)
BULK SAMPLE
TH-3
EL.=104
TH-4
EL.=100
NOTES:
104
102 -
100-
98.
00-
98.,
96 -
94 -
92
- NOIIVA313
11
m
m
1 THE TEST HOLES WERE DRILLED MAY 8, 1992
WITH A 4 -INCH DIAMETER CONTINUOUS FLIGHT
POWER AUGER.
2. ELEVATIONS WERE OBTAINED WITH A HAND
LEVEL AND ARE APPROXIMATE. THE SOUTH-
EAST PROPERTY CORNER WAS ASSUMED TO BE
ELEVATION 100..
3. NO FREE GROUNDWATER WAS FOUND TF -E DAY
OF DRILLING.
DRIVE SAMPLE. THE SYMBOL 50/5
INDICATES THAT 50 BLOWS OF A
140 -POUND HAMMER FALLING 30
INC -ES WERE REQUIRED TO DRIVE
A 2.5 -INCH O.D. SAMPLER 12 INCHES.
DEPTH AT WHICH PRACTICAL DRILL RIG
REFUSAL WAS
ENCOUNTERED. SUMMARY LOGS OF TEST
HOLES
JOH NO. 18,865 FIG, 2
7-8-92
bEPARTMENT
OF EMERGENCY SERVICES
EMS • FIRE • RESCUE
Rocky Mountain Natural Gas
2517 Grand Avenue
Glenwood Springs, CO. 81601
Attn: Greg Flickner, Randy Niemi, Tom Boita
GARFIELD COUNTY
Gentlemen,
Per your request I will contact the county building department
and advise them that it is acceptable to issue a foundation only
permit for your new building. It must be understood that no
walls or other structure shall be built until we have received
and approved complete details on your fire protection system.
We have gone over the requirements before, but I feel it
necessary to reiterate in writing what is required to avoid any
confusion. First of all adequate water supply is required by
the Uniform Fire Code 1982. section 10.301 c.. Water supply may
consist of reservoirs, pressure tanks, elevated tanks, water
mains, or other fixed system capable of supplying the required
flow. We have already copied you on the approximate capacities
as calculated by the ISO standards,
Should you desire to utilize an approved sprinkler system, which
is our understanding you will be doing, the system will need to
be designed based on the National Fire Protection Associations
Standard for Installation of Sprinkler Systems, Pamphlet 13. Any
referenced standards ie. for pressure tanks etc. shall also be
taken into consideration.
In talking with your designer, Raymond Segura of Excel Fire
Protection, Inc. I advised that he should base the design on a
ordinary hazard occupancy, duration for 60 minutes, plus 250 GPM
hose allowance. This is based on conversations with you
concerning type of construction, and limited combustibles ie. no
flammable liquid storage and no welding or cutting operations.
Installation of the system will need to be done by state
licensed contractors. All required testing by pamphlet 13 will
need to be completed. Generally we can turn around a set of
plans within seven working days upon complete submittal of
plans, calculations, component cut sheets, etc.
Should you wish to propose alternative methods or want to
discuss any details please feel free to contact our office.
806 Cooper Avenue • Glenwood Springs, Colorado 81601 • (303) 945-2575 • FAX (303) 945-2597