HomeMy WebLinkAboutWelding Inspection ReportsWest Slope Testing & Inspection LLC
3177 Glendam Dr.
Grand Junction, CO 81504
Phone:970-434-6988
Cell: 970-260-2844
Date: 11-17-16
Inspection Report
Client: H-P,.....Kumar (Project #16-7-279)
Report#5
Page 1of1
Project: Garfield County Shop Building CNG Upgrade (PNCijob #1655)
Address: 0298 CR 333A Rifle, CO
General Contractor: PNCI
Contractor that Performed Work: Contact Welding
Inspection of shop fabrication or field work at job site: Field
Report: Visually inspected steel deck attachment puddles welds & verified steel
deck materials at the main roof area.
The field welding & steel deck materials inspected/verified above appeared to be
in substantial conformance with the plans, and the quality requirements of the
A WS Structural Welding Code.
Inspector/Technician: Douglas E Young
Douglas E Yo ung
CWI 96070131
QC1 EXP. 711/2017
West Slope Testing & Inspection LLC Report#6
3177 Glen dam Dr.
Grand Junction, CO 81504
Phone:970-434-6988
Cell: 970-260-2844
Page 1of1
Final Inspection Report
Date: 11-28-16
Client: H-P~Kumar (Project #16-7-279)
Project: Garfield County Shop Building CNG Upgrade (PNCijob #1655)
Address: 0298 CR 333A Rifle, CO
General Contractor: PNCI
Contractor that Performed Work: Contact Welding
Inspection of shop fabrication or field work at job site: Field
Report: Visually inspected steel deck attachment puddles welds at the canopy
roof areas.
The field welding inspected above appeared to be in substantial conformance
with the plans, and the quality requirements of the AWS Structural Welding Code.
To the best of my knowledge this completes the special inspections of the
structural steel welding & high strength A325 bolting, as outlined in reports # 1
thru #6 for the project.
•
Douglas E Young
CWI 96070131
QC1 EXP. 7/112017