Loading...
HomeMy WebLinkAboutEngineer's Final Report 03.22.2017Froi i E: Rick Olofson rick.j.oIofscn(LI)'gr I lail.co 7ubject: Engineer reports Date: Apr 3, 2017, 9:21:40 AM -To: Saultrrs@cs.com Cc: rick.j.olofson@gmail.com March 22, 2017 TO: Rick Olofson rick j.olofson®gmail.com Gary R. Reeder, P.E. Registerea' ProftsionalFagincer 2937 Four Comers Drive, Grand Junction, CO 81503 cell: 970/250-9242 e-mail: garyreeder34@gmail.com RE: Underpinning {PieriirgtProject — Final Report 0066 Silver Mountain Drive Glenwood Springs, CO 81601 In summary, the concrete house and garage foundation walls, including the center concrete stem wall in the crawl space, are stabilized. The push piers were installed in accordance with the manufacturer's recommendation and specifications. The lift was accomplished in a proper manner by personnel from Foundation Repair of Western Colorado (FRWC). The two attached drawings show the fmal post -lift elevations and the amount of lift that was attained. The "Final Post -Lift Elevations" drawing can be used as a benchmark for future reference. Prior to lifting on March 21, 2017, the elevation difference between the highest and lowest areas of the house was 18-5/8". After lifting the elevation difference was ±3/4". The greatest amount of lift was attained at the front of the house and garage. The floor in the front bedroom at the front wall was lifted ±9". However, the settlement that had separated the floor structure from the foundation wall by about 4- 1/2"-5" resulted in the front foundation wall being raised about 13-1/2"-14". The front portion of the house and garage had settled quite severely. It is my understanding that you will replace the t;a rage slab. Please call me if you have any questions. Respectfully submitted, 441, Gary R. ceder, PE CO #19404 attachments (21 • r 4.0 1,,.r�• • �- ffj! ▪ f I err yj. .. -LDS 1.V,.•;j� .r -/^' 14rx ne�dei:3 y�aaI& . un r tri. _ ... _ . - • 6Ie420054i _ _1g5 8t6_a! ►p 1/C //.e? UiCAIS T �qr. �f;.o17 „ -P, 3L1 44,07'1 1111 '.9404 t r• TV M RR{, ff7 a LI 7- t k 77. QI From: Rick Olofson rick.j.olofson@gmail.com B Subject: lift plan Date: April 13, 2017 at 10:28 AM To: Saultrrs@cs.com Ir. _Ainadaitt Zr2L,_ Mart�1r107 -t4 orf R-Reaer, Pa - gaor250tYa+V.1 ��' S .ft lDrrv+�