March 22, 2017
TO: Rick Olofson
rick j.olofson®gmail.com
Gary R. Reeder, P.E.
Registerea' ProftsionalFagincer
2937 Four Comers Drive, Grand Junction, CO 81503
cell: 970/250-9242
e-mail: garyreeder34@gmail.com
RE: Underpinning {PieriirgtProject — Final Report
0066 Silver Mountain Drive
Glenwood Springs, CO 81601
In summary, the concrete house and garage foundation walls, including the center concrete stem wall in
the crawl space, are stabilized. The push piers were installed in accordance with the manufacturer's
recommendation and specifications. The lift was accomplished in a proper manner by personnel from
Foundation Repair of Western Colorado (FRWC).
The two attached drawings show the fmal post -lift elevations and the amount of lift that was attained. The
"Final Post -Lift Elevations" drawing can be used as a benchmark for future reference.
Prior to lifting on March 21, 2017, the elevation difference between the highest and lowest areas of the
house was 18-5/8". After lifting the elevation difference was ±3/4". The greatest amount of lift was
attained at the front of the house and garage. The floor in the front bedroom at the front wall was lifted
±9". However, the settlement that had separated the floor structure from the foundation wall by about 4-
1/2"-5" resulted in the front foundation wall being raised about 13-1/2"-14". The front portion of the
house and garage had settled quite severely.
It is my understanding that you will replace the t;a rage slab.
Please call me if you have any questions.
Respectfully submitted,
441,
Gary R. ceder, PE
CO #19404
attachments (21
•
r
4.0 1,,.r�•
• �- ffj! ▪ f I err yj.
.. -LDS 1.V,.•;j� .r -/^'
14rx ne�dei:3 y�aaI& .
un r tri.
_ ... _ . - • 6Ie420054i _ _1g5 8t6_a!
►p 1/C //.e?
UiCAIS
T
�qr. �f;.o17
„
-P, 3L1
44,07'1
1111 '.9404 t r•
TV M
RR{,
ff7
a
LI
7-
t k
77.
QI
From: Rick Olofson rick.j.olofson@gmail.com B
Subject: lift plan
Date: April 13, 2017 at 10:28 AM
To: Saultrrs@cs.com
Ir.
_Ainadaitt Zr2L,_
Mart�1r107
-t4
orf R-Reaer, Pa
- gaor250tYa+V.1
��' S .ft lDrrv+�