Loading...
HomeMy WebLinkAboutOWTS Design Report 02.14.17KENNETH J. BROTSKY, P.E. 558 Rio Oso Lane Grand Junction, CO 81507 INVOICE DATE February 14, 2017 BILL TO: Clayton Homes 67123 Road Grand Jct, CO 81505 Profassiona1 Engineering Services R.andarad for On-Sita Wastewater Treatment System for proposed home at 1960 Chair Bar Road, Garfield County, Colorado. Soil Observation and Percolation Test Design and preparation of plans And specifications Inspection and final certification Total Amount Dua Thia Invoice $300.00 600.00 450.00 $1,350.00 .· DESIGN REPORT ON-SITE WASTEWATER 'l'REATMEN'T S?STP (OWTS) 1960 CaAIR BAR RO~ Prepared By: " GARFIELD COUNTY, COLORADO Kenneth J. Brotsky, P.E. 558 Rio Oso Lane Grand Junction, CO 81507 ( 970) 216-88 61 I. INTRODUCTION: February 14, 2017 This Report has been prepared at the request of Clayton Homes, representative for the above referenced property. This Report addresses the design of an On-Site Wastewater Treatment System to serve a proposed residence. Public sewer service is not available. The procedures used in this report follow the "Garfield County Health Department On-Site Wastewater Treatment System Regulations". II. SOILS AND PERCOLATION TEST: A test hole was dug in the area of the proposed absorption field and observed by Garfield County personnel and it was found that the percolation rate exceeded 5 minutes per inch and because of this, a registered Professional Engineer was needed to design the system. Therefore, the Professional Engineer, named above, performed a second percolation test. The results of that test are attached hereto. This test confirmed the County's test that the percolation rate was faster than 5 minutes per inch. The soil from surface to 12" depth the soil is a loamy clay topsoil. The material encountered below 12" to 24" was a gravely clay. Below 24" the soil is a fine, silty, clay, chalky in appearance. The ground surface where the OWTS absorption bed will be built is sloping down slightly at about 1% to the west into a natural drainage swale. Due to the rapid percolation rate it will be necessary to remove existing soil and replace with concrete sand with a long term acceptance rate of 0.80 gallons per square foot per day. Since this is a soil replacement, regulations require that the bed be pressure dosed. The bottom of the absorption bed will be set 28" below existing grade at the north end of the bed. ---------------·--- III. SYSTEM DESIGN: A. Estimated Sewage Flow: (4 bedrooms) 4 x 150 600 gallons per day B. Septic Tank 4 bedrooms require 1,500 gallon tank and since a pump in the second chamber will be needed for the pressure doing, the tank capacity must be upsized 250 gallons to provide the necessary detention time, therefore use 1500 gallon tank C. Absorption Bed: The absorption bed size is calculated as follows: A 600/.80 750 sq. ft. Adjustment Factors: Table 5.2 Method of Application is Dosed bed Factor 1.0 Table 5.3 Type of Distribution is Chambers Factor 0.70 Bed Size required is 750 x 1.0 x 0.70 525 Sq. Ft. Total Number of chambers required is 525/12 44 units Use bed configuration, with 4 rows and 11 chambers per row for a total of 44 chambers. PERCOLATION TEST DATA TABLE ~ -;sic_r t-6 ADDRESS: /fl,;,d eH'l/e 'ffe;~ ~~c . DATE L>z.//o/17 • I :OU I DEirnt I R//P TIME Zll..'O Z I j fJ OJ 9'~-5~ Z3~ /0 1)~ ?~ti•} ~ (ZJ ~-S'l .3 7~ 'Ol!'f #.1i,£2i.) ~ m 51-&.Z ~~~ 9 ti.Zi '9"'~(zo) '{ SOIL PROFILE . D E p T H IZ " \ 9 -IZ. t.o ,t:/h?'/ C"t.A ..J #'P:;,c.1'- Z</., -l 12-21 Gi2lft:1ct:.'1 {!.t..Mt 'Jt." , l/I;" m 11 KJ Z.L/-10 'L. hA/£ 511..r'f t1./Q~ ~"· \ (CH,4L~~) , ?~ [j) fl:)@ P11' 'Je: ""''~ sPt'-f /)/G" 17~"J . RATE SLOWER THAN 60 MPI N RATE FASTER THAN S MPI y' SLOPE GREATER THAN 30% 1 Al BOLE LOCATION DIAGRAM ---uswr DEEPER THAN 4 FT. Y BEDROCK LESS THAN 4 FT. /../ FLOODPLAIN N ------------0 N -SITE WATER Al ;..___ _____ _ REPAIR AREA ----+---------G WT ...,___ HSWT __ --_-_-:_ __ _ '· COMMENTS: I 1$1 I ,Jt> -------------- . ......+---+~t---+--i--+---t---t~-t----+---t-'"""':1'---t-~1c--:;---i--1---:t---;t---ic--t--t-...+---t---f-t--+---+-+--+----J.-.~- ! n'..9.i!U! 9 .it.Ii~ --(e,(>,(J t.7'1A ... , a8~ ~~·~/r.,c.VJ.i·14,, I , . I I .. ' j ff().,/.,"": -u.-' ~. ' ~-. 7 $?} ·~ , I , ,/;, ~-"lt. µ...L..-;·+--..;..."' +..::;;._+ 6~__,.S~-"_.~~Pt;~-.,1--4----!---l!--~+--+--1---1----.l---l­ $),C: ~ '> /~ ... i ~ 'I -t./•:· t: u ~-;"1 ' ~ '/ ~-,0 'ft.., ~·w I ~"'-; . " /fJ;v.P ..,....;, J.;WA!lie~1.t.c:i. 4V< ~·.~i ~P .. I 't _..,, ----'l"'-~'-+---l ~-+-""l--+--F----'+-"--'?---+-~!-----+---t----J---+--1---+--+--+~ ' 7 ") :: (_ I . ~ ':' ~ .. e:?::.. q_-t-~'""'+'-~'~~-1 "--~-1'--".s.--+--.---+-~~--1, _?.__,,1,!!-P--+.6 --1c-+---1----!----+---r--1--1--- v.(11 ~:(~ 1 . I -·----··---··----------·---· --·---·-·-----------------· ---........... --·--·------·-· .. -~ -·---·-i : J ) : -: ~ ;... l , .. I .: ~---:-.~ _; • t. i . : I :. -! ~ '. _I • ~ c-Wal<ImTIH~~<Dt i....r-...:....~ I 1 · I r l I .l ... : I I I I . I : . ; ' I ··.-+· .. --·.·-~--I-I -!-·!· •• l. COii'a.&c't. ~ f~: ~ •L C:M foll.Dwil:lg t1.1H.!1 (&l.lW •t .hu'I:. :14 Miu~ .0~ --=ieel • {l!D;1.nRar Vil OOONl.»te ~ U.. VJ.ttj mGDO:M CO!mq-J l.l llben ar.cavaticm U ~eta iLDd be.fore .ail repl.•Q!mml is 1.D ,phce. 2) When inna.llat.ion ot soil. ni.pl•~t. •apt.ii;: taak ill.tlltrators, pump •mi. p:ipi.rag, is cc-.:ilat• bztt bef;ora coveri.D.q. EDginaoar h Kanoetb J_ BrQt:.l:::y (9701 216 &elil 2. na .111Pt .trm. u.. ~. ~ to t;bc: M9.0c. t:&D.li: aMll :ti- 4 tadti d.1-tu. SC18. l.S, ~ .-sr pif19• ~ P~PI •bdl hi 1.a1rl •t • lllA1-·~ at-1/t-~ t:aior:. ni. pip. !:n::.. t2"9 c:io. <1n m. ..pt:t.c: ~1 to tu ~ bfiC ~ be~. to. 2..00p:111JNiep~Jd.pil .