HomeMy WebLinkAboutParking RequirementsN,cbfAt PiCIDIeZ P.wki�
PA'1411/ 9r cis
iilekfity
6069 fsl
tomtit; Vofft'o 600
HSP 5
AC 4S1'J4 Jam'
Ibfekt .S0
Act[ Couml:
fziI (f.i t(444/6 HGp)
24 Com ck
16,5 rofA(
•
Gh,c. uwcek
•&'- 4/"1/I?
Ok OA
ReStore, Proposed Road Impact Fee: $69,527.40
The parking lot is proposed to be reduced from 166 t 9 p'er sketch below:
The savings to delete this scope of work from the contractor is estimated at $96,224 for the asphalt paving, the subgrade
prep and the retaining wall on the NE corner of the site which can also be deleted due to additional space to grade on site.
Proposed Scenario 1:
As originally designed, only a small portion of the parking lot as required for accessibility was assumed to be paved
(highlighted in gray below). This does not include areas scheduled to be concrete for loading dock areas.
p
Wag
8-
g�
iQ
a
•-.•Iar�
,'
- -T.
c
=tt--„a..
M1
-:r
dv
r
H eco
o•••
The proposed reduction in parking spaces, based on the original scope would eliminate gravel parking area and a retaining
wall on the NE corner of the building. The savings associated with this scope of work is $27,724. Within this proposal HFH
would pay this amount as a road impact fee, and request forgiveness on an agreeable portion of the $41,803 balance with
the BOCC.