HomeMy WebLinkAbout188 (2)SIGN PERMIT APPLICATION
Gauteld County Building D"ruutnt
M 8th Suter 3rd Floor
(Aenwood Springs, Colorado 91601
303) 945.8212
Lln l..an:va. -
�:Onlragw: -_—•
�AC\
Setback.:
_5e e -
R11541.
SI1n Ara&:
ID Yat XNo
This application shat: Le accompanied by sign plans and
'Pecaflcatiovs, and may require engineered drawings,
P.Ol
i 1v
to
13 13
Or Aerarl 3ismevrC �l
r I
.00 par quua foal ,IIA ■ mldoum of 12!.00):
Approved2e-r terlms berein stated this
day al—�L✓j j1
BATTLENIENT NIESA SERVICE ASSOCIATION
ARCHITECTURAL COMMITTEE APPLICATION & CHECKLIST
(for New Home Construction projects)
Homeowner: 1.1-0-
Ham e Mailing Address:
Hame Phone: 2S
Project Address: At+�cr:Y
Production Homeplan Name (if applicable):
Homebui Ider:
Business Mail
Business Phan
E)E
Work Phone (if desired):
Lot: _ Block: _ Subdivision:
Submittal Date b'34)-0l__J Estimated Stott Date: Estimated Completion Date: / QQ
SUBMITTAL REQUIREMENTS: Two copies each of items 1, 2 & d need to be submitted.
(Check -off items attached to the Application. Fill in spaces as indicated.)
_V/ I. Site Plan Drntying W'=10' or I"=20' scale) with the following information shown:
N/rr Lot, Block & Subdivision name.
✓^ Street Address of Project.
IT Building Setback Lines (also fill-in the shortest distance between property line to the exterior wall
closest to that property line). Please be aware that all Building Setback Lines are taken from your_
Property Line Pins !! Your Property Line is not the Curb Line !!
Dwelling Unit Garage
Front Setback: feet feet
NI� Left Side Setback: feet feet
IJ Right Side Setback: feet feet
Rear Setback. feet feet
Utility Easements.
55' Clear Site -Line at Intersection Corner Lots.
Site Grading Elevations & Drainage.
First (main) Floor Height in relation to top of street curb at front -center of lot.
Driveways (include width of driveway), Walkways, Patios, etc.
Outbuildings
a:lbmsaac.ap2.draft031698 Page 2 of 5
2. Architectural Drawings (1/4" = I' or 1/8" = I' scale) with following information shown.
Floor Plan(s) with overall dimensions (fill-in the following square foot areas).
First Floor Finished Living Area: square feet
Second Floor Finished Living Area: square feet
Lower Floor Finished Living Area: square feet
Total Finished Living Area: square feet
Total Unfinished Living Area: square feet
Garage Area: square feet
P' Building Elevations Plans indicating doors, windows, exterior materials, building height, roof pitch,
roof -mounted evaporative coolers, etc. (fill-in maximum height below).
Maximum building height to highest ridgeline or building structural projection feet above
top of street curb elevation at front -center of your lot.
Engineered Foundation Plan.
At+ Outbuildings indicating dimensions, elevations and overall height to ridgeline.
T` 3. Exterior Materials (till -in the selections below):
qr' Roofing Material:
Primary Siding Material:
.Accent Siding Material:
Trim Material:
N,lasonry Material:
Stucco Material:
Front Door Material:
Garage Door Material:
COLOR SAMPLE
COLOR SAMPLE
Color:
Color:
Color:
Color:
Color:
Color:
Color:
Color.
COLOR SAMPLE
COLOR SAMPLE
aAbmsaac.ap2.draft031698 Page 3 of 5
COLOR SAMPLE
COLOR SAMPLE
This portion of the Application Form to be completed by the
Architectural Committee (not the Applicant).
CONDITIONS OF APPROVAL
No sirework or building construction may proceed on any Lot (including no preliminary site clearing, grubbing,
gnde alteration, storing of material, foundation excavation, extension of underground utilities, etc.) until the Project
has received a Project Approval from the Architectural Committee and has been issued a Building Permit (as
required by Garfield County for New Home or Renovation projects).
2. All general building and site improvements construction for any Project shall be completed and shall have issued
a Certificate of Occupancy from the Garfield County Building Dept. no later than one (1) year after the issuance
date of this Architectural Committee Aonroval.
The completed landscaping and revegetation of the improved Lot, to specifically include the front, side and rear
yard areas, shall be completed no later than six (6) months from the date of Certificate of Occupancy. An
additional maximum four (4) month extension may be granted by the Architectural Committee if the Certiftca.e
of Occupancy was issued shortly prior to the non -growing winter months such that landscape construction could
not diligently proceed; however, in any event, the landscaping construction shall be fully complete no later than
ten (10) months from the date of Certificate of Occupancy.
S.
Ell
Application App�pval (Initials hitectur Committee Members):
By: SKY �, lii;-
Application App�rov�0 onstruction subject to the above conditions:
By ChairmaDate: 71S -1-0r)
Applicationwed (Initials of Architectural Committee Members):
By: ((�
Application Denied:
By Chairman:
a•\bmsaac ao2 draft031698 Page 5 of 5
Date:
11
a
m
a
r
RI IF Marni iaa Rinht 1 nratinn
Rainbow Trail
D Marquee Proposed Sight "NOT TO SCALE"
BUE Monument Sign (existing)
Distance to back of curbs
'Sign will be 15 to 20 feet off ground. Can install as low as 12 feet off the ground
'Single round pole will hold marquee up. It is placed 6' deep in 30" round hole (with
.concrete.)
'Sign will be non -illuminated, Eft x Sft
'Sign will be maroon in color
0
docc
MMM
owo� WIVMLA�� 44;wvem
MINUMMM d"Pio..z. M-f�"41W Oscull-f;
ls� Namur% A-QMUO. no--%Apk4d
ARMNA*-.M 3AUPSWft WOROM
AUMLWI AqLwej% &w4AI*"
C& asomaw Ift.,010"
9keffow wft.'V�ift MWAVI=
441 *� - TL40
MML
NOW jpvfr.�l
WMI"OLMS VA blil %Wevp*q
TAMW.At�lp lAVMwv" 16"SJUMM
" SOWAY, ?014W"A" wMaw
vyONOR-A, IWIM14","
MWAMM ISIM"M IMSMAN
wxw� IMMIN"t IMAInm ASOMMS