Loading...
HomeMy WebLinkAboutApplication- PermitJob Address Nature of Work_ Use of lluildin_ Owner Contractor Amount of Permit S No. 6250 GARFIELD COUNTY BUILDING, SANITATION and PLANNING DEPARTMENT 109 8th Street Suite 303 Glenwood Springs, Colorado 81601 (303) 945-8212 0521 Springridge Drive,, Springridge Place., Lot 16, Glenwood Springs Building Perni.t Single 'amity- Dwelling w/Uniinish.ed Basement.& Double Garage Bruce Nampler & Trina Haines Long Associates 3,377.96 Permit: 2,047.25 Plan: 1,330.71 Paid $1,242.96 Date April 2, 1997 S. Archuleta Clerk BUILDING PERMIT APPLICATION GARFIELD COUNTY, COLORADO Applicant to complete numbered spaces only: PER T NO, sz PARCEVSCHEED NO. JOB ADDRESS 1 2 3 4 LEGAL DESCR. LOT NO. BLOC OWNERBrN [F l ,ofF�J�'14 /114. CONTRACTOR CONTRACTOR 1 On %.55t,5 [ Je L ARCHITECT OR DESIG SUBDIVISION \ roaADDRESS 1 o�o ADDRESS DL99-7ESuhAce, {Ct 12/et ce PRGr -33/i WK. PH. ADDRESS PH75'5-9 97/ PH. LICENSE NO. LICENSE NO. 5 6 ENGINEER IPA r! /4 i -SS (7c, SF OF BUILDING 34//8 7 USE OF BUILDING Xe s i de n C e ADDRESS /14 *Ark w#04 S.F OF LOT 5/c' S3 (2.ggA) PH71f5769S HEIGHT .2.) LICENSE NO. NO. OF FLOORS 8 9 CLASS OF WORK: )(NEW 0 ADDITION :ALTERATION a REPAIR ❑ MOVE ❑ REMOVE DESCRIBE WORK f m„ y[_, /7?J d L - e 10 11 GARAGE SINGLEDOUBLE DRIVEWAY PERMIT VA. WiTION OF WORK: $ CARPORT SINGLE DOUBLE ON SITE SEWAGE DISPOSAL PERMIT SITE PLAN 01'/330, 7/ acf � PLAN CHECK FEE ADJUSTED VIiL.$, 3 n',77 SPECIAL CONDITIONS: 9/6 p 27 ' x SCHOOL IMPACT F 8/3 'X /7. as = /44 0 ay. Z� ia,36 = /8, .3b y 4/74 ,7 NOTICE SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS COMMENCED. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED HEREIN OR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR LOCAL LAW REGULATING CONSTRUCTION DR THE PERFORMANCE OF CONSTRUCTION. S Buitding Department Apkentprovaal /41 ;' above. not a nning Department Appr TOTAL/457 WATER SUPPLY EE1/44, PERMIT F4. 0 % 7, 2 S' NO. OF BUILDINGS ON PARCEL USE OF BUILDINGS NOW ON PARCEL %9D CONST ,TYPE V A/ DATE PERMIT ISSUED -% 7 OCC. GR. SPECIAL APPROVALS REQUIRED RECEIVED NOT REQUIRED ZONING HEALTH DEPT. FIRE DEPT. SOIL REPORT SETBACKS FLOOD HAZARD MANUF. HOME OTHER 1S-1)5 1 I -9) '19° AGREEMENT PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT IN CONSIDERATION OF THE ISSUANCE OF THS PERMIT THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE REGULATIONS ADOPTED BY GARFIELD COUNTY PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED WITH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT SHALL BECOME NULL AND VOID. THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE OR ANY OTHER ORDINANCE OR REGULATION OF THIS JURISDICTION. THE REVIEW OF THE SUBMITTED PLANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER, BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST. Garform.003 I HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE (INITIAL .fid 56,fa _9‘ The following items are required by Garfield County for a final inspection: 1. A final Electrical Inspection from the Colorado State Electrical Inspector; 2. Permanent address assigned by Garfield County Building Department posted where readily visible from access road; 3. A finished roof, a lockable house, complete exterior siding, exterior doors and windows installed, a complete kitchen with cabinets, a sink with hot & cold running water, non-absorbent kitchen floor coverings, counter tops and finished walls, ready for stove and refrigerator, all necessary plumbing; 4. A complete bathroom, with wash bowl, tub or shower, toilet stool, hot and cold running water, non-absorbent floors and walls finished and a privacy door; 5. All steps outside or inside over three (3) steps must have handrails, guard rails on balconies or decks over 30" high constructed to all 1994 UBC requirements; 6. Outside grading done to where water will detour away from the building; 7. Exceptions to the outside steps, decks and grading may be made upon the demonstration of extenuating circumstances, i.e. weather, but a Certificate of Occupancy will not be issued until all the required items are completed and a final inspection made. A CERTIFICATE OF OCCUPANCY WILL NOT BE ISSUED UNTIL ALL THE ABOVE ITEMS HAVE BEEN COMPLETED. ****Cannot occupy or use dwelling until a Certificate of Occupancy (C.O.) is issued. Occupancy or use of dwelling without a C.O. will be considered an illegal occupancy and may be grounds for vacating premises until above conditions are met. I understand and agree to abide by the above conditions for occupancy, use and the issuance of a Certificate of Occupancy for the dwelling under building permit # Signature Date March 31, 1997 Bruce Wampler and Katrina Haines P.O, Box 140 Cedar Crest, NM 87008 Dear Bruce and Trina, The architectural Committee for Spring Ridge Place have reviewed the plans you submitted on March 6, 1997 for building a home on lot number 16, at 521 Spring Ridge Drive. They, hereby, approve the submitted plans with the sole exception of roof color, which they feel should be green rather than the blue shown in the illustration that you furnished. The home should be built within the envelope previously approved by the committee. Enclosed is one set of signed plans. Sincerely yours, Steve Kennedy Chairperson Spring Ridge Place Architectural Committee 41/212-12 ee4 w4' 4 Aet:t-),0- S /7 X , 3(/f=712 *X f a 9 - /61 4.046 t� 47,21- 1 330,7 i_31-3 77, /63x,64 I �l, ?-v z7 2747,7 31S'Iio?,?7 V4),,x,;,. 33 �,)) 7 /do, oeo a,32- /5-,60s-,o�,�,���23�15'� /e 5-4 5 7-6?Lct, x_18 __9 7 Specifications Wampler/Haines Home (Revision 4 - 2/17/96) 521 Springridge Dr. Glenwood Springs, CO 81601 1. Materials This house shall be built to have a northern New Mexico territorial look according to the plans. House is to be frame construction with stucco siding (both levels) and a metal roof. House will be terraced into the hillside to follow the natural slope of the lot. All material is to be high quality. 2. Roof Roof shall be standing seam metal roof, 26 gauge, hidden fasteners and clips, with snow breaks. Roof shall include drip edge. Roof slopes are as specified in the structural plan. 3. Floors Basement shall be of concrete construction, with framing as structurally appropriate for the above ground portions of the lower level. Flooring for the upper level over the basement shall be constructed to minimize creaking and cracking. The bedroom wing will be crawl space. 4. Heating Heating shall be radiant floor heat. The system shall include a high efficiency boiler. The pipes should be installed in the slab where it exists. For other floors, the pipes should be installed using a thin layer of standard concrete typically used for such installations. The system shall be zoned. Zones are indicated by the 10 thermostat locations on the electrical plan. (This includes the greenhouse, but not the garage at this time. if we decide to heat the garage, we will handle that as a change order.) 5. Cooling House will be cooled by an evaporative cooler. The cooler is to be installed outside on the ground outside Kid's bathroom, with duct into unfinished basement. Ductwork will run through unfinished basement and crawlspace to MBR, main hall outside of Risa's bedroom, east end of Rec room, and south wall of closet at top of stairs. 6. High ceilings The west wing of the house with the kitchen, dining, and family rooms, and the master bedroom, shall have a high ceiling, following the slope of the roof. This construction shall include pine T & G finish for the main part of the ceiling and finished sheetrock in the dormers. There will be exposed structural beams in the ceiling. The ceiling over the west deck will be T&G. 7. Lighting The bid should assume that the electrical plan includes the final number of light fixtures, and should include a budget for standard quality light fixtures. The exact placement and style of the lights will be determined later. 8. Hot Water There shall be two gas hot water heaters, one for each wing of the house. The small hot water tank shall be 30 gallons, and must be able to fit through door D18, which can be adjusted if necessary. The large hot water tank shall be at least 50 gallons. 9. Roof penetrations The plumbing shall be installed to minimize the number of roof penetrations needed for vent pipes. If Colorado code allows, the new devices recently available for venting into the attic shall be used. Otherwise, the vent pipes shall be routed and combined to minimize roof penetrations. Page 1 02/18/97 10. TV Wiring TV wiring shall be done with high grade 72 ohm coax (RG -6) cable. Each coax outlet shall have an individual cable run to a point in the basement under the Media Closet. There shall be a 2" PVC conduit from the Media Closet running to the basement for cable routing. The feed for the Glenwood cable TV shall be routed to the central media location. 11. Interior finish The interior walls will mostly be standard sheet rock construction. The finish will be appropriate to simulate a smooth adobe plaster look. Corners shall be rounded. The north and east walls of the family room (between the family room and the entry hall and the long hall) will be finished to Iook like adobe bricks. It will have a series of steps between the entry door and the family room, and will include several small nooks. We will work with the contractor to develop the final design of this wall. 12. Walls The wall between the family room and dining room will extend to the ceiling. The wall between the dining room and kitchen will be open above what would be normal ceiling level. The wall around the open stairs will also be designed with a series of steps, to be determined. 13. Computer network conduit There shall be 2" PVC conduit with pull strings installed between the kitchen, the rec room., the kid's rooms, and the office leading to the same area under the Media Closet for future routing of computer network cable. There shall be boxes with cover plates installed in specified locations in the specified rooms at the conduit outlet. 14. Flooring material The bid should include the cost of installation plus a material budget for the flooring as specified in the materials list. 15. Cabinets We will supply all cabinets (kitchen, bathrooms, laundry) from a source here in New Mexico. The bid should include the installation of cabinets (assume standard modular cabinets for the bid), as well as a budget for installation of granite counter tops, in the kitchen, tile in all the bathrooms, and standard Formica in the laundry. 17. Doors Contractor shall supply the doors specified in the materials list, which are all external doors. These doors are mostly specified Hurd doors. We will supply southwestern style doors from a source in New Mexico for the remainder of the doors (standard prehung doors). 18. Windows Most of the windows are standard size Hurd windows. Several are fixed glass, which may or may not be built by Hurd. The Hurd windows shall be white, aluminum clad wood windows, using Hurd Low- EfArgon and Heat Mirror TC -88 glass as specified in the materials list. The exterior trim of the windows shall be in the New Mexican territorial style as indicated on the plans. We will work with the contractor to finalize the exact trim used. 19. Phone wiring The house shall be wired for two phone lines using standard four conductor wiring. As with the TV coax and the computer network, the phone wiring shall be routed to the central location under the Media Closet. 20. Greenhouse The octagonal greenhouse shall be built with 7 1/2 foot walls, and sunken 18" below the floor level of the basement. The design of the greenhouse is as specified in the structural plan. The specifications of the doors and Rec room windows are changed to reflect this. We failed to include a sink in the greenhouse. We want to add a small utility sink just to the east of the stairway, as well as a hose faucet. The floor of the greenhouse will be tile. Page 2 02/18/97 • 21. Landscaping The area around the house shall be terraced or sloped to account for the slope of the lot. There will also need to be some leveling on the east side of the house. The plans show terrace on both the north and south sides of the house to make up for the elevation difference. At this point, we think the north side will actually be a sloped yard, while the south side will be terraced. Because this part of the landscaping will probably best be determined after the main part of the house is in place, the bid construction should account for the excavation needed to build the basement and foundation, and use the earth removed to fill in the elevation difference, keeping in mind that there will probably be terrace on the south. 22. Trim The interior trim shall be consistent with the southwestern look. Contractor shall work with Wampler/Haines to determine final trim, but the bid can assume some kind of standard molding wiII be used. 23. Customer supervision Bernie Haines of Glenwood will be our local representative during construction. We will also make periodic visits to Glenwood. Contractor shall not make modifications to the plans without consulting Bernie. We will also be available for phone consultation. 24. Garage Doors Garage doors shall be white metal clad doors. Automatic garage door openers shall be installed. 25. Utilities Bid shall include costs of utility hookup: electrical, water, phone, cable TV, gas, and septic system. 26. Budgets The bids should include budgets for plumbing fixtures, flooring materials, and electrical fixtures assuming standard quality components. The final materials and fixtures are yet to be finalized. 27. Starting Date We would like construction to begin as soon as possible within the limits of the weather. The bid should include an estimated starting date, as well, as an anticipated completion time. We would like to discuss a bonus/penalty clause for timely completion of this house. We would like to receive your bid as soon as possible, too. Thank you very much for your time and attention to this bid. Bruce E. Wampler Katrina G. Haines PO Box 140 35 High Country Dr. Cedar Crest, NM 87008 Phone: 505/281-4477 Fax: 505/281-1307 Page 3 02/18/97 GARFIELD COUNTY BUILDING AND PLANNINCG 970-945-8212 MINIMUM APPLICATION REQUIREME\TS for SINGLE FAMILY DWELLING CONSTRUCTION including NEW CONSTRUCTION MANUFACTURED HOMES ADDITIONS ALTERATIONS an d MOVED BUILDINGS In order to understand the scope of the \vork intended under a permit application and expedite the issuance of a permit it is important that complete information be provided. adequate and complete information will prevent delays in the plan review process. Reviewing_ a plan and the discover that required information has not been provided by the applicant mav result in the delay of the permit issuance and in proceeding with building construction. The owner or contractor mav be required to provide this information before the plan review may proceed. This causes delays because other plans that are in line for review may be given attention before the new information may be reviewed after it has been prodded to the Building Department. Please review this document to determine if you have enough information to design your project and provide adequate information to facilitate a plan review. If you do not, it may be helpful to obtain a book titled "Dwelling Construction under the Uniform Building Code". This book is available to you through this department at our cost. Also, please consider using a design professional for assistance in your design and a construction professional for construction of your project. To provide for a more understandable plan in order to determine compliance with the building„ plumbing, and mechanical codes, applicants are requested to review the following check list prior to and during design. Applicants are require to indicate appropriately and to submit the completed check list at time of application for a permit. For the placement of a manufactured home, questions numbers 1-4 and 19-28 are the only questions that need to be addressed: Is a site plan included that indicates the distances of the proposed building or addition to property lines, other ildings, set back easements and utility easements' Yes Does the site plan include the location of the I.S.D.S (Individual Sewage Disposal System) and the distances to property lines. wells (on subject property and adjacent propenies), streams or water coon ? Yes Does the site plan indicate the location and direction of the County or private road accessing the property? Yes Do the plans include a foundation plan indicating the size, location and spacing of all reinforcing steel in accordance with the uniform building code or per stamped engineered design? Yes Y Do the plans indicate the location and size of ventilation openings for under boor crawl spaces and the clearances required between wood and earth? Yes Do the plans indicate the size and location of ventilation opening=s for the attic. roof joist spaces and soffits'j Yes !/ Do the plans include design loads as required under the Uniform Building Code for roof snow loads. (a n um of -1-0 pounds per square foot in Garfield County)_ floor loads and wind loads') Yes Does the plan include a building section drawing indicating foundation_ wall. floor and roof constructio Yes V/ Does the building section drawing. include size and spacing of floor joists, wall studs, ceiling joists, roof rafters joists or trusses? Yes 10. Does the building section drawing or other detail include the method of positive connection of all columns andel beams? Yes (/ Does the plan indicate the height of the building. or proposed addition from the highest point of the building or addition measured at mid span between the ridge and the eave down to existing grade contours? Yes 12. Does the plan include any stove or zero clearance fireplace planned for installation including make and model nd Colorado Phase II certifications or phase II EP.A certification'' Yes V No M// /�:4 t-"�iiG.ie. f.. -e- e° As 7-d/I1-p� 7 1",i~Ppltzto V d mene Y Coot v e 13 Does the plan include a masonry fireplace including a fireplace section indicating design to comply with the Uniform Building Code Chapter 37? Yes No 1/ . 14. Does the plan include a window schedule or other verification that egressrrescue windows from sleeping. ro2.rns and/or basements comply with the requirements of the Uniform Building Code? Yes No 15 Does the plan include a window schedule or other verification that windows provide natural light and ventilar'on for al] habitable rooms' Yes 'r o 16 Do the plans indicate the location of glazing subject to human impact such as Edass doors. glazing immediately adjacent to such doors, glazing adjacent to any surface normally used as a walking surface; sliding glass doors: fixed glass panels, shower doors and tub enclosures and specifv safety glazing for hese areas? Yes No 17 Is the location of all natural and liquid petroleum gas furnaces. boilers and water heaters indicated on the pla Yes j No 18 Do you understand that if vou belong to a homeowners association, it is your responsibility to obtain written permission fro the association, if required by that association, prior to submitting an applicat n for a building permit? Yes d No 19. Will this be)he only residential structure on the parcel? Yes ►/ No If no -Explain: 20. Have two (2) complete sets of construction drawings been submitted with the application? Yes 3 21_ Is this an application for the placeem of a manufactured home' Yes No if yes, have you specified the size of the unit (min. 20ft. x 20ft), live roof load (min. 40 ); wind design (min. wind speed of 80 mph & 15 ]b. wind load): foundation desiy_=n; method of anchoring? Yes 2? Have you designed or had this plan designed while considering building and other construction code requirements? Yes No 23 Does the plan accurately indicate what you intend to construct and what will receive a final inspection by the Garfield County Building Department? Yes 1.-----"' No 24 Do you understand that approval for desizt and/or construction changes are required prior to the application f these changes° Yes No 25 Do you understand that the Building Department will collect a "Plan Review" fee from vou at the time of application and that you will be required to pay the "Permit Fee" as well as any "School Impact" or eptic System" fees required- at the time you pick up your building permit Yes No , 26 Are you aware that twenty four (24) hour notice is required for all inspections? Inspections will be made from Battlement Mesa to West Glenwood in the mornings and from Glenwood Springs to Carbondale in the afternoon. Morning inspections must be called in by 12:00 p.m. the day before: afternoon inspections must be called in by 5:00 p.m. the day before. Failure to Give twenty four (24) hour notice for inspections will delay your inspection one (1) day? Yes No - 27 Are vou awia.re that you are required to call for all inspections required under the Uniform Building, Code including approval an a final inspection prior to receiving a Certificate of Occupancy and occupancy of the building? Yes .No 28 Are you aware that the person signing the Permit Application, whether the "Owner"- "Agent of the Owner". "General Contractor". "Contractor" or otherwise, is the party responsible for the project complying with the Uniform Building Code? Yes 1/ No 4 1 hereby acknowledge that 1 have read. understand and answered these questions to the best of my ability. signature Phone �rJ�`~r�ffdatis}: Project Name: date Project Address 15:2/ /n Ri v1 e Notes. ri 'La (evenini. s ) ff you have ans-weroi "No" on any of the questions. you may he required to provide tins information al the request of the Building Official prior to benirminn the plan review. process. Delays in is.sumg the permit are to he e.wpeided Work may not prodeed without the issuance of a permit. If it is determined b.- the Buildina Official that additional information is nocessan- to re\ ;en the application and plans to doterniine minimum c.ornpliance with the adopted ,.odes the application may be placed behind wore rent applications for building permits in the review process and not reviewed until required mlormauon has been provided and the applicauon rotates aoam to fust position for review. delay m issuance of the permit or delay to proceeedine with construe,son Per•App02.95 5 Effective _ li{ ust 1 _ _ 199f INSPECTION WILL MOT BE MADE UNLESS IS UR POSTED ON THE Jria :No -FT; t{i;i�� ;i 't;i' ,.ASP:, BUILDING PERMIT RFIELD COUNTY, COLORADO Date Issued.'"'' .# { Zoned Area Permit No AGREEMENT In consideration of the issuance of this permit, the applicant hereby agrees to comply with all laws and regulations related to the zoning, location; construction and erection of the proposed structure for which this permit is granted, and further agrees that if the above said regulations are not fully complied with in the zoning, location, erection and construction of the above described structure, the permit may then be revoked by notice from the County Building Inspecto nd L1 BECOME COME NU L ANDrV D. Use 1t' i l D 6I4tiet /-1)6L 6dtie I Add. egal Description 6/5ll a fi a K , ., ' Xontractor A Lf S� 1 -� + Setbacks Front...,Side Side Rear This Card Must Be Posted So It is Plainly Visible From The Street Until Final Inspection. a • INSPECTION RECORD Footing a v .,- i1.- y J' ___.,..,/l7'_4,,,-...:,_ -)q,..„/.-,_- r :, . Foundation `{ �`��97' Underground Plumbing j _ , f J Insulation s./.5-_,-7 Rough Plumbing 5,_,,,_97 f Drywall 8_,A7. y7 k - Chimney & Vent $-�Z q7 Jr. , HE- ... .. ............. . I Gas Piping g_ ,s --_.y,7 /�e+� , ".. .,- A s,'-)1 !C•'-0 .. 3-25.'ice, Electric Row,ii ii;. ;.,,ir ns=:::;:•,,ri ae, Septic Final = Framing y'", /I -..1i, (To include Roof in place and Windows • and Doors installed). ?_la 7, Notes: `.t.cs,,-, x.4Tia.'1 ��.q-C__- 4---g _. =p..*;hu)y-e---GP . s.6 -R7 g_442 s97tJ .e' 6, _ -97 i' ..., ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING - WHETHER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND. PERMIT IS NOT TRANSFERABLE Phone 945-8212 109 8th Street County Courthouse Glenwood Springs, Colorado. APP OVED Date e Byf. TT T'T t i". -!ti ,T-^'� r, .�, Ziff Y t.