Loading...
HomeMy WebLinkAboutApplication,' ¡l',tr i 1. ' ..,i'j .. 1,. : ttAY 0 3 I//t. Communlty Development Department 108 8th Street, Sulte 401 Glenwood Sprlngs, CO 81601 19701945-8212 www.garfield-countv.com WPE OF CONSTRUCTION X New lnstallation tr Alteration WASTE WPE X Dwell E Transient Use t] Comm/lndustrial n Non-Domestic E Other Describe INVOLVED PARTIES Property Owner: Chevron USA INC Phone:( ) Malllng Address:PO Box 285 n. TX 77001 ir ONSITE WASTEWATER TREATMENT SYSTEM (owrs) PERMIT APPLICATION Contractor:TEP Rockv Mountain Ll c Phone: ß701 285-9377 Maillng Address PO Box 370.ute- Cô 81635 Engineer: - David Fox Phone: (970) 250-5505 Malling Address PO Box 37O. Pa¡achutp. CO 81635 PROJECT NAME AND TOCATION Job Address:TR 44-27-597 Pad - See attached olat for descriotion Assessol's Parcel Number: 213722300003 Sub. - lot _ Block -Bullding or Servlce Type: Temoorarv office & house SBedrooms: 2 Garbage Grinder No Dlstance to Nearest Community Sewer System: NA Was an effort made to connect to the Communlty Sewer System:NA FlnalDlsposalby E Evapotransplratlon X Other Hauled to Garfield Counw Landfill Disposal Water Source & Type tr Well El Sprlng B Clstern X Communlty Wat€r Syet€m Name Citv of Rifle Bulk S2 - Hauled bv HB Rentals tr Compost¡ngTo¡¡etD Aeratlon Plant X Vault E Vault Prlnytr SeptlcTank X Other Hauled bv HB Rentals to Garfleld Countv Landflll Dlsposal Slte E Recyclln& Potable Use E Chemlcal Tollet E Recycllng El PltPflw E lnclneratlonTollet Type of OWTS Percent Ground Slope NAGround Conditlons Depth to l¡t Ground water table NA E Above Ground Dlspersal E Wa¡tewater Pond E sand Fllter E Absorptlontrench, Bed orPlt E Underground Dlspersal Effluent WlllEffluentbedlschargeddlrectlylntowat€rsoftheState? E Yes XNo CERTIFICATION I hereby acknowledge that I have read and understand the Notice and Certiflcation above as well as have the req uired which is correct and accurate to the best of my knowledge. or,/a¿Ld t z Property Owner Print and Sign D"r{ / 2(5 {v\e-¿Z5_.co .OFFICIAT USE ONtY Special Condltions: '"Sîs.6 td:Fees Pâs @75- Perk Feert.\lAäffi..o OOBalance Duel$dSeptlcYPermit:q?og lssue Date:5.?.t7-Bullding Permlt DnÀlna .STEü BIDG DIV:5-3-zon7 DATE , I ll I fi[ri'ïTþflr lllllfü'f ltïll t'llitllrl fl lLtìqþ il' hL ll ll I'--Êedeotion$: 879861øztldtzøtø Ø2:18:46 Pf1 Jêån Êlbèrlcot ói Z nec Fee:$16.Ø9 Doc Fee'Ø.Ø@ GARF¡ELD ooUNTY C0 AMfu PO\ryËROFATTORNEY KNOW ALL PERSONS BY TI{ESE PRESENTS: THAT TEP ROCI(Y MOUNTAIN LLC, a Delaware limited liability company, hereby nominates, constitutes, and appoints Bryan S. Ilotard, âs iß true and lawful Atùorney-in-Fact to execute and deliver in the name and on behalf of TEP ROCI(Y I}IOIJNTAIN LLC ('Prinçipal") any of the following designated instruments or documents in connection with the Principal's operations in exploring for and producing oil, gas, or other minerals from lands, or interests in lands, owned, held, or claimed by the United States, any state or political suMivision thereof, any persorL corporation, parürership or other legal entity: A. (l) Applications for perrrits or leases; (2) consents, stipulations, or agreements in connection with the issuance of permits or leases; (3) acceptances of leases" subleases, or permits; (4) acceptances of all insfuments tansferring leases, offers to lease, permits, applications for permits, or subleases, or an interest in any ofthese (including æsignmenß of working or royalty interests) to Principal. B. Applications for extensions or renewals of leases and permits. C. (1) Prospecting, seismic, or exploration permits; (2) inshuments in connection with the acquisition or maintenance of prospecting seismic, or exploration permits. D. Instruments withdrawing applications for leases or perrnits. E. (l) Requests for rights-of-way and surface use permits; (2) acceptance of grants of rigþts-of-way and surface use permþ including any stþulation or condition in the grants; (3) any statements that may be required in oonnection with applications for rights-of-way and surface use permits. F. Requests for extension oftime in which to drill wells. Principal agrees to be bound by all representations the Attomey-in-Fact may make in any instrument or document he or she is authorized to execute and deliver under this Power of Atûorney. Principal hereby waives any defenses available to it to contest, negate, or disaffirm the actions of its Attorney-in-Fact under this Power of Attorney. This Power of Attorney is effective July 1, 2016, and shall continue in full force and effect until revoked in writing, and has the same force and effeot as if the Prinoipal granted separate special auürority to the named Aftomey-intact to execute and deliver each such insFument or docr¡ment separately fo¡ each and every such instn¡ment or document so executed and delivered. EXECUTED by Principal on this 13ù day ofJul¡ 2016. Terra Energr Partners LLC as sole member of TEPRocþ Mountain LLC AGREED TO AND ACCEPTED BY: ü0ruFtmnflËÐ üOFY eY: Àrllchael S. Lanã ITS: President and CEO s 4 Attorney-in-Fact ACKNOWLEDGEMENT St¿te of Texas CountyofHanis This insfument was acknowledged before me on me to be the President and CEO of Terra Enerry corporation. (Notary SeaI) f ß .2016 by Michael s. Land known to Pa¡tnefs LLC, a.Delaware corporation, on behalf of the IIFFANY CEEEI.I POTTOCT Nofory Public, Slote ol ¡exos My Commi¡sion €xpfes April2ó, ?019 É5 d e z g É a x '¡ Ë: tf)(') + 1 I 1 1 Noo "| I 1 10' Ex¡sí VOC Un¡t (5 61', -es L]q lt 140', co(\¡ *-U"'t-ttf (\\t a 47', ¡\o, e;\t rR544-27-597 Ex. TR 1R433-27-597 N Az. 130.97" 90' tc)\t Ex. TR 441-34-597 TR 534-27-597 42-34-597 &*(rì .8.Þ o*.s -!R43-27-597 TRU3-27-597 TR443-27-597 --Ex. TR Prop. TR Separator (70k30') Ex. Edge of Exist. Pad ESTIMATED EARTHWORK QUANTITIES (cy) ITEM CUT FILL TOPSOIL EXCESS PAD 4440 1240 0 3200 PIT 1400 1400 TOTALS 5840 1240 0 4600 REWSED:8/16/16 -NOTE: 1.) Topsoil Volume Based on 12" Soil Depth. 2.) 10Vo Swell Factor Applied to Earthwork Cut Volume. 3.) Total Disturbed Area= x9.42 ac. TEP Rocky Mountain LLCT TR 44-27-597 Dnil Pad - PIat 2 CONSTRUCNON LAYOUT SCALE: DATE: PI.AT: PRA]ECT: DFT: ;..i. .-t.:jt : '::.'.: ..t,t.t l.'' ßOOKCIßF Sø"uica.c, Inc. È t é g t 9 ã Sectíon 27 7]55.,R.97W. II b i ,1 t' a ì d,. ¡ :J I l:'.=-'. r05+t , ;,'. tl ,1. :.n.4 I 1! I J ! l: 1'. i I ',, ':!b- ACCESS DESCRIPTION: FROM THE INTERSECTION OF THE I-70 FRONTAGE ROAD AND COUNTY ROAD 215 AT PARACHUTE, PROCEED IN A NORTHERLY DIRECTION ALONG COUNTY ROAD 215 17.2 MILES TO THE INTERSECTION WITH GARDEN GULCH ROAD, PROCEED LEFT IN A WESTERLY DIRECTION ALONG GARDEN GULCH ROAD T19.6 MILES TO AN INTERSECTION WITH A DIRT/GRAVEL ROAD, PROCEED LEFT IN A SOUTHERLY DIRECTION IO.B MILES TO THE EXISTING TR 44-27-597 DRILL PAD LOCATION, AS SHOWN HEREON. REVTSED:8/9/16 n an repared for: îË TEP Rocky Mountain LLC ons 136 East Third sfreet RiÍe, PIL Colorado 81650 (e70) 625-2720 /97O) 62s-2773Fü SCALE: DATE: PI,AT: PROJECT: DFI: 1 TR 44-27-597 Drill Pad - Plat 5 ACCESS ROAD & TOPO MAP . r, ,r' jlTR 44-27-597 PadVault System DescriptionThe site will temporarily office and house up to a maximum of eight individ-uals during natural gas drilling activities and is expected to be completed inone year or less. The individuals will occupy four individual trailer offices/houses located on the well pad. Office/houses have Colorado Division ofHousing compliance tags.Two aboveground sewage holding tanks each with 4000-gallon capacity on-site.ïhe Vault System is displayed in the pictures. Sewage flows estimated to be 600gallons/day (8 individuals x 75 gpcd). Sewage holding tank needs to be emptiedapproximately every 7 days (4000 gallons/ 600 gallons per day). Wastewatervault is equipped with overflow alarm device. Terra Energy Partners utilizes theservices of a licensed contractorto removed and haul the wastewaterto a statecertifìed treatmenVdisposal facility.Two potable aboveground water tanks of approximately 4000 gallons each ca-pacity on-site. Posted on the front of the Tank there is a Sign that states "PotableWater Only". Potable water demand is estimated to be 600 gallons/day (8 individ-uals x 75 gpcd). Required minimum fire suppression demand is 2500 gallons.Total potable and fire suppression demand is estimated to be 4000 gallons.Road access to the site ismaintained year roundthrough the services of pri-vate road maintenance andconstruction contractor.