HomeMy WebLinkAboutApplication- PermitJob Address
Nature of Work Building Permit
Use of Building Manu. Home on Foundation
No. 6188
GARFIELD COUNTY
BUILDING, SAIVITATIONand PLANNING DEPARTMENT
109 8th St::ct Suite 303
Glcnwood Springs, Colorado 81601
(303) 945-8212
1300 Quick. Silver Way, Grass Mesa, Lot 1—A, Rifle
ownerTroy Petree
Contractor Owner
Amount ofPermit S 449.09 Date January 20, 1997
Permit: 149.75
Plan : 99.34
Set. Up Fee : 200.00
Paid $599.09 1-10-97 S. Archuleta
Clerk
BUILDING PERMIT APPLICATION
GARFIELD COUNTY. COLORADO
applicant to complete numbered spaces only. PERMIT NO. 6// PARCEUSCHED NO.
Joe ADDRESS ' U ly j/,',.C�C.�1L/-{iLbM4V) W •.y 1feeitzt___.
1
LEGAL
DESCR.
LOT NO. r'-
1t
BLOCK
SUBDIVISION „-„-1`)S 14t;G,.) }
L•(:L,KGI G
2
�.{ I-
OWNER Tg0 I" �i l 1r i
ooa-. si l� r 1
ADDRESS rya, h ctie_r Gd Fsllo
PH. r-. if Gam.
WK. PH, IJA 5 11 I C'i1
s
3
CONTRACTOR ..c.;_.
ADDRESS "
PH. ! '
LICENSE NO. f._ i r}A._,
4
ARCHITECT OR DESIGNER N r,t
ADDRESS N f im
PH, 1J i Li
LICENSE NO. i...)11
..)f 4
5
ENGINEER til
ADDRESS rye
PFI. ►.,r 1 kr1
LICENSE NO, ,I,U L 1
6
S.F OF BUILDING 1 r zi.c1.3
S.F OF LOT 1,318 R.- L 1, 3!g .1=1'
HEIGHT -
NO. OF FLOORS r
7
USE OF BUILDING -Re___.6- c til
8
CLASS OF WORK: ❑ADDITION o ALTERATION ❑ REPAIR o MOVE o REMOVE
9
'p(NEAI
DESCRIBE WORK: I 7Qc4n/'] � �d c.- ��X 0.-4.0r` `) n f
`may
/-1li
1 t. l �bl J • J
lo
GARAGE SINGLE11)1 DLUBLE n CARPORT SINGLE ' DOUBLE J� I J) - ro -Qaae_._/
DRNEWAYPERMITAHd p( 014 SITE SEWAGE DISPOSAL PERMIT ad+cG{ SITEP{}-r �d99,3 Ai
11
raADJUSTED VAL.S
VALUATION OF WORK: S Rs-g
PLAN CHECK FEE
iimi
�j
PERMIT FEE1M/ I/ q 1 7 .rte
SPECIAL CONDITIONS: a f V
a k, 8•
SCHOOL IMPACT FEE % ,;I
�t f (D
NO. OF BUILDINGS ON
USEL POF BUILDINGS NOW ON
ARCEL
a
/ / 3 ' K
TOTAL FEE 7
OCC. GR.jf 3
CCNST. TYPE
NOTICE
WATER SUPPLY
DATE PERMIT ISSUED a0- 97
1
SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL PLUMBING, HEATING,
1 SPECIAL APPROVALS
REWIRED
RECEIVED
NOT REQUIRED
VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED 0
DAYS, IF CONSTRUCTION OR WORK IS SUSPENDED
ZONING
!�
.„....-----
�NOT
NOTCOMMENCED WITHIN 180 OR
OR ABANDONED FOR A PERIOD OF 180 DAYS AT ANY TIME AFTER WORK IS
COMMENCED.
HEALTH DEPT.
V HERESY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW
THE SAME TO BE TRUE AND CORRECT. ALL PROVISIONS OF LAWS AND ORDINANCES
FIRE DEPT.
GOVERNING THIS TYPE OF WORK WILL BE COMPLIED WITH WHETHER SPECIFIED
HEREIN CR NOT. THE GRANTING OF A PERMIT DOES NOT PRESUME TO GIVE
SOIL REPORT
AUTHORITY TO VIOLATE OR CANCEL THE PROVISIONS OF ANY OTHER STATE OR
LOCAL LAW REGULATING CONSTRUCTION OR THE PERFORMANCE OF
SETBACKS
CONSTRUCTION. f 91
. `y . , • .` /• 411, -
FLOOD HAZARD
Signature of ! mer, •ntractoror authorized agen rsiood n • ice above.
1'
MANUF. HOME
d
0760 .
Building Department Approvaidate , Planning DepartmentApprurr>r-
OTHEI
1 I Co L 6-1D
AGREEMENT
PERMISSION IS HEREBY GRANTED TO THE APPLICANT AS OWNER, CONTRACTOR AND/OR THE AGENT OF THE CONTRACTOR OR OWNER TO
CONSTRUCT THE STRUCTURE AS DETAILED ON PLANS AND SPECIFICATIONS SUBMITTED TO AND REVIEWED BY THE BUILDING DEPARTMENT
IN CONSIDERATION OF THE ISSUANCE OF THIS PERMIT THE SIGNER HEREBY AGREES TO COMPLY WITH ALL BUILDING CODES AND LAND USE
REGULATIONS ADOPTED BY GARFIELD COUNT( PURSUANT TO AUTHORITY GIVEN IN 30.28.201 CRS AS AMENDED. THE SIGNER FURTHER
AGREES THAT IF THE ABOVE SAID ORDINANCES ARE NOT FULLY COMPLIED W1TH IN THE LOCATION, ERECTION, CONSTRUCTION AND USE OF
THE ABOVE DESCRIBED STRUCTURE. THE PERMIT MAY THEN BE REVOKED BY NOTICE FROM THE COUNTY AND THAT THEN AND THERE IT
SHALL BECOME NULL AND VOID.
THE ISSUANCE OF A PERMIT BASED UPON PLANS, SPECIFICATIONS AND OTHER DATA SHALL NOT PREVENT THE BUILDING OFFICIAL FROM
THEREAFTER REQUIRING THE CORRECTION OF ERRORS IN SAID PLANS, SPECIFICATIONS AND OTHER DATA OR FROM PREVENTING BUILDING
OPERATION BEING CARRIED ON THEREUNDER WHEN IN VIOLATION OF THIS CODE (DR ANY OTHER ORDINANCE OR REGULATION OF THIS
JURISDICTION.
THE REVIEW OF THE SUBMITTED PIANS AND SPECIFICATIONS AND INSPECTIONS CONDUCTED THEREAFTER DOES NOT CONSTITUTE AN
ACCEPTANCE OF ANY RESPONSIBILITIES OR LIABILITIES BY GARFIELD COUNTY FOR ERRORS, OMISSIONS OR DISCREPANCIES. THE
RESPONSIBILITY FOR THESE ITEMS AND IMPLEMENTATION DURING CONSTRUCTION RESTS SPECIFICALLY WITH THE ARCHITECT, DESIGNER,
BUILDER AND OWNER. COMMENTS ARE INTENDED TO BE CONSERVATIVE AND IN SUPPORT OF THE OWNERS INTEREST.
Gartorm.003 1 HEREBY ACKNOWLEDGE THAT I HAVE READ AND UNDERSTAND THE AGREEMENT ABOVE IINITIAL �. 1
a� �C,
45-94°2-. /— /d -97
01/11'97 SAT 12:11 FAX 1 970 213 7707 PINION HOMES
L2
2322 Fiwy. 6 & SO Phone OTO) 243-1500
Fax (910)243-1797
Grand Junclian, Co. 31505
Date. j /dig
To.
:Facsimile Cover Sheet:
Time.
77 .i
From: 15zr;i1vS U v
Please Deliver the following, Pages (Including this page)
Telecopier Number Called:
Confidentiality Notice:
The documents accompanying this telecopy transmission contain Confidential
information which is intended only for use of the individual named above. if you are
not the intended recipient, you are hereby notified that any disclosures, copying or
distribution, or the taking of any action in reliance on the contents of this telecopied
information is strictly prohibited. l!fyou have received this telecopy in error, please
immediately notify us by telephone. Thank You (970) 243-1500
:Message:
1001
VIED
To Nara)
Coufr- CcPj'
a GARFIELD cou,
Data.
EL corY.
NO INSPECTION
THOM 'LOIS OW Silt
'page tit
01.11/97 SAT 12:11 FAX 1 970 243 7707 FINON HOMES
u..r (FRI 1.11:45 SUMMIT CREST IMES
10 January 1997
To whom it may concern:
V002
TEL:97I/532263J P. 002
Surnmit Crest
HOMES
Colorado Bulli
The home that Summit Crest Homes will be TniIding for Petriee. is a model number 041 and will
be built to the preemptive HUD code. This home will have aft 40 lb. snow load and be built to
withstand a 15 PST wind Ioad.
Ifyou have any questiori5, feel free to give me a call.
Thank You
Gig R_ Aiessatdre
Zone Manastr
2221 C:k wn Linc - P.O. ]Sox lU • Berthoud, Colorado 80513
(9 0) 552-.26-32 fax (970) 5324352
011/11-`97 SAT 12:11 FAX 1 970 243 77(17 PINON HO.MES
32
1i 003
Vertical
Ground Strap
Strap buckle
Systems 2 & 3
TVertical strap connector
6" Max.
Typical outrigger
8503593
4 STATE OF
1,12 /'/9S
ff a IMD 115,0
telt#t���� WM
l�Main Rail
r
Listed ground anchor- _ i"
I ' F'll =11 I
1-111T ;; I i I i d I ISI i` 1=H
if
Strap angle ( min. 20')
Anchor angle (40' Min.)
STANDARD NOTES:
Pier Ht. (36" Max.)
Near Frame Strap
System 2
Far Frame Strap
System 3
Optional ground anchor installed vertically,
See note below.
1. All anchoring parts must be listed to 4725 Ib.
min. capacity.
2. Ground anchor maximum vertical/horizontal
displacement of 2"
3. Tie dawn straps shall be listed 1 114" wide
galvanized strap or equivalent.
4. Ground anchor hardware illustrated, is to be
installed in accordance with anchor
manufacturer's instructions for rated capacity.
5. Pier supports and footings may be constructed
of materials other than as shown. As long as
they provide the equivalent load bearing
capacity and are acceptable for use by local
jurisdiction.
6. Vertical ground straps are not to be used
without Beam straps. Vertical ground straps
must be fastened to anchors, capable of
supporting both straps.
7. There must be an anchor within 24" of each
end on both sides.
8. Periodic retightening of frame and ground
straps is required.
9. Optional: Ground anchor installed vertically,
with adequate concrete cylindrical "collar"
paurad around the anchor shaft or stabiliz-
ing device. Vertically installed ground
anchor must be listed for the required
capacity with the load applied at the anchor
angle shown in system 2 or system 3
tables.
10. Vertical strap connectors are located 5'-4"
o.c. in wind zone li or 4'-0" o.c. in wind zone
III_ Maximum anchor spacing in system 2
tables must be 5'-4" o_c_ or greater in zone
I I or 4'-0" o.c. or greater in zone 111. If
anchor spacing is less than 5-0" o.c, in
zone II or less than 4' o.c. in zone I[1 you
must use system 3.
01.'11'97 SAT 12:12FAX 1 970 243 7707 PINCIN HOMES[[ i)ii4
Figure 5.9 Proper Alignment of Straus and Anchors
OME BUILDERS CO.
Frame Strap
Stabilizing Device
Aitemate to concrete
collar at ground
1H 'IT
Optional ground anchor installed vertically.
Ground anchor
—Stabilizing device
See note page 32_
Typical outrigger
Strap ATgle
Min. 40
0 41 STATE OF
sT
11114S/ON Al t‘1,:alf
Pier Height
Main Rail
8503593
•
System
— Strap buckle
r 7
Ground anchor ember
in ground on same lin
beam strap.
Anchor Angle
CHAMPION I
01.04/97 SAT 13:4 FAX 1 970 343 7707 PINON HOMES
,. JAN. -05. 9; (FRI) 14 ? l SUMM T (;REST HoMES
TEL:9705322652
A,r
v
;�7s7i9 212nocl 5ilitOOd iG1 x.9E K19E
D
VOla TVAtI9 91004 4 Xii9I >< F
L1
O
OVER-ALL WIDTH OF LIMIT
TTP. 5Ears EF4c e•
r �
=; n
xL.
T1'P- EEArlAGING
451 Ol
r1
It g
mEr- rIg0
mnDQ�rj
13 m"rn
rn
�,�
rn 1J9 rrrn
-0 rrrm
014
P. 006
'3
.
.. . ---
TATNIM....••=rnm•
-
...
R.M•m••••.......•
'1--.
-
-
-..-
-
-
--..
1 _ _
.
.
.
tit)
__
ti.)_
____
•_
_
u.1
(.1;e4C.,1)
._.
,- ------
r-.,
_
_..._.__
tA
-•-1
___
___.
.
.... .
.
a
0
I_
tr.
01
4
IA
R il.1
) q \
-----
4t,.
\
\
_
.
...
,.....,.,..,,..,
t..,)
tA
:
1.11
fx
f
V
_
,
7 A
....
_
I
CC.
11
_ .
...
j.
.-...
:
.
......_
.....
GARFIELD COUNTY BUILDING AND PLANNING
MINIMUM APPLICATION REQUIREMENTS
for
SINGLE FAMILY DWELLING CONSTRUCTION
including
NEW CONSTRUCTION
MANUFACTURED HOMES
ADDITIONS
ALTERATIONS
and
MOVED BUILDINGS
In order to understand the scope of the work intended under a permit application and
expedite the issuance of a permit it is important that complete information be provided.
Adequate and complete information will prevent delays in the plan review process.
Reviewing a plan and the discovery that required information has not been provided by the
applicant may result in the delay of the permit issuance and in proceeding with building
construction. The owner or contractor may be required to provide this information before
the plan review may proceed. This causes delays because other plans that are in line for
review may be given attention before the new information may be reviewed after it has
been provided to the Building Department.
Please review this document to determine if you have enough information to design
your project and provide adequate information to facilitate a plan review. If you do
not, it may be helpful to obtain a book titled "Dwelling construction under the
Uniform Building Code. This book is available to you through this department at our
cost. Also, please consider using a design professional for assistance in your
design and a construction professional for construction of your project.
To provide for a more understandable plan in order to determine compliance with the
building, plumbing and mechanical codes, applicants are requested to review the following
check list prior to and during design. Applicants are required to indicate appropriately and
to submit completed check list at time of application for a permit:
For the placement of a manufactured home, questions numbers 1-4 and 19-28 are
the only questions that need to be addressed:
1
1. Is a site plan included that indicates the distance of the proposed building or
addition to property lines, other buildings, set back easements and utility
easements?
Yes jX No a» Not necessary for this project (2)
2. Does the site plan include the location of the I.S.D.S. (Individual Sewage
Disposal System) and the distances to property lines, wells (on subject
propert and adjacent properties) , streams or water courses?
Yes No (i) Not necessary for this project (2)
3. Does the site plan indicate the location and direction of the County or private road
accessing the property?
Yes A No (1) Not necessary for this project (2)
4. Do the plans include a foundation plan indicating the size, location and spacing of
all reinforcing steel in accordance with the uniform building code or per stamped
engineered design?
Yes )( No (1) Not necessary for this project (2)
5. Do the plans indicate the location and size of ventilation openings for under floor
crawl spaces and the clearances required between wood and earth?
Yes No (1) Not necessary for this project r2,
6. Do the plans indicate the size an location of ventilation openings for the attic, roof
joist spaces and soffits?
Yes No (1) Not necessary for this project (2)
7. Do the plans include design loads as required under the Uniform Building code for
roof snow Toads, (a minimum of 40 pounds per square foot in Garfield County) floor
loads and wind loads?
Yes No (1) Not necessary for this project (2)
8. Does the plan include a building section drawing indicating foundation, wall, floor
and roof construction?
Yes No (1) Not necessary for this project (2)
9. Does the building section drawing include size and spacing of floor joists, wall
studs, ceiling joists, roof rafters or joists or trusses?
Yes No (1) Not necessary for this project (2)
10. Does the building section drawing or other detail include the method of positive
connection of all columns and beams?
Yes No (1) Not necessary for this project (2)
2
11. Does the plan indicate the height of the building or proposed addition from the
highest point of the building or addition measured at mid span between the ridge
and the eave down to existing grade contours?
Yes No (1) Not necessary for this project (2)
12. Does the plan include any stove or zero clearance fireplace planned for installation
including make and model and Colorado Phase 11 certifications or phase 11 EPA
certification?
Yes No (1) Not necessary for this project (2)
13. Does the plan include a masonry fireplace including a fireplace section indicating
design to comply with the Uniform Building Code Chapter 37?
Yes No (1) Not necessary for this project (2)
14. Does the plan include a window schedule or other verification that egress/rescue
windows from sleeping rooms and/or basements comply with the requirements of
the Uniform Building Code?
Yes No („ Not necessary for this project (z)
15. Does the plan include a window schedule or other verification that windows provide
natural light and ventilation for all habitable rooms?
Yes No (1) Not necessary for this project (z)
16. Do the plans indicate the location of glazing subject to human impact such as glass
doors, glazing immediately adjacent to such doors; glazing adjacent to any surface
normally used as a walking surface; sliding glass doors; fixed glass panels; shower
doors and tub enclosures and specify safety glazing for these areas?
Yes No (1) Not necessary for this project (2)
17. Is the location of all natural and liquid petroleum gas furnaces, boilers and water
heaters indicated on the plan?
Yes No (1) Not necessary for this project (2)
18 Do you understand that if you belong to a homeowners association, it is your
responsibility to obtain written permission from that association, if required by that
association, prior to submitting an application for a building permit?
Yes No (1) Not necessary for this project (2)
19. Will this be the only residential structure on the parcel?
Yes X No If No -Explain
3
20. Have two (2) complete sets of constructions drawings been submitted with the
application?
Yes No (1) Not necessary for this project X a)
21. Is thin application for the placement of a manufactured home?
Yes - No
If yes, have you specified the size of the unit (min. 20ft x 20ft); live roof Load
(min.40#); wind design (min. wind speed of 80 mph & 15 Ib. wind load); foundation
design; method of anchoring?
Yes X No (1) Not necessary for this project (2)
Have you designed or had this plan designed while considering building and other
\tft.\
construction code requirements?
Yes No (3)
23. Does the plan accurately indicate what you intend to construct and what will receive
a final inspection by the Garfield Building Department?
Yes j( No (3)
24. Do you understand that approval for design and/or construction changes are
required prior to the application of these changes?
Yes X No (3)
25. Do you understand that the Building Department will collect a "Plan Review" fee
from you at the time of application and that you will be required to pay the "Permit
Fee" as well as any "School impact" or "Septic system " fees required, at the time
you pick up your building permit?
Yes X No (3)
26. Are you aware that twenty four (24) hour notice is required for all inspections?
Inspections will be made from Battlement Mesa to West Glenwood in the
mornings and from Glenwood Springs to Carbondale in the afternoon.
Morning inspections must be called in by 12:00 p.m. the day before; afternoon
inspections must be called in by 5:00 p.m. the day before . Failure to give 24
hour notice for inspections will delay your inspection one (1) day.
Yes No
27. Are you aware that you are required to call for all inspections required under the
Uniform Building Code including approval on a final inspection prior to receiving a
Certi i ate of Occupancy and occupancy of the building?
YesNo (3)
4
28. Are you aware that the person signing the Permit Application whether the "Owner",
"Agent of the Owner", "General Contractor", "Contractor" or otherwise, signing the
application is the party responsible for the project complying with the Uniform
Code ')
Yes No (3}
I hereby acknowledge that 1 have read, understand and answered these questions
accurately to the best of my ability.
1 J-
signa ure date
Phone: al 85 (days); or SS --13 9,4'--44"-a
(evenings)
Project N a me:
Project Address: i-- 1- , —1300 QM -,(--a)
Notes:
(1) If you have answered "No" on any of these questions you may be required to provide this information at the request of the Building
Official prior to beginning the plan review process. Delays in issuing the permit are to be expected. Work may not proceed without
the issuance of the permit.
(2) if you have answered "Not necessary for this project" on any of the questions and it is determined by the Building Official that the
information is necessary to review the application and plans to determine minimum compliance with the adopted codes, please
expect the fallowing:
(3)
A. The application may be placed behind mare recent applications for building permits in the review process and not
reviewed until required information has been provided and the application rotates again to first position for review.
B. Delay in issuance of the permit.
C. Delay in proceeding with construction.
If you answered "No" to this question the circumstances described in the question could result in a "Stop Work Order" being issued
or a "Certificate of Occupancy' not being issued.
PerApp02.95 Effective August 15, 1995
5
COLORADO STATE ELECTRICAL BOARD
,4IVSPECTION REPORT AND CORRECTION NOTICE
Permit # ,
Gaertf&ctor H o m eown er
Address
Phone #
Date received
L
Travel Time~) Inspection Time
Arrival Time ./ ..r
TYPE INSPECTION
Res. i Comm ❑
Date Inspected
Time Lapse
Power Connected Yes i` No E
Rough -in ❑ FinaIJ t Partial ❑
Reins E
Temp Meter ❑ Temp Heat ❑ Mobile Homer" Service ❑
Other (please specify)
Service:
Typpi .0
S iz
r
r 3 0
Overhead
l.9nder ro
Type Grnd
Size Grnd Conductor
Date Meter Releasedr`'..!
Action: Accepted Rejected
Wiring Method
Classified area
GFCI
Finished basm't
Sub panels
Elec Range
Flec Dryer
Elec Wtr Heater
Remarks
Yes No
Yeses,, -No
Yes No ;
Yefai No
Yes No
No
Yes
REINSPECTION FEE REQUIRED. A reinspection will not be
performed until the reinspection fee is received.
COMMENTS.
t -
Inspector 4(
Page 1 of
a..
INSPECTION WILL NOT BE MADE UNLESS
THIS CARD IS POSTED ON THE JOB
24 HOURS NOTICE REQUIRED FOR INSPECTIONS
BUILDING PERMIT
G RFIELD COUNTY, COLORADO
1 feeDate Issued/ f . .7.1 . -Zoned Area Permit No
AGREEMENT
In consideration of the issuance of this permit, the applicant hereby agrees to comply with all .
laws and regulations related to the zoning, location; construction and erection of the proposed
structure for which this permit is granted, and further agrees that if the above said regulations
are not fully complied with in the zoning, location, erection and construction of the above
described structure, the permit may then be revoked by notice from the County Building
Inspector and IMMEDI TELY BECOME
. ME N ND VOID. ,
Use r OA) WV baQ r"
Address. al Descri n to t 1R
Owner l _ J1 . ."„ CVntracio100) W < 1
Setbacks Front Side Ssle Rear
This Card Must Be Posted So It is Plainly Visible From The Street Unlit Final Inspection.
INSPECTION RECORD
Footing Z . 143.. rit A 4'JA
ori
Foundation Z .- r' _07.-2 ,-,�
Underground Plumbing
Insulation
Rough Plumbing
Drywall
Chimney & Vent
Electric Final (by,State Inspector) �i` 1, 'j
'
Gas Piping -gri irk"
.jri.i hial --(,J -T7 ,A .v -
Electric Rough (By State Inspector)., ;;:+,a;e4
' ..Septic Final 3 -,,i.(7; -9'17.1_1_10, ,�'
Framing ''
(To include Roof in place and Windows .:'
and Doors installed). `,
:, Notes:
ALL LISTED ITEMS MUST BE INSPECTED AND APPROVED BEFORE COVERING -
Wl•IE'I'I-IER INTERIOR OR EXTERIOR, UNDERGROUND OR ABOVE GROUND.
THIS PERMIT IS NOT TRANSFERABLE
Phone 945-8212 109 8th Street County Courthouse Glenwood Springs, Colorado.
APPRO EDDO NOT DESTROY THIS CARD
Date
..,.: X� .... Bye
IF PLACED OUTSIDE - VTR WITH CLEAR PLASTIC