CONSTRUCTION ACTIVITY REPORT
Project No.: 161-459 Day:
Date:
Page:
Wednesday
9121t16
l of 1
Giard Homes
Attn: Roger Giard
1431 Airport Road
Rifle, Colorado 81650
Project:
Weather:
Lot24, Pinyon Mesa, Sage Meadow Road, Garfield County, Colorado
Cloudy, calm, dry Temperature: 70oF at l2:30 pm
Contracto¡'s Construction Activities: The contractor was excavating for waterline.
Equipment in Use:
HP Geotech's Site Activities:We visited the site and obtained a sample of on-site solls for
laboratory analysis. We observed trench excavation for
footings dug down 6 feet below design footing elevation and
about I feet wide in accordance with recommendations
presented in our subsoil study dated July 18, 2016.
Verbal Cornmunication:
dislribution:
Glard Homes - Roger Glard (giaød!¡g[g*$
Justin Orgill Danlel E. Hardin, P.E.
Field Technician Reviewed By
ttir
Test
No
Location Depth or
Elev.
Field Dry
Density
(pc0
Field
Moisture
Content
o/o
Field
Comp.
l%o')
Min.
Comp.
Req.
(olol
Proctor
Lab No.
113.2 15.4I 100 98 243:14
No.Method ry opt.
Dens.Moist.
2' E. & 25'S. of NW corner of
excavation footing
elevatlon
243-14 ASTM D 698 with fi0.9 {4.8
Oñice Locations: Parker, Glenwood Springrs, and Silverlhome, Colorado
H-P*I(UMAR 5020 County Road 134
Glennood Springs, CO 81601
Pho¡æ: (970) 945-7988
Fax (970) 945.8491
Email hokg]enwoosl@kumarusa.com
*s¡:zr:tl ¡nital *rzçitt**rir4 | e*çir,eu)r.,ç {}a*i*ç'¡
l¿i'J !. 2r,,3: ?", i t: t I : t tç i * #; * r:n r* ri r,z. al
Earthwork Gompaction Testing Report
Client: Glard Homes Proiect No.: 16-7.459 Day:
Attn: Roger Giard Date:
1431 Airport Road Page:
Rifle, Golorado 81650
Project: Lot24, Pinyon Mese, Sage Meadow Road, Garfield County, Colorado
Weather: Glear, calm, dry Temperature: 50o at g:00 am
Earthwork Contractor: E & LTrucking
Used:
Description of Earlhwork A compaction test was performed on first lift of structural backfill below
Tested:proposed footings along west side of excayation. The tsst indicated
acceptable compaction.
Sample(s) Obtained:
Verbal Communication: Luis with E & L Trucking was informed of our test result
Placement and Compaction Procedure: Not observed by H-P/Kumar
Lift Thickness Max. Rock Size:Conditioning:
Number of Passes:Compactor(s) Used:
Nuclear Test Results
Reference:
TO FIIL OURIHGTHE llft¡lEg l t¡lËfi¡OUR OBSÉRVER !s
THE OF IESÏINGWAS ll{WrfH ASru t 6938_USEO stßsf l¡Tr t ACCORDANCE
D¡stribution:
Glard Homee - Roger Glard (trle,rddÞrof.nott
flit
Thursday
gt22t16
lofz
Chris Neyberry DanielE. Hardin, P.E.
Field Technician Reviewed By
Test Results
Test
No
Location Depth or
Elev.
Field Dry
Density
(pcO
Field
Moisture
Content
o/a
Field
Comp.
(Yo)
Min.
Gomp.
Req.
(olol
Proctor
Lab No.
I NW corner 3'below
subqrade 108.8 15.5 t00 98 217-16
2 SW corner 3'below
suborade 108.0 16.8 100 98 217-16
a
Lab No.Method Description Max. Dry
Dens. (%)
opt.
Moist. (Yo)
217-ô ASTt¡t D 698 av with Sand f 05.9 15.8
Office Locations: Pârker, Glenwood Springs, and Silverlhorne, Colorado
H-P*I(UMAR S¡20 Counly Road154
Glenwood Springs, CO 81601
Phone; (970) 94S7S88
Fax (970) 945-8454
Email: hpkqlenwood@kumarusa.com
Ce{}i*tl1*i{;sl 7:tt1z¡etNi*q I e*çireetl*ç i:,;rsi*3y
î\Ì\;31.,)1 t ítt s I î.1ii.1tt \ fi rtvi{ i} ttfi1.t}.{ tl ;;Z
Earthwork Compaction Testing Report
Client: Giard Hornes Project No.; 16.7.159 Day:
Attn: Roger Giard Date:
l43l Airport Road Page:
Rifle, Golorado 81650
Project: Lot24, Pinyon Mesa, Sage Meadow Road, Garfield County, Colorado
Weather: Cloudy, windy, dry Temperature: 74o at 3:00 pm
EarthworkContractor: E & LTrucking
Vibratory double drum walk behind
Description of Earthwork We performed compaction testing on fill placed under proposed footings atTested: west wall. Based on our test rEsults satisfactory compaction was obtained.
Sample(s) Obtained:
Verbal Communication: Luis with E & L Trucklng was informed of our test results.
Placement and Compaction Procedure: Not observed by H-PlKumar
Lift Thickness:Max. Rock Size:Conditioning:
Compactor(s) Used:Number of Passes:
Proctor
Thursday
9122t162 of 2
CCFúFACÌ|VE EFFORT Al{D MOISTURE fO FltL ttuRlNG r}lE nMÊS WtE¡'l oUR ts OBSERVINS OPEF.ÀTIONS.
ÏHE ilUCLEAñ DÊi¡SOfT{ET€R MET}fi¡D OF TESTING TÂ,AS USEO IN SUBSÎÁNTIAI ACGOROAI¡CË WITH ASITi D Ë9I8.
Distribution:
Glard Homee - Roger Giard ftgþICËfúgD
/rjf
Justin Orgill 9a¡iel E. Hardin, P.E.
Fleld Technician Reviewed By
Test
No.
Location Depth or
Elev.
Field Dry
Density
(pcO
Field
Moisture
Content
%
Field
Comp
(Yol
Min.
Gomp.
Req.
P/ol
Proctor
Lab No.
I 6'S. of NWcomer subgrade 106.0 14.2 100 98 217-16
10' N. of SW corner 103.s 14.5 21't-1629898subgrade
Method on opt.
Dens.
217-16 ASTm D 698 Sand t05.9 15.8
Office Locations: Parker, Glernvood Springs, and Silverlhome, Colorado
H-P*I(UMAR 5020 Counly Road 154
Glenwuod Springs, CO 81601
Phone: (970) 945-7988
Fax: (970) 945-8454
Email hokolenwood@kumarusa.com
*€:t{:,1çe't t .:i}1 t.rcf**uNinç i Li::çutz:*tàt:ç {}*:;1r,:¡;.¡
1,-1;:ir:¡t;zi* ítn útl t r;avtt{tr'ftÐfi1.tâ
Earthwork Compaction Testing Report
Client: Giard Homes Proiect No.: 16-7459 Day:
Attn; Roger Giard Date:
1431 Airport Road page
Rifle, Colorado 81650
Project Lot 24, Pínyon Mesa, Sage Meadow Road, Garfield Gosnty, Golorado
wealher: cloudy, light wlnd, rain overnight remperature: 46' at 2:10 pm
Earthwork Contractor: E A LTrucklng
Used:Trackhoe, Vibratory e rum behind
Description of Earthwork We performed compaction testing for under-footing structural backfill. BasedTested: on our test results compaction was satisfactory.
Sample(s) Obtained:
Verbal Communication: Luis wlth E & L Trucking was informed of ourtest results.
Placement and Compaction Procedure: Not observed þy H-P/Kumar
Friday
9123t16lofl
Lift Thickness;
Compactor{s} Used:
Proctor
COI,IPACTIVE ÊFPORT ¡T¡D
THE NUCLEAR DgNSOt IETER OF
Max. Rock Size:Moisture
Gonditioning:
Number of Passes:
Teet ResultsN
wllH AST¡Itt D 593¡.
Dislribution:
Glard Homes - RogerGiard lrgrtrd@rs$üGtt
/rjf Justin
Field
Daniel E. H P.E.
Reviewed Byn
Test Results
Test
No.
Location
Under footing backfill
Depth or
Elev.
Fietd Dry
Density
(pc0
Field
Moisture
Content
a/o
Field
Gomp.
('/"',
Min.
Comp
Req.
(olol
Proclor
Lab No.
I Zno footlng line from west, 10'
S. of N. end
4'below
footins srade 113.8 14.2 100 98 243-14
l5.l
Lab No.Max. Dry
west,2 109.6 99 98 243-14
opt.
N. of S. end
2nd footing
141 ASTM D 698 31 0 .9
217-18 ASTM D 698 15.8
H-P\IruMAR 5020 County Road 'lå4
Glenwsod Spdngs, CO 81601
Phone: {S70) 9¡15-7988
Fax (970) 945.8454
Email: hokolenwood@kumarusa.com
{..:,r.:::"t:-:i::'t::;::1 '::: *.¿r'; :t'::: i1 t: : i i.t|.;tt tt:tr:t:::'i 'l'::.:i.:itií,)\l
i':tí'.í ::.:.;:i't:1 i t:; ia::-i ¡ vi.tt,;i¡ i;r¡¡ : i¡::t ii :,¡,i
Oflice Locatiofls: Parker, Glenwood Spings, and Silverlhome, Colorado
Earthwork Compaction Testing Report
Client:Giard Homes
Attn: Roger Giard
143f Airport Road
Rifle, Colorado 81650
Project No.:16-7,459 Day:
Date:
Page:
illonday
9126116{ofz
Project Lot 24, Pinyon Mesa, Sage Meadow Road, GarÌield Gounty, Colorado
Weather: Clear, calm, dry Temperature: 55'at 10:30 am
EarthworkContractor: E<rucking
Equipment Used:t remote drum roller, garden hose
Description of Earthwork Backfill below footings was tested with acceptable results during our morningTested: site visit Proctor value referenced is from adjacent Lot 31.
Verbal Communication: Rafael with E&L trucking was inlormed of our test results.
Placement and Compaction Procedure: Not observed by H-FlKumar
Lift Thickness:Max. Rock Síze:Conditioning:
Compactor(s) Used:Number of Passes:
Nuclear Gau
Proctor Sam Reference
COMPACTTVE EFFORÎ A¡\IO i,|OITiTURE TO FIIL DURING THE TIMES W}€N OUR OESERYER F I¡OT OE$ERVING OP€RATIOÍ\¡S
THE NUCLEAR DENSOMETER MET}IOD QF TEıTNAWAS USED II{ SUgSTA¡ffiAL ACCOROAilC€ WTffi AåTM O 893€.
Distribution:
Giard Homes - Roger Giaro (Hiå{dgæû!Sü
Thomas J. Westhoff, CET DanielE. Hardin, P.E.
TJwl
t Field Technician Reviewed by
Test
No.
Locatíon Depth or
Elev.
Field Dry
Density
(pcr)
Field
Moisture
Content
o/a
Field
Comp.
{Yo}
Min.
Comp.
Req.
(a/ol
Proctor
Lab No.
I W. interior footlng 2'N. of S. end 3'below
subsrade 1T3.3 13.8 100 98 243.14
2 E. exterior footing, SE corner 3'below
subErade 112.1 12.9 100 98 243-14
3'belowW. interior footing, 5' N. of S. end fl0.9 100 243-14
Lab No.
3 14.4 98
Max.Ðescriptíon opt.
Moist.
243-14 ASTTV|D 698 c fi0.9
H.P*I<UMAR 5020 County Road 154
Glenwood Spdngs. CO 81601
Phone: (970) 945-7988
Far: (970) 945{454
Email: hokolenwood@kumarusa.com
¡)et:1<t¡:ltr,i:r:í l|. Ûçir*:,tz i*;; | íl: t itlar* *ti*{} ú::ts?r:rJv
l'",1í1!4r ì:lií 1 {t}tt.i' I Y-t1\¿iií}(tzTt:}t1?iii
Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado
Earthwork Compactlon Testing Report
Clíent Giard Homes Project No.: 16-7459 Day:
Attn: Roger Giard Date:
1431 Airport Road Page:
Rifle, Colorado 81650
Projec'h Lot 24, Pinyon Mesa, Sage lllleadow Road, Garfield County, Colorado
itonday
gt26t16
2af2
Weather: Clear, lightwind, dry Temperaturel 68o at2;00 pm
Earthwork Contractor: E & LTrucking
Equipment Used:Trackhoe,drum walk behind
Description of Earthwork We performed compaction testing of under-footing structural fill. Based on ourTesled: test results, compaetion was ludged to be adequate.
Sample(s) Obtained:
Verbal Communication: Luis with E & L Trucking was informed of our test results.
Placement and Compaction Procedure: Not observed by H-PlKumar
Lift Thickness:
Compactor(s) Used: walk behind
Max. Rock Síze:Moisture
Conditioning processed at stockpile
Number of Passes:
Nuclear Ga Moistu Test Results
Proctor
EFFORT AN9 irorsTuRE TO FILI.DURÚ{G THE WHEN ts NOf OgSERVING oPãRAÌtOr.¡S.IHE MJCLEÁR OËNSOMgfER MEIHOD OF rEsltr'tci w8 USEO WÌfi ASru o 6sxtð.
Dislribution:
Glard Homas - Roger Giard (uhdtrof.nstl
iljr
Justin
Technician
Daniel E,
By
P.E.
Test
No.
Location Depth or
Elev.
Field Dry
Density
(pcÐ
Field
Moisture
Content
a/o
Field
Comp.
(o/o)
Min.
Gomp.
Req.
(o/ol
Proctor
Lab No,
.|interior W. footing, 6' S. of N. end 2'below
suborade r1û.2 15.0 99 98 243-14
2 8. footings, l2'W. of E. end 2'betow
subnrade lll.6 15.9 100 98 243-14
3 lnteriorllU. footing,lS'N. of S. end I'below
suborada 109.8 14.0 99 98 243-14
4 exterior E. footing, l0' N. of S, end 6" below
subnrade 104.7 t6.r 99 98 277-76
interior W. footing, 6' S. of N. end 106.1 15.8 t00 217-16
Lab No.
5 subgnde 98
Moist.
Max.
Dens.
243-'I ASTM D 6Ð8 110.9 14.8
217-lB ASÎtlrl ay with Sand t0ı.9 15.8
H-P*¡SMAR 5020 county Road 154
Glenu¡ood Springs, CO 9160r
Phone: {970) 945-7988
Fax {970) 945-8454
Email; hpkqlenwoodGDkumarusa.com
{}r: ;: 1+<.:i:¡ui.it t î z t:1it 4 i; 7 i ¡,ii i *¡t:yr* e t *<; Ç r::tyi rs*t
l':' ;'tiii\ t;1il:, 1.2:* ;ëi{;t I i {1uit í}ti í.r \{;ttrini
Oflicæ Locations: Parker, Glernvood Springs, and Sllve¡thorne, Coloredo
Earthwork Compaction Testing Report
Client:Giard Homes
Attn: Roger Giard
1431 Airport Rdad
Rifle, Colorado 81650
Project No.: 16-7459 Day: Tuesday
Date: 9¡,2il16
Page: I aî I
Project Lot24, Pinyon Mese, Sage Meadow Road, Garfield County, Colorado
Weather: Glear, calm, dry Temperature:t4o at 9:30 am
EarthworkConlractor: E<rucking
Used:Vibratory double walk behi
Description of Earthwork We visited the site twice today to perform compaction testing of under-footingTested: strucutral fill. Based on our test results, compâction was judged to be euitabie.
Sample(s) Obtained:
Verbal Communication: Luis with E & L Trucking was informed of our test results.
Placement and Compaction Procedure: Not obse¡ved by H-p/Kumar
LiftThickness:Max. Rock Size:Gonditioning:processed at stockpile
Compactor(s) Used:Number of Passes:
Nuclear Moistu Test Results
TO FILL OIJñINÊTHE ouR OSSERVER OPERA1IONS,1HÉ OF IESTT{GWAs u$Eo 6UESTAt'tTrAt âc0(}RDAr.¡cE Wü ÂSltìt ¡¡09¡8.
Distribution:
Glard Homes - Roger Glard (rclr@r,f,f.nctl
tw Justin Oroill DanielE. Hardin
Field Technician Reviewed By
P.E.
Results
Test
No.
Localion Depth or
Elev.
Field Dry
Density
(pcD
Field
Moisture
Content
o/o
Field
Comp.
(%)
Min.
Comp.
Reg.
(olol
Proctor
Lab No.
1 lnterior E. footing, l5'$. of N. end subgrade 113.7 14.3 100 98 243114
Lab No.Method Description Max. Dry
Dens. (%)
opt.
Moist. (%)
243-14 ASTM D 698 Sand f 10.9 14.8
Office Localions: Pa¡kEr, Glenwood Springs, and Silverthome, Colorado
H-P*IruMAR 5020 Gounty Road 154
Gþnrvood Springs, CO 81601
Phona: (970) 945-7988
Fax (970) S4$,8454
Email: hokglenwood@kurnarusa.com
*e'sí*ti zz ti:¡¡1 F: t1.)ii it: t:ji ulij I Yr tg* **tifir,; i)*alr.sçv
l.ii al,3{ r:1L', I *:;tt¿tí} 1 Fi:.ri,t Í {}{irr¿{: 1iî.i21
Earthwork Compaction Testing Report
Client Giard Homes Project No.: l6-Z-tg9 Day:
Attn: Roger Giard Daie:
1431 Airport Road page:
Rifle, Golorado 81650
Project Lot 24, Pinyon ifiesa, sage Meadow Road, Garfield Gounty, colorado
Weather: Partly cloudy, calm, dry Temperaturez 74" at l2:30 pm
Earthwork Contractor: E & LTrucking
Eq Trackhoe,walk behind
Description of Earthwork lllfe performed compaction testing of structural backfill under-footings. BaeedTested: on our test results, compaction was judged to be suitable
Sample(s) Obtained:
Verbal Communication: Luis with E & L Trucking was informed of our test result
Placement and Compaction Procedure: Not observed by H-plKumar
Max. Rock Size Moisture
Conditioning:
Number of Passes:
Wednesday
9l/28/,'t6lof't
processed at stockpileLift Thíckness:
Compactor(s) Used: walk behind
lo FII.L OURIIìIG rHE OBSERVER ts oSsgRvr¡re OPERATIONS-
ACCORDAI¡CE WTH ASIî,1O 6938.
I
Tt{E oFlESnt{GWÂS USED IN
Oistribution:
Glard Homes - Roger Giard lgln¡üE¡g[q$
iljt Justin Oro ¡il Daniel E.P.E.
Field Technician Reviewed By
Test Results
Test
No.
Location Depth or
Elev.
Field Dry
Density
(pcr)
Field
Moisture
Content
a/o
Field
Comp.
(Yo)
Min.
Comp.
Req.
(o/o\
Proctor
Lab No.
1 North corner
4'below
footing
orade
106.2 18.2 100 9s 217-1Ê
2 East comer
2'below
footing
qrade
f 08.3 15.8 100 95 217-16
Lab No.Method Description Max. Dry
Dens. (%)
opt.
Moist. (%ì
217¿6 ASTM D 698 105.9 15.8
H-P*I(UMAR 5020 County Road 15.4
,Glenwood Springs, CO 81601
Phone: {970) S45-7988
Fa* (970) 945-8454
Ernail hokolenwood@kumarusa.com
i;.: ij',rj{:ì1 úníJi l. n g: t t:; 4¡ ¡¡19 | 7" *r;ti *e+ : t* ç i}t t:i cç1y
I't1 ;, t" ¿ ¡ ¡ ni "'
I rjt t' ú. í: t! i r.,.; i r r: r¡ r* ¡,: n I *i
Oñice Localions: Parker, Glenwood Springs, and Silverlhome, Cslorado
Earthwork Gompaction Testing Report
Client:Giard Homes
Attn: Roger Giard
f 431 Airport Road
Rifle, Colorado 81650
Project No.: 16-7-{59 Day:
Date:
Page:
ïhursday
9t2st16lofz
Project Lot24, Pinyon Mesa, Sage Meadow Road, Garfield Count¡r, Colorado
Weather: Cloudy, calm, dry Temperature:63o at 9:30 am
Earthwork Contractor: E& LTrucking
Used:Trackhoe,roller
Description of Earthwork We performed compaction testing on under-footing backf¡ll. All tests metTested: minimum proJect compaction specifications.
Sample(s) Obtained:
Verbal Communication: Luls with E g L TruckÍng was lnformed of our test results.
Placement and Compaction Procedure: Reported by the Contractor.
Lift Thickness: 1'Max. Rock Size: I'Conditioning hose
Compactor(s) Used: Vibratory double drum roller Number of Passes:as requested
Nuclear Moistu
Proctor
COilIPÂClME ÊFFORT ANB MOISTURE TO FItL OURINB ]HE oln rs t¡ol OgSERVING
THE NUCLEAR OENSOMËTÊN MEfHOD OF TEST¡ilC WA8 U6ED vìñûl ASTT,l D 6938.
Distribution:
Giard Homes - Roger Giard lrdrd8rctnotl
/ljf Ph¡t o
Field Technician
Danlel E.
By
P.E.
Test
No.
Location Depth or
Elev.
Field Dry
Density
(pcr)
Field
Moisture
Content
a/o
Field
Comp.
(%)
Min.
Comp.
Req.
(%)
Proctor
Lab No.
1 exterior E. footlng, f 5' N. of S. end
l'belour
footing
grade
1'11.2 14.1 {0t 98 243-14
interior N. footlng, 20' E. of W. end
Lab Description Max. Dry
2 109.3 15.6 99footing 98 243-14
Method opt.
Moist.
243-14 ASTIUID 698 s I10.9 r4.8
H-P*KUMAR 5020 Coung Road 'lå4
Glenrvood Springs, CO 816Of
Phone: (970) 94$.7988
Fax: (970) 94F.8454
Email: hokolenwood@kumarusa.com
t";,j*|a::':i1i1i{:;it. |litL1itt+:t:riit:¡ i i::r¿t¡¿:¿:t}ii:trt {.}t},,.jifj,-;rí
,, I :' r¡.ìi:, l. ..' ,, : I ,::,. .. ,í ,i,;.¡,:.:r
Office Localions: Parker. Glenwood Springe, and Silverlhorne, Colorado
Earthwork Gompact¡on Testing Report
Client: Giard Homes Proiect No.: 16-Z459
Attn: Roger Giard
l43l Airport Road
Rifle, Colorado 8lô50
Project Lot 24, Pinyon Mesa, Sage Meadow Road, Garfield County, Colorado
Day:
Date:
Page:
Thursday
9r29fi62 of 2
Weather: Cloudy, calm, dry Temperature: 66" at 1:00 pm
EarthworkContractor: E & LTrucking
Equipment Used:
Description of Earthwork
Tested:
Sample(s) Obtained:
We performed compaction testing of undEr-footing structural fill. Based on our
test results, compaction was judged to be suitable.
Verbal Communication: Luis with E & L Trucking was informed of our test results.
Placement and Compaction Procedure: Not observed by H-plKumar
Lift Thickness:
Compactor(s) Used: walk behind
Max. Rock Size:Conditioning at stockpile
Number of Passes:
Nuclear MofsturelDe Test Results
Sam Reference:
fo FILL oußtNG ÏHE TlfrcS wfiEN OUR ossEnvER iloT OPÊRANO'{S
THE NUCLEAR OF TESTING wAs uÍiED IN SUSSTAhMAL ACCOROAT¡CE waH
^sït¡
6936.
Distrlbution:
Giard Homee - Roger Giard {fSEg$&eûE*!,
aif
Just¡n O Daniel E. Hard P.E.
LocationTest
No.
Depth or
Elev.
lJensrfy
Field
Dry
Density
(pcfl
Field
Moisture
Content
o/o
Field
Comp.
(%)
Min
Comp.
Req
Proctor
Lab No,
1 N. corner of interior W. footing footlng grade 108.2 16.4 s8 98 243-14
2 E. exterior footing, 30' N. of S. end footing grade 113.6 14.8 t00 98 243-14
3 N. interlor footing, 15' ìlll. of E. end footing grade 110.e 15.6 r00 98 ?l.3-14
4 E. garage footing, {2'S. of N, end 3'below
footina qrade 108.8 13.¡t 98 98 2l,3-14
5 E. garage footing, 10' S. of N. end l'below
footins grade 3.0t1 13.1 100 98 243-14
W. garage footing, I'S, of N. end 111.6 100 24s-14
Lab No.
6 14.0 98
Method on Max. Dry
Dens.
opt.
Moist.
243-14 ASTM D 6Ð8 fi0.9 r4.8
H-P+IruMAR 5020 Counly Road 154
Gle¡wood Springs, CO 81601
Phone: (970) 945-7988
Far (970) 9458454
Ëmail: hpkqlenwood@kumarusa.com
iìea\1,1 ía:îii',i,::a:ìt f:aí.2i{/:,:ti{:.;} i íi:';r:7r-;t:f:r:;:t:3 a,.'i=tl,.:t¿:;
li ;:.i ::: ¡;:,i:; í r:t:I:z t'4 i iaii'jit a;n'i-:¿i..i ::,i
Offce Locations; Pärker, Glenrvood Springs, and Silverthome, Colorado
Earthwork Compaction Testing Report
Clienl Giard Homes Project No.: l6-7"f59 Day:
Attn: Roger Giard Date:
1431 Airport Road Page:
Rifle, Colorado 81650
Project: Lot 24, Pinyon Me$a, Sage Meadow Road, Garfield County, Golorado
Friday
9t30fi61of1
Weather: Cloudy, calm, dry Temperature:66o at l1:45 am
EarthworkContraclon E<rucking
Used:Trackhoe, Vibratory double drum walk
Description of Earthwork We peÉormed compaction testing of under-footing structural bacKlll. BasedTested: on our test results, compaction was judged to be adequate.
Sample(s) Obtained:
Verbal Communication: Luis with E & L Trucking was informed of our test results.
Placement and Compaction Procedure: Not observed by H-P/Kumar
Lift Thickness:Max. Rock Size:Conditioning:processed at stockpile
Used: walk behind Number of
Nuclear Ga ñlloistu Test
Proctor le Reference:
COi¡FACTIVT EFFORT ANO MOISTUFE
THE ilUCTEAR OENSOME'TER MÉ,THOO
TO FILL DURING lHE ll¡r,lES WHEN OUR OBSERVER rs NOt oasÊRvrr{G
OF lESTl{G wAs us€o SUASTAIYTIAL ACCOROANCE WfTH ASTU D 6838.
Distribution:
Glard Homee - Roger Giard (fg&ld@[gÊS
iltî
Juetin Orgill Daniel E. ïardin, P.E.
Field Technician Reviewed By