Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT
BLRE-04-17-4664 & SEPT-04-17-4668
Robert & Keano Velasquez -New SF Residence
3064 County Road 113, Carbondale
Velasquez Minor Subdivision, Lot 1 (Cattle Creek)
1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (1.R.C.)
AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (1.E.C.C.)
2) COMPLIANCE WITH ALL GARFIELD COUNTY FLOOD PLAIN REQUIREMENTS IS REQUIRED
FOR ANY DEVELOPMENT LOCATED WITHIN THE FLOOD PLAIN FOR CATILE CREEK.
3) OPEN-HOLE SOILS REPORT IS REQUIRED AT FOOTING INSPECTION TO VERIFY 1500 PSF
SOIL BEARING CAPACITY.
4) IN ACCORDANCE WITH PLAT NOTE #26, INSTALL A LOW EARTHEN BERM, 2 TO 3 FEET
HIGH ABOVE THE EXISTING DEBRIS FAN SURFACE AND LOCATED IN THE NORTHERN
PART OF THE BUILDING ENVELOPE, TO PROTECT THE RESIDENCE FROM REASONABLY
LIKELY DEBRIS FLOW EVENTS. VERIFY FINAL LOCATION AND DESIGN CRITERIA WITH
SOILS ENGINEER OF RECORD.
5) ENGINEERED DESIGN FOR ON-SITE WASTEWATER TREATMENT SYSTEM IS REQUIRED,
AND INSPECTIONS OF OWTS SHALL BE PERFORMED BY COLORADO LICENSED ENGINEER.
OWTS DESIGN SHALL COMPLY WITH STATUTORY SEPARATION DISTANCES (SETBACKS)
FROM IRRIGATION DITCHES, UNLESS ON-OR OFF-SITE IRRIGATION DITCHES ARE LINED
OR PIPED. PROVIDE ENGINEER'S FINAL REPORT PRIOR TO FINAL BUILDING INSPECTION
& CERTIFICATE OF OCCUPANCY.
6) AN IN-HOME WATER TREATMENT SYSTEM IS REQUIRED. AFTER SYSTEM IS INSTALLED
AND PRIOR TO FINAL BUILDING INSPECTION, THE WATER SHALL BE FURTHER TESTED TO
ENSURE COMPLIANCE WITH MINIMUM SAFE WATER DRINKING STANDARDS. PROVIDE
ENGINEER'S APPROVAL REPORT PRIOR TO FINAL BUILDING INSPECTION.
7) ELECTRICAL PERMITIING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD.
ELECTRICAL ROUGH-IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL
FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.