HomeMy WebLinkAboutPlansGENERAL ST1 X37L!2AL NoIES GENERAL I. Design is based on the 2003 Edition of the International Building Code (1.8.C,) Snow Load: 40 PSF 2. The Contractor shall be responsible for the temporary shoring and bracing of all systems and protection of all adjacent structures. 3. The Contractor shall confirm dimensions and elevations shown with drawings; notify Engineer immediately of discrepancies. 4. Notify Engineer if any openings are to be cut in 90-ear/rat systems for mechanical or electrical items. 5. Design is for the new portions of the tank only and does not include investigation of the existing wails and stab. FOUNDATIONS 1. Foundation Design is based on Soils Report #6504634 by GTL Thompson dated Febrvery 8, 2006. Maximum design bearing capacity. 3000 PSF. The Contractor shall review the Soils Report and follow all recommendations therein. 2 All existing footings are assumed to bear- on undisturbed natural bearing materials or compacted structural Fill. FASTENERS AND C0tV ECTORS 1, Powder -actuated fasteners for attachment of various materials to structural steel or concrete shall be "Ramset" fasteners as manufactured by Rarnset Fastening Systems. 2. Threaded Rod For post installed anchors shall be A307 (SAE 4140). Drilled -in rebarsha11 ire ASTM Abl5 Grade bO. Epoxy shall be Simpson SET High Strength Epoxy -Tie by Simpson or HIT-HY15O by the Hilti Corporation. Installation shall be inspected by a Special inspection service as required by 1BC Chapter 17 or by the National Evaluation Research Product Sheets. 3. Connectors, hangers, d fasteners (including screws, nails, bolts, lags, piles, etc) in contact with preservative -treated wood shall comply with 1BG 200b section 2304.45. 4. Alternate connectors and fasteners to those listed oloove, which have I.GB.O. approval, may be used with approval by the Engineer. Above Acteslve Additional Ad enc Al Anchor Bolt Angle Approximate Architectural Basement Bean Bearing Between Blocking Bottom Bottom Of ... eottom of Footing Bottom Of Wall Bettidinng Cantilever Center Line Channel Colum Cap Clear Or Clecr'ance Colum Common Concrete Concrete hlahorrry Unit Comection(s) Construction Continuous Contractor Control Joint Countersank Continuous Structural Panel Sheathing Detail Diagonal Diameter Dimension Double Douglas Fir Domei(s) Drawing(s) Each Each Face Edge Distance Elevation Embedded Engineer Equal Existing East-West Each Nay Face Of Concrete Face OfMasorn) Face Of Stud Face Mount Far Side Floor Floor Drain Footing Foundation Gauge Galvanized Glue Laminated Grade Hanger Hardened Headed Anchor Stud Header Height Hold -Doren Anchor Horizontal Heavy Timber STANL2ARD ABBREVIATION LIST ASV ADH ADDL APJ ALT AB. L APPROX ARCH 135ff Bff 13R EirriN BLK6 BTM B.D. B.O.F. B.O.W. 6RDG BLDG CANT G CC CLR COL COM GONG CONN CONST DONT CONTR GJ CTRSK G5P5 DTI_ DIA& DIA DIM DBL PF DefL(5) DWG(S) EA EF. ED EL, REV EMBED EN6R EQ EXiST, (E) EXP E -W F_V+l FOC FOM FOS FC. MHT. F/5 FL.R FD. FTG FDN &A. 6ALV 6L 6R I-1GR HD HAS. HDR HOT HD- HOR1Z N.T. inverted Precast Tee 13m interior .Joint Joist King Stud Lag Screw Laminated Veneer Lumber Laminated Strand Lumber Long Leg Horizontal Long Leg Vertical Longitudinal fricawfocturer Masonry Maximum Mechanical Miilmum Mtscellaneovs Not Appitcabie Near Side North-South Not To Scale Overframing On Center Opening Opposite Option) Oriented Strand Board Parallel Parallel Strand Lumber Perimeter Perpendicular Pocket Plate Plywood Prwiatic Precast Concrete Prefata-)cated Preliminary Predeftected hold Down Anchor Rafter Reference Reinforcing Required Retaining Ranh Sano (not planed) Surfaced to 4 Sides Schedule Section Sffnliar Simple Square Spa -e(5) Sten:ice d Steel Stiffener Structural Insulated Pane) Structu^e/5truchraf Support Surfaced Four Sides (Planed) 5prnetrlcal Sky Light Threaded Tongue and Groove Top and Bottom Top Of _.. Top Of Bean Tap Of Concrete Top Of Footing Top Of Finish Floor Top OF slab Top Of Steel Top of Wall Transverse Treated (Preservative) Trimmer Typical Unless Noted Otherwise Verify In Field Vertical Welded Wire Fabric Wide Flange With LT. INT Jr J5T K LAG LVL L5L LLH LLV LONG MFR MA5 MAX l-ECH MIN MISG WA WS N-5 N.T.S. OF. O.G. OPG OPP OPT 056 PLL OR If PSL. PERIM PERP PKT Pt. ORE PLY PNU P/C PREFAB PRELIM PHD_ RF7 R RE: RElNF REa42 RET R5. 545 SGHED SECT SIM SIMP 50 SPA STD 511 STIFF 5.IF. 5TRUGT OR 5TR SPRT 545 5YM 51. TND T t G Tis T.O. T.OB. T.O.G. T.O.FF T.O.SLA5 TAS. T.O.W. TRAJ iV rRll) T TYP uxO. VIE. VERT KAP WORhP /1 / / 1IW,mr i EiTh , SPLICE LENGTH - A i Ef/% Critical section HOOK DEVELOPMENT LENGTH - G SPLICE NOTE: CONTINUOUS REINF SHALL BE SPLICED A5 FOLLOWS (U.N.0): TOP REINF: AT HIDSPAN BOTTOM REINF: OVER SUPPORTS OTHER REINF: AT' MIDSPAN Bar size A G D E 1 MIN. INSIDE BEND DIAMETER #4 101.0' 7.0" 45" 8.0" 3.0" #5 24.0" 1.0" S.O" 10.0" 3.75" #b 2q.O" 10.0" 6.0" 12.0" 45" #8 48.0" (3.0" &0" 17.0" 6.0" REINFORCEMENT EM6E frtENT LEN TI --f, HOOKS, ANI) SRL I CES TYPICAL UNI F55 NOTED OTHERWISE SPECIFICATIONS FOR CAST -IN-PLACE CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. Provide cast -in-place concrete, including formwork and reinforcement, where shown on the Drawings, as specified herein, and as needed for a complete and proper installdion. 1.2 SUBMITTALS A. Secure concrete mix designs from the concrete supplier and submit to the Engineer for review and approval. B. Distribute approved mix designs to testing laboratory, batch plant, job site, and governmental agencies having jurisdiction. C. Submit shop drawings showing details of bars, anchors, and other items, if any, provided for concrete reinforcement. D. Provide samples for walerstops. E. Material certificates for each of the following, signed by the manufacturers: Cementilious materials, form materials and form -release agents, admixtures, waterstops, curing compounds, sealants. 1.3 QUALITY ASSURANCE A. Use adequate numbers of skilled workmen thoroughly trained and experienced in the necessary crafts and completely familiar with the specified requirements and methods needed for proper performance of the work of this Section. B. Comply with "Specifications for Structural Concrete for Buildings," ACI 301, except as may be modified herein. Provide hot or cold wedher protection per ACI 305 and 306. C. Provide access for, and cooperate with, the Building Inspector, Engineer and Testing Agency. D. Do not commence placement of concrete until mix designs have been reviewed and approved by the Engineer and all governmental agencies having jurisdiction, and until copies of the approved mix designs are at the job site and the batch plant. 1.4 DELIVERY, STORAGE, AND HANDLING A. Steel Reinforcement: Deliver, store, and handle steel reinforcement toprevent bending and damage. B. Waterstops: Store waterstops under cover to protect from moisture, sunlight, dirt, oil and other contaminants. PART 2- PRODUCTS 2.1 FORMS . A. Form facing materials shall be plywood, lumber, metal, or other approved material. B. Forms for Cylindrical columns shall be metal or plastic, paper, or fiber tubeswith sufficient wall thickness to resist plastic concrete loads without detrimental deformation. C. Chamfer strips shall be wood, metal, PVC or rubber strips, minimum size3/4" x3/4". D. Form Ties: Factory -fabricated, removable or snap -off metal or glass -fiber reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spelling of concrete on removal. Furnish units that will leave no corrodible metal closer than 1.5 inch to the plane of exposed concrete surface. Furnish ties that, when removed, will leave holes a minimum of 1 inch in diameter in the concrete surface. E. Form Release Agent: Commercially formulated form -release agent that will not bond with, stain, or adversely affect concrete surfaces andwhich is non-toxic after 30 days. 2.2 REINFORCEMENT AND ACCESSORIES A. Comply with the following as minimums: 1. Bars: ASTM A615, grade 60 unless otherwise shown on the Drawings, using deformed bars for number 3 and larger. 2. Bending: ACI 318. B. Fabricate reinforcement to the required shapes and dimersions, within fabrication tolerances stated in the CRSI "Manual of Standard Practices." C. Do not use reinforcement having any of the following defects: 1. Bar lengths, depths, or bends exceeding the specified fabricating tolerances; 2. Bends or kinks not indicated on the Drawings or required for this Work; 3. Bars with cross-section reduced due to excessive rust or other causes. D. Joint Dowel Bars: ASTM A 615, Grade 60, plain -steel bars, cut true to length with ends square and free of burrs. E. Bar Supports: For bolsters, chairs, spacers and other devices for spacing, supporting and fastening reinforcing bars or welded wire fabric, use manufactured steel wire, plastic, or precast concreted greater compressive strength than concrete. Use CRSI Class 1 plastic -protected steel wire or CRSI Class 2 stainless steel bar supports. 2.3 CONCRETE A. Comply with the fallowing materials as minimums: 1. Cementitious Material: Use the following cementitious materials, of the sane type, brand, and source, throughout the project: a. Portland cement: ASTM C150, type i or II, low alkali. b. Fly Ash: ASTM C 618, Class C 2. Aggregate, general: Provide aggregates from a single source;. a. ASTM C33, uniformly graded and clean; b. Do not use aggregate known to cause excessive shrinlage. c. Aggregate shall be free of materials with deleterious reactivity to alkaliin cement. 3. Aggregate, coarse: Sound crushed rock or washed gravel with maximum size between 20 mm (3/4") and 38 mm (1-1/2"), and with a minimum size number 4 (114'). The maximum size shall be limited to 314 of the clear distance between reinforcing bars, 1/5 of the narrowest dimension between sides of forms, or 113 of any slab or wall section. 4. Aggregate, fine: Natural washed sand of hard and durdele particles varying from fine to particles passing a 9.5 mm (3/8") screen, of which at least 12% shall pass a 50 -mesh screen. 5. Water Clean and potable. B. Concrete Mixtures shall be proportioned as follows 1. Minimum 28 day compressive strength 3500 psi. 2. Maximum Water-Cementitious Materials Ratio: 0.45 3. Maximum Fly Ash (percentage by weight of cementitious materials): 25percent 4. Slump Limit: 4 inches, plus or minus 1 inch, except for concrete with verified slurp of 2 to 4 inches before adding high -range water -reducing admixture: 8 inches. 5. Air content: 6 percent plus or minus 1.5 percent. 2.4 ADMIXTURES A. Air -entraining Admixture: ASTM C260 B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other adixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. 1. Water -Reducing Admixture: ASTM C 494, Type A 2. Retarding Admixture: ASTM C 494, Type B. 3. Water Reducing and Retarding Admixture: ASTM C 494, Type D. 4. High -Range Water Reducing Admixture: ASTM C 494, Type F. 5. High -Range Water -Reducing and Retarding Admixture: ASTM C 494, Type G. 6. Plasticizing and Retarding Admixture: ASTM C 1017, Type II. C. Crystalline Waterproofing Additive: Provide proprietary rraterial by Xypex Chemical Corporation of Richmond, B.C., Canada that chemically controls and permanently fixes crystalline structure throughout the ceeillary voids of the concrete. The system shall cause the concrete to become sealed against the penetration of liquids from any direction, and shall protect the concrete from deterioration due to harsh environmental conditions. The Xypex additive must be added to concrete mix at thetime of batching. Dosage, Application, and Curing shall be in accordance with manufacturer's recommendations. 2.4 OTHER MATERIALS A. Self -Expanding Rubber Strip Waterstops: Manufactured rectangular or trapezoidal strip, bentonite -free, hydrophilc polymer modified chloroprene rubber, for adhesive bonding to concrete, 1/4" x 1" dimension. Available product by Greenstreak: Hydrotite, or approved equivalent. B. Provide other reeterials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the Engineer. PART 3 - EXECUTION 3.1 FORMWORK A. Design, erect, support, brace, and maintain formwork so it will safely support vertical and lateral loads which might be applied until such loads can be supported safely by the concrete structure. B. Construct forms to the exact sizes, shapes, lines, and dimensions shown, and as required to obtain accurate alignment, location, grades, and level and plumb work in the finished structure. C. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, as Class B, 1/4 inch, for rough -formed finished surfaces. D. Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the Work. Do not proceed until unsatisfactory conditions are corrected. 3.2 REINFORCING A. Comply with the following, as well as the specified standards, for details and methods of reinforcing placement and supports. 1. Clean reinforcement and remove loose dust and mill scale, earth, and other materials which reduce bond or destroy bond with concrete 2. Position, support, and secure reinforcement against displacement by forms. construction, and the concrete placement operations. Use bolsters, chairs, spacers and other devices for securing the reinforcing in place. 3 Place reinforcement to obtain required coverages for concrete protection. 4. Unless otherwise shown on the Drawings, or required by governmental agencies having jurisdiction, lap bars 32 diameters minimum. 5. Set the wires so twisted ends are directed away from exposed concrete surfaces. 3.3 EMBEDDED ITEMS A. Do not embed piping or electrical conduit other than pipe sleeves, in structural concrete. B. Set bolts, inserts, frames, and other required items in the concrete, accurately secured so they will not be displaced, and in the precise locations needed. 3.4 MIXING CONCRETE A. Measure, batch, mix and deliver Ready -Mixed concrete in accordance with provisions of ASTM C94, and furnish batch ticket information. B. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery tie to 60 minutes. Do not use concrete that has stood for over 30 minutes after leaving the mixer. 3.5 PLACING CONCRETE A. Preparation: 1. Remove foreign matter accumulated in the forms. 2. Rigidly close openings left in the formwork. 3. Wet wood forms sufficiently to tighten up cracks; wet other material sufficiently to maintain workability of the concrete. 4. Use only clean tools. B. Conveying: 1. Perform concrete placing at such a rate that concrete which is being integrated with fresh concrete is still plastic. 2. Deposit concrete as nearly as practicable in its final location so as to avoid separation due to rehandling and flowing. Do not permitconcrete to free drop more than six feet. 3. Do not use concrete which becomes non -plastic and unworkable, or does not meet required quality control limits, or has been contaminated by foreign materials. 4. Remove rejected concrete from the job site. C. Placing concrete in forms: 1. Deposit concrete in horizontal layers not deeper than 600 mm (24"), and avoid inclined construction joints. 2. Remove temporary spreaders in forms when concrete has reached the elevation of the spreaders. D. Placing concrete slabs: 1. Deposit and consolidate concrete slabs in a continuous operation, within limits of construction joints, until the placing of a panel or section is completed. 2. Bring slab surfaces to the correct level with a straightedge, and then strike off. 3. Use bultfoats or derbies to smooth the surface, leaving the surface free from bumps and hollows. 4. Do not sprinkle water on the plastic surface. Do not disturb the slab surface prior to start of finishing operations. 3.6 CONSOLIDATION A. General: 1. Consolidate each layer of concrete immediately after placing, by use of internal concrete vibrators supplemented by hand spading, rodding, or tamping. 2. Do not vibrate forms or reinforcement. 3. Do not use vibrators to transport concrete inside the forms. 3.7 JOINTS A. Construction joints: 1. Do not use horizontal construction joints except as may be shown on the Drawings. 2. if additional construction joints are found to be required, secure theEngineer's approval of joint design and location prior to start of concrete ptacenent. B. Doweled joints: Install smooth dowel bars at joints where indicated. Lubricate or asphalt coat one-half of dowel length to prevent concrete bonding to one side of joint 3.8 WATERSTOPS A. Self -Expanding Strip Waterstops: Install in construction joints and at other locations indicated, according to manufacturer's written instructions, adhesive bonding, mechanically fastening, and firmly pressing into plate, Install in longest lengths practicable. 3.9 CONCRETE FINISHING A. Rough -Formed Wall Finish: As -cast concrete texture imparted by forrn.facing material with tie holes and defects repaired and patched. Remove fins and other projections that exceed specified limits on formed -surface irregularities. B. Slab Surface Finish: Comply with ACI 302.1 R recommendations for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces. 1. Float Finish: Consolidate surface with power -driven floats or by hand floating if area is small or inaccessible to power dri/en floats. Restraighten, Cut cbwn high spots and fill low spots. Repeat float passes and restraighten'ng until surface is left with a uniform, smooth, granular texture. Apply float finish to floor slab and roof slab surfaces. 2. Broom Finish: Apply a broom finish to roof slab drainage pan, and exterior slab surfaces. Immediately after float finishing, slightly roughensurface by braoming with fiber -bristle broom in an east -west direction. 3.10 CONCRETE PROTECTING AND CURING A. General: Protect freshly placed concrete from prenature drying and excessive cold or hot temperatures. Comply with ACI 306for cold -weather protection and ACT 305 for hot - weather protection during curing. B. Evaporation Retarder: Apply monomolecular evaporation retarder to unformed concete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. per hour before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bul floating or darbying concrete, but before float finishing. C. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces. If forms remain during curing period, moist cure after loosening forms. If removing forms before end of curing period, continue curing for the remainder of the curing period. D. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed surfaces, including floors and slabs, concrete floor toppings, and other surfaces. E. Cure concrete according to ACI 308.1, by one ora combination of the following methods: 1. Moisture Curing: Keep surfaces continuouslymoistfornot less than seven days with the following materials: a. b. c. Water. Continuous water -fog spray. Absorptive cover, water saturated, and kept continuously wet Cover concrete surfaces and edges with 12 -inch (300 -mm) lap over adjacent absorptive covers. 2. Moisture -Retaining -Cover Curing: Cover concrete surfaces with moisture -retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches (300 mm), and sealed by waterproof tape or adhesive. Cure for not less than seven days. Immediately repair any holes or tears during curing period using cover material and waterproof tape. 3.11 FIELD QUALITY CONTROL A. Testing and Inspecting: Owner will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports. B. Inspections: 1. Steel reinforcement placement. 2. Concrete placement, including conveying and depositing. 3. Curing procedures and maintenance of curing temperature. C. Concrete Tests: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements: 1. Testing Frequency: Obtain one composite sample for each day's pour of each concrete mixture exceeding 5 cu. yd. (4 cu. m), but less than 25 cu. yd. (19 cu. m), plus one set for each additional 50 cu. yd. (38 cu. no or fraction thereof. 2. Slump: ASTM C 143/C 143M; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture. Perform additional tests when concrete consistency appears to change. 3. Air Content: ASTM C 231, pressure method, for normal -weight concrete: one test for each composite sample, but not less than one test for each day's pour of each concrete mixture. 4. Concrete Temperature: ASTM C 1064/C 1064M; one test hourly when air temperature is 40 deg F (4.4 deg C) and below and when 80 deg F (27 deg C) and above, and one test for each composite sample. 5. Compression Test Specimens: ASTM C 31/C 31M. a. Cast and laboratory cure two sets of two standard cylinder specimens for each composite sample. b. Cast and field cure one set of two standard cylinder specimens for each , composite sample. 6. Compressive -Strength Tests: ASTM C 39/C 39M; test one set of two laboratory - cured specimens at 7 days and one set of two specimens at B days. a. Test one set of two field -cured specimens at 7 days and one set of two specimens at 28 days. Hold one set for future testing if necessary. b. A compressive -strength test shall be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated. 7. When strength of field -cured cylinders is less than 85 percent of companion laboratory -cured cylinders, Contractor shall evaluate operations and provide corrective procedures for protecting and curing in-place concrete. 8. Strength of each concrete mixture will be satisfactory if every average of any three consecutive compressive -strength tests equals or exceeds specified compressive strength and no compressive -strength test value falls below specified compressive strength by more than 500 psi (3.4 MPa). 9. Test results shall be reported in writing to Engineer, concrete manufacturer, and Contractor within 48 hours of testing. Reports of compressive -strength tests shall contain Project identification name and number, date of concrete placement, name of concrete testing and inspecting agency, location of concrete batch in Work, design compressive strength at 28 days, concrete mixture proportions and materials, compressive breaking strength, and type of break for both 7 and 28 -day tests. 10. Nondestructive Testing: Impact hammer, sonoscope, or other nondestructive device may be permitted by Engineer but will not be used as sole basis for approval or rejection of concrete. 11. Additional Tests: Testing and inspecting agency shall make additional tests of concrete when test results indicate that slump, air entrainment, compressive strengths, or other requirements have not been met, as directed by Engineer. Testing and inspecting agency may conduct tests to determine adequacy of concrete by cored cylinders complying with ASTM C 42 or by other methods as directed by Engineer. 12. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements. 13. Correct deficiencies in the Work that test reports and inspections indicate does not comply with the Contract Documents 3.12 LEAKAGE TESTING AND DISINFECTION A. Prior to filling, the contractor shall clean and sanitize the interior surfaces of the tank in conformance with AWWA C652. B. Prior to backfilling and grading, the contractor shall fill the tank to full operating level and measure leakage losses over a period of three days (72 hours). If average leakage in excess of 1/10 of one percent per day occurs, remediation will be required. 3.13 REMEDIAL WORK A. Repair or replace deficient work as directed by the Engineerand at no additional cost to the Owner. APPROVED SUBJECT TO NOTED .XCEFITONS & INSPECTIONS GARFYELD COUNTY BUILD G DEPARTMENT Dater By FIELD COPY NO INSPECTION WITHOUT THESE PLANS ON SITE Page of PATTILLO ASSOCIATES ENGINEERS ALL DRAfrI AHD WRITTEN lir-OIRMtnGN APP£ARN& WREN E*IM.L NOT BE I PLICATED, DtSLW5ED, anuaisc Ir --XO WHOM TpE PIRITTI31 C.CfEENT or PATILLO ASSOCIATES INVIEE t5, DHC. GARFIELD COUNTY, COLORADO DRAWN 13Y: MJ13 PROJECT EMS,: t lJt3 CHECKED BY: RMP SCALE: AS SHOWN ISSUE DATES: 7201.200e1 BID REVISION: c) 97-D PROJ. NO. MMet02T SHEET TITLE GONG. DETAILS AND 5ECTIONS SHEET Si i T.O.W. } /� ILO" } 4 a EDGE OF STRUCTURAL 1 CONC. ROOF SLAB \\I m * 8" T� 7'-0" vx .•v.wwr.x TOP MAT RE!NF. (TVP OVER 4 COLS) 10" PROVIDE SCREENED (T. DIA. VENT HOLE EA END WALL 151. INVERT ELEV. II4'-2" 1 TOP OF WALL SLOPES 11-#5 x 12'-0" ® 12" O.C. EAST WEST TOP OF TOP MAT (2" CLR) ADD b-#5 X I2' -O" EAST -WEST TOP OF TOP MAT T.O.W. 1151_3" T.O.SLAB 1151-1 3/8" TO? MAT FE1 51-0' 15-4" I1-#5 (lo' -O') NORTH SOUTH BTM OF TOP —MAT 5'-0" I. K T.O.W. ADD 5-#5 X 10'-O" NORTH SOUTH BTM OF TOP MAT I14' -O" F A T.O.W. 114'-'0" - mile J -1 #5 x I5--0" ® 12" O.G. BTM OF 13TM MAT (2" CLRT TYP T.O.SLAB II7-2i" LIFTING HOOKS; (4 THUS) SEE - DETAIL D/52 1 f .r f 5-0'x 5'-8" ® 12" O.G. SPLICE BAR NOTE: PROVIDE I 2-#5 EA. SIDE' --t------- OF OPENING (TVP T.O.COL II4-1k" TVP, U.N.O. T.O.W. 115'-3" TOP OF WALL SLOPES 4'-O", 3'-O" / bt-0 1 1 4 NO ADDITIONAL #5 DOWELS REQ77 IN CORNERS, TYP oa NOTE: PROVIDE SPLICES FOR N -S BTM MAT BARS NEAR GRIDS 25, 35 AND 4.5 f r A b Y 9 EA • w EXISTING TOW. ROOF TO BE 114'-O" REMOVED PROVIDE 2" CONDUIT FOR CONTROL CABLE ELEV 1141-2" ROOF FLAN 1/4" = I' -O" PROJECT NORTH NOTE: REINF AT CONC. HATCH COVER NOT SHOWN FOR CLARITY -- SECTION A/53 FOR REINF. DESCRIPTION T.O.SLAB 10!'-0" TYP ® PERIMETE NO ADDITIONAL #5 DOWELS REQD IN CORNERS, TYP 7L0" IIP 32'4" AS -BUILT V.I.F. maimummi au�uu 1 . .1-. I -, s ! ' ;,ifs-T:?�h«'' ,->. `£?v �:. 1,--- I ....�:t: :;'i,�.•••?�:;"`,r:�':� u ____,, 7 -_- O � _ i I I ` I ' ' ,................ iii t 1. I f t et. , _ f .t- -f• •t- t r m 4-4-.I --- --- -- 4- jr' -# j- r- ----- -_ -- --- .. .. _. 1 a 1 I e 4 f .I_._;— _}—.I— - #tum - 4--- 1 It i 1 E 1 08 £ 4 f : 8 4 i I I i I ! I i ! 2 _ F s i I 8 4 I 1 a i I 1 : I14' -O" F A T.O.W. 114'-'0" - mile J -1 #5 x I5--0" ® 12" O.G. BTM OF 13TM MAT (2" CLRT TYP T.O.SLAB II7-2i" LIFTING HOOKS; (4 THUS) SEE - DETAIL D/52 1 f .r f 5-0'x 5'-8" ® 12" O.G. SPLICE BAR NOTE: PROVIDE I 2-#5 EA. SIDE' --t------- OF OPENING (TVP T.O.COL II4-1k" TVP, U.N.O. T.O.W. 115'-3" TOP OF WALL SLOPES 4'-O", 3'-O" / bt-0 1 1 4 NO ADDITIONAL #5 DOWELS REQ77 IN CORNERS, TYP oa NOTE: PROVIDE SPLICES FOR N -S BTM MAT BARS NEAR GRIDS 25, 35 AND 4.5 f r A b Y 9 EA • w EXISTING TOW. ROOF TO BE 114'-O" REMOVED PROVIDE 2" CONDUIT FOR CONTROL CABLE ELEV 1141-2" ROOF FLAN 1/4" = I' -O" PROJECT NORTH NOTE: REINF AT CONC. HATCH COVER NOT SHOWN FOR CLARITY -- SECTION A/53 FOR REINF. DESCRIPTION T.O.SLAB 10!'-0" TYP ® PERIMETE NO ADDITIONAL #5 DOWELS REQD IN CORNERS, TYP 7L0" IIP 32'4" AS -BUILT V.I.F. 'r.;•� 1 . 1 1 a i ! ' ;,ifs-T:?�h«'' ,->. `£?v �:. I i ....�:t: :;'i,�.•••?�:;"`,r:�':� E i I I ` I iii t 1. = •S t et. t f .t- -f• •t- t r m 4-4-.I E ! NI 1.--- 1 -_ .. .. _. ....t....._........ 8 ._ .I_._;— _}—.I— - #tum 4--- NI : 8 4 i I I I 8 4 I 1 a i I 1 : I I I I I I I• 4 I Yf+ , „: < 111111.111111111111 11111111111169111111111 1 1 • i ' 4 l 1 f I 1 I I i 1111111111O11111111 11111M11111111111111111111111 u auR� I14' -O" F A T.O.W. 114'-'0" - mile J -1 #5 x I5--0" ® 12" O.G. BTM OF 13TM MAT (2" CLRT TYP T.O.SLAB II7-2i" LIFTING HOOKS; (4 THUS) SEE - DETAIL D/52 1 f .r f 5-0'x 5'-8" ® 12" O.G. SPLICE BAR NOTE: PROVIDE I 2-#5 EA. SIDE' --t------- OF OPENING (TVP T.O.COL II4-1k" TVP, U.N.O. T.O.W. 115'-3" TOP OF WALL SLOPES 4'-O", 3'-O" / bt-0 1 1 4 NO ADDITIONAL #5 DOWELS REQ77 IN CORNERS, TYP oa NOTE: PROVIDE SPLICES FOR N -S BTM MAT BARS NEAR GRIDS 25, 35 AND 4.5 f r A b Y 9 EA • w EXISTING TOW. ROOF TO BE 114'-O" REMOVED PROVIDE 2" CONDUIT FOR CONTROL CABLE ELEV 1141-2" ROOF FLAN 1/4" = I' -O" PROJECT NORTH NOTE: REINF AT CONC. HATCH COVER NOT SHOWN FOR CLARITY -- SECTION A/53 FOR REINF. DESCRIPTION T.O.SLAB 10!'-0" TYP ® PERIMETE NO ADDITIONAL #5 DOWELS REQD IN CORNERS, TYP 7L0" IIP 32'4" AS -BUILT V.I.F. EXTEND (F) 4" DIA. LT -FLOOR DRAIN TO NEW SLAB SURFACE I -1 - - (ELEV TOO'-IO"J t 7'-0" FOUNPAT(ON/SLAB FLAN (1) 1/4".1,-0. PROJECT NORTH I _J OUTFALL TO STONE LINED SWALE, EXTEND TO BTM OF NATURAL GULCH (E) FILL SUPPLY PIPE EXTEND (E) b" DIA. MAIN INLET/OUTLET PIPE TO ELEV 105-0" EXTEND (E) b" DIA EMERGENCY F® LINE TO ELEV IOI'-b" DRAINAGE PAN SLAB EDGE OF EXIST'G BASE SLAB T.0.SLAB 102'-O" U) F z F z 0 .-a U U) Ft- ts-,, en �Ir OS tr• I- di 0 Z 6 X49 in o.E AIL D12H•44 A}D ARIT TEN rar-OR "IATIGH .'PPEARIN SERUM ANAL Nor OE DLPLK.ATI D, Da5GLOSEP, OR O11-ERi^45E MED 44111:JUr T}f Yi2'rrei cc» eIr OF PATRE I n ASsoGIATS 1369445375, WEST BANK WATER TANK UPGRADE GARFIELD COUNTY, COLORADO DRAM BY: MJB PROJECT ENG: MJB CHECKED BY: RMP SCALE: AS SHOPIN ISSUE DATES: 1.2c1 .2O01 BID REVISION: PROJ. NO. MMao2-1 SHEET TITLE ROOF AND FOUNDATION PLANS SliEET S2 'r.;•� "v4�J� ' . - - Y{ �'N' �:f....�Fr.'r: .-:4=�. G.'>^�ic.s.rrfos�. o. ri, bt a�z;,-i`,-3�.b>:;: WF�y�� iq6. ;,ifs-T:?�h«'' ,->. `£?v �:. �e::2�xc%>. - • .F$%' V:L: >:.xa>:.:;.:. 's„t4v ..�-47 ....�:t: :;'i,�.•••?�:;"`,r:�':� R ` -_ •a! t 1. t •S t et. t f .t- -f• •t- t •:.: NI 1 - #tum NI �Aw14 � Yf+ , „: < 111111.111111111111 11111111111169111111111 H , 1111111111O11111111 11111M11111111111111111111111 u auR� 6-N111---0*. 1 > - r. - L•` {ox. a111111111111111114111111 41111111111111111111111111.11 1111111111111111111111111 - s:. , 4}J. K"vi'n • 111 . 11111111111111111111112111 I 11111 K' . rk 1.J\' Y FXS . SLOPES a SLOPES_ 11 1 •'�y b:%•ENI Mali _r rr �'" = -1111111:11111111111111111 11 I T 1; _ 1 T-'+ ! i s 1 � -r 4k3. 4+4 E dec. tri ga maw 1 I I + I ; ib: -- tr.._-..»-- 4 4 �_C�-3___f. 1 — 1 1 .. .•r?: ;..., 8 1 I i s ~- . T. PER.DEIAIL P,MAT.REINF } _ d i .,a iia.. M,ilal- 5{3 A 1 I } i 3 4 :..i 3`.xe • ' , i I 4 ., 100'-10” `...""*"" TYP ® VALLEY LINE ' _; } 1 _ I Y. - I-1-_,.� ; `fi #4024100 OF TOP x 10 r MAT) 0$TM 111 .,:,: 1 I 1 ;v:u L< 4.. _ I Q s Q a I E } E £4'E v 1fl A 0 1 1 a :435 4 i 4 I t 4 Y 100i-0", V.I.F. :(14:16-i ; 1„,,,„ i - -•Y- •f. �......_1. 4. _._�.....�- 4 I i *.- —� ---; -- i -- If.L �ATREINF 1 '1 TOP A.2. 2£`W Row. MAT R� 1 %y a. M -� Cv+:+ - - • es' Ian- J Z�._ • d - _ _-- --- --.. --- - a:a2a r.n - __� _ _-....-- #5 O.G. x IO' -O` E -W �(B TM LAYER OF BTM MAT) •®12” <µ; . - --_ _ ___ ___ _ #5 ® Ib" O.G. NORTH SOUTH >' - --- -- ---- --- - (TOP LAYER OF BTM MAT) • - - --- ::iii:i --- _- __- --- ' --- - - T.O.SLAB zc <' " ip1 %; '�' ---N1/4--- - ' 101'-O' DP 0 PERIME1tR =3^ y.. SLAB`' I .` ' „Cy f •>= 7/16" ANCHOR BOLTS IJ2" DI(ALIGN W/ FRAME HOLES A. fl./.:----1-47:- ON HATCH, PER MANUFJ GALVAN1797 LIFTING HOOKS ' 1 #4 BENT OWLS 11/2" , �/ I2" O.G. CHAMFER" CONTINUOUS' a� MASTIC 1 ROPE_'• SEALANT ril 1411 5" 1'i " CHAMFER ELEV IOS'-D" AND ABOVE #4 LONGIT. I " TYP, U.N.O. CLR #3 HOOKED OWLS ® 12" O.G. 2-#5 LONGIT. ® OPEN'G PERIMETER EXTEND 24" PAST OPENING DETAIL 3/4" = P-0" NOTE: MANHOLE COVER (NOT SHOWN) TO ATTACH VIA 3 I/2" METAL CURB kV 3/16" DIA. SIMPSON TITEN CONCRETE SCREWS (2 3/4" LENGTH) REMOVE SOIL AROUND TANK PERIMETER PRIOR TO ROOF REMOVAL I T.O.GONG 'V 116-I 3/8" T.O.I^I r15'-3" GALVANIZED BILCO TYPE E ROOF HATCH OR APPROVED EQUAL r T.O.CONC 117'-8" 6" CONG. SLAB W/ #4 ® 12" O.G. EA. WAY PLACE E -W BARS 0 1 1/2" CLR FRM BTM 15 =4" CONTINUOUS BENTONITE WATER STOP 15 MIN 51M r 0 L_� FINISH GRADE : '-, r SLOPE SPIALE TO NORTH MIN 2% GRADE COMPACT STRUCTURE BACKFILL TO MIN. a0% STD. PROCTOR DENSITY 5'-10" ADD #5 OWLS ® 16" O.G. X m —J 13/8" GLR I°x3" FORMED KEYWAY 2'-6" MIN LAP FOR ALL REO'D BARS 3/4" X 3/4" FORMED NOTCH-_� FOR SILICONE SEALANT, EA. SIDE CONTINUOUS WATERSTOP CONST. JOINT SECTION I° I' -O" NOTE: CONTRACTOR SHALL SUBMIT ALL PROPOSED CONSTRUCTION JOINT LOCATIONS TO ENGINEER FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION 12" #5 OWLS X ® 16" O.G. N WALL REINFORCING PER DETAIL C/SI TYP. CORNER REINF. 3/4" = I' -O" 3/4" MAX V;: zzz 41111 3'-0" MIN 1E1 T.O.SLAB E " 5'--O" REGLET SET IN CAULKED SAWN OR FORMED GROOVE (6) #5 LONGIT. AS SHOWN MIN .2* II 1 3 LQ" 0 2'-6" its=51:?: F Nv water level (113'-6") 17-#5 X 12'-O" EAST PEST TOP OF TOP HAT 15-#5 NORTH SOUTH BTM OF TOP MAT (153,500 GALLON CAPACITY' J 6.0.511 - 108' S" PROVIDE OSHA -COMPLIANT STAINLESS STEEL OR ALUMINUM LADDER WITH UPPER CAGE ENCLOSURE, ATTACHED TOP rI BTM W/ 55 ANCHOR BOLTS. CONTRACTOR SHALL PROVIDE EQUIPMENT CUT -SHEET OR SHOP DRAWING FOR REVIEW AND APPROVAL. #5 ® 12" O.G. ADDITIONAL FLOOR SLAB 1 DWLS (10" HOOK EXr) (VV 15--4" #5 ® 12" O.G. EAST -PEST (BTM LAYER OF BTM MAT) #5 ® 12" D.G. NORTH SOUTH (TOP LAYER OF BTM MAT) 2" CONDUIT FOR rykv CONTROL CABLE (FOREGROUND) EXISTING PIOOD ROOF STRUCTURE SHALL BE REMOVED .fb+tAjz NKA TYPICAL #5 ® 12" O.G. FLOOR SLAB REINF. DI^IL5 (10° HOOK EXT,) #3 SPIRAL TIES VARIES DUE TO WALL BOW (0" TO 3") FLASHING ADHERED W/ MASTIC d POWDER DRIVEN PINS A5 REQ? DETAIL TYPICAL AT ALL MALLS 1 1/2" = 1'-0" CONTINUOUS NATERSTOP NOTE: ALL FLASHING SHALL BE MINA VM 25 GA GALV. STEEL N SECTION T.O.SLAB 1O0'-10 3/8" .A .1' Y -r.:�t ,',:kg: . ?�.ik'}r Z3 .$... h.1..`-'. J #5 DILLS X mi- EA. COL LONGIT. BAR — #3 SPIRAL REINF. (3" PITCH) 14" DIA GONG COL #5 OWLS X m t_..._ �-- SEE SECTION 10" T.O.SLAB 1001-I01," 1 • 4Ye,Vki}.114. q DETAIL 3/4" = 1'-0" EXISTING 6" CONG SLAB I NOTE: EXISTING INTERIOR TANK SURFACES SHALL BE GLEANED BY HIGH PRESSURE HYDRO BLASTING PRIOR TO PLACEMENT OF NEW CONCRETE NEW CONG. SLAB (10" MIN TO 12" MAX THICKNESS) SEE PLAN g:%4 SECTION 3/8" = 1'-0" EXISTING 12" X 31-0" 50. THICKENED SLAB FTG (PER ORIG. PLANS) R TOP OF TOP MAT: #5 ® 12" O.G. BTM OF TOP MAT: #5 ® 12" O.G. 2" • .O.CONC IOW J14' -D" SIM (E)T.0YI I08' -O" U/2" DRIP NOTCH TYP, ALL OVERHANGS 5" THICK GONG SLAB W/ #4 ® 16" O.G., EA NAY 3° GLR, BTM MAT SLOPE I" /FT TRANSVERSE DIRECTION . 2 . fw +o- �tr� � .n. �'*x. K : ��. :ct.�5:M+iC'. s.>.:4}1:.h:+: . {Di t:C'�', ..-.....,....fi.......... f. ta...'�,:r+„rY hh...i.«t-xr.-,->�Lc.,.xd:`o,t3,tr.rr.,,.,,...:,�:...,,.hd�a' :�i ...}i. 1 1/2" CHAT fl -Eta • SLAB CORNER SLAB BEARS ON TOP OF LEVEL NIL 8" 5" y EXISTING 8" CONG. WALL POUR NEPI NALL TIGHT TO EXIST'G CONG. WALL 0 #4 VMS X ® 12° O.G. 2'-8" CONST. ugh 2" CLR vS r ivy ry (F) T.O.SLAB 100-0 ! ° N V 5/8" DIA. SMOOTH BAR OWLS X 2" MIN (A307 MIN GRADE) ® 18" O.G. (6" EMBED) Npl'r T.O.NIATER 4 113'-6" IP-- A T.0.5LAB`A PLAN CONTINUOUS PLATER STOP 10" GONG WALL # 515 0 16" D.G. HORIZ #5s o 12" D.G. VERT LAYER REINF. AS SHOWN #5 OWLS X to 6" O.G. 2" GLR 10" O" CONTINUOUS �- WATER STOP °L. 10" #5 DIALS X iy 6° • 6" O.G. �� \ 12" iramwm* #5 o 12" D.G. ADDITIONAL FLOOR SLAB OWLS (10" HOOK EXT.) • DETAIL 3/4" = n� R TYPICAL #5 0 12" D.G. FLOOR SLAB REINF. OWLS (10" HOOK EXT,) ALL Pale* ATV $17JITEN INFORMATION PtIPIJGATT3), DISCLOSED, CR OTHERASE USED PITH= TIE PRITTEI1 cameo. cv PATTILLO ASSOCIATES EtISNEEPS, RIC WEST BANK WATER TANK UPGRADE GARFIELD COUNTY, COLORADO DRAM BY: M.33 PROJECT ENG: MJE3 CHECKED BY: RMP SCALE: AS SHONN ISSUE DATES: 7.241.20044 BID SHEET TITLE DETAILS SECTIONS SHEET S3 II9X3" FORMED KEYWAY 3/4" X 3/4" FORMED NOTCH FOR SILICONE SEALANT, EA. SIDE 1/2" DIA. GALVANIZED LIFTING HOOKS 7/le ANCHOR BOLTS 14(ALIGN N!/ FRAME HOLES ON HATCH, PER MANE) I I #4 BENT OWLS 11/2" c� ®12" O.G. CHAMFER � _ CONTINUOUS `` #4 LONGIT. MASTIC ROPE •� TYP, U.N.O. SEALANT I5" I2 CLR I1" CHAMFER ELEV I08' -O" AND ABOVE CONTINUOUS HATERSTOP CONST. JOINT SECTION . = 11-0" NOTE: CONTRACTOR SHALL SUBMIT ALL PROPOSED CONSTRUCTION JOINT LOCATIONS TO ENGINEER FOR REVIEN AND APPROVAL PRIOR TO CONSTRUCTION #3 HOOKED DIALS ® 12" O.G. 245 LONGIT. 0 OPEN'G PERIMETER EXTEND 24" PAST OPENING DETAIL 3/4" = I' -O" NOTE: MANHOLE COVER (NOT SHOWN) TO ATTACH VIA 3 I/2" METAL CURB N/ 3/1b" DIA. SIMPSON TITEN CONCRETE SCRENS (2 3/4" LENGTH) ADD #5 DNLS o lb" O.G. X m v REMOVE SOIL AROUND TANK PERIMETER PRIOR TO ROOF REMOVAL SLOPE SHALE TO NORTH MIN 2% GRADE <r TO.CONC I Y1161-1 3/8" Vtan II II5'-3" GALVANIZED BILGO TYPE E ROOF HATCH OR APPROVED EQUAL clieT.O.CONC IIT' -8" !l t `LO r CONTINUOUS BENTONITE NATER STOP IS MIN r -1I FINISH GRADE F -- :✓j COMPACT STRUCTURE BACKFILL TO MIN. X10% STD. PROGTOR DENSITY 5'-10" 1 3/8" CLR 12" #5 DHL. X C— o Ib'O.G.w v HALL REINFORCING PER DETAIL C/5I TYP. CORNEF REINF. 3/4" = 1'-0" 3/4" MAX REGLET SET IN CAULKED SAWN OR FORMED GROOVE (6) #5 LONGIT. A5 SHORN SECTION I 4 Vii t U 6" CONC. SLAB H/ #4 ® 12" O.G. EA. HAY PLACE E -H BARS ® I I/2" CLR FRM BTM m 0 3'-0" / 2-6" i I5'-4" 17-#5 X 12-O" EAST HEST TOP OF TOP MAT I5-#5 NORTH SOUTH 5Th OF TOP MAT --a-r-r^o-- r -s -"at -s -a water level (II3'-6') (153,500 GALLON CAPACITY/ 51M _'__________= $ s°=' __ ___= ==__ 1===_____ 8.0.5TL-------------------- - - " 1O8'-5" PROVIDE OSHA -COMPLIANT STAINLESS STEEL OR ALUMINUM LADDER WITH UPPER CAGE ENCLOSURE, ATTACHED TOP d BTM H/ 55 ANCHOR BOLTS. CONTRACTOR SHALL PROVIDE EQUIPMENT CUT -SHEET OR SHOP DRAWING FOR REVIEH AND APPROVAL. #5 ® 12" O.G. ADDITIONAL FLOOR SLAB �DWLS 00" HOOK EXT.) nr- i9 TYPICAL #5 ® 12" O.G. FLOOR SLAB REINF. SAILS (IO" HOOK EXT.) TV EZ N 0 N ' a 2" CONDUIT FOR CONTROL CABLE (FOREGROUND) #5 ® 12" O.G. EAST -NEST r (BTM LAYER OF BTM MAT) #5 ® 12" O.G. NORTH SOUTH (TOP LAYER OF BTM MAT) EXISTING HOOD ROOF STRUCTURE SHALL BE REMOVED C " .O.CONC --a ..O.W NOTE: EXISTING INItKIOR TANK SURFACES SHALL BE CLEANED BY HIGH PRESSURE HYDRO BLASTING PRIOR TO PLACEMENT OF NEN CONCRETE NEW CONC. SLAB (10" MIN TO 12" rMAX THICKNESS) SEE PLAN TOP OF TOP MAT: #5 o 12" O.G. BTM OF TOP MAT: #5 a I2" O.G. 16" #5 DNLS X m1 EA. COL LONGIT. BAR #3 SPIRAL REINF. (3" PITCH) #3 SPIRAL TIES 'UE5 DUE 'NALL BON (TO 3') FLASHING ADHERED H/ MASTIC 6 PONDER DRIVEN PINS A5 REQ'D DET'_ TYPICAL AT ALL WALLS' I/2" = 1'-0" NOTE: ALL FLASHING SHAL MINIMUM 25 GA. GALV. STEEL CONTINUOUS HATERSTOP 14" DIA. COMO COL #5 DHLS X SEE SECTION 10" EXISTING 12" X 3'-0" 50. THICKENED SLAB FTG (PER ORIG. PLANS) 41-0" SIM 1 V2" CHAMFER ®/�SpL�A��Bp CORNER \ " " a... TPI iI 21-0" C-1/2" DRIP NOTCH TYP, ALL OVERHANGS (E)TO.H J, ± 1081-0" 5" THICK CONC SLAB N/ #4 0 16" O.G., EA NAY 3" CLR, BTM MAT SLOPE I" /FT TRANSVERSE DIRECTION 2'-0" EXISTING 5" CONC. HALL POUR NEW HALL TIGHT TO EXIST -1G CONC. HALL SLAB BEARS ON TOP 0 LEVEL 2" CLR (E) TO SLABS 1OO'-0" Y 5/8" DIA. SMOOTH BAR DNLS X 2" MIN (A301 MIN GRADE) ® 18" O.G. (6" EMBED) TO.HATER J, I13' -b" V //, 10" CONC WALL I^U # 5's ®I6" O.G. IIORIZ #5'' ® 12" O.G. VERT LAYER REINF. AS SHOWN #5 DIALS X ® on O.G. 11) 2" CLR 10" O I #4 DNLS X Si- ® 12" O.G. CONST. JOINT T.0.5LA' B CCC PLAN CONTINUOUS HATER STOP CONTINUOUS i- WATER STOP 10" b" O. #5 DIALS.v X i • ®G. 12" #5 o 12" O.G. ADDITIONAL FLOOR SLAB I DIALS (10" HOOK EXT.) DETAIL 3/4" = P-0" TYPICAL #5 0 12" O.G. FLOOR SLAB REINF. DIALS (10" HOOK EXT.) OC 41 4.n YJ W F IIL z43- Ci W F ¢ m b a th vv In Tr w OOS ...• .. O 6 is n o 0 ZUO2 -. dS U] Q < fl Qcc 9QQr O F Kq in 0H [— F 11.1 d In C:1.4 ALL Ilan AND MITTEN WM/ATM . F?E RR1& IMIN SHALL NOT BE ITOPLICATTR FSCIDSM. OR Ofl '4lE USED PCB= ME MITTEN COMM OF PATTILLO ASSOCIATES @ISMER% rte. GARFIELD COUNTY, COLORADO DRAWN BY: MJB PROJECT ENS: MJB CHECKED BY: RMP SCALE: AS SHOWN I55UE DATES: 1.29.2001 BID REVISION: PROJ. NO. MM9o21 SHEET TITLE GONG. DETAILS AND SECTIONS SHEET s3