Loading...
HomeMy WebLinkAboutApplication- PermitJob Address Nature of Work Use of Building Owner Contractor Amount of Permit $ GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 2014 Blake Avenue Glenwood Springs, Colorado 81601 (303) 945-8241 / (303) 625-3321 0854 W. Battlement Parkway, Parachute, CO Building °Permit Solar System - Solar Building "R" Lincoln Battlement Mesa Associates Limited P.B.M.C.,. Inc. 48.00 N9 002169 Date: November 4, 1981 Patsy 43, Tenney Clerk BUILDING PERMIT APPLICATION GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 2014 Blake Avenue Glenwood Springs, Colorado 81601 945-8241 / 625-3321 Solar Building "R" Garfield County, Colorado, October 27 , 19_81- Owner: 981Owner: Lincoln Battlement Mesa Associates Limited Contractor or Builder: PB.M. C., Inc Location- 0854 Battlement Parkway, Parachute, Colorado Purpose for which building is to be used: solar system Size of Lot: 38.41 Block 1 & 2 Willow Creek Village Section 2 Distance of building from property line at Front: Rear: Left Side: Right Side: Distance from nearest building: Number of stories: nn Source of water supply: BMI , Inc . ppy� Number of rooms• one Type of sewage disposal- BMI , Inc . Type of foundation- post tensioned slab on grac Width of building: 6 ' 7" Material in outside walls- frame Length of building: 40' Exterior finish: s iding Height of walls: 8 ' 6" Type of roof: asphalt Floor space in square feet 264 Estimated value: $ f` /2 (a Date construction will begin: 11/2 / 81 Date of completion: _ 5/1/82 Permit charge: $ 44/ 0 0 Plan check fee: $ TOTAL: $ 4./` C And I/We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and adjacent street or streets of all rubbish and debris cause;by the construction of said building. Respectfully, L The County Commissioners hereby grant the above permit as per terms therein stated. This / ") 0 e A'I '1 !� , 1 9_ra. BUILDING OFFICIAL 7 day of 9tAspectwR21 ecohd POST THIS CARD AT OR NEAR FRONT OF BUILDING GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 2014 Blake Avenue Glenwood Springs, Colorado 81601 (303) 945-8241 / (303) 625-3321 O I; N° 002169 Job Address 0954 W. € att1 unent Parktg.:.v ,, rachute, CO Nature of Work Building Permit Use of Building Solar System - Solar Buil • , .. t�R n Owner Lincoln Battlement�il':Set :',' -:• Ates i itI?ited pgg aD.M. . 4 clic. Contractor Amount of Permit: $ "'(iO FORM 300.2 Date: 1''ovemh'r 4, 1)1 Patsy J. Tenney Clerk NOTE: ALL CHECKS MUST BE MADE PAYABLE TO GARFIELD COUNTY TREASURER Inspector must sign all spaces pertaining to this job INSPECTION DATE INSPECTO R Foundations -i ` s r J Setback Trench Reinforcing Foundation Wall Weatherproofing Pour no concrete until above has been signed Concrete Slab Floor Electrical (Groundwork) Plumbing (Groundwork) Gas Piping (Groundwork) Do not pour floor until above has been signed Rough Electrical Rough Plumbing Rough Gas Piping p/�/� s� j# Rough Heating and Ventilation Cs� (Above must be signed prior to framing inspection) Insulation Framing 0-/77'� Cover no work until above has been signed Lath and Plaster (Interior) Lath Scratch Coat Brown Coat Finish Coat Wallboard Lath and Plaster (Exterior) Lath Scratch Coat Brown Coat Finish Coat Miscellaneous Roofing Sewer Refrigeration Electrical Underground Final ..- % / ',0 Electrical Fixtures Plumbing Fixtures Gas Piping Heating and Ventilation Job Completed • peetioiixeod POST THIS CARD AT OR NEAR FRONT OF BUILDING GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 2014 Blake Avenue Glenwood Springs, Colorado 81601 (303) 945-8241 / (303) 625-3321 N2 002168 Job Address 035 �'y o r,a .._ I; { f_:., 7 i'ir it A : .'_4s; : �' . 1'tl S a.'. g `.7 Nature of Work Use of Building `;� : ` r•` i n ? .M1v L ' Owner Contractor Amount of Permit: $ FORM 300.2 i 0V.: -ibC11' - A :L) Date: NOTE: ALL CHECKS MUST BE MADE PAYABLE TO GARFIELD COUNTY TREASURER Inspector must sign all spaces pertaining to this job INSPECTION DATE INSPECTOR t 1 Foundations /%f7„� ' ' A � Setback _ ✓ Trench Reinforcing Foundation Wall Weatherproofing Pour no concrete until above has been signed Concrete Slab Flo.r Electrical (Groundwork) Plumbing (Groundwork) Gas Piping (Groundwork) L Do not pour floor until above has been signed Rough Electrical Rough Plumbing Rough Gas Piping Rough Heating and Ventilation (Above must be signed prior to framing inspection) insulation Framing Cover no work until above has been signe Lath and Plaster (Interior) Lath Scratch Coat Brown Coat Finish Coat Wallboard Lath and Plaster (Exterior Lath Scratch Coat Brown Coat Finish Coat Miscellaneous Roofing Sewer Refrigeration Electrical Underground Final Electrical Fixtures Plumbing Fixtures Gas Piping Heating and Ventilation Job Completed