Loading...
HomeMy WebLinkAboutApplication- PermitJob Address Nature of Work Use of Building Owner Contractor Amount of Permit: $ GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 2014 Blake Avenue Glenwood Springs, Colorado 81601 (303) 945-8241 / (303) 625-3321 0854 W. Battlement Parkway, Parachute, CO Building 'Permit Solar System - Solar Building "S" Lincoln Battlement Mesa Associates Limited P.B.M.0 , Inc.. 48.00nate: November 4. 1981 N2 002168 Patsy:J.. Tenney C1 erk BUILDING PERMIT APPLICATION GARFIELD COUNTY BUILDING AND SANITATION DEPARTMENT 2014 Blake Avenue Glenwood Springs, Colorado 81601 945-8241 / 625-3321 Solar Building Garfield County, Colorado, October 27 , 19 81 Owner Lincoln Battlement Mesa Associates Limited Contractor or Builder: PB . M . C . , INC . Location. 0854 Battlement Parkway, Parachute, Colorado Purpose for which building is to be used• solar system Size of Lot: 38.41 Block 1 & Distance of building from property line at Front: Rear: Distance from nearest building. Source of water supply: BMT , Inc . Type of sewage disposal. Width of building: 6'7" Length of building: 8'6" Height of walls: 2 Willow Creek Village Section 2 Left Side: Right Side. Number of stories: one BMI, inc. 40' Floor space in square feet• Estimated value: $©,. 264 Date construction will begin• Permit charge: $ Plan check fee: $ TOTAL: $ 11 /2/81 " r t C) Number of rooms• one Type of foundation• Dost tensioned slab on gs.de Material in outside walls: frame Exterior finish: siding Type of roof: asphalt Date of completion • 9/1 / 82 And I/We hereby agree to build strictly to the terms of the above description, and also to clear the grounds and adjacent street or streets of all rubbish and debris cuse'by the construction of said building. Respectfully, 7 The County Commissioners hereby grant the above permit as per terms therein stated. This OY C, Or -7X // `� , 19 r/ day of BUILDING OFFICIAL .LU (. 1 SA1cor. Col orzdo tr; Dtlic c- of Duilcf;ng Official - REOLJE ST FOR INSPECTION Time M. OLvrter's Name. J Job o,ess 4VgC) F ounclation Chlrnney Framing Final ---------------- Footings 0 Weatberprf • Insu anon Cl PLASTERING wire Lath 00 Scrasch_ Brown Finish Wallboard READY Con.' ra ELECTBICA N o. District No. Locality L • PLUMBING Rough Wiring _ F in7sh Fixt0ICS Molors. FOR INSPECTION Mon. Wed. 1 -/-:--,--/--r-2—,--_ ,_. ,speclion Made Ire • Oa 300.1 HEATING 0 F10.10„ 0 • Rough 0 ri Final 0 Final .0 0 S eNeert 0 Water Healer_ 0 0 Gas - 0, Cesspool--- a .. Unciergroun 0 Thurs.. FrI.