Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLRE-03-17-4645 Jack & Jeanette Prock 281 Silver Mountain Drive Ironbridge PUD, Phase I, Lot 115 Glenwood Springs, Colorado 1) ALL WORK SHALL COMPLY WITH THE 2015 INTERNATIONAL RESIDENTIAL CODE (IRC) AND 2009 INTERNATIONAL ENERGY CONSERVATION CODE (IECC). 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY BUILDING REQUIREMENTS. REDLINED NUMERICAL NOTATIONS ON PLANS REFER TO ANNOTATED ITEMS ON THE ATTACHED "RESIDENTIAL PLAN REVIEW LIST". 3) AS STIPULATED IN IRONBRIDGE P.U.D. PHASE 1 PLAT (PLAT NOTE #6) CONSTRUCTION WORK ON THIS PROPERTY SHALL NOT TAKE PLACE BETWEEN FEBRUARY 15 - MAY 31, AND WORK AT THE PROJECT SITE IS SPECIFICALLY HELD TO PROVISIONS OF THIS REQUIREMENT. 4) A LOT IMPROVEMENT CERTIFICATE SEALED BY A COLORADO LICENSED SURVEYOR IS REQUIRED TO VERIFY THAT STRUCTURE (INCLUDING ROOF OVERHANGS) WILL BE IN COMPLIANCE WITH ALL BUILDING SETBACK REQUIREMENTS. 5) UNFINISHED SPACE AT THE UPPER LEVEL & UNFINISHED BASEMENT IS INCLUDED IN THIS BUILDING PERMIT. CONVERSION OF THESE AREAS INTO FINISHED INTERIOR FLOOR AREA WILL BE SUBJECT TO ADDITIONAL BUILDING PERMITS. 6) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.