Loading...
HomeMy WebLinkAboutConditions of PermitCONDITIONS OF PERMIT BLCO-05-17-4725 Wayne Rudd Commercial Tenant Improvements: Installation of Spray Paint Booth Midland Exemption, Parcel B — Units G3 & G4 62 County Road 113 (Cattle Creek Road) Glenwood Springs, Colorado 1) NEW WORK RELATED TO PROPOSED TENANT IMPROVEMENTS SHALL COMPLY WITH THE FOLLOWING BUILDING CODES: 2015 IBC, IMC, IPC, IFGC AND 2009 IFC, IECC. 2) REFER TO PLAN ATTACHMENTS FOR GARFIELD COUNTY'S BUILDING REQUIREMENTS AND INSPECTIONS POLICY. 3) ALL WORK TO COMPLY WITH "COMMERCIAL LIMITED" ZONE DISTRICT REGULATIONS PER GARFIELD COUNTY'S LAND USE & DEVELOPMENT CODE. 4) EXISTING TENANT SPACE AND SURROUNDING BUILDING WERE PREVIOUSLY APPROVED AS TYPE II -B CONSTRUCTION WITH FIRE SPRINKLERS, OCCUPANCY GROUP F-1 (MODERATE - HAZARD FACTORY INDUSTRIAL). MAXIMUM ALLOWABLE QUANTITIES OF HAZARDOUS MATERIALS ARE LISTED IN TABLE 307.1(1). 5) NEW PRE -FABRICATED SPRAY BOOTH & ADJACENT AREAS WITHIN THE TENANT SPACE SHALL COMPLY WITH I.B.C., SECTION 416, I.F.C., SECTIONS 1504.3.2.1 THROUGH 1504.3.2.6, SECTIONS 1504.4 THROUGH 1504.8, AND NFPA 33. 6) INSTALLATION OF SPRAY BOOTH SHALL COMPLY WITH MANUFACTURER'S SPECIFICATIONS & REQUIREMENTS. 7) AN AUTOMATIC FIRE SPRINKLER SYSTEM OR FIRE EXTINGUISHER SYSTEM SHALL BE PROVIDED AND SHALL BE INSTALLED IN ACCORDANCE WITH I.B.C., CHAPTER 9. 8) APPLICANT RESPONSIBLE TO CONTACT LOCAL FIRE DISTRICT FOR PERTINENT I.F.C. AND FIRE SPRINKLER REQUIREMENTS FOR SPRAY BOOTH INSTALLATION INCLUDING ALTERATIONS TO EXISTING FIRE ALARM AND/OR FIRE SPRINKLER SYSTEMS. FIRE DISTRICT SHALL CONDUCT ROUGH -IN AND FINAL INSPECTIONS, AND FINAL APPROVAL REPORT IS REQUIRED PRIOR TO FINAL BUILDING INSPECTION & CERTIFICATE OF OCCUPANCY. 9) MECHANICAL VENTILATION AND INTERLOCKS WITH THE SPRAYING OPERATION SHALL BE IN ACCORDANCE WITH 2015 I.M.C. AND 2009 I.E.C.C., SECTION 503. MECHANICAL ROUGH -IN INSPECTION REQUIRED PRIOR TO FRAME INSPECTION. 10) ELECTRICAL PERMITTING AND INSPECTIONS BY COLORADO STATE ELECTRICAL BOARD. ELECTRICAL ROUGH -IN APPROVAL IS REQUIRED AT FRAME INSPECTION. ELECTRICAL FINAL APPROVAL IS REQUIRED FOR FINAL INSPECTION & CERTIFICATE OF OCCUPANCY.