Loading...
HomeMy WebLinkAbout3.0 Land Use Change PermitIlll fiitrl[+|il{ lilrl'li|'tlfi L lr'IlH ill lltlLlllh I l'hl ll ll I Raceotlon$: 893478bi lld'"u*!! l*?34 I 8roB""'F:!, a : BB' tf fi F r ELD coulrTy co LAND USE CHANGE PERMIT for A Portion of a Parcel of Land Owned by Aspen EqurU Group, LLC (Operated by Roaring Faft Valley Cooperative Assocrafion (Co-op) Located at ltighway 82 and County Road 113 North of the Town Of Carbondale in Section 7 and Section 18, Township 7 South, Range 88 West Of The 6th Principal Meridian, Garfield Caunty with a Proiect Area of Approximately 9,00A square feet Wthin an Overall 11.056 acre Property (Assessor's P arcel No. 239307 400357 ) ln accordance with and pursuant to provisions of the Garfield Co,untY Land Use and Development Code of 2013, as amended, and a Resolution of Approval (Resolution Number 2017-191of the Board of Coun$ Commissioners of Garfield County, State of Colorado, the following activity is hereby authorized by Land Use Cfrange Permit: A BULK SATES OF PROPANE FACILITY (LtPA-11-16-84e8) This Land Use Change Permit- Limited lmpact Review is issued subjectto conditions of approval as set forth in Exhibit uB" and shall be valid only during crrmpliance with such conditions and other applicable provisions of the Garfield Coun$ Land Use and Development Code, as amended, Building Code, and other regulations of the Board of Coun$ Commissioners of Garfield County, Colorado. ATTEST: 0futr of the Board GARFIELD NTY BOARD OF COUNTY 'eS)i."""":11rr; C"t n.lt. i sngr" i Page 1 of 4 -\ +l,hl rllll cout{TY C0 Exhibit A (Project Site Plan) .ylEwttr,,'{fu4 ,auoa urduldaocwoolJw EE C tilli'il qllU EIGtlira Ia)lqll EI E Sl*E TI*Ec'l$ B EIEEEt I\t EJ slEl r ,/,!; \ I I ) I:r 1i,l 't ,ll Page 2 of 4 ,'8,.'F3B,BleE"AEfi,Euo Itl lll?rlflI{ilfi lIJl l$l,lllh I {il:ll EI'Iil flltfilthl ll ll I ['"fl:f fl^:"i?3,ffi 3B*'e*, I 1 BB " lEF, ELD c ouNry co Exhibit B Conditions of Approval Conditions Prior to Issuanee of Permit l. The Applicant shall obtain a driveway access permit from Garfield County Road and Bridge and make all necessary improvements prior to issuance of the Land Use Change Permit. Demonstration that the Driveway Permit has been obtained and improvements have been completed shall be provided to the Community Development Department. Other Conditions That all representations made by the Applicant in the application shall be conditions of approval, unless specifically altered by the Board of County Commissioners. That the operation of the Aspen Equity Group, LLC (Roaring Fork Co-op - Bulk Sales of Propane) shall be done in accordance with all applicable Federal, State, and local regulations goveming the operation of this type of facility. The Applicant shall control fugitive dust during the construction and operation of the site. The facility shall maintain compliance with Section 7-306 Lighting, as outlined: A. Downcast Lighting. Exterior lighting shall be designed so that light is directed inward, towards the interior of the Subdivision or site. B. Shielded Lighting. Exterior lighting shall be fully shielded or arranged in a manner so that concentrated rays of light will not shine directly onto other properties. C. Hazardous Lighting. The direct or reflected light from any light source shall not create a traffic hazard. Colored lights shall not be used in such a way as to be confused or construed as traffic control devices. D. Flashing Lights. Blinking, flashing, or fluttering lights, or other illuminated device that has a changing light intensity, brightness, or color, shall be prohibited in all zone districts. 5- 4. 5. Page 3 of 4 f lll HrJlHl,tilHrl,l*fi HhL{!l} If ll},l}l {Ii# L hl' tl ll I Reception$: 893478 0,611tl2@17 12:37:19 PM Jean Rlberlco4-;i-4 n;; Feei$a,00 Doc Fee:@.00 GARFIELD cotNTY c0 E. Height Limitations. Light sources which exceed 40 feet in height shall not be permifted except for temporary holiday displays or as required by local, Sate or Federal regulations. 6. The Applicant shall control all noxious weeds during construction and operation of the site. 7. The tanks shall be installed in accordance with the recommendations made by the submitted H-P Kumar Geotechnical Study dated November 4,2016. 8. Operation of the site as proposed is permitted 24 hours per day, 7 days per week- 9. A 50 foot bulfer surrounding all tanks shall be clear of all potentially combustible natural or manmade materials. 10. The facility shall be contained within the approximately 120 ft. by 80 ft. lease area and located within the subject parcel as represented on the site plan. 11- Access to the facility from the County road shall be limited to the access location represented on the site plan. lZ-The bulk propane tanks are limited to two 30,000 gallon tanks located as represented on the site plan. I3. The facility shall not be open to the public. Only employees ofthe Roaring Fork Valley Co-op, or the current operator and/or manager of the facility, shall have access to the facility. Page 4 of {