HomeMy WebLinkAboutFoundation Improvement Location CertificateI
I
I
I
r
LOl 271
=5Écl
5¡fLU'
sE923''t6"E EO.90'
b6
@tt¡
I
I
I
t
I
I
,
J
N89þ0'50'W
5.38'
I
I
I
1
\
EXISTING HOUSE
LOT 271
SCALE. l'-2O'
POSTED ADDRE.SS:
135 BLUE HERON
T4SIÁ
PROPERTY DESCRI ïoN
t:Ol 272, BLOCK 2, AMENDED FINAL PLAT OF BLOCK 2, IRONBRIDGE P.U.D. PHASE II, ACCORDING TO 'IHE
PLAT RECORDED JULY 22, 2014 AS RECEPTION NO. 85'1641, COUNTY OF GARFIELD, STATE OF COLORADO.
FOUNDATON IMPROVEMENT LOCATON CER'IIFICATE
I HEREBY STATE THAT THIS IMPROVEMENT LOCATION CERTIFICATE WAS PREPARED BY HIGH COUNTRY
ENGINEERING, INC. FOR R&M CONSTRUCTION, THAT IT IS NOT A LAND SURVEY PLAT OR AN IMPROVEMENT
SURVEY PLAT, AND THAT IT IS NOT TO BE RELIED UPON FOR THE ESTABLISHMENT OF FENCE, BUILDING, OR
OTHER FUTURE IMPROVEMENÎ UNES.
I FURTHER STATE THAT THE IMPRO\EMENTS ON THE ABOVE DESCRIBED PARCEL ON THIS DA'IE, JANUARY 17,
20,17, EXCEPT UTILITY CONNECTIONS, ARE ENTIRELY V'II.IHIN lHE BOUNDARIES OF THE PARCEL, EXCEPT AS
SHOWN, THAT THERE ARE NO ENCROACHMENTS UPON THE DESCRIBED PREMISES BY IMPRO\EMENTS ON ANY
ADJoIN|NG PREMISES, EXCEPT AS INDICATED, AND IHAT THERE IS NO APPARENT EVIDENCE OR SIGN OF ANY
EASEMENT CROSSING OR BURDENING ANY PART OF SAID PARCEI- EXCEPT AS NOTED.
P. KISER, L.S. #38215
DATE: 01-18-2017
JOB NO.: 2161063
HIGH COUNTRY ENGINEERING, INC
1 5 ,I 7 BLAKE AVENUE, SUITE 1 O 1
GLENWOOD SPRINGS, CO AI60l(970) 94æ676
A
A
ooNAA
A
< 35.1'
d 5.5'
atót zzz-æ
ri <rO
A
CONCRE:fE
SLAB
A
t.
ttoJOOJ
00
¡
l?I