Loading...
HomeMy WebLinkAboutContractor's Material and Test Certificate for Aboveground PipingContractor's Material and Test eertificate for Aboveground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the contraclor's Íepresênlâtive and witnqssed by an owner's reprêsentatlve. All defects shalì be corrected and system lett in service before conlractor's personnel finally leave the.iot). A certilicate shall be filled-out and signed by both representatives. Copies shall be prepared for approving authorilies, owners, and cotlttaulut. lt ís unüerstood tlìË owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure tc comply with approving authorily's requiremenls or local ordinances. 7¡ Property nam€fr1in¿ llnæ' Ð Properly âddress 6etPlans No t_l No Address #w ffi ves ttô ves lnstallalion conforms to accepted plans Ëquipmenl used is approved lf no, explain deviation$ Has person in chatge of fire equipmenl been instructed as to localion of control valvês and care and mâintenance of this new equ¡pment? ll no, explain Have copies of the lollowing been left on the prenises? 1. Sysl€m components instrucl¡ons 2. Care and mainlenance ìnslructions 3. NFPA25 lnstruclions lX ves fl ruo Yes Yes Yes Yes E]Fm l--.1 ruo f-l t¡o []ruo l--l ruo l.-ocation Õl iSupplies building$system Ouânl¡lv Temp6raturo ratingMoclel Year of manufâcture u1 IT{ 4¡7\t - {{;--* Or¡fice size YY \:7.1Ç '-tt; 7 )?,-u_iz_.-l1zï_E{3*3i Make Spr¡nklers Pipe and fittings Type oi fittings Type of pipe Maximum time to operate through tesl connectionAlârm device Minutes ; $econdsTypeMakeModel þ,r Alarm valve or flow indicator Serial no.Serial no. trip tesl Trip point valve o. Make Make Model operaÌed ptessure ]lm6 to through Time waterDry pípe operaling test lf no, explain Yes NoMinutesSecondsSecondsPst Measured from time inspector's tesl connection is opened NFPA 13 only requíres the 60-second lim¡tation in specilic set:tions ; ;ot the complete and official postion of the Nat¡onal FÍre Protection Association, on the reterenced subiect which is rapresenled only by the stôndard in its ontlrety' ,merican Fire Sprlnkler Asgociåtion 696 Skillman Strëet, Suite 300, Ðallãs, Texas 75243 AFSA Form #4F063 ll no, sxpla¡n FYgl I-l ¡ro Maximun t¡nê lo fives operâto alarm?Mñhe Model Operation Preumalic :l No I Dclqotíng media ouperv¡sodPipÌog supervls9d i'-l tto Dos6 êach circuil lo66 Does sach circuil operate valvô r6loa6e? lB thoro an acco6sible lacility in each o¡rouit for t$tino? Does valvo operale from the manual trip, remole, or bolh conlrol 6lalions? ^83 ves [] ¡to ûeluge and preåclion valves R€s¡dual presêur€FIN râ16 2:get*€ Mâkê ând Sëtl¡ng I/Outlet (psí)outlet Froy !gqrì. . . Location and floorPressure redrc¡ñg Vaìve tost lest desorÌption Hyû9-ñlaltc; Hydrostaliçlosleshallbsmadcalnollessthan200psi{13.6bar)for2hours0rS0psi(3.4bar) abovestaticpressur6in€xcêssof150psj{10,2bar)for2hours. D¡fê¡entialdry-p¡pevalv€clappersshallb€lstl open during the tesl to prevent damage. Al¡ arrovgground piping leâkage sha.ll be ôlopped. Fjgufltlic: Eslâlrlish 40 ps¡ {2.7 bâr) air prÊssur€ aôd m€ssure drop, which shall not exceed 1 y, psl (0.1 bar) i¡ 24 hours. Têst pr€Gsurô tanks at normal wålor lov€l and âir pressul€ and m€8sure â¡r pressure dlop, wh¡ch shall nol exceed 'l% psi (0.1 Itar) in 24 hours. Dra¡n lssl Ðo you cerl¡fy as ths spr¡nklsrcontraclor lhat addilives ancJ corËsive chemcals, sodum s¡l¡cale or derivatives of sodlum s¡ficate, brìno, or olhor aorrosive chemical6 wore ¡ol used tor teslilìg syslems orslopping leaks? ilbves f--i ¡lo I U¡derground ma¡ns and lead-in connêclìons lo system risers tlushgd beloro conneclion ñade spr¡nkler piping : verifiod by copv ol {he Conrractols Matcr¡ıl and fcst X""" i-]l No j Oil u. Csrtil¡cató for Underground Piping. r Flushed by inslallôr ol underg.ound sprinklor piping lffvu" I I ¡lo lfpowder.drivân l66t€ners are used in concrete, i] Yes lF. "ohas ropresentaÌlve samplè tesling been satielactorily empleled? lf no, slate roaçon ¡,- L; lest Tesls Explain ú+'r( bar) for ---- hourg Residual prossure connecl¡on opon ll no. €xplalô ol çãu0e conneclion: al -.-..*-(- Yes Yês No No All pip¡ng hydrostâlically tested Dry piping pneumatjcally tested Égulpment operates ProPerl'J Locations Number removedBlsnk losting gãskets Nriñberilsed Dô you cerlily lhat lhe wêldlng w8s ca(i€d out iñ compligncè wllh a documonted quality control pmedure to €nsure ihàt all discs ârê rotrlâvêd, lhâl opeilings ¡n p¡ping â¡e smoolh, lhåt slag ând otherwolding residuê are removed, ¿nd thal thg inte.nal diameters ól pip¡ng are not peDetrated? ffi ves I ¡¡o L.Þ Yes L-; No fi ves iI No lf y6s, corlify as lh€ sprlnkle. conlÞctor lhaf weldìng p¡ocedùres comply requiremenß of a{ leasl AWS 82.1? pip¡ng W€ld¡ng Yos [ ] ¡lo Do you wilh the Do yôu certify lhat lho welding wa6 performed by wetders qualllisd i¡ comp¡rance wtlh the tequiremenls of al leasl AWS 82.1? Culouts (discs) I Do you cerlify lhal you lrave å conlrol laälure lo ßnsure lhal I all cutouls (diss) are r€triwed?l.-j(, ves fl wo Nameplatê p.ovidsd fÉ ve" [_ì uo lf no. explârnHydraulic data nameplal€ R6marks Date lefl in sÊrvicö w¡lh 6¡l conko¡ volves open Name ot sp¡inklêr Tèeis witnessed by ç I(¡ 'fìtlê Signalures For Additìmal 6xplanatiôn6 and noles I'J Contractofs Material and Test Certificate lor Aboveground Piping