HomeMy WebLinkAboutStructural Steel Inspection Report 06.27.17THUNDER MOUNTAIN TESTII{G 2970 N. Ronlin Avenue / Grand Junction, Colorado BlS04 office (970) 2s6-9965 Cell (970) 210-7008 Fax (970) tt4-7067 E-Mail : kx kid3g@aol.com / www.th u nderm ountaintestin g.com CUC Construction 635 Glassier Drive Carbondale. CO 81623 June 27.2017 ATTN: Mr. Ben Sanders RE:Mine Drop Building 1850 Transfer Trail Glenwood Springs. CO *Field Inspection Permit #4574 Dear Mr. S¿rnders. As requested. structural steel special inspection was conducted per the IBC 2015 Edition - Chapter l7: Structural Tests and Special Inspection and the City of Glenwood Springs requirements. I arrived at the job site at l2:00 PM. I met with you to be briefed about the project requiring my presence. The certitìed welder perlorming the welding *as Mr. Brian Stoddard. I have been provided with Mr. Stoddard's Welder Qualification Test Record (WQTR) and Continuity Record. Documents viere reviewed and all were obsen'ed to be acceptable with project requirements. The drawings utilized during inspection were prepared by Alpine Edge Engineering. The structural drawing 53.2 provides the pertinent details as follows: Detail 4 - Glu Lam beanr pocket. Detail 8 - Column Cap to Beam and to Column welded connections. and Detail I I - Colurnn Base Plate to Column welded connection. Prior to my inspection I received and reviewed an e- tnail conespondence for the project structural engineer Mr. Mike Arbaney with Colorado Structural, Inc. accepting a non-detailed column splice. Please refer to the aÍached correspondence lor pr oj ect documentation. Visual rvelding inspection was conclucted at level L2 Stl. The items inspected were the following: l) Grid point D.4 & 3: column to column cap and column cap to beam welded connections. 2) Grid point 8.7 &.3: column to column cap and column cap to beam rvelded connections, ând all welding on a Glu Lam beam pocket,3) Grid point 3 & C: all welding on a Glu Lam beam pocket. and 4) Grid point 3 & D: all welding on a Glu Lam beam pocket. Visual welding inspection was also conducted at the crawl space level as follows: I ) Grid point 8.7 & 3: column to base plate welded con¡rection and all welding on a Glu Lam beam pocket, 2) Grid point 8.7 & 2: column to base plate. colunrn 10 cap plate and cap plate to beam welded connections. and all welding on a Clu Lam beam pocket. 3) Grid point D.4 & 2: column to base plate, column to cap plate and cap plate to beanl u'elded connections. anil all welding on a Glu Lanl bearn pocket.4) Grid Page2 of2 point 2 & c: all welcling on a Glu l-am beam pocket. and 5) Grid point 2 & C.9: oll welding on a Glu Lam beam pocket. All areas of inspection referenced above were observed to comply with project requirements and AWS D l .1 : Edition 20 1 S. Clause 6 -Table 6.1. William K. Bwgin AWS CWI #11120021 Thunder Mountain Testing L. AWS CWI #91040201 ICC Certified #0863569-St & S2 ASNTNDT Level lll #30242 Fwd: Mine Drop retaining wall and column splice Mike Arbaney P.E Colorado Structural. lnc. rcl; u:lll:r.!,¡':L:: t at: il¡ ir.ll - -l-1jlllj-! !tl-.,l.grlgritþ:gt¡*lrdlill'! Page2 of2 https://mai l.aol.com/webmai l-std/en-us/printMessage 7tsnrJû Fwd: Mine Drop retaining wall and column splice From: lMlllam Burgin <smoothfitter@gmail.com> To: Scott Maxwell <kxkid39@aol.com> Subject Fwd: Mine Drop retaining wall and column splice Date: Tue, Jun 27, 2017 6:59 pm Page I ofZ Forwarded message From: Ben Sanders <sltgjglLgliliçllg¡lLul.qlU]> Date: Tue. Jun 27. 2017 at l2:32 PM Subiect: Fwd: Mine Drop retaining wall and column splice To: sntortth iìtte r. rt, gtttiti l.conr Bill See note below from Colorado Structural (the E.O.R for project) indicating the splice to the column is structurally sound and works in these locations. Thanks Ben Sent from my iPhone Begin tbrwarded message : From : Mike Arbaney <j¡rr L cl.llU:l-rr.¡:iLrlA¡¡f,UT_lljil *¡¡ rì> Date: June 26, 2017 at 17:34;l I MDT To: Ben Sanders <i1|el'j !.lg¡1!gjfg¡¡3-¿!j i. ct¡ ¡ rl> Cc: Bruce Barth <b¡'r-lc*ri,r'{:dhti¡re hilcctt¡l"e .ür r¡1¡;>. ernesto cuc <gn'ì.t: frtr:sto ¡r lrr.rt r'¡Ït i l.eollr) Subject: Re: Mine Drop retaining wall and column splice Ben. f'he column that has been spliced 10" has been spliced with the same material f'or the additional 10". They have done a full penetration weld around the column. and also added 20" long l/4" stiffener plates to two sides of the column. This rvorks structurallv. The new'foundation wall that is going to be a 6'-0" tall wall will have a 36" looting ancl will have half geo foam and half soil retaining. This will work with the same detail as the building. Tlte new wall may be dowled into the existing building with #5 epoxy tlowels Qyl6"o.c. with 4" embedment. Please let me know if you need anytlring else. T-hanks. Mike Arbaney https://mai l.aol.com/webmai l-std/cn-us/PrintMessage 7t5t2017