HomeMy WebLinkAbout23 Wastewater Mgmt PlanWASTEWATER MANAGEMENT PLAN
O\OLSSON
ASSOCIATES
Battlement Mesa PUD Phase 11— BMC A
Ursa Operating Company and Battlement Mesa Land Investments
WASTE MANAGEMENT AND SYSTEM PLAN
016-3531
The operations of the facility will be similar to other natural gas development operations in Garfield
County.
During the drilling activities sanitary facilities will be provided via a vault and haul system by
Stallion Oilfield Services. A will serve letter is included in this section.
After drilling is completed and the rig is removed staff will not be assigned to the facility on a
regular basis. Personnel will be at the facility only for short periods of time. Workers will be
performing routine facility maintenance and inspections. Sanitary facilities will be provided by
portable toilets placed on site. These portable toilets will be maintained by Redi Services and
Western Colorado Waste. All waste is hauled to a licensed treatment facility. Will Serve letters
are included in this section, documenting the maintenance of these sanitary facilities.
Produced water will be piped via a pipeline to the BMC B well pad where the water will join the
Phase I Pipeline to Ursa's temporary water storage facility located in another area of the
Battlement Mesa PUD, which will be permitted as part of Ursa's Phase II permitting requests.
Produced water will be reused during completions operations on this well pad and others until
Ursa's drilling activities in the Battlement Mesa area are complete. The pipelines permits are
shown below:
Pipeline
Permit
BMC A Pipeline
Permit application submitted May 2017
Phase I Pipeline
Garfield County Resolution 2016-04
Once there is no longer a need to reuse the produced water, it will be disposed of by injecting the
water into a COGCC approved injection well. These injection wells may be used for the disposal:
Injection Well
Permit
Tompkins
Garfield County Planning File GAPA-02-16-8418
Watson Ranch B
Garfield County Planning File GAPA-02-15-8224
Speakman A
Garfield County Planning File GAPA-7835
BMC A
Permit application submitted May 2017
May 19, 2017
O\OLSSON®
ASSOCIATES
1
L
Battlement Mesa PUD Phase 11— BMC A
Ursa Operating Company and Battlement Mesa Land Investments 016-3531
This page intentionally blank.
May 19, 2017 2
O\OLSSON®
A550CIATE5
SERVICES, LLC
Subject: Will Serve Letter
Company: Ursa Resources
To whom it may concern,
Friday, March 10, 2017
Redi Services LLC will provide Ursa Resources with Portable Toilet Units on designated locations. Redi
Services will service and maintain the units and dispose of the waste at an approved disposal site. At this
time we are disposing of the waste at the West Garfield County Landfill and the South Canyon Landfill.
Respectfully,
Cra Abernath
Regional Manager
Redi Services, LLC
2143 Airport Road, Rifle Colorado 81650
Phone (970) 625-0233
Fax (970) 625-0232
WESTERN COLORADO WASTE, INC.
Mailing Address: P.O. Box 26 Mack, Co 81525
Hank Bounds —Trash: (970) 210-2330 Casey Altenbern —Toilets: (970) 216-5668
Fax: (970) 255-7080
RE: Roll -off Trash Containers, Portable Toilets
February 23rd, 2017
To whom it may concern,
Western Colorado Waste, Inc. provides roll -off trash containers and portable toilet service to
Ursa in the Garfield County, Mesa County, and Rio Blanco County areas of Colorado. Toilets are service
on a weekly basis, or as requested by Ursa. All waste is disposed of at in the county that it is removed
from. We use the following landfills for the different counties.
Garfield County Landfill, Rulison, CO — All Garfield County Trash and Septic
Clifton Sanitation, Clifton, CO — All Mesa County Toilet Septic
Persigo Wastewater Treatment Facility, Grand Junction, CO —All Mesa County Toilet Septic
Mesa County Landfill, Grand Junction, CO — AII Mesa County Trash
Wray Gulch Landfill, Meeker, CO —All Rio Blanco County Trash
Garfield County Landfill, Rulison, CO — All Rio Blanco County Toilet Septic
Thank you,
Hank Bounds
Western Colorado Waste, Inc.
(970) 210-2330