Loading...
HomeMy WebLinkAbout12 Grading_Drainage RptGRADING AND DRAINAGE REPORT O\OLSSON ASSOCIATES DRAINAGE REPORT URSA OPERATING COMPANY, BMC A PAD March, 2017 PREPARED BY 6SGM I 18 WEST SIXTH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 970.945.1 004 970.945.5948 FAX URSA Operating Company, BMC A March 2017 TABLE OF CONTENTS SGM Project # 2006-479.062 PadA_DrainReport.docx 1 Introduction 1 1.1 Purpose 1 1.2 Current Site 1 1.3 Methods Used 2 Hydraulic and Hydrologic Analysis 2.1 Off -Site Drainage 2.2 On -Site Drainage 2.3 Stormwater Detention 3 Hydraulic Analysis 4 Stormwater Quality Plan APPENDIX APPENDIX A - NOAA Atlas 14 Information APPENDIX B - Rational Method Calculations 1 1 2 2 2 3 3 ii URSA Operating Company, BMC A March 2017 1 Introduction 1.1 Purpose The purpose of this drainage report is to provide calculations for storm water runoff volumes to be detained on-site. This report contains a discussion of both off-site and on-site drainage and the methodology used to design various drainage elements. The designed drainage elements ensure that storm water runoff produced from the 24 hour storm will be detained and treated on site to reduce possible contamination off-site. 1.2 Current Site The project site is currently a vacant lot in the Unplatted portion of Battlement Mesa P.U.D. located between the Tamarisk/Monument Creek Village Subdivisions and the Battlement Mesa Metropolitan District's Wastewater Treatment Facility. The Pad is located below the bluff that both Tamarisk and Monument Creek Village Subdivisions sit on. BMC A is served by River Bluff Road, south of Interstate 70 and the Colorado River. The site is relatively flat riverfront land sloping toward the Colorado River. There is grading and soil wall nailing proposed to minimize visual impacts that would be otherwise visible from Parachute and the Interstate 70 corridor. The project site, in its pre -developed condition, is located in a semiarid plateau region between 5000 ft. and 6000 ft. in elevation. The vegetative cover consists of mostly sage brush and juniper mix. A majority of the drainage basin for the project is composed of hydraulic soil group C and D. 1.3 Methods Used The Rational Method was used to produce a conservative set of hydrologic flood peak calculations for sizing particular drainage elements (i.e., the Rational Method would predict higher flood peaks than alternative methods). The Rational Method uses the equation below: Q = CiA Equation 1 where: Q = flow rate (cfs) C = runoff coefficient based on soil type and cover i = rainfall intensity corresponding to the time of concentration A = basin area (acres). 2 Hydraulic and Hydrologic Analysis The project site in its developed condition will consist of a main gravel entrance road and large gravel pad. Because only a small portion of the site is being developed, only these areas will be analyzed in the detention calculations due to the rest of the site maintaining historic flow patterns and characteristics. Drainage facilities will be provided to route tributary/offsite flows around the pad into the common historic flow paths associated with the property containing this pad. 1 IStorm Return Period 2 year (cfs) 25 year (cfs) 100 year (cfs) I Historic Flow 1.56 3.30 4.56 I Developed Flow 1.96 4.09 5.65 I URSA Operating Company, BMC A March 2017 2.1 Off -Site Drainage In its developed condition, BMC A has some introduction of off-site surface drainage from other properties above the pad. This offsite surface drainage generally exists in the form of sheet flow from above with no incised tributary channels observed. An utility access corridor exists above and east of the site between Tamarisk Subdivision that serves to route drainage from the subdivision to the east of the project site. For the sheet flow area immediately above the site, the tributary off-site drainage shall be redirected by constructing a valley pan at the base of the proposed soil nail wall and redirecting the offsite drainage around the pad (prior to entering directly onto the pad). For the road area of the pad, a borrow ditch will collect the tributary offsite flow and transfer it around the pad area into the historic drainage path for the site. 2.2 On -Site Drainage The project site in its developed conditions will consist of 5.59 acres of a large gravel pad and tributary access road area. Compared to historic conditions, construction of the proposed developed conditions would produce a reduction in pervious ground cover, resulting in a minor change to the runoff coefficient. This will result in an increase in peak discharge of the 24 hour storm and detention will be needed for the stormwater flowing across the developed site. The developed flows for the site are summarized below. Table 1 Historic Vs. Developed Flow Rates The flows shown above are determined from a rainfall intensity corresponding to the 24 hour storm and appropriate storm return period. These intensities and the flow calculations can be seen in the appendix. Note that the time of concentration (or storm duration) used in the analysis is 60 minutes. 2.3 Stormwater Detention For the purpose of this report and this project, it will be required to detain the additional stormwater runoff volume generated from the developed site from historic conditions. In order to determine required detention, the developed and historic stormwater runoff volumes were analyzed. Storm runoff volume was calculated from the 2 and 25 year, 24 hour storm precipitation depth determined from the NOAA Atlas 14 information. These depths for each storm return period can be seen in the appendix. The runoff volume of the site was calculated from area of the developed site multiplied by the 2 and 25 year, 24 hour precipitation depth and the weighted runoff coefficient for the appropriate site condition. 2 URSA Operating Company, BMC A March 2017 Table 2 Stormwater Flow Summary Pond Location Runoff Coefficient HistoricHistoric (Historic) Runoff Coefficient (Developed) 2 -YR Rainfall Volume, CF ( ) 25 -YR Rainfall Volume, CF Historic ( ) 2 -YR Rainfall Volume, CF Develo ed ( P ) 25 -YR Rainfall Volume, CF (Developed) Pond Storage Needed for Detention, CF (25 -YR) BMC Pond A 0.5 0.7 5618 11881 6969 14736 2855 The maximum calculated detention necessary to capture the stormwater runoff volume generated from the 25 -year storm is approximately 2,855 cubic feet. A detention pond with this capacity and drainage features to convey water to the pond will be provided on site. Pond specific size calculations are attached in the appendix of this report. 3 Hydraulic Analysis The site design will require various drainage features including ditches and culverts. These will be required to divert the storm water runoff away from the site appropriately. 4 Stormwater Quality Plan The main goal of the site design is to provide detention for the project, and ensure the post - development peak discharge rates do not exceed the pre -development peak flow rates. The only area where a significant increase in runoff coefficients occur is the gravel pad and road. A detention pond will be sized appropriately and provide a location for sedimentation of the storm water runoff generated from the developed site. The remaining site will remain native vegetation and provide historic flow patterns and characteristics. There is an increase of runoff generated with the construction the gravel pad and associated access road. This increase in runoff is measurable, however; a detention pond will be constructed just downstream of the respective pad, with a controllable outfall pipe and valve structure. The controlling valves in the detention pond discharge pipes will each be left in the normally open position at approximately 60% open. Alternatively, these valves can be closed in the event of a non-compliant release, and further ensure no detrimental impact to the surrounding area. In order to minimize any threat of property damage, the respective pond structures will have an 18" culvert pipe installed at a higher elevation, along with the normal use 8" discharge pipe, in order to facilitate conveying the 100 year storm event safely to the respective outfall drainage features. Both proposed detention ponds will discharge into existing "natural channel" drainage features. It is not anticipated for any additional erosion and sedimentation protection beyond that proposed at the pipe outfalls. The operator will monitor outfall locations to ensure there is no channel scour or additional erosion cause by the detention pond outfall pipe. Supporting calculations have been included in the appendix of this report. Temporary erosion control measures will be required for the duration of construction. A CDPHE Stormwater Permit for Construction activities will be obtained prior to construction activities. Best Management Practices will be utilized during construction to control the stormwater runoff during construction. Key temporary erosion control measures include 3 URSA Operating Company, BMC A March 2017 installation and maintenance of straw wattles, inlet protection, a stabilized construction entrance and all necessary acceptable best management practices that would relate to this project. See Ursa's Stormwater Management Plan (SWMP) for more details. 4 URSA Operating Company, BMC A March 2017 APPENDIX A —NOAA Atlas 14 Information Appendix 5 Precipitation Frequency Data Server Page 1 of 3 NOAA Atlas 14, Volume 8, Version 2 Location name: Parachute, Colorado, US* Latitude: 39.4472°, Longitude: -108.0330° Elevation: 5202 ft* source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Deborah Martin, Sandra Pavlovic, Ishani Roy, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Michael Yekta, Geoffery Bonnin NOAA, National Weather Service, Silver Spring, Maryland PF tabular 1 PF graphical 1 Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration 1 2 5 10 25 50 100 200 500 1000 5 -min 0.137 (0.110-0.173) 0.162 (0.130-0.205) 0.215 (0.172-0.273) 0.269 (0.215-0.344) 0.360 (0.284-0.500) 0.443 (0.336-0.618) 0.536 (0.391-0.769) 0.643 (0.446-0.948) 0.800 (0.531-1.22) 0.933 (0.595-1.42) 10 -min 0.200 (0.161-0.253) 0.237 (0.191-0.300) 0.314 (0.252-0.400) 0.394 (0.314-0.504) 0.527 (0.416-0.732) 0.648 (0.492-0.905) 0.785 (0.572-1.13) 0.941 (0.653-1.39) 1.17 (0.777-1.78) 1.37 (0.871-2.07) 15 -min 0.244 (0.197-0.309) 0.289 (0.233-0.366) 0.383 (0.308-0.487) 0.481 (0.383-0.614) 0.643 (0.507-0.893) 0.791 (0.600-1.10) 0.958 (0.698-1.37) 1.15 (0.797-1.69) 1.43 (0.948-2.17) 1.67 (1.06-2.53) 30 -min 0.309 (0.249-0.390) 0.389 (0.313-0.492) 0.534 (0.428-0.678) 0.667 (0.532-0.853) 0.872 (0.677-1.19) 1.05 (0.786-1.44) 1.23 (0.891-1.74) 1.44 (0.990-2.10) 1.73 (1.14-2.60) 1.96 (1.25-2.98) 60 -min 0.389 (0.313-0.492) 0.484 (0.390-0.613) 0.652 (0.523-0.828) 0.802 (0.639-1.03) 1.03 (0.792-1.38) 1.21 (0.908-1.66) 1.41 (1.01-1.98) 1.62 (1.11-2.35) 1.91 (1.26-2.87) 2.15 (1.37-3.26) 2 -hr 0.469 (0.382-0.586) 0.580 (0.472-0.725) 0.770 (0.624-0.966) 0.936 (0.754-1.18) 1.18 (0.917-1.56) 1.37 (1.04-1.85) 1.58 (1.15-2.18) 1.80 (1.25-2.57) 2.10 (1.40-3.09) 2.33 (1.51-3.49) 3 -hr 0.536 (0.439-0.665) 0.641 (0.525-0.796) 0.824 (0.672-1.03) 0.985 (0.798-1.23) 1.22 (0.959-1.61) 1.42 (1.08-1.89) 1.62 (1.19-2.22) 1.84 (1.29-2.60) 2.14 (1.44-3.13) 2.38 (1.55-3.53) 6 -hr 0.661 (0.548-0.809) 0.773 (0.639-0.947) 0.963 (0.794-1.18) 1.13 (0.924-1.39) 1.37 (1.08-1.77) 1.56 (1.20-2.05) 1.76 (1.31-2.38) 1.97 (1.40-2.75) 2.26 (1.54-3.25) 2.49 (1.64-3.64) 12 -hr 0.819 (0.685-0.989) 0.946 (0.791-1.14) 1.16 (0.967-1.41) 1.35 (1.12-1.64) 1.61 (1.29-2.05) 1.83 (1.43-2.36) 2.05 (1.54-2.73) 2.28 (1.64-3.13) 2.61 (1.79-3.69) 2.86 (1.91-4.11) 24 -hr 0.993 (0.840-1.18) 1.14 (0.964-1.36) 1.39 (1.17-1.67) 1.61 (1.35-1.94) 1.92 (1.56-2.41) 2.17 (1.71-2.76) 2.43 (1.85-3.18) 2.70 (1.97-3.65) 3.07 (2.15-4.29) 3.37 (2.28-4.77) 2 -day 1.17 (1.00-1.38) 1.35 (1.15-1.58) 1.64 (1.40-1.94) 1.90 (1.60-2.25) 2.26 (1.85-2.78) 2.55 (2.03-3.19) 2.84 (2.19-3.67) 3.16 (2.33-4.20) 3.58 (2.53-4.91) 3.92 (2.69-5.46) 3 -day 1.29 (1.11-1.50) 1.48 (1.27-1.73) 1.81 (1.55-2.12) 2.09 (1.78-2.46) 2.49 (2.05-3.04) 2.81 (2.26-3.49) 3.13 (2.43-4.00) 3.48 (2.58-4.58) 3.94 (2.81-5.36) 4.31 (2.99-5.95) 4 -day 1.39 (1.20-1.61) 1.59 (1.38-1.85) 1.94 (1.67-2.26) 2.24 (1.92-2.62) 2.67 (2.21-3.24) 3.01 (2.43-3.71) 3.36 (2.62-4.26) 3.72 (2.78-4.87) 4.22 (3.02-5.69) 4.60 (3.21-6.31) 7 -day 1.63 (1.42-1.87) 1.87 (1.62-2.14) 2.26 (1.96-2.60) 2.60 (2.24-3.00) 3.07 (2.56-3.68) 3.44 (2.80-4.19) 3.82 (3.01-4.78) 4.22 (3.18-5.44) 4.75 (3.44-6.32) 5.16 (3.64-6.99) 10 -day 1.85 (1.62-2.10) 2.10 (1.84-2.39) 2.52 (2.20-2.87) 2.87 (2.49-3.29) 3.37 (2.83-4.00) 3.76 (3.08-4.54) 4.16 (3.29-5.15) 4.56 (3.46-5.84) 5.11 (3.73-6.74) 5.54 (3.93-7.43) 20 -day 2.47 (2.19-2.77) 2.76 (2.45-3.10) 3.24 (2.86-3.64) 3.64 (3.19-4.11) 4.19 (3.55-4.89) 4.61 (3.83-5.47) 5.04 (4.04-6.14) 5.48 (4.21-6.88) 6.06 (4.48-7.84) 6.50 (4.68-8.57) 30 -day 2.99 (2.67-3.32) 3.33 (2.97-3.71) 3.89 (3.45-4.33) 4.34 (3.84-4.87) 4.96 (4.24-5.73) 5.43 (4.54-6.38) 5.90 (4.76-7.11) 6.37 (4.94-7.91) 6.98 (5.21-8.94) 7.44 (5.41-9.72) 45 -day 3.64 (3.27-4.01) 4.07 (3.66-4.49) 4.77 (4.27-5.27) 5.33 (4.74-5.92) 6.08 (5.22-6.93) 6.64 (5.57-7.70) 7.17 (5.83-8.55) 7.70 (6.01-9.46) 8.38 (6.29-10.6) 8.86 (6.50-11.5) 60 -day 4.18 (3.77-4.58) 4.72 (4.26-5.17) 5.57 (5.01-6.12) 6.25 (5.59-6.90) 7.13 56.14-8.07) 7.78 (6.56-8.95) 8.40 (6.85-9.92) 8.99 (7.05-10.9) 9.73 (7.34-12.2) 10.2 (7.57-13.2) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis o partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given dura ion and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical http://hdsc.nws.noaa.gov/hdsc/pfds/pfds printpage.html?lat=39.4472&lon=-108.0330&dat... 9/30/2014 Precipitation Frequency Data Server Precipitation depth (in) 12 10 w O • 6 a 2 a. T T TT CO CO r0 113 n7 n7 'a O O in c MI m 'tip 5 10 25 50?}Pea 100 200 Average recurrence interval ?} ears to Teop�a�g Mapscrreareo turn Tue Sep 30 16:23:31 2014 NOAA Atlas 14, Volume 8, Version 2 500 1000 Small scale terrain Page 2 of 3 Average recurrence interval {years} — 1 2 — 5 — 10 — 25 — 50 — 100 — 200 — 500 — 1000 Duration — 5 -min — 2 -day — 10 -min — 3 -day 15 -min --- 4 -day — 30 -min — 7 -day — 60 -min — 10 -day — 24r — 20 -day — 3 -he — 30 -day — 6 -Sr — 45 -day — 12 -hr — 60 -day 24 -hr {?' .•;Fo''i- Collins h liar t v i 18ndo' pngmant ter' . 'ArapahaNarionul.oe r pBoulder a '.S 6enver 11 5.P Gr _ A and ' ; Junction Gentenn :y.a oC y41 • CoIUrz S pri n r'iY�u lrlrntli"fUr J , Conon Ci!y s,-tlw 11 s� Uncompahgre I,'�;'. National Forest;:a.tr• � • - Map data 02ndAlanglg, gd l P Large scale terrain http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=39.4472&lon=-108.03 30&dat... 9/30/2014 Precipitation Frequency Data Server Page 3 of 3 Para ute fist ement 'Meas f Club t�lement Mesa 2 km Large scale aerial Grand Asmy of Thr. Renu Map dP40142,44,430emlie Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service Office of Hydrologic Development 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions(&noaa.gov Disclaimer http://hdsc.nws.noaa.gov/hdsc/pfds/pfds printpage.html?lat=39.4472&lon=-108.0330&dat... 9/30/2014 Precipitation Frequency Data Server Page 1 of 3 NOAA Atlas 14, Volume 8, Version 2 Location name: Parachute, Colorado, US* Latitude: 39.4472°, Longitude: -108.0330° Elevation: 5202 ft* source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Deborah Martin, Sandra Pavlovic, Ishani Roy, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Michael Yekta, Geoffery Bonnin NOAA, National Weather Service, Silver Spring, Maryland PF tabular 1 PF graphical 1 Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals in inches/hour)1 Average recurrence interval (years) Duration 1 2 5 10 25 50 100 200 500 1000 5 -min 1.64 (1.32-2.08) 1.94 (1.56-2.46) 2.58 (2.06-3.28) 3.23 (2.58-4.13) 4.32 (3.41-6.00) 5.32 (4.03-7.42) 6.43 (4.69-9.23) 7.72 (5.35-11.4L 9.60 (6.37-14.6) 11.2 (7.14-17.0) 10 -min 1.20 (0.966-1.52) 1.42 (1.15-1.80) 1.88 (1.51-2.40) 2.36 (1.88-3.02) 3.16 (2.50-4.39) 3.89 (2.95-5.43) 4.71 (3.43-6.76) 5.65 (3.92-8.33) 7.03 (4.66-10.7) 8.20 (5.23-12.4) 15 -min 0.976 (0.788-1.24) 1.16 (0.932-1.46) 1.53 (1.23-1.95) 1.92 (1.53-2.46) 2.57 (2.03-3.57) 3.16 (2.40-4.42) 3.83 (2.79-5.49) 4.59 (3.19-6.77) 5.72 (3.79-8.68) 6.66 (4.25-10.1) 30 -min 0.618 (0.498-0.780) 0.778 (0.626-0.984) 1.07 (0.856-1.36) 1.33 (1.06-1.71) 1.74 (1.35-2.37) 2.09 (1.57-2.88) 2.46 (1.78-3.49) 2.87 (1.98-4.19) 3.45 (2.28-5.20) 3.93 (2.50-5.96) 60 -min 0.389 (0.313-0.492) 0.484 (0.390-0.613) 0.652 (0.523-0.828) 0.802 (0.639-1.03) 1.03 (0.792-1.38) 1.21 (0.908-1.66) 1.41 (1.01-1.98) 1.62 (1.11-2.35) 1.91 (1.26-2.87) 2.15 (1.37-3.26) 2 -hr 0.234 (0.191-0.293) 0.290 (0.236-0.362) 0.385 (0.312-0.483) 0.468 (0.377-0.590) 0.589 (0.458-0.780) 0.687 (0.520-0.924) 0.789 (0.575-1.09) 0.898 (0.624-1.28) 1.05 (0.698-1.55) 1.17 (0.753-1.74) 3 -hr 0.178 (0.146-0.221) 0.213 (0.175-0.265) 0.274 (0.224-0.342) 0.328 (0.266-0.411) 0.407 (0.319-0.535) 0.471 (0.360-0.629) 0.539 (0.396-0.740) 0.611 (0.429-0.867) 0.712 (0.478-1.04) 0.792 (0.516-1.18) 6 -hr 0.110 0.129 0.161 0.189 0.228 0.261 0.294 0.329 0.377 0.416 (0.092-0.135) (0.107-0.158) (0.133-0.198) (0.154-0.233) (0.181-0.295) (0.201-0.342) (0.218-0.397) (0.233-0.458) (0.257-0.543) (0.274-0.607) 12 -hr 0.068 (0.057-0.082) 0.079 (0.066-0.095) 0.096 (0.080-0.117) 0.112 (0.093-0.136) 0.134 (0.107-0.170) 0.152 (0.118-0.196) 0.170 (0.128-0.226) 0.190 (0.136-0.260) 0.216 (0.149-0.306) 0.237 (0.159-0.341) 24 -hr 0.041 (0.035-0.049) 0.048 (0.040-0.057) 0.058 (0.049-0.069) 0.067 (0.056-0.081) 0.080 (0.065-0.100) 0.091 (0.071-0.115) 0.101 (0.077-0.133) 0.113 (0.082-0.152) 0.128 (0.089-0.179) 0.140 (0.095-0.199) 2 -day 0.024 (0.021-0.029) 0.028 (0.024-0.033) 0.034 (0.029-0.040) 0.039 (0.033-0.047) 0.047 (0.038-0.058) 0.053 (0.042-0.066) 0.059 (0.046-0.076) 0.066 (0.048-0.087) 0.075 (0.053-0.102) 0.082 (0.056-0.114) 3 -day 0.018 (0.015-0.021) 0.021 (0.018-0.024) 0.025 (0.022-0.029) 0.029 (0.025-0.034) 0.035 (0.028-0.042) 0.039 (0.031-0.048) 0.044 (0.034-0.056) 0.048 (0.036-0.064) 0.055 (0.039-0.074) 0.060 (0.041-0.083) 0.014 0.017 0.020 0.023 0.028 0.031 0.035 0.039 0.044 0.048 4 -day (0.012-0.017) (0.014-0.019) (0.017-0.024) (0.020-0.027) (0.023-0.034) (0.025-0.039) (0.027-0.044) (0.029-0.051) (0.031-0.059) (0.033-0.066) 7 -day 0.010 (0.008-0.011) 0.011 (0.010-0.013) 0.013 (0.012-0.015) 0.015 (0.013-0.018) 0.018 (0.015-0.022) 0.020 (0.017-0.025) 0.023 (0.018-0.028) 0.025 (0.019-0.032) 0.028 (0.020-0.038) 0.031 (0.022-0.042) 10 -day 0.008 (0.007-0.009) 0.009 (0.008-0.010) 0.010 (0.009-0.012) 0.012 (0.010-0.0141 0.014 (0.012-0.017) 0.016 (0.013-0.0191 0.017 (0.014-0.021) 0.019 (0.014-0.024) 0.021 (0.016-0.028) 0.023 (0.016-0.031) 20 -day 0.005 (0.005-0.006) 0.006 (0.005-0.006) 0.007 (0.006-0.008) 0.008 (0.007-0.009) 0.009 (0.007-0.010) 0.010 (0.008-0.011) 0.011 (0.008-0.013) 0.011 (0.009-0.014) 0.013 (0.009-0.016) 0.014 (0.010-0.018) 30 -day 0.004 (0.004-0.005) 0.005 (0.004-0.005) 0.005 (0.005-0.006) 0.006 (0.005-0.007) 0.007 (0.006-0.008) 0.008 (0.006-0.009) 0.008 (0.007-0.010) 0.009 (0.007-0.011) 0.010 (0.007-0.012) 0.010 (0.008-0.013) 45 -day 0.003 (0.003-0.004) 0.004 (0.003-0.004) 0.004 (0.004-0.005) 0.005 (0.004-0.005) 0.006 (0.005-0.006) 0.006 (0.005-0.007) 0.007 (0.005-0.008) 0.007 (0.006-0.009) 0.008 (0.006-0.010) 0.008 (0.006-0.011) 60 -day 0.003 (0.003-0.003) 0.003 (0.003-0.004) 0.004 (0.003-0.004 0.004 (0.004-0.005) 0.005 (0.004-0.006) 0.005 (0.005-0.006) 0.006 (0.005-0.007) 0.006 (0.005-0.008) 0.007 (0.005-0.008) 0.007 (0.005-0.009) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis o partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=39.4472&lon=-108.03 30&dat... 9/30/2014 -el'= ;Fo'rtCollins rsrr ��1 0 land."• Gre vn mont ter.'ArapahoNetionul.arestpBoulder • • ' Gentenn Precipitation Frequency Data Server Precipitation intensity (infhr) 10.000 1.000 0.100 0.010 0.001 In 100.000 r• 10.000 1.000 0.100 0.010 0.001 1 ation inten C C E .E N N C_ E E L -C N ml L .0 L • r -i M Duration T T T . -4a . fV r�1 T T TT -0'0 '0a O O in ry m V 1p 2 5 10 25 50 'Sack 1004 200 Average recurrence interval Wears�Teop�a�g MapscrreaPear i�1: Tue Sep 30 16:24:37 2014 NOAA Atlas 14, Volume 8, Version 2 500 1000 Small scale terrain Page 2 of 3 Average recurrence interval {years} — 1 2 — s — 10 — 25 — 50 — 100 — 200 — 500 — 1000 Duration — 5 -min — 2 -day — 10-rnln — 3 -day 15 -min --- 4 -clay — 30 -min — 7 -day — 60 -min — 10 -day — 2 -hr — 20 -day — 3 -hr — 30 -Clay — 6 -hr — 45 -day — 12 -hr — 60 -day 24 -hr .S.rr--fir �:x,,_ l ". ' Grand " Junction p .o °c '1 7A:, COIorB Sin r'iY�u ERRslYUl J. Canon Ci!y t;j\ d s, tlw cs Uncompahgre I,'�;'. Nalronal Forest • • Map data 020d4coqkp gd l P Large scale terrain http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=39.4472&lon=-108.03 30&dat... 9/30/2014 Precipitation Frequency Data Server Page 3 of 3 Para ute fist ement 'Meas f Club t�lement Mesa 2 km Large scale aerial Grand Asmy of Thr. Renu Map dP40142,44,430emlie Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service Office of Hydrologic Development 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions(&noaa.gov Disclaimer http://hdsc.nws.noaa.gov/hdsc/pfds/pfds printpage.html?lat=39.4472&lon=-108.0330&dat... 9/30/2014 URSA Operating Company, BMC A March 2017 APPENDIX B — Rational Method Calculations 6 SIZING CATCH BASIN FOR WELL PAD Pad Description: URSA PAD A - Developed Conditions Date: 3/21/2017 Location: URSA Pad A, Parachute, Garfield County Rainfall Intensity Data Table Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 0.278 0.455 0.615 0.938 15 0.339 0.555 0.750 1.140 30 0.450 0.767 1.010 1.440 60 0.558 0.923 1.180 1.630 To populate Data Table, refer to website below. Area of Pad Calculations: Coefficienst of Runoff: Gravel Pad and Road: Tributary undisturbed: Rational Method: Q=CiA Pad and Road Area: Trib. area to Pad/Road: 0.8 0.5 CA Value: CA Value: Sum: 97596.20 squ. Ft. 146065 squ. Ft. Sum: 1.79 Acres 1.68 Acres Peak Flow (Q, cfs) Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 0.964 1.578 2.133 3.254 15 1.176 1.925 2.602 3.955 30 1.561 2.661 3.504 4.995 60 1.936 3.202 4.093 5.654 Volume of Runoff (cf) Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 578.629 947.036 1280.059 1952.351 15 1058.391 1732.763 2341.572 3559.190 30 2809.887 4789.296 6306.634 8991.637 60 6968.519 11526.779 14736.294 20356.068 http://hdsc.nws.noaa.gov/hdsc/pfds/pfds map cont.html 3.47 Acres 2.241 Acres 3.353 Acres 5.594 Acres SIZING CATCH BASIN FOR WELL PAD Pad Description: URSA PAD A - Historic Conditions Date: 5/12/2017 Location: URSA Pad A, Parachute, Garfield County Rainfall Intensity Data Table Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 0.278 0.455 0.615 0.938 15 0.339 0.555 0.750 1.140 30 0.450 0.767 1.010 1.440 60 0.558 0.923 1.180 1.630 To populate Data Table, refer to website below. Area of Pad Calculations: Coefficienst of Runoff: Gravel Pad and Road: Tributary undisturbed: Rational Method: Q=CiA Pad and Road Area: Trib. area to Pad/Road: 0.5 0.5 CA Value: CA Value: Sum: 97596.20 squ. Ft. 146065 squ. Ft. 1.12 Acres 1.68 Acres Peak Flow (Q, cfs) Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 0.778 1.273 1.720 2.623 15 0.948 1.552 2.098 3.188 30 1.259 2.145 2.825 4.027 60 1.561 2.581 3.300 4.559 Volume of Runoff (cf) Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 466.51 763.54 1032.04 1574.06 15 853.32 1397.02 1887.87 2869.56 30 2265.45 3861.33 5084.67 7249.42 60 5618.30 9293.36 11881.00 16411.89 http://hdsc.nws.noaa.gov/hdsc/pfds/pfds map cont.html Iffl Worksheet: Pad A Pond Outlet Solve fa: ID'rtcharpe J Manig's Formula 10 Mannings Coefficient:I0.028 _I Channel Slope:10.004060 f1/It Depth: 1.40 11 Diameter: 191 h Discharge:13.32 cfs lSolve Flom Areal 1.7 IF Welled Pernnelec[ 3.93 ft Top Width[ on Critical Depth:[ 0.69 ft Percent Fut 93-3 %6 Critical Slope: 024167 ft111 Velocity:1 1.93 ftla Velocity Head 0.06 ft Specific Energy: 1-1.46 ft Fronde Numbes:1 0.22 Maxamum Discharge:{ 3.32 Gs Discharge Full: 3.08 ds Slope Frit) 0.0 4627 ft/ft Flow Typo) 46cn1'cal Deport I Close 1 Help 2.80 Acres 2.241 Acres 3.353 Acres 5.594 Detention Volume Required (CF) Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 112 183 248 378 15 205 336 454 690 30 544 928 1222 1742 60 2233 2855 3944 For pond sizing: Detained Contour Area Cumm. Volume Comment Volume 5069 335 5070 1158 747 747 5071 1508 1333 2080 5072 1722 1615 3695 5073 2030 1876 5571 5074 2526 2278 7849 DESIGN OVERFLOW CULVERT FOR 5.7 CFS DRAIN CULVERT CAN BE AN 12" PIPE WITH A HEADGATE ON IT. NORMAL MAINTENANCE WOULD ALLOW DRAINING OF THE POND IN NON PRECIPITATION EVENTS AND COLLECTION OF SEDIMENT TO MAINTAIN THE 25 YEAR VOLUME OF RUNOFF FROM PAD AND ROAD 9000 8000 7000 6000 5000 4000 3000 2000 1000 0 Stage/Storage ---------- t�t�tttta>_1-i _ I WSW- --'- 111111111.1."'- 5069 5070 5071 5072 5073 5074 • Volume Volume established at 5071.4 contour Depth in pond: 2.4 feet