Loading...
HomeMy WebLinkAbout11 Drainage ReportGRADING AND DRAINAGE REPORT O\OLSSON ASSOCIATES THIS PAGE LEFT BLANK FOR TWO-SIDED DUPLICATION. O\OLSSON ASSOCIATES DRAINAGE REPORT URSA OPERATING COMPANY, BMC F PAD March, 2017 PREPARED BY 65GM I 18 WEST SIXTH STREET, SUITE 200 GLENWOOD SPRINGS, CO 81601 970.945.1004 970.945.5948 FAX URSA Operating Company, BMC F March 2017 TABLE OF CONTENTS SGM Project # 2006-479.062 Pad F_Drain Report.docx 1 Introduction 1 1.1 Purpose 1 1.2 Current Site 1 1.3 Methods Used 2 Hydraulic and Hydrologic Analysis 2.1 Off -Site Drainage 2.2 On -Site Drainage 2.3 Stormwater Detention 3 Hydraulic Analysis 4 Stormwater Quality Plan APPENDIX APPENDIX A - NOAA Atlas 14 Information APPENDIX B - Rational Method Calculations 1 1 1 2 2 3 3 ii URSA Operating Company, BMC F March 2017 1 Introduction 1.1 Purpose The purpose of this drainage report is to provide calculations for storm water runoff volumes to be detained on-site. This report contains a discussion of both off-site and on-site drainage and the methodology used to design various drainage elements. The designed drainage elements ensure that storm water runoff produced from the 24 hour storm will be detained and treated on site to reduce possible contamination off-site. 1.2 Current Site The project site is located in the unplatted portion of Battlement Mesa P.U.D. located South of Stone Quarry Commons and the SI Gardner property. The Pad is located in the south eastern portion of this unplatted parcel. BMC F is served by CR 308W near its south terminus in Section 16 next to Monument Gulch. The site is sloping from east to west. The project site, in its pre -developed condition, is located in a semiarid plateau region between 5000 ft. and 6000 ft. in elevation. The vegetative cover consists of mostly pasture grass intermixed with sage brush and juniper trees. A majority of the drainage basin for the project is composed of hydraulic soil group C and D. 1.3 Methods Used The Rational Method was used to produce a conservative set of hydrologic flood peak calculations for sizing particular drainage elements (i.e., the Rational Method would predict higher flood peaks than alternative methods). The Rational Method uses the equation below: Q = CiA Equation 1 where: Q = flow rate (cfs) C = runoff coefficient based on soil type and cover i = rainfall intensity corresponding to the time of concentration A = basin area (acres). 2 Hydraulic and Hydrologic Analysis The project site in its developed condition will consist of a main gravel entrance road and large gravel pad. Because only a small portion of the site is being developed, only these areas will be analyzed in the detention calculations due to the rest of the site maintaining historic flow patterns and characteristics. Drainage facilities will be provided to route tributary/offsite flows around the pad into the common historic flow paths associated with the property containing this pad. 2.1 Off -Site Drainage In its developed condition, BMC F has some introduction of off-site surface drainage from a smaller 36,090 square foot area immediately above the access roadway for the pad. Aside from this area, the remaining offsite drainage tributary to the pad will be routed around the 1 URSA Operating Company, BMC F March 2017 pad. This offsite surface drainage generally exists in the form of sheet flow from above with no incised tributary channels observed. 2.2 On -Site Drainage The project site in its developed conditions will consist of 3.8 acres of a large gravel pad and 1,150' long tributary access road. Compared to historic conditions, construction of the proposed developed conditions would produce a reduction in pervious ground cover, resulting in a minor change to the runoff coefficient. This will result in an increase in peak discharge of the 24 hour storm and detention will be needed for the stormwater flowing across the developed site. Two borrow ditches are proposed for the access road construction to route drainage to a detention pond for the increased runoff detention for the roadway while collection ditches at the base of the pad will route flows to a detention pond for the pad itself. The developed flows for the site are summarized below. Table 1 Historic Vs. Developed Flow Rates (Access Road Pond) Storm Return Period i 2 year (cfs) i 25 year (cfs) 1 100 year (cfs) Historic Flow Developed Flow 0.36 0.49 0.79 1.20 1.08 1.64 Table 2 Historic Vs. Developed Flow Rates (Pad Pond) i Storm Return Period 2 year (cfs) 25 year (cfs) 100 year (cfs) I Historic Flow 0.64 1.43 2.17 Developed Flow 1.03 2.28 3.47_1 The flows shown above are determined from a rainfall intensity corresponding to the 24 hour storm and appropriate storm return period. These intensities and the flow calculations can be seen in the appendix. Note that the time of concentration (or storm duration) used in the analysis is 15 minutes. 2.3 Stormwater Detention For the purpose of this report and this project, it will be required to detain the additional stormwater runoff volume generated from the developed site from historic conditions. In order to determine required detention, the developed and historic stormwater runoff volumes were analyzed. Storm runoff volume was calculated from the 2 and 25 year, 24 hour storm precipitation depth determined from the NOAA Atlas 14 information. These depths for each storm return period can be seen in the appendix. The runoff volume of the site was calculated from area of the developed site multiplied by the 2 and 25 year, 24 hour precipitation depth and the weighted runoff coefficient for the appropriate site condition. 2 URSA Operating Company, BMC F March 2017 Table 2 Stormwater Flow Summary (Access Road Pond) Pond Location Runoff Coefficient HistoricHistoric (Historic) Runoff Coefficient (Developed) 2 -YR Rainfall Volume, CF ( ) 25 -YR Rainfall Volume, CF Historic ( ) 2 -YR Rainfall Volume, CF Develo ed ( P ) 25 -YR Rainfall Volume, CF (Developed) Pond Storage Needed for Detention, CF (25 -YR) Access Road Pond 0.5 0.7 321 711 438 970 259 Table 3 Stormwater Flow Summary (Pad F Pond) Pond Location Runoff Coefficient (Historic) HistoricHistoric Runoff Coefficient (Developed) 2 -YR Rainfall Volume, CF ( ) 25 -YR Rainfall Volume, CF Historic ( ) 2 -YR Rainfall Volume, CF Develo ed ( P ) 25 -YR Rainfall Volume, CF (Developed) Pond Storage Needed for Detention, CF (25 -YR) BMC Pond F 0.5 0.7 580 1283 928 2052 769 The maximum calculated detention necessary to capture the stormwater runoff volume generated from the 25 -year storm is approximately 259 cubic feet for the access road pond and 769 cubic feet for the F Pad pond. Detention ponds with this capacity and drainage features to convey water to the ponds will be provided on site. Pond specific size calculations are attached in the appendix of this report. 3 Hydraulic Analysis The site design will require various drainage features including ditches and culverts. These will be required to divert the storm water runoff away from the site appropriately. 4 Stormwater Quality Plan The main goal of the site design is to provide detention for the project, and ensure the post - development peak discharge rates do not exceed the pre -development peak flow rates. The only area where a significant increase in runoff coefficients occur is the gravel pad and road. Detention ponds are sized appropriately and provide a location for sedimentation of the storm water runoff generated from the developed site. The remaining site will remain native vegetation and provide historic flow patterns and characteristics. There is an increase of runoff generated with the construction the gravel pad and associated access road. This increase in runoff is measurable, however; a detention pond will be constructed just downstream of the respective pad, with a controllable outfall pipe and valve structure. The controlling valves in the detention pond discharge pipes will each be left in the normally open position at approximately 60% open. Alternatively, these valves can be closed in the event of a non-compliant release, and further ensure no detrimental impact to the surrounding area. A similar pond will be constructed for the access road. In order to minimize any threat of property damage, the respective pond structures will have an 18" culvert pipe installed at a higher elevation, along with the normal use 12" discharge 3 URSA Operating Company, BMC F March 2017 pipe, in order to facilitate conveying the 100 year storm event safely to the respective outfall drainage features. Both proposed detention ponds will discharge into existing "natural channel" drainage features. It is not anticipated for any additional erosion and sedimentation protection beyond that proposed at the pipe outfalls. The operator will monitor outfall locations to ensure there is no channel scour or additional erosion cause by the detention pond outfall pipe. Supporting calculations have been included in the appendix of this report. Temporary erosion control measures will be required for the duration of construction. A CDPHE Stormwater Permit for Construction activities will be obtained prior to construction activities. Best Management Practices will be utilized during construction to control the stormwater runoff during construction. Key temporary erosion control measures include installation and maintenance of straw wattles, inlet protection, a stabilized construction entrance and all necessary acceptable best management practices that would relate to this project. See Ursa's Stormwater Management Plan (SWMP) for more details. 4 URSA Operating Company, BMC F March 2017 APPENDIX A —NOAA Atlas 14 Information Appendix 5 Precipitation Frequency Data Server Page 1 of 3 NOAA Atlas 14, Volume 8, Version 2 Location name: Parachute, Colorado, US* Latitude: 39.4472°, Longitude: -108.0330° Elevation: 5202 ft* source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Deborah Martin, Sandra Pavlovic, Ishani Roy, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Michael Yekta, Geoffery Bonnin NOAA, National Weather Service, Silver Spring, Maryland PF tabular 1 PF graphical 1 Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) Duration 1 2 5 10 25 50 100 200 500 1000 5 -min 0.137 (0.110-0.173) 0.162 (0.130-0.205) 0.215 (0.172-0.273) 0.269 (0.215-0.344) 0.360 (0.284-0.500) 0.443 (0.336-0.618) 0.536 (0.391-0.769) 0.643 (0.446-0.948) 0.800 (0.531-1.22) 0.933 (0.595-1.42) 10 -min 0.200 (0.161-0.253) 0.237 (0.191-0.300) 0.314 (0.252-0.400) 0.394 (0.314-0.504) 0.527 (0.416-0.732) 0.648 (0.492-0.905) 0.785 (0.572-1.13) 0.941 (0.653-1.39) 1.17 (0.777-1.78) 1.37 (0.871-2.07) 15 -min 0.244 (0.197-0.309) 0.289 (0.233-0.366) 0.383 (0.308-0.487) 0.481 (0.383-0.614) 0.643 (0.507-0.893) 0.791 (0.600-1.10) 0.958 (0.698-1.37) 1.15 (0.797-1.69) 1.43 (0.948-2.17) 1.67 (1.06-2.53) 30 -min 0.309 (0.249-0.390) 0.389 (0.313-0.492) 0.534 (0.428-0.678) 0.667 (0.532-0.853) 0.872 (0.677-1.19) 1.05 (0.786-1.44) 1.23 (0.891-1.74) 1.44 (0.990-2.10) 1.73 (1.14-2.60) 1.96 (1.25-2.98) 60 -min 0.389 (0.313-0.492) 0.484 (0.390-0.613) 0.652 (0.523-0.828) 0.802 (0.639-1.03) 1.03 (0.792-1.38) 1.21 (0.908-1.66) 1.41 (1.01-1.98) 1.62 (1.11-2.35) 1.91 (1.26-2.87) 2.15 (1.37-3.26) 2 -hr 0.469 (0.382-0.586) 0.580 (0.472-0.725) 0.770 (0.624-0.966) 0.936 (0.754-1.18) 1.18 (0.917-1.56) 1.37 (1.04-1.85) 1.58 (1.15-2.18) 1.80 (1.25-2.57) 2.10 (1.40-3.09) 2.33 (1.51-3.49) 3 -hr 0.536 (0.439-0.665) 0.641 (0.525-0.796) 0.824 (0.672-1.03) 0.985 (0.798-1.23) 1.22 (0.959-1.61) 1.42 (1.08-1.89) 1.62 (1.19-2.22) 1.84 (1.29-2.60) 2.14 (1.44-3.13) 2.38 (1.55-3.53) 6 -hr 0.661 (0.548-0.809) 0.773 (0.639-0.947) 0.963 (0.794-1.18) 1.13 (0.924-1.39) 1.37 (1.08-1.77) 1.56 (1.20-2.05) 1.76 (1.31-2.38) 1.97 (1.40-2.75) 2.26 (1.54-3.25) 2.49 (1.64-3.64) 12 -hr 0.819 (0.685-0.989) 0.946 (0.791-1.14) 1.16 (0.967-1.41) 1.35 (1.12-1.64) 1.61 (1.29-2.05) 1.83 (1.43-2.36) 2.05 (1.54-2.73) 2.28 (1.64-3.13) 2.61 (1.79-3.69) 2.86 (1.91-4.11) 24 -hr 0.993 (0.840-1.18) 1.14 (0.964-1.36) 1.39 (1.17-1.67) 1.61 (1.35-1.94) 1.92 (1.56-2.41) 2.17 (1.71-2.76) 2.43 (1.85-3.18) 2.70 (1.97-3.65) 3.07 (2.15-4.29) 3.37 (2.28-4.77) 2 -day 1.17 (1.00-1.38) 1.35 (1.15-1.58) 1.64 (1.40-1.94) 1.90 (1.60-2.25) 2.26 (1.85-2.78) 2.55 (2.03-3.19) 2.84 (2.19-3.67) 3.16 (2.33-4.20) 3.58 (2.53-4.91) 3.92 (2.69-5.46) 3 -day 1.29 (1.11-1.50) 1.48 (1.27-1.73) 1.81 (1.55-2.12) 2.09 (1.78-2.46) 2.49 (2.05-3.04) 2.81 (2.26-3.49) 3.13 (2.43-4.00) 3.48 (2.58-4.58) 3.94 (2.81-5.36) 4.31 (2.99-5.95) 4 -day 1.39 (1.20-1.61) 1.59 (1.38-1.85) 1.94 (1.67-2.26) 2.24 (1.92-2.62) 2.67 (2.21-3.24) 3.01 (2.43-3.71) 3.36 (2.62-4.26) 3.72 (2.78-4.87) 4.22 (3.02-5.69) 4.60 (3.21-6.31) 7 -day 1.63 (1.42-1.87) 1.87 (1.62-2.14) 2.26 (1.96-2.60) 2.60 (2.24-3.00) 3.07 (2.56-3.68) 3.44 (2.80-4.19) 3.82 (3.01-4.78) 4.22 (3.18-5.44) 4.75 (3.44-6.32) 5.16 (3.64-6.99) 10 -day 1.85 (1.62-2.10) 2.10 (1.84-2.39) 2.52 (2.20-2.87) 2.87 (2.49-3.29) 3.37 (2.83-4.00) 3.76 (3.08-4.54) 4.16 (3.29-5.15) 4.56 (3.46-5.84) 5.11 (3.73-6.74) 5.54 (3.93-7.43) 20 -day 2.47 (2.19-2.77) 2.76 (2.45-3.10) 3.24 (2.86-3.64) 3.64 (3.19-4.11) 4.19 (3.55-4.89) 4.61 (3.83-5.47) 5.04 (4.04-6.14) 5.48 (4.21-6.88) 6.06 (4.48-7.84) 6.50 (4.68-8.57) 30 -day 2.99 (2.67-3.32) 3.33 (2.97-3.71) 3.89 (3.45-4.33) 4.34 (3.84-4.87) 4.96 (4.24-5.73) 5.43 (4.54-6.38) 5.90 (4.76-7.11) 6.37 (4.94-7.91) 6.98 (5.21-8.94) 7.44 (5.41-9.72) 45 -day 3.64 (3.27-4.01) 4.07 (3.66-4.49) 4.77 (4.27-5.27) 5.33 (4.74-5.92) 6.08 (5.22-6.93) 6.64 (5.57-7.70) 7.17 (5.83-8.55) 7.70 (6.01-9.46) 8.38 (6.29-10.6) 8.86 (6.50-11.5) 60 -day 4.18 (3.77-4.58) 4.72 (4.26-5.17) 5.57 (5.01-6.12) 6.25 (5.59-6.90) 7.13 56.14-8.07) 7.78 (6.56-8.95) 8.40 (6.85-9.92) 8.99 (7.05-10.9) 9.73 (7.34-12.2) 10.2 (7.57-13.2) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis o partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given dura ion and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical http://hdsc.nws.noaa.gov/hdsc/pfds/pfds printpage.html?lat=39.4472&lon=-108.0330&dat... 9/30/2014 Precipitation Frequency Data Server Precipitation depth (in) 12 10 w O • 6 a 2 a. T T TT CO CO r0 113 n7 n7 'a O O in c MI m 'tip 5 10 25 50?}Pea 100 200 Average recurrence interval ?} ears to Teop�a�g Mapscrreareo turn Tue Sep 30 16:23:31 2014 NOAA Atlas 14, Volume 8, Version 2 500 1000 Small scale terrain Page 2 of 3 Average recurrence interval {years} — 1 2 — 5 — 10 — 25 — 50 — 100 — 200 — 500 — 1000 Duration — 5 -min — 2 -day — 10 -min — 3 -day 15 -min --- 4 -day — 30 -min — 7 -day — 60 -min — 10 -day — 24r — 20 -day — 3 -he — 30 -day — 6 -Sr — 45 -day — 12 -hr — 60 -day 24 -hr {?' .•;Fo''i- Collins h liar t v i 18ndo' pngmant ter' . 'ArapahaNarionul.oe r pBoulder a '.S 6enver 11 5.P Gr _ A and ' ; Junction Gentenn :y.a oC y41 • CoIUrz S pri n r'iY�u lrlrntli"fUr J , Conon Ci!y s,-tlw 11 s� Uncompahgre I,'�;'. National Forest;:a.tr• � • - Map data 02ndAlanglg, gd l P Large scale terrain http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=39.4472&lon=-108.03 30&dat... 9/30/2014 Precipitation Frequency Data Server Page 3 of 3 Para ute fist ement 'Meas f Club t�lement Mesa 2 km Large scale aerial Grand Asmy of Thr. Renu Map dP40142,44,430emlie Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service Office of Hydrologic Development 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions(&noaa.gov Disclaimer http://hdsc.nws.noaa.gov/hdsc/pfds/pfds printpage.html?lat=39.4472&lon=-108.0330&dat... 9/30/2014 Precipitation Frequency Data Server Page 1 of 3 NOAA Atlas 14, Volume 8, Version 2 Location name: Parachute, Colorado, US* Latitude: 39.4472°, Longitude: -108.0330° Elevation: 5202 ft* source: Google Maps POINT PRECIPITATION FREQUENCY ESTIMATES Sanja Perica, Deborah Martin, Sandra Pavlovic, Ishani Roy, Michael St. Laurent, Carl Trypaluk, Dale Unruh, Michael Yekta, Geoffery Bonnin NOAA, National Weather Service, Silver Spring, Maryland PF tabular 1 PF graphical 1 Maps & aerials PF tabular PDS -based point precipitation frequency estimates with 90% confidence intervals in inches/hour)1 Average recurrence interval (years) Duration 1 2 5 10 25 50 100 200 500 1000 5 -min 1.64 (1.32-2.08) 1.94 (1.56-2.46) 2.58 (2.06-3.28) 3.23 (2.58-4.13) 4.32 (3.41-6.00) 5.32 (4.03-7.42) 6.43 (4.69-9.23) 7.72 (5.35-11.4L 9.60 (6.37-14.6) 11.2 (7.14-17.0) 10 -min 1.20 (0.966-1.52) 1.42 (1.15-1.80) 1.88 (1.51-2.40) 2.36 (1.88-3.02) 3.16 (2.50-4.39) 3.89 (2.95-5.43) 4.71 (3.43-6.76) 5.65 (3.92-8.33) 7.03 (4.66-10.7) 8.20 (5.23-12.4) 15 -min 0.976 (0.788-1.24) 1.16 (0.932-1.46) 1.53 (1.23-1.95) 1.92 (1.53-2.46) 2.57 (2.03-3.57) 3.16 (2.40-4.42) 3.83 (2.79-5.49) 4.59 (3.19-6.77) 5.72 (3.79-8.68) 6.66 (4.25-10.1) 30 -min 0.618 (0.498-0.780) 0.778 (0.626-0.984) 1.07 (0.856-1.36) 1.33 (1.06-1.71) 1.74 (1.35-2.37) 2.09 (1.57-2.88) 2.46 (1.78-3.49) 2.87 (1.98-4.19) 3.45 (2.28-5.20) 3.93 (2.50-5.96) 60 -min 0.389 (0.313-0.492) 0.484 (0.390-0.613) 0.652 (0.523-0.828) 0.802 (0.639-1.03) 1.03 (0.792-1.38) 1.21 (0.908-1.66) 1.41 (1.01-1.98) 1.62 (1.11-2.35) 1.91 (1.26-2.87) 2.15 (1.37-3.26) 2 -hr 0.234 (0.191-0.293) 0.290 (0.236-0.362) 0.385 (0.312-0.483) 0.468 (0.377-0.590) 0.589 (0.458-0.780) 0.687 (0.520-0.924) 0.789 (0.575-1.09) 0.898 (0.624-1.28) 1.05 (0.698-1.55) 1.17 (0.753-1.74) 3 -hr 0.178 (0.146-0.221) 0.213 (0.175-0.265) 0.274 (0.224-0.342) 0.328 (0.266-0.411) 0.407 (0.319-0.535) 0.471 (0.360-0.629) 0.539 (0.396-0.740) 0.611 (0.429-0.867) 0.712 (0.478-1.04) 0.792 (0.516-1.18) 6 -hr 0.110 0.129 0.161 0.189 0.228 0.261 0.294 0.329 0.377 0.416 (0.092-0.135) (0.107-0.158) (0.133-0.198) (0.154-0.233) (0.181-0.295) (0.201-0.342) (0.218-0.397) (0.233-0.458) (0.257-0.543) (0.274-0.607) 12 -hr 0.068 (0.057-0.082) 0.079 (0.066-0.095) 0.096 (0.080-0.117) 0.112 (0.093-0.136) 0.134 (0.107-0.170) 0.152 (0.118-0.196) 0.170 (0.128-0.226) 0.190 (0.136-0.260) 0.216 (0.149-0.306) 0.237 (0.159-0.341) 24 -hr 0.041 (0.035-0.049) 0.048 (0.040-0.057) 0.058 (0.049-0.069) 0.067 (0.056-0.081) 0.080 (0.065-0.100) 0.091 (0.071-0.115) 0.101 (0.077-0.133) 0.113 (0.082-0.152) 0.128 (0.089-0.179) 0.140 (0.095-0.199) 2 -day 0.024 (0.021-0.029) 0.028 (0.024-0.033) 0.034 (0.029-0.040) 0.039 (0.033-0.047) 0.047 (0.038-0.058) 0.053 (0.042-0.066) 0.059 (0.046-0.076) 0.066 (0.048-0.087) 0.075 (0.053-0.102) 0.082 (0.056-0.114) 3 -day 0.018 (0.015-0.021) 0.021 (0.018-0.024) 0.025 (0.022-0.029) 0.029 (0.025-0.034) 0.035 (0.028-0.042) 0.039 (0.031-0.048) 0.044 (0.034-0.056) 0.048 (0.036-0.064) 0.055 (0.039-0.074) 0.060 (0.041-0.083) 0.014 0.017 0.020 0.023 0.028 0.031 0.035 0.039 0.044 0.048 4 -day (0.012-0.017) (0.014-0.019) (0.017-0.024) (0.020-0.027) (0.023-0.034) (0.025-0.039) (0.027-0.044) (0.029-0.051) (0.031-0.059) (0.033-0.066) 7 -day 0.010 (0.008-0.011) 0.011 (0.010-0.013) 0.013 (0.012-0.015) 0.015 (0.013-0.018) 0.018 (0.015-0.022) 0.020 (0.017-0.025) 0.023 (0.018-0.028) 0.025 (0.019-0.032) 0.028 (0.020-0.038) 0.031 (0.022-0.042) 10 -day 0.008 (0.007-0.009) 0.009 (0.008-0.010) 0.010 (0.009-0.012) 0.012 (0.010-0.0141 0.014 (0.012-0.017) 0.016 (0.013-0.0191 0.017 (0.014-0.021) 0.019 (0.014-0.024) 0.021 (0.016-0.028) 0.023 (0.016-0.031) 20 -day 0.005 (0.005-0.006) 0.006 (0.005-0.006) 0.007 (0.006-0.008) 0.008 (0.007-0.009) 0.009 (0.007-0.010) 0.010 (0.008-0.011) 0.011 (0.008-0.013) 0.011 (0.009-0.014) 0.013 (0.009-0.016) 0.014 (0.010-0.018) 30 -day 0.004 (0.004-0.005) 0.005 (0.004-0.005) 0.005 (0.005-0.006) 0.006 (0.005-0.007) 0.007 (0.006-0.008) 0.008 (0.006-0.009) 0.008 (0.007-0.010) 0.009 (0.007-0.011) 0.010 (0.007-0.012) 0.010 (0.008-0.013) 45 -day 0.003 (0.003-0.004) 0.004 (0.003-0.004) 0.004 (0.004-0.005) 0.005 (0.004-0.005) 0.006 (0.005-0.006) 0.006 (0.005-0.007) 0.007 (0.005-0.008) 0.007 (0.006-0.009) 0.008 (0.006-0.010) 0.008 (0.006-0.011) 60 -day 0.003 (0.003-0.003) 0.003 (0.003-0.004) 0.004 (0.003-0.004 0.004 (0.004-0.005) 0.005 (0.004-0.006) 0.005 (0.005-0.006) 0.006 (0.005-0.007) 0.006 (0.005-0.008) 0.007 (0.005-0.008) 0.007 (0.005-0.009) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis o partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top PF graphical http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=39.4472&lon=-108.03 30&dat... 9/30/2014 -el'= ;Fo'rtCollins rsrr ��1 0 land."• Gre vn mont ter.'ArapahoNetionul.arestpBoulder • • ' Gentenn Precipitation Frequency Data Server Precipitation intensity (infhr) 10.000 1.000 0.100 0.010 0.001 In 100.000 r• 10.000 1.000 0.100 0.010 0.001 1 ation inten C C E .E N N C_ E E L -C N ml L .0 L • r -i M Duration T T T . -4a . fV r�1 T T TT -0'0 '0a O O in ry m V 1p 2 5 10 25 50 'Sack 1004 200 Average recurrence interval Wears�Teop�a�g MapscrreaPear i�1: Tue Sep 30 16:24:37 2014 NOAA Atlas 14, Volume 8, Version 2 500 1000 Small scale terrain Page 2 of 3 Average recurrence interval {years} — 1 2 — s — 10 — 25 — 50 — 100 — 200 — 500 — 1000 Duration — 5 -min — 2 -day — 10-rnln — 3 -day 15 -min --- 4 -clay — 30 -min — 7 -day — 60 -min — 10 -day — 2 -hr — 20 -day — 3 -hr — 30 -Clay — 6 -hr — 45 -day — 12 -hr — 60 -day 24 -hr .S.rr--fir �:x,,_ l ". ' Grand " Junction p .o °c '1 7A:, COIorB Sin r'iY�u ERRslYUl J. Canon Ci!y t;j\ d s, tlw cs Uncompahgre I,'�;'. Nalronal Forest • • Map data 020d4coqkp gd l P Large scale terrain http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=39.4472&lon=-108.03 30&dat... 9/30/2014 Precipitation Frequency Data Server Page 3 of 3 Para ute fist ement 'Meas f Club t�lement Mesa 2 km Large scale aerial Grand Asmy of Thr. Renu Map dP40142,44,430emlie Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service Office of Hydrologic Development 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions(&noaa.gov Disclaimer http://hdsc.nws.noaa.gov/hdsc/pfds/pfds printpage.html?lat=39.4472&lon=-108.0330&dat... 9/30/2014 URSA Operating Company, BMC F March 2017 APPENDIX B — Rational Method Calculations 6 SIZING CATCH BASIN FOR ACCESS ROAD Pad Description: URSA PAD F ACCESS ROAD- Developed Conditions Date: 3/24/2017 Location: URSA Pad F Access Road, Parachute, Garfield County Rainfall Intensity Data Table Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 0.278 0.455 0.615 0.938 15 0.339 0.555 0.750 1.140 30 0.450 0.767 1.010 1.440 60 0.558 0.923 1.180 1.630 To populate Data Table, refer to website below. Area of Pad Calculations: Coefficienst of Runoff: Gravel Road: Tributary undisturbed: Rational Method: Q=CiA Pad and Road Area: Trib. area to Pad/Road: CA Value: CA Value: Sum: 91760.00 55,670.00 squ. Ft. 36,090.00 squ. Ft. Sum: 1.02 Acres 0.41 Acres Peak Flow (Q, cfs) Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 0.399 0.654 0.884 1.348 15 0.487 0.797 1.077 1.638 30 0.646 1.102 1.451 2.069 60 0.802 1.326 1.695 2.342 Volume of Runoff (cf) Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 239.635 392.209 530.128 808.553 15 438.326 717.613 969.747 1474.015 30 1163.696 1983.456 2611.852 3723.828 60 2885.967 4773.741 6102.940 8430.333 http://hdsc.nws.noaa.gov/hdsc/pfds/pfds map cont.html 1.44 Acres 1.278 Acres 0.829 Acres 2.107 Acres SIZING CATCH BASIN FOR WELL PAD Pad Description: URSA PAD F - Historic Conditions Date: 3/24/2017 Location: URSA Pad F, Parachute, Garfield County Rainfall Intensity Data Table Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 0.278 0.455 0.615 0.938 15 0.339 0.555 0.750 1.140 30 0.450 0.767 1.010 1.440 60 0.558 0.923 1.180 1.630 To populate Data Table, refer to website below. Area of Pad Calculations: Coefficienst of Runoff: Gravel Pad and Road: Tributary undisturbed: Rational Method: Q=CiA Pad Area: Trib. area to Pad: 0.5 0.5 CA Value: CA Value: Sum: 165,554.00 squ. Ft. - squ. Ft. 1.90 Acres 0.00 Acres Peak Flow (Q. cfs) Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 0.528 0.865 1.169 1.782 15 0.644 1.055 1.425 2.166 30 0.855 1.458 1.919 2.736 60 1.060 1.754 2.242 3.097 Volume of Runoff (cf) Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 316.97 518.78 701.21 1069.49 15 579.78 949.20 1282.70 1949.71 30 1539.24 2623.55 3454.74 4925.57 60 3817.32 6314.31 8072.47 11150.95 http://hdsc.nws.noaa.gov/hdsc/pfds/pfds map cont.html 1.90 Acres ( Worksheet: Pad F Outflow Pipe Solve for. Discharge ISI 1-1=Il1 Manning's Formula I Mannings Coefficient:0.028 Channel Slops ft/ft Depth: .00 fl Diameter. l i 2.0 Discharge, 1.38 cfs Flow Are. 0.8 11= Wetted Perimeter:[ 3.14 ft Tap Width 000 It Critical Depth 0.50 It Percent Full:7- 100.0 Critical Slope:r 00284661t)ft Velocity: 1.76 Itis Velocity Head: 0.05 It Specific Energy: 1.05 It Fronde Number 0.00 Maximum Discharge: 1.49 cfs Discharge Full: 7- 1_30 cfs Slope Full 0.007000 IVft Flow Type: Subcrillcal Solve j Report Cbse Help 3.801 Acres 0.000 Acres Detention Volume Required (CF) Recurrence Interval (Years) Duration (minutes) 2 10 25 100 10 190 311 421 642 15 348 570 770 1170 30 924 1574 2073 2955 60 4843 6691 For pond sizing: Contour Area Detained Volume Cumm. Volume Comment 5827 598 5828 804 701 701 5829 1070 937 1638 DESIGN OVERFLOW CULVERT FOR 3.5 CFS DRAIN CULVERT CAN BE AN 12" PIPE WITH A HEADGATE ON IT. 12" INVERT = 5827.0, PIPE LAID AT 0.70% NORMAL MAINTENANCE WOULD ALLOW DRAINING OF THE POND IN NON PRECIPITATION EVENTS AND COLLECTION OF SEDIMENT TO MAINTAIN THE 25 YEAR VOLUME OF RUNOFF FROM PAD AND ROAD 1800 1600 1400 1200 1000 800 600 400 200 Stage/Storage 0 5827 8 5829 • Volume Volume established at 5428.1 contour Depth in pond: 1.1 feet