HomeMy WebLinkAbout1.18 Wastewater Treatment Plan7) Wastewater Treatment Plan
REQUESTS FOR WAIVERS OF SUBMITTAL REQUIREMENT AND REQUESTS FOR
WAIVER OF STANDARDS
WATER SUPPLY PLAN
Applicant requests a waiver of the Water Supply Plan Submittal Requirement. There will be no full
time personnel on the site and those personnel accessing the site will be arriving by their truck to fill
with propane and will leave once that process is completed. Personnel will be spending minimal time
at the site and drivers will have access to bottled water. There is no current access to water at the site
and there is no need for any water at the site for the proposed use. Any water required for fire safety
is covered in the Fire Safety Analysis.
Waiver of Submission Requirements: Like many approved oil and gas sites, the nature of this project
supports that there is no need for water at the site. The project is relatively small in nature with few
personnel on site (see traffic study for anticipated daily traffic) and the project is simple in that the
drivers will arrive on site, fill their truck with propane and leave the site to deliver the propane as
quickly as possible. There are no additional anticipated impacts on the site or surrounding area
except as otherwise described in this application. The proposed use fits within the existing conditions
and uses of the subdivision and a waiver would not compromise a proper and complete review as
water is just not necessary for this use. The scope of the proposal is described otherwise within the
application and submittal of a water plan is not material to determination of compliance of this
proposed use.
Waiver of Standards Requirements: The alternative proposed is that personnel will be supplied
access to bottled water for drinking purposes. This alternative is sufficient to meet the standard due to
the scope of the proposed use and the small amount of time that personnel will be on site. This
alternative actually imposes lesser impacts on adjacent properties as no water system will be installed
therefore creating no impact whatsoever to the subject site and surrounding properties.
WASTEWATER TREATMENT PLAN
Applicant requests a waiver of the Wastewater Treatment Plan Submittal Requirement. There will be
no fill time personnel on the site and those personnel accessing the site will be arriving by their truck
to fill with propane and will leave once that process is completed. Personnel will be spending
minimal time at the site. There is no current wastewater system at the site and there is no need for
any wastewater treatment for the proposed use.
Waiver of Submission Requirements: Similar to the need for no water, the nature of this project
supports that there is no need for a wastewater treatment plan at the site. The project is relatively
small in nature with few personnel on site (see traffic study for anticipated daily traffic) and the
project is simple in that the drivers will arrive on site, fill their truck with propane and leave the site
to deliver the propane as quickly as possible. There are no additional anticipated impacts on the site
or surrounding area except as otherwise described in this application. The proposed use fits within
the existing conditions and uses of the subdivision and a waiver would not compromise a proper and
complete review as a wastewater treatment plan is just not necessary for this use. The scope of the
proposal is described otherwise within the application and submittal of a wastewater treatment plan is
not material to determination of compliance of this proposed use.